![焊线及焊线工艺介绍.ppt_第1页](http://file1.renrendoc.com/fileroot2/2020-1/17/92440617-af3f-4dbf-a4c6-32a2bae69cbe/92440617-af3f-4dbf-a4c6-32a2bae69cbe1.gif)
![焊线及焊线工艺介绍.ppt_第2页](http://file1.renrendoc.com/fileroot2/2020-1/17/92440617-af3f-4dbf-a4c6-32a2bae69cbe/92440617-af3f-4dbf-a4c6-32a2bae69cbe2.gif)
![焊线及焊线工艺介绍.ppt_第3页](http://file1.renrendoc.com/fileroot2/2020-1/17/92440617-af3f-4dbf-a4c6-32a2bae69cbe/92440617-af3f-4dbf-a4c6-32a2bae69cbe3.gif)
![焊线及焊线工艺介绍.ppt_第4页](http://file1.renrendoc.com/fileroot2/2020-1/17/92440617-af3f-4dbf-a4c6-32a2bae69cbe/92440617-af3f-4dbf-a4c6-32a2bae69cbe4.gif)
![焊线及焊线工艺介绍.ppt_第5页](http://file1.renrendoc.com/fileroot2/2020-1/17/92440617-af3f-4dbf-a4c6-32a2bae69cbe/92440617-af3f-4dbf-a4c6-32a2bae69cbe5.gif)
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、WIRE BOND PROCESS INTRODUCTION,CONTENTS,ASSEMBLY FLOW OF PLASTIC IC Wire Bond 原理 M/C Introduction Wire Bond Process Material SPEC Calculator DEFECT,封裝簡介,晶片Die,金線 Gold Wire,導線架 Lead fram,Wafer Grinding,Die Bonding,Wafer Saw,toaster,Wire Bonding,Die Surface Coating,Molding,Laser Mark,Solder Ball Place
2、ment,Singulation,Packing,封裝流程,Dejunk TRIM,Solder Plating,Solder Plating,Dejunk TRIM,TRIM/ FORMING,BGA,SURFACE MOUNTPKG,THROUGH HOLE PKG,Wire Bond 原理,pad,lead,Gold wire,Ball Bond ( 1st Bond ),Wedge Bond ( 2nd Bond ),Al,B.PRINCIPLE,銲接條件,HARD WELDING Pressure (Force) Amplify 或著一個Die上出現不同Pad大小那就是以兩個Pad中
3、心距離為BPP,但是一般我們要取一個Die上最小的BPP,Bond Pad Pitch,Bond Pad Open,Bond Pad Open,Ball Size,Ball Thickness,Ball Size Ball Size = y; Area = (y/2) x/(y/2) = z g/mil,C,Ball bond,Test specimen,Specimen clamp,Shearing ram,Wire,Bond shoulder,Interfacial contactball bond weld area,Bonding pad,h,(A) Unsheared,C,L,C,B
4、all bond,C,L,Test specimen,Specimen clamp,Bonding pad,Full ball attached towire-except for regionsof intermetallic voiding,Ball separated at bonding pad-Ball interface-residual intermetallic(and sometimes portion of unalloyedball and metal) on pad in bondinteraction area,(D) Ball bond-bonding pad in
5、terface separation (typical Au to Al),C,Test specimen,Specimen clamp,Shearing ram,Wire,Minor fragment of ballattached to wire,Bonding pad,C,L,Ball sheared too high(off line, etc.)only aportion of shoulder andball top removed,Interfacial contactball bond weld area,(B) Wire (ball top and/or side) shea
6、r,C,Ball bond,C,L,Test specimen,Specimen clamp,Bonding pad,Major portionof ball attached to wire,Interfacial contact-ball bond weld areaintact,(C) Below center line shear, ball sheared through (typically Au to Au),C,Ball bond,C,L,Test specimen,Specimen clamp,Bonding pad,Pad metallizationseparates fr
7、omunderlying surface,Residual pad on ballball-pad interfaceremains intact,(E) Bond pad lifts,Test specimen,Specimen clamp,C,Ball bond,C,L,Bonding pad,Bonding pad lifts,taking portion of underlyingsubstrate material with it,(F) Cratering,Residual pad and substrate attachedto ball,ball-pad interface r
8、emainsintact,Shear Failure Modes,Crater Test,Calculate (I),UP Time =,(Total Actual Production Times Total Repair Time ),Total Actual Production Time,DOWN TIME RATE=,Total Repair Time,Total Actual Production Times,Total Operator Actual Repair Time,Total Operator Repair Frequency Stoppages,Total Actua
9、l Production Times Total Operator Repair Time,Total Operator Repair Frequency Stoppages,Total Technical Actual Repair Times,Total Technical Repair Frequency Stoppages,MTTS (MEAN TIME TO STOP ) =,MTBS (MEAN TIME BETWEEN STOP)=,MTTA (MEAN TIME TO ASSISTANCE ) =,Calculate (II),MTBA (Mean Time Between A
10、ssistance) =,Total Actual Production Times Total Technican Repair Times,Total Technical Repair Frequency Stoppages,MTBF(Mean Time Between Failure)=,Total Actual Production Times Total Technician Repair Time,Total Change Parts Repair Frequency Stoppage,規格寬度,製程寬度,規格上限 - 規格下限,6 ( 公差),(上限 or 下限 ) - 平均值,
11、三個公差,CP ( 製程能力指標) =,CPK =,=,Quality,正常品 Material Problem 1st Bond issue (Peeling , Ball Lift , Off Center) 2nd Bond issue (滑針,縫點脫,short tail ) Looping Fail (wire snake wire,sweep wire loop base bent ),正常品,Material Problem,With Ball,Wire,Pad Size,Missing Ball,Wire Broken,Bonding Ball Inspection,Ball
12、Detection,Ball Size,Pad Center,Ball Center,Ball Placement (X,Y),Ball Off Pad,Bonding Ball Inspection (cont.),Ball Measurement,Peeling,1st Bond Fail ( I ),Ball Lift,1st Bond Fail (II),Ball Lift,Neck Crack,1st Bond Fail ( III ),Off Center,1st Bond Fail (IV),Off Center Ball,1st Bond Fail (V),Smash Ball,Smash Ball,With Weld,Wire,Capillary Mark,Missing Weld,Wire Broken,Lead,Bonding Weld Inspection,Weld Detectio
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 【正版授权】 ISO 12129-1:2019 EN Plain bearings - Tolerances - Part 1: Fits
- 【正版授权】 ISO 12128:1995 EN Plain bearings - Lubrication holes,grooves and pockets - Dimensions,types,designation and their application to bearing bushes
- 【正版授权】 ISO 1212:1976 EN Apples - Guide to cold storage
- 【正版授权】 ISO 12080-1:2009 EN Dried skimmed milk - Determination of vitamin A content - Part 1: Colorimetric method
- 【正版授权】 ISO 11992-2:2014 EN Road vehicles - Interchange of digital information on electrical connections between towing and towed vehicles - Part 2: Application layer for brakes and
- 自动门市场发展分析及行业投资战略研究报告
- 羊肉行业市场发展分析及前景趋势与投融资发展研究报告
- 网上书店行业市场发展分析及发展趋势前景预测报告(2024-2030)
- 红葡萄酒行业发展分析及投资价值研究咨询报告
- 石油化工设备行业市场深度分析及竞争格局与投资价值研究报告
- 2024届河北省石家庄市裕华区九年级化学第一学期期中达标检测试题含答案解析
- 厂房照明更换安装施工方案
- 英语语法名词变复数的规则
- 国开2023春《语言学概论》形考任务1-3+大作业参考答案
- 2022-2023学年安徽省阜阳市城南中学数学七年级第二学期期末统考试题含答案
- GB 42590-2023民用无人驾驶航空器系统安全要求
- 企业财务会计全套教学课件
- 内分泌科疾病诊疗指南诊疗规范(2020版)
- 初中美术人美七年级下册(2023年新编)几何形体的联想《几何形体的联想》美术教学设计
- 2023-2024学年安徽省阜阳市小学语文六年级期末高分通关试卷附参考答案和详细解析
- 人教版八年级下册数学期末考试题型分类整理
评论
0/150
提交评论