




全文预览已结束
下载本文档
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
When people mention the Beijing Olympics, associated with the birds nest ; and mentioned the London games, you will think of The answer is the dazzling red steel spiral tower of view-arcelor mittal rail tower. Scheme is come from 3 britons indians-designer Ann furnish kapoor, Mr YaNa (Arup)engineering consultant companys construction engineers Cecil barr have DE, and investors-the worlds largest steel companies, arcelor mittal boss lakshmi mittal,. The tower is a continuous steel tube composition of the track. The British seemed more like the monster nicknamed the iron blame, shredded tobacco for water pipes, peoples aesthetic view may different, but no matter how you evaluation, it is the model of steel construction engineering innovation. Although the Eiffel Tower track Tower is half high of Rail tower, but it is a challenging structure. Its unique design means that is impossible to adjust after construction starts . Singular appearance, because the Eiffel Tower has four legs, Tower itself from bottom to top are all general shape, but Rail tower has three rail tower leg, therefore can do from any Angle is not the shape of the unity at all. It is a sculpture, it is a kind of structure, and it is also a building. The shape of the Rail tower is complex, which is about 9 km steel pipe, and the size to be different from each otherthrough the 1800 connections dish together formed various kinds of dazzling geometric shapes. The project of another amazing at, the whole construction site only three workers operate. Rail tower will hang a weighed 40 tons, and reducing the pendulum similar place, in order to offset the wind and cause of the mast vibration, eliminate movement to visitors and bring insecurity. Rail tower during the games are open to the public, it has two direct elevator, but the design company more encourage people to climb the 455 steps, feel unique experience, the entire tower in the 70 m and 80 m has two observatory. Arcelor mittal company expect, the Olympic Games opening after 3 months, each hour can accommodate 500 to 700 people up to the tower. After the Olympic Games, it will be permanent, ascend the tower by ticket system, expected a profit of 10 million pounds a year. Beijing Olympic Games birds nest invited a famous designer Switzerland Jacques herzog design, water cube also has invited Australian designer participation and cooperation. And in 2012, the London Olympic Games are main venue by British home construction firm finish design, including the Atkins company which is responsible for cleaning up the ground and recycling, they were asked to circular utilization to achieve 90%; Populous company responsible for London bowl design, firm, hadid, building firm responsible for swimming pool design. As the regional soil is already a highly pollution type of soil, Atkins companies and even set up a soil hospital, more than 80% of the contaminated soil get clean again, they also at the site through the soil bioremediation technology (through some microorganisms to clean up the soil), let the soil was again use. The sports field London bowl is known as the London games beating heart. The appearance of the bowl for London all white, appearance on wide below narrow, like a large soup bowl. London bowl a total of five ring structures, London bowl is lowering shape design, can let the audience closer watching the action of the athletes. In the external, with special material to fill the whole stadium package up, the porous, translucent, printing fabric, can make whole venues are natural breath in London, the walls of the bowl printed many Olympic Games on the history of outstanding athletes. Door curtain will surround the London temporary buildings of the bowl of part, as to the audience, protection and covered. After the game, fabrics for protecting wall will be made to people the bag. London bowl design project of the Lord, comparing the vick birds nest and London bowl the similarities and differences, but he said: the UK design philosophy is very different.China is square and round The Olympic Games ended,
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 环境修复过程中企业创新与产业升级的协同
- 高技能人才培养的内涵与实施路径探索
- 甘肃省白银市育才中学2025届数学八上期末质量检测模拟试题含解析
- 辽宁理工职业大学《比较政治制度》2023-2024学年第一学期期末试卷
- 城市绿化槽棎种植与养护合同
- 电视台节目制作人述职报告
- 如何应用基因编辑技术治疗遗传性疾病
- 企业培训项目的设计与实施管理报告
- 公共营养师技能考核教学计划
- 游戏策划与关卡设计教程
- 2025年第九届“学宪法、讲宪法”活动知识竞赛测试题库及答案
- 采棉机操作手册和维护指南
- 2025年山西省华远国际陆港集团有限公司招聘笔试参考题库含答案解析
- 塞尔维亚语教学与学习作业指导书
- 农商银行贷款合同电子版
- 翼状胬肉术后护理
- 《目视化管理》课件
- ERP车间管理模块操作培训手册
- 机械制造项目检测试验计划
- 2025-2030年中国产业园区物业管理行业开拓第二增长曲线战略制定与实施研究报告
- 2025神华新街能源限责任公司系统内招聘23人(第二批)高频重点提升(共500题)附带答案详解
评论
0/150
提交评论