




版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、HDI Manufacturing Process Flow,Pre-engineering,Pattern imaging,Etching,Laminating,Drilling,Desmear,Cu plating,Hole plugging,Cu plating,Belt Sanding,Laser Ablation,Mechanical drilling,Cu plating,Solder Mask,Gold plating,Routing,Electrical test,Pattern imaging,Hole counter,Shipping,Visual inspection,*
2、 Raw material (Thin Core,Copper,Prepreg.),Raw Material : FR-4 (Difuntional,Tetrafuntional) Supplier : EMC ,Nan-Ya Sheet size : 36”*48” , 40”*48” ,42”*48 Core Thickness : 0.003”,0.004”,0.005”,0.006” 0.008”,0.010”,0.012”,0.015” 0.021”,0.031”,0.039”,0.047” Copper Foil : 1/3 oz,1/2 oz,1.0 oz,2 oz Prepre
3、g type : 1080,2113,2116,1506,7628,7630,4. 內層線路製作(顯影)(Develop),5. 內層線路製作(蝕刻)(Etch),6. 內層線路製作(去膜)(Strip Resist),7.黑氧化 ( Oxide Coating),8. 疊板 (Lay-up),9. 壓合 (Lamination),10. 鑽孔 (Drilling),11. 電鍍Desmear & Copper Deposition,12. 塞孔(Hole Plugging),13. 去溢膠 (Belt Sanding),14. 減銅 (Copper Reduction) Option,15.
4、 去溢膠 (Belt Sanding) Option,16. 外層壓膜 Dry Film Lamination (Outer layer),17. 外層曝光 Expose,18. After Exposed,19. 外層顯影 Develop,20. 蝕刻 Etch,20. 去乾膜 Strip Resist,21.壓合 (Build-up Layer Lamination),21. 護形層製作 (壓膜)(Conformal Mask),22. 護形層製作 (曝光)(Conformal Mask),Before Exposure,After Exposure,23.護形層製作 (顯像)(Confo
5、rmal Mask),24. 護形層製作 (蝕銅) (Conformal Mask),25.護形層製作(去膜) (Conformal Mask),26. 雷射鑽孔 (Laser Ablation)及機械鑽孔,27. 機械鑽孔 (Mechanical Drill),28. 電鍍(Desmear & Copper Deposition),29. 外層線路製作 (Pattern imaging),壓膜(D/F Lamination),曝光(Exposure),顯像(D/F Developing),蝕銅 (Etching),去膜(D/F Stripping),30. 防焊(綠漆)製作 (Solder
6、Mask),WWEI 94V-0,R105,31. S/M 顯像 (S/M Developing),32. 印文字 (Legend Printing),33. 浸金(噴錫)製作(Electroless Ni/Au , HAL),Dedicate or universal Tester,Flying Probe Tester,34. 成型 (Profile),35. 測試 (Electrical Testing),36. 終檢 (Final Inspection),37. O.S.P. (entek plus Cu_106A.) Option,LASER BLIND & BURIED VIA L
7、AY-UP,A = THROUGH VIA HOLE (導通孔),B = BURIED VIA HOLE (埋孔),C = One Level Laser Blind Via (雷射盲孔 ),LASER BLIND & BURIED VIA LAY-UP,BURIED VIA AND LASER BLIND VIA OPTION (雷射盲埋孔之選擇),D,C,C,D = Two Level Laser Via (雷射盲孔 ),C,D,C,B-STAGE,FR-4 Core,RCC,A,B,B,A,BURIED VIA LAY-UP,A = THROUGH VIA HOLE (導通孔),B = BURIED VIA HOLE (埋孔),C = BLIND VIA HOLE (盲孔 ),D = BLIND HOLE MLB VIA (多層盲孔),BLIND VIA LAY-UP,BLIND VIA SEQUENTIAL LAY-UP,A,B,B,A,RESIN,B-STAGE,BLIND AND BURIED VIA OPTION (盲 埋 孔 之 選 擇 ),D,A,C,C,E = V
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 停产劳动合同范本
- 供暖公司合同范本
- 厂房他项权证合同范例
- 受限空间安全管理制度汇编
- 关于包装采购合同范本
- 原料购货合同范本
- 变形监测合同范本
- 净水设备采购合同范本
- 关于基金合同范本说明
- 浙江2025年01月浙江省义乌市公证处公开招考工作人员笔试历年典型考题(历年真题考点)解题思路附带答案详解
- 农村土地承包调解仲裁与仲裁庭审技巧课件
- 介入放射学全套教程
- 人教版政治七年级下册全套课件
- 外研版小学英语五年级下册课文翻译
- 口语教程4整套课件完整版教学教程最全电子讲义教案
- 高压氧舱课件
- 加德纳多元智能测评量表【复制】
- 译林英语四年级下册4B各单元教学反思
- 国家电网有限公司十八项电网重大反事故措施(修订版)
- 环氧乙烷固定床反应器课程设计
- 班、团、队一体化建设实施方案
评论
0/150
提交评论