已阅读5页,还剩11页未读, 继续免费阅读
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
Soft Tech Development Inc.,1,Software Project Tracking,A CMM Level 2 Key Process Area,Soft Tech Development Inc.,天马行空官方博客:/tmxk_docin ;QQ:1318241189;QQ群:175569632,Soft Tech Development Inc.,2,Purpose,The purpose of Software Project Tracking and Oversight is to provide adequate visibility into actual progress so that management can take effective actions when the projects performance deviates significantly from the plans. Software Project Tracking and Oversight involves tracking and reviewing the accomplishments and results against documented estimates, commitments, and plans, and adjusting these plans based on the actual accomplishments and results.,天马行空官方博客:/tmxk_docin ;QQ:1318241189;QQ群:175569632,Soft Tech Development Inc.,3,Goals,Goal 1 Actual results and performances are tracked against the software plans. Goal 2 Corrective actions are taken and managed to closure when actual results and performance deviate significantly from the software plans. Goal 3 Changes to software commitments are agreed to by the affected groups and individuals.,Soft Tech Development Inc.,4,Commitment,A project software manager is designated to be responsible for the projects software activities and results. The project follows a written organizational policy for managing the software project.,Soft Tech Development Inc.,5,Ability,A software development plan for the software project is documented and approved. The project manager explicitly assigns responsibility for work products and activities. Adequate resources and funding are provided for tracking the software project. The managers are trained in managing the technical and personnel aspects of the project. First-line managers receive orientation in the technical aspects of the project.,Soft Tech Development Inc.,6,Activities,A documented software development plan is used for tracking the software activities and communicating status. The projects software development plan is revised according to a documented procedure. Software project commitments and changes to commitments made to individuals and groups external to the organization are reviewed with senior management according to a documented procedure.,Soft Tech Development Inc.,7,Activities,Approved changes to commitments that affect the software project are communicated to the members of the software engineering group and other software-related groups. The size of the software work products (or size of the changes to the software work products) are tracked, and corrective actions are taken as necessary. The projects software effort and costs are tracked, and corrective actions are taken as necessary.,Soft Tech Development Inc.,8,Activities,The projects critical computer resources are tracked, and corrective actions are taken as necessary. The projects software schedule is tracked, and corrective actions are taken as necessary. Software engineering technical activities are tracked, and corrective actions are taken as necessary. The software risks associated with cost, resource, schedule, and technical aspects of the project are tracked.,Soft Tech Development Inc.,9,Activities,Actual measurement data and replanning data for the software project are recorded. The software engineering group conducts periodic internal reviews to track technical progress, plans, performance, and issues against the software development plan. Formal reviews to address the accomplishments and results of the software project are conducted at selected project milestones according to a documented procedure.,Soft Tech Development Inc.,10,Measures,Measurements are made and used to determine the status of the software tracking and oversight activities. Examples of measurements include: effort and other resources expended in performing the tracking and oversight activities; and change activity for the software development plan, which includes changes to size estimates of the software work products, software cost estimates, critical computer resource estimates, and schedule.,Soft Tech Development Inc.,11,Verification,The activities for project tracking and oversight are reviewed with senior management on a periodic basis. The activities for project tracking and oversight are reviewed with the project manager on both a periodic and event-driven basis. The software quality assurance group reviews and/or audits the activities and work products for project tracking and oversight and reports the results.,Soft Tech Development Inc.,12,Coverage Goal 1,Actual results and performance are tracked against the plans,The software group uses the project plan AC 1 and conducts periodic internal reviews AC12 to track: product size AC 5 effort and cost AC 6 critical computer resources AC 7 project schedule AC 8 technical activities AC 9 project risks AC 10,Measurement and re-planning data are recorded AC 11,Formal reviews are help at key milestones AC 13,Soft Tech Development Inc.,13,Coverage Goal 2,Corrective actions are taken and managed to closure,The following are tracked and corrective actions taken: product size AC 5 effort and cost AC 6 critical computer resources AC 7 project schedule AC 8 technical activities AC 9,Measurement and re-planning data are recorded AC 11,The project plan is revised using a documented procedure AC 2,Soft Tech Development Inc.,14,Coverage Goal 3,Changes to commitments are agreed,Commitments and changes to commitments with external groups are reviewed with senior managem
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 石河子大学《医学统计学》2021-2022学年第一学期期末试卷
- 石河子大学《食品贮藏与保鲜》2022-2023学年第一学期期末试卷
- 石河子大学《结构力学一》2022-2023学年第一学期期末试卷
- 石河子大学《复变函数》2022-2023学年第一学期期末试卷
- 智慧高速解决方案
- 沈阳理工大学《审计学》2022-2023学年第一学期期末试卷
- 2018年四川内江中考满分作文《我心中的英雄》13
- 沈阳理工大学《化工工艺设计》2022-2023学年第一学期期末试卷
- 沈阳理工大学《产品仿生学应用设计》2023-2024学年第一学期期末试卷
- 广州海珠区法院判决继续履行劳动合同的案例
- 2024年头孢菌素行业现状分析:头孢菌素国内市场规模达到5515.47亿元
- 班主任能力大赛情景答辩环节真题及答案高中组
- 2024年中国邮政集团限公司贵州省分公司社会招聘高频考题难、易错点模拟试题(共500题)附带答案详解
- 2024山西航空产业集团限公司公开招聘105人高频考题难、易错点模拟试题(共500题)附带答案详解
- 机动车检验检测机构授权签字人考核试题及答案
- 小学语文“思辨性阅读与表达”学习任务群
- 加装电梯投标方案(技术方案)
- 25《古人谈读书》(教学设计)-2024-2025学年语文五年级上册统编版
- 银行提前还贷授权委托书
- 2024年江苏江南水务股份限公司公开招聘工作人员10人(高频重点提升专题训练)共500题附带答案详解
- 【新课标】人音版一上第四单元《可爱的动物》大单元整体教学设计
评论
0/150
提交评论