版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、,质检部质量周例会报告,质量周例会Weekly Quality Report,一、部品 1、 质量数据概况quality data summary 2、 质量数据推移及分析quality data process and analyse 部品品质MO延误率The MO delay rate with components 关键部品工程不良率The Defect rate on line with Key components 关键部品批次合格率The Pass lots rate with Key components 来料异常关闭The complain timely closed rate
2、 with incoming 生产异常关闭The complain timely closed rate with produce 3、本周产生的投诉The complain in this week,二、产品品控 1、 质量数据概况quality data summary 2、 SMT-交验合格率 Sampling Inspection Accept Ratio of SMT 3、 C4交验不合格率 Sampling Inspection Defect rate of C4 3.1 TCL品牌包装交验不合格率及主要影响因素3.2 ALCATEL品牌包装交验不合格率及主要影响因素 3.3 MO
3、TO品牌包装交验不合格率及主要影响因素 4、外协贴片质量状况the quality issue on OEM mounting side 4.1直通率PRY 4.2各机型直通明细the pass rate for every project 4.3总装反馈外协贴片质量状况the quality issue on OEM mounting side 4.4、总装反馈外协贴片各机型前五项不良汇总Top 5 defect for every projects on OEM mounting side. 5、停线的质量问题Quality Issue for Line Stop 6、 C2例行实验报告状
4、况C2 Weekly Test Report 7、质量异常关闭率QualityAbnormity Close ratio 8、客户投诉Customer Complaint 三、所需支持,1、 质量数据概况quality data summary 2、 质量数据推移及分析quality data process and analysis 部品品质MO累计延误率The MO delay rate with components 关键部品工程不良率The Defect rate on line with Key components 关键部品批次合格率The incoming lots accept
5、ance rate with key components 来料异常关闭率The complain timely closed rate with incoming 生产异常关闭率The complain timely closed rate with produce 3、本周产生的投诉The complain in this week,部 品 质 量 周 报 Weekly Report of Components,质检部 SQA,W16( 2010.04.102010.04.16),summary: 目标值1.8%,本周累计值: 1.08,达标。 The cumulative rate is
6、 1.08 % , which meet the target this week (target: 1.8%),部品品质MO累计延误率The MO delay rate with components,部品品质MO累计延误率The MO delay rate with components,部品品质MO累计延误率The MO delay rate with components,关键部品工程不良率(总)The Defect rate on line with Key components (total),本周关键部品工程不良率为 738 PPM, 达标 (目标:750PPM),相对前一周上升
7、了 201 PPM. This week, key components defects rate on line was 738 PPM ,which meet the target this week, and UP by 201 PPM as compared with thedatalast week. (target: 750PPM),关键部品工程不良率(总)The Defect rate on line with Key components (total),本周 This week, incoming components lots acceptancerate is 96.5
8、%,which Less the target this week ,and dropped by 0.8 % as compared with the data last week.(target: 98%),关键部品批次合格率(总) The incoming lot acceptance rate with Key components (total),本周&上周比较,部品批次合格率发生变化较大的前三项如下: The top 3 components increasing/decreasing Incoming lots acceptance rate compared to last w
9、eeks data:,关键部品批次合格率(总) The incoming lot acceptance rate with Key components (total),以目标值为参照物,本周影响批次合格率较大的前三项如下: The top 3 components most effect Incoming lots acceptance rates in this week:,影响部品批次合格率前三项分析top 3 analysis of The Pass lots rate of Key components,影响部品批次合格率前三项分析top 3 analysis of The Pass
10、 lots rate of Key components,影响部品批次合格率前三项分析top 3 analysis of The Pass lots rate of Key components,关键部品批次合格率(ALCATEL) The incoming lot acceptance rate with Key components (ALCATEL brand),summary: 目标值98 %,本周实际值 96.5 % , 不达标 ; target: 98 %, The rate is 96.5 % , which Less he target this week.,关键部品批次合格率
11、(TCL) The incoming lot acceptance rate with Key components (TCL brand),summary: 目标值98 %,本周实际值 97.5 % , 不达标 ; target: 98 %, The rate is 97.5 % , which Less the target this week.,量科按键批次合格率及工程不良率数据,主要问题点:无,来料异常及时关闭率The complain timely closed rate with incoming,summary: 目标值95 %,本周实际值 81.1 % , 未达标 ; 未关闭的
12、部品主要有:塑胶件、包材、滑轨、装饰片、屏蔽件、Touch lens target: 95 %, The rate is 88.1 % , which Less the target this week.,生产投诉及时关闭率(部品责任)The complain timely closed rate with produce,summary: 目标值95 %,本周实际值 100 % , 达标 ; 未关闭的部品主要有:/ target: 95 %, The rate is 100 % , which meet the target this week.,本周发生的来料异常共 34 单,具体分布如下: A total of 34 times , distribution is as follows :,本周发生的来料异常The complain with incoming in this week,具体见附件.The attached is the
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 《焊接标准》教学大纲
- 广西理论知识和业务规范考题
- 建筑装饰材料与设计教案
- 家教教案(教师版)必修一第三章
- 玉溪师范学院《社会政策》2022-2023学年第一学期期末试卷
- 玉溪师范学院《马克思主义经典文献导读》2023-2024学年第一学期期末试卷
- 冀教版六年级下册英语全册教案
- 2下第二单元课件
- 2024年盐业项目综合评估报告
- 2023年微电子组件项目综合评估报告
- 排洪渠道清淤施工方案
- 北科大岩石力学-李长洪1.2-岩石的力学性质
- 国开(河北)2024年秋《现代产权法律制度专题》形考作业1-4答案
- 2024-2030年度假酒店项目融资商业计划书
- 新商科“专业-产业双链融通式”人才培养模式探究
- 2024年重庆新版劳动合同范本
- 公务员2018年国考《申论》真题卷及答案(副省级)
- 2024年基金从业资格证(含三个科目)考前必刷必练题库500题(含真题、必会题)
- 2024年海南琼中黎族苗族自治县招聘事业单位人员17人历年高频难、易错点500题模拟试题附带答案详解
- 水利基建项目内部审计方法与技巧培训
- 路灯改造施工方案
评论
0/150
提交评论