标准行车安全操作规则_第1页
标准行车安全操作规则_第2页
标准行车安全操作规则_第3页
标准行车安全操作规则_第4页
标准行车安全操作规则_第5页
已阅读5页,还剩1页未读 继续免费阅读

下载本文档

版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领

文档简介

1、标准行车安全操作规则1.遵守公司安全规程,遵守设备操作规程和生产工艺操作规程。(All safety rules of company, operating rules for equipment and production process are to be seriously complied with)2.行车的操作,只应由下述持证人员进行, 执行任务的检修人员 非行车工作人员,未经安全部门认可,严禁操作。The following persons with authorized license shall be allowed to operate Demag cranes, Mai

2、ntenance workers undertaking crane repair. 3.设备的性能完好,是安全操作的保障。行车投入使用前,必须根据德马格行车日检表进行点检。(It is the assurance to safety operation that the cranes are at the good condition function well. The daily checking must be undertaken according to Daily Checking List for Demag Cranes before putting the cranes i

3、nto service.4.严格遵守十不吊, 歪拉,斜拉不吊 冒险作业,视线不清不吊 物件捆扎不牢不吊 吊具不符合要求不吊 指挥人员未离开吊运危险区域不吊 对于违反十不吊原则的操作,操作人员有权拒绝执行。The 10 No Lifting Rules are to be strictly observed at all times. The rules are as followings; No lifting when the wire rope is not vertical under load. No lifting when it is under any risk or the o

4、perator has restricted sight. No lifting of loads that are not secured firmly and correctly slung. No lifting of loads with slings, shackles, hooks and etc. that are not at good condition. No lifting when the person directing the lift is in a position where he maybe injured. If the given direction b

5、reaks the 10 No Lifting Rules, the operator has the right to refuse to execute the direction.5. 不得频繁利用极限位置限位开关停车;不得在有载荷得情况下调整起升马达的制动器,物件不得从人和重要设备得上空通过;给车辆吊运时,必须等车辆停靠平稳,装卸人员离开车辆后方可进行;吊运散件时,必须试吊,平稳后方可吊运;所吊重物接近或达到额定起重能力时,吊运前应检查马达刹车系统,并用小高度,短行程试吊,再平稳地吊运。Do not frequently use the end limit switch to stop

6、 the crane. Do not adjust the brake system of hoist when a load is on the hook. Loads should not be moved over personnel or key equipment. When unloading from trucks or loading to trucks, the crane should wait until the truck is parked and people are clear on the area. Care should be taken when lift

7、ing loose loads, after rigging the load and before carrying out the lift the load should be lifted little up slowly to test its stability. Before undertaking lifts of loads that are close to SWL, the brake system and safety device should be checked. The load should be lifted little up slowly to test

8、 the function of the crane.6.加强对制动器,吊钩,钢丝绳和吊具等的日常点检,并且相应做好记录。发现故障,应及时汇报和处理,不得带隐患作业。Enhance the daily checks of key device, such as the brake system, hook, wire rope and sling, shackle and results recorded. If there is any fault, the crane should not be put into use and the supervisor should be promp

9、tly notified.7.严格执行交接班制度。交班人员应向接班人员说明行车运行概况,以及安全设施,电气和机械设备的使用情况。接班人员应对行车进行设备点检。When changing shifts the person who hands over to the next shift operator should make known any safety problems, and report about condition of crane s safety device and control system. The person who accepts the crane sho

10、uld undertake the short daily pection.8. 开车前,必须看清周围情况,确认危险区域内无人后,才可以启动。行车启动停车应平稳,遵循从慢速到快速,再从快速到停的原则。避免频繁点动。Before starting the crane, the surrounding area should be checked to make sure that no one would be injured. The crane should be started and stopped smoothly. The rules of starting and stopping

11、 at slow speed must be followed. Inching frequently is forbidden.9. 工作中突然断电,需使所有的控制器处与零位。并且设法将重物放下后,方可离开,严禁重物长时间滞留空中。In the case of abrupt power supply interruption, all control switches should be set to zero position. The load should be relief to ground before operator leaving. Load staying on the

12、hook for long time under power off is not allowed.10. 行车检查,维修,清洁时,必须切断电源,并在主开关上悬挂警告牌。行车司机负责确定合理的停车位置。维护保养结束后,行车操作人须认真检查设备是否符合要求,然后按照安全,正确的步骤检验行车。When overhead crane is being checked, maintained and cleaned , the power should be isolated. A mark or lock is required to isolating switch. The operator i

13、s responsible for parking crane in a suitable area. After maintenance, the operator is in charge of the confirmation of maintenance performance and testing the crane following up relative procedures.11. 工作完毕,主附钩应升到高位,吊钩上不允许有负载。行车停留在指定位置。各控制开关复位。按下急停开关,切断总电源。At the completion of the work with crane, the main auxiliary hoo

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论