版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、WIRE BOND PROCESS INTRODUCTION,CONTENTS,ASSEMBLY FLOW OF PLASTIC IC Wire Bond 原理 M/C Introduction Wire Bond Process Material SPEC Calculator DEFECT,封裝簡介,晶片Die,金線 Gold Wire,導線架 Lead fram,Wafer Grinding,Die Bonding,Wafer Saw,toaster,Wire Bonding,Die Surface Coating,Molding,Laser Mark,Solder Ball Place
2、ment,Singulation,Packing,封裝流程,Dejunk TRIM,Solder Plating,Solder Plating,Dejunk TRIM,TRIM/ FORMING,BGA,SURFACE MOUNTPKG,THROUGH HOLE PKG,Wire Bond 原理,pad,lead,Gold wire,Ball Bond ( 1st Bond ),Wedge Bond ( 2nd Bond ),Al,B.PRINCIPLE,銲接條件,HARD WELDING Pressure (Force) Amplify 或著一個Die上出現不同Pad大小那就是以兩個Pad中
3、心距離為BPP,但是一般我們要取一個Die上最小的BPP,Bond Pad Pitch,Bond Pad Open,Bond Pad Open,Ball Size,Ball Thickness,Ball Size Ball Size = y; Area = (y/2) x/(y/2) = z g/mil,C,Ball bond,Test specimen,Specimen clamp,Shearing ram,Wire,Bond shoulder,Interfacial contactball bond weld area,Bonding pad,h,(A) Unsheared,C,L,C,B
4、all bond,C,L,Test specimen,Specimen clamp,Bonding pad,Full ball attached towire-except for regionsof intermetallic voiding,Ball separated at bonding pad-Ball interface-residual intermetallic(and sometimes portion of unalloyedball and metal) on pad in bondinteraction area,(D) Ball bond-bonding pad in
5、terface separation (typical Au to Al),C,Test specimen,Specimen clamp,Shearing ram,Wire,Minor fragment of ballattached to wire,Bonding pad,C,L,Ball sheared too high(off line, etc.)only aportion of shoulder andball top removed,Interfacial contactball bond weld area,(B) Wire (ball top and/or side) shea
6、r,C,Ball bond,C,L,Test specimen,Specimen clamp,Bonding pad,Major portionof ball attached to wire,Interfacial contact-ball bond weld areaintact,(C) Below center line shear, ball sheared through (typically Au to Au),C,Ball bond,C,L,Test specimen,Specimen clamp,Bonding pad,Pad metallizationseparates fr
7、omunderlying surface,Residual pad on ballball-pad interfaceremains intact,(E) Bond pad lifts,Test specimen,Specimen clamp,C,Ball bond,C,L,Bonding pad,Bonding pad lifts,taking portion of underlyingsubstrate material with it,(F) Cratering,Residual pad and substrate attachedto ball,ball-pad interface r
8、emainsintact,Shear Failure Modes,Crater Test,Calculate (I),UP Time =,(Total Actual Production Times Total Repair Time ),Total Actual Production Time,DOWN TIME RATE=,Total Repair Time,Total Actual Production Times,Total Operator Actual Repair Time,Total Operator Repair Frequency Stoppages,Total Actua
9、l Production Times Total Operator Repair Time,Total Operator Repair Frequency Stoppages,Total Technical Actual Repair Times,Total Technical Repair Frequency Stoppages,MTTS (MEAN TIME TO STOP ) =,MTBS (MEAN TIME BETWEEN STOP)=,MTTA (MEAN TIME TO ASSISTANCE ) =,Calculate (II),MTBA (Mean Time Between A
10、ssistance) =,Total Actual Production Times Total Technican Repair Times,Total Technical Repair Frequency Stoppages,MTBF(Mean Time Between Failure)=,Total Actual Production Times Total Technician Repair Time,Total Change Parts Repair Frequency Stoppage,規格寬度,製程寬度,規格上限 - 規格下限,6 ( 公差),(上限 or 下限 ) - 平均值,
11、三個公差,CP ( 製程能力指標) =,CPK =,=,Quality,正常品 Material Problem 1st Bond issue (Peeling , Ball Lift , Off Center) 2nd Bond issue (滑針,縫點脫,short tail ) Looping Fail (wire snake wire,sweep wire loop base bent ),正常品,Material Problem,With Ball,Wire,Pad Size,Missing Ball,Wire Broken,Bonding Ball Inspection,Ball
12、Detection,Ball Size,Pad Center,Ball Center,Ball Placement (X,Y),Ball Off Pad,Bonding Ball Inspection (cont.),Ball Measurement,Peeling,1st Bond Fail ( I ),Ball Lift,1st Bond Fail (II),Ball Lift,Neck Crack,1st Bond Fail ( III ),Off Center,1st Bond Fail (IV),Off Center Ball,1st Bond Fail (V),Smash Ball,Smash Ball,With Weld,Wire,Capillary Mark,Missing Weld,Wire Broken,Lead,Bonding Weld Inspection,Weld Detectio
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- JJF 2436-2026示波器校准仪校准规范
- T/SDSES 014-2023水泥窑协同处置垃圾焚烧飞灰技术规范
- T/LXLY 38-2025牙骨质撕裂临床诊疗规程
- T/CDEIIEA 9-2024成渝地区电子信息先进制造集群公共服务平台 网络平台功能规范
- T/CFEII 0015.3-2023内容安全检测人工智能系统鲁棒性测评规范 第3部分:文本
- T/CSPSTC 207-2026抽水蓄能电站建筑装饰装修技术导则
- GB/T 7424.2219-2026光缆第2-219部分:总规范光缆基本试验方法环境性能试验方法方法F19材料相容性
- 2025~2026学年贵州省遵义市播州区人教版六年级上册第三次月考数学试卷【附答案】
- 河北滦平县2027届九上数学期末考试试题含解析
- PHP程序员面试题及详细答案(真实企业版)
- 2026年注册(营养师、营养指导员)资格证必过考试题库与答案
- 常见肿瘤急症及并发症的护理课件
- 2026年软件工程开发工程师试题及答案
- 2025年10月自考02126应用文写作试卷及答案
- 2026年监理员考试题库及答案
- 航道、通航建筑物及航运枢纽大坝运行安全风险辨识评估管控指南(试行)
- 2026年屠宰兽医卫生检验员考试题库(含考点)
- 2026中国资源循环集团有色金属投资有限公司社会招聘2人笔试历年典型考点题库附带答案详解
- 2025年国企董事会办公室工作人员考试题及答案
- pdf日语专业毕业论文写作指导
- (正式版)DB50∕T 959-2019 《营运高速公路施工管理规范 》
评论
0/150
提交评论