版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
,指标编号,名称,单位,概算指标(元),人工费,材料费,机械费
1,1-1001,多级离心泵安装0.5t,台,840,512,268,60
2,1-1002,多级离心泵安装1t,台,1152,704,338,110
3,1-1003,多级离心泵安装3t,台,2222,1413,535,274
4,1-1004,多级离心泵安装5t,台,3818,2485,705,628
5,1-1005,多级离心泵安装7t,台,4973,3119,1016,838
6,1-1006,多级离心泵安装10t,台,6729,4207,1570,952
7,1-1007,多级离心泵安装15t,台,8829,5496,2038,1295
8,1-1008,多级离心泵安装20t,台,13956,8674,3144,2138
9,1-1009,多级离心泵安装30t,台,17769,10004,3708,4057
10,1-1010,离心式油泵安装0.2t,台,651,476,157,18
11,1-1011,离心式油泵安装0.5t,台,1063,729,296,38
12,1-1012,离心式油泵安装1t,台,1132,753,310,69
13,1-1013,离心式油泵安装3t,台,2650,1837,586,227
14,1-1014,离心式油泵安装5t,台,3787,2390,785,612
15,1-1015,离心式油泵安装7t,台,5385,3473,1043,869
16,1-1016,离心式油泵安装10t,台,6326,4348,1224,754
17,1-1017,离心式油泵安装15t,台,9975,7132,1662,1181
18,1-1018,离心式油泵安装20t,台,13763,9637,2171,1955
19,1-1019,离心式油泵安装25t,台,16333,11684,2602,2047
20,1-1020,离心式油泵安装30t,台,21581,14425,3307,3849
21,1-1021,高压柱塞泵安装0.5t,台,1122,784,281,57
22,1-1022,高压柱塞泵安装1t,台,1828,1219,419,190
23,1-1023,高压柱塞泵安装3t,台,3639,2647,550,442
24,1-1024,高压柱塞泵安装5t,台,4581,3198,911,472
25,1-1025,高压柱塞泵安装7t,台,7417,5322,1255,840
26,1-1026,高压柱塞泵安装10t,台,8273,5614,1692,967
27,1-1027,高压柱塞泵安装16t,台,11726,8283,2225,1218
28,1-1028,高压柱塞泵安装25t,台,16824,11426,3406,1992
29,1-1029,高压柱塞泵安装35t,台,22191,14330,4158,3703
30,1-1030,离心式深水泵安装1t,台,2321,1870,338,113
31,1-1031,离心式深水泵安装2t,台,2698,2157,378,163
32,1-1032,离心式深水泵安装3.5t,台,3927,3181,464,282
33,1-1033,离心式深水泵安装5.5t,台,4961,4004,596,361
34,1-1034,离心式深水泵安装8t,台,7883,6197,864,822
35,1-1035,螺杆泵及齿轮油泵安装0.5t,台,1211,871,269,71
36,1-1036,螺杆泵及齿轮油泵安装1t,台,1628,1195,312,121
37,1-1037,螺杆泵及齿轮油泵安装3t,台,3085,2373,478,234
38,1-1038,螺杆泵及齿轮油泵安装5t,台,4788,3354,962,472
39,1-1039,螺杆泵及齿轮油泵安装7t,台,7078,5126,1112,840
40,1-1040,螺杆泵及齿轮油泵安装10t,台,8876,6513,1378,985
41,1-1041,活塞式L型及Z型2列压缩机组安装2t,台,3282,2064,514,704
42,1-1042,活塞式L型及Z型2列压缩机组安装5t,台,5395,3572,978,845
43,1-1043,活塞式L型及Z型2列压缩机组安装10t,台,9844,6353,1883,1608
44,1-1044,活塞式L型及Z型2列压缩机组安装20t,台,13504,8950,2493,2061
45,1-1045,活塞式L型及Z型2列压缩机组安装30t,台,29649,19202,4909,5538
46,1-1046,活塞式L型及Z型2列压缩机组安装40t,台,38598,25602,5932,7064
47,1-1047,活塞式L型及Z型2列压缩机组安装50t,台,46093,29857,6933,9303
48,1-1048,活塞式Z型3列压缩机整体安装5t,台,9579,6533,2173,873
49,1-1049,活塞式Z型3列压缩机整体安装10t,台,14679,9352,3624,1703
50,1-1050,活塞式Z型3列压缩机整体安装20t,台,18636,12320,4361,1955
51,1-1051,活塞式V.W.S型压缩机组安装气缸缸径70mm,台,2460,1101,567,792
52,1-1052,活塞式V.W.S型压缩机组安装气缸缸径100mm,台,3617,2160,657,800
53,1-1053,活塞式V.W.S型压缩机组安装气缸缸径125mm,台,4911,3091,998,822
54,1-1054,活塞式V.W.S型压缩机组安装气缸缸径170mm,台,6902,4336,1490,1076
55,1-1055,活塞式V.W.S型压缩机组安装气缸缸径200mm,台,10081,6435,2377,1269
56,1-1056,往复DMH型对称平衡式压缩机安装10t,台,20188,13061,4686,2441
57,1-1057,往复DMH型对称平衡式压缩机安装20t,台,41506,25194,8548,7764
58,1-1058,往复DMH型对称平衡式压缩机安装30t,台,52852,32035,10940,9877
59,1-1059,往复DMH型对称平衡式压缩机安装40t,台,62766,37711,13370,11685
60,1-1060,往复DMH型对称平衡式压缩机安装50t,台,73773,44599,15124,14050
61,1-1061,往复DMH型对称平衡式压缩机安装60t,台,87935,54177,17679,16079
62,1-1062,往复DMH型对称平衡式压缩机安装90t,台,121635,78526,23857,19252
63,1-1063,往复DMH型对称平衡式压缩机安装120t,台,136331,84962,26797,24572
64,1-1064,往复DMH型对称平衡式压缩机安装150t,台,163350,94220,33232,35898
65,1-1065,离心式压缩机(电动机驱动)安装5t,台,11295,7248,1410,2637
66,1-1066,离心式压缩机(电动机驱动)安装10t,台,16696,11080,2233,3383
67,1-1067,离心式压缩机(电动机驱动)安装20t,台,26924,18374,3758,4792
68,1-1068,离心式压缩机(电动机驱动)安装30t,台,42894,30645,5584,6665
69,1-1069,离心式压缩机(电动机驱动)安装40t,台,53648,37890,7375,8383
70,1-1070,离心式压缩机(电动机驱动)安装50t,台,65057,45408,9415,10234
71,1-1071,离心式压缩机(电动机驱动)安装90t,台,97148,70776,12649,13723
72,1-1072,离心式压缩机(电动机驱动)安装120t,台,114960,81739,15112,18109
73,1-1073,离心式压缩机(电动机驱动)安装165t,台,134094,94146,18175,21773
74,1-1074,通(引)风机安装0.5t,台,1035,661,291,83
75,1-1075,通(引)风机安装1t,台,1413,933,372,108
76,1-1076,通(引)风机安装2t,台,2051,1294,619,138
77,1-1077,通(引)风机安装3t,台,2996,1958,808,230
78,1-1078,通(引)风机安装5t,台,4711,2880,1325,506
79,1-1079,通(引)风机安装7t,台,6873,4280,1951,642
80,1-1080,通(引)风机安装10t,台,8124,5252,2086,786
81,1-1081,通(引)风机安装15t,台,10425,6632,2748,1045
82,1-1082,通(引)风机安装20t,台,14196,8141,3821,2234
83,1-1083,通(引)风机安装30t,台,17844,9819,4513,3512
84,1-1084,通(引)风机安装40t,台,23758,11851,6282,5625
85,1-1085,通(引)风机安装50t,台,26831,13389,7078,6364
86,1-1086,通(引)风机安装60t,台,32505,15864,8459,8182
87,1-1087,通(引)风机安装70t,台,40723,17814,9700,13209
88,1-1088,鼓风机安装0.5t,台,1846,1480,268,98
89,1-1089,鼓风机安装1t,台,2532,1959,464,109
90,1-1090,鼓风机安装2t,台,3352,2709,534,109
91,1-1091,鼓风机安装3t,台,4445,3585,670,190
92,1-1092,鼓风机安装5t,台,9634,7712,1437,485
93,1-1093,鼓风机安装7t,台,12864,10251,1824,789
94,1-1094,鼓风机安装10t,台,17075,13390,2331,1354
95,1-1095,鼓风机安装15t,台,23287,18003,3343,1941
96,1-1096,鼓风机安装20t,台,29584,21935,4912,2737
97,1-1097,鼓风机安装30t,台,35243,23575,6772,4896
98,1-1098,鼓风机安装40t,台,40442,26499,8154,5789
99,1-1099,鼓风机安装60t,台,47375,30233,9241,7901
100,1-1100,鼓风机安装90t,台,57583,36107,13067,8409
101,1-1101,鼓风机安装120t,台,69959,42162,16908,10889
102,1-1102,输送设备安装斗式提升机高度12m,台,4525,3441,863,221
103,1-1103,输送设备安装斗式提升机高度22m,台,6415,4752,1032,631
104,1-1104,输送设备安装斗式提升机高度32m,台,8342,6255,1226,861
105,1-1105,输送设备安装刮板输送机每组长度30m,台,8397,5336,2758,303
106,1-1106,输送设备安装刮板输送机每组长度50m,台,15380,9789,4929,662
107,1-1107,输送设备安装刮板输送机每组长度80m,台,23344,15160,7526,658
108,1-1108,输送设备安装刮板输送机每组长度120m,台,31639,20351,10374,914
109,1-1109,输送设备安装刮板输送机每组长度170m,台,44419,27975,14804,1640
110,1-1110,输送设备安装刮板输送机每组长度250m,台,63219,40029,20699,2491
111,1-1111,输送设备安装板(裙)式输送机链板宽1500mm链轮中心距10m,台,6350,4027,1850,473
112,1-1112,输送设备安装板(裙)式输送机链板宽1500mm链轮中心距15m,台,11317,7510,2622,1185
113,1-1113,输送设备安装板(裙)式输送机链板宽2400mm链轮中心距10m,台,10204,7030,2442,732
114,1-1114,输送设备安装板(裙)式输送机链板宽2400mm链轮中心距15m,台,14745,9767,3591,1387
115,1-1115,输送设备安装螺旋输送机机身长度16m,台,3975,2320,1409,246
116,1-1116,输送设备安装螺旋输送机机身长度26m,台,6139,3619,2145,375
117,1-1117,输送设备安装固定式胶带输送机带宽1400mm以内长度20m,台,10357,6123,3199,1035
118,1-1118,输送设备安装固定式胶带输送机带宽1400mm以内长度50m,台,16040,9887,4980,1173
119,1-1119,输送设备安装固定式胶带输送机带宽1400mm以内长度80m,台,23345,14926,6934,1485
120,1-1120,输送设备安装固定式胶带输送机带宽1400mm以内长度110m,台,28170,18280,8124,1766
121,1-1121,输送设备安装固定式胶带输送机带宽1400mm以内长度150m,台,36803,23322,10996,2485
122,1-1122,输送设备安装固定式胶带输送机带宽1400mm以内长度200m,台,46255,28584,14170,3501
123,1-1123,输送设备安装固定式胶带输送机带宽1400mm以内长度250m,台,57046,35425,17255,4366
124,1-1124,输送设备安装固定式胶带输送机带宽1400mm以上长度20m,台,17966,10151,5019,2796
125,1-1125,输送设备安装固定式胶带输送机带宽1400mm以上长度50m,台,24763,14655,7067,3041
126,1-1126,输送设备安装固定式胶带输送机带宽1400mm以上长度80m,台,34750,21362,9415,3973
127,1-1127,输送设备安装固定式胶带输送机带宽1400mm以上长度100m,台,43648,27666,11333,4649
128,1-1128,输送设备安装固定式胶带输送机带宽1400mm以上长度110m,台,42286,26100,11387,4799
129,1-1129,输送设备安装固定式胶带输送机带宽1400mm以上长度150m,台,53508,33354,14441,5713
130,1-1130,输送设备安装固定式胶带输送机带宽1400mm以上长度200m,台,65485,39841,18022,7622
131,1-1131,输送设备安装固定式胶带输送机带宽1400mm以上长度250m,台,79780,49802,21807,8171
132,1-1132,输送设备安装固定式胶带输送机带宽1400mm以上长度500m,台,99225,65840,24324,9061
133,1-1133,电动双梁起重机安装5t,台,14400,9271,2049,3080
134,1-1134,电动双梁起重机安装10t,台,18237,11133,2551,4553
135,1-1135,电动双梁起重机安装15t,台,20336,11910,2756,5670
136,1-1136,电动双梁起重机安装20t,台,23564,13147,2958,7459
137,1-1137,电动双梁起重机安装30t,台,26213,14064,3137,9012
138,1-1138,电动双梁起重机安装50t,台,36596,17588,4144,14864
139,1-1139,电动双梁起重机安装75t,台,50609,24396,5002,21211
140,1-1140,电动双梁起重机安装100t,台,65552,30354,6422,28776
141,1-1141,电动双梁起重机安装150t,台,92950,44625,8007,40318
142,1-1142,电动双梁起重机安装200t,台,131126,60016,10146,60964
143,1-1143,电动双梁起重机安装250t,台,156916,72288,12046,72582
144,1-1144,电动双梁起重机安装300t,台,191253,87837,13702,89714
145,1-1145,电动双梁起重机安装400t,台,264269,124880,20491,118898
146,1-1146,电动梁式(悬挂)起重机安装3t跨距17m以内,台,5520,3301,886,1333
147,1-1147,电动梁式(悬挂)起重机安装5t跨距17m以内,台,6633,3797,967,1869
148,1-1148,手动梁式(悬挂)起重机安装3t跨距14m以内,台,3036,1554,403,1079
149,1-1149,手动梁式起重机安装10t跨距14m以内,台,4150,1714,473,1963
150,1-1150,手动双梁起重机安装10t跨距17m以内,台,4944,2156,478,2310
151,1-1151,手动双梁起重机安装20t跨距17m以内,台,5402,2555,537,2310
152,1-1152,电动葫芦安装2t,台,1810,751,365,694
153,1-1153,电动葫芦安装10t,台,4597,2100,486,2011
154,1-1154,单轨小车安装5t,台,990,423,94,473
155,1-1155,单轨小车安装10t,台,1723,656,122,945
156,1-1156,混凝土梁上安装轨道38(43)kg/m,10m,4257,1274,2868,115
,Z00001,普碳钢重轨38(43)kg/m,10m,,,,
157,1-1157,电动葫芦、单轨小车轨道安装工18(地轨24kg/m),10m,1052,719,216,117
,Z00002,工18,10m,,,,
158,1-1158,电动葫芦、单轨小车轨道安装工25(地轨38kg/m),10m,1347,833,338,176
,Z00003,工25,10m,,,,
159,1-1159,电动葫芦、单轨小车轨道安装工28(地轨43kg/m),10m,1459,883,384,192
,Z00004,工28,10m,,,,
160,1-1160,车挡制作与安装总重1t以内,t,5438,2813,2147,478
161,1-1161,车挡制作与安装总重6t以内,t,6184,3281,2317,586
162,1-1162,NP转筒式干燥机分段组对、安装,台,60660,35953,14751,9956
163,1-1163,箱式干燥机整体安装,台,106139,55099,22023,29017
164,1-1164,挤压脱水机安装3t,台,3160,2222,733,205
165,1-1165,挤压脱水机安装5t,台,5173,3518,1169,486
166,1-1166,挤压脱水机安装10t,台,9717,6372,2100,1245
167,1-1167,挤压脱水机安装20t,台,17644,11915,3843,1886
168,1-1168,挤压脱水机安装30t,台,24196,16336,5669,2191
169,1-1169,挤压脱水机安装40t,台,30385,19979,7445,2961
170,1-1170,挤压脱水机安装50t,台,33782,20923,9529,3330
171,1-1171,离心机安装0.5t,台,1137,638,368,131
172,1-1172,离心机安装1t,台,2187,1542,455,190
173,1-1173,离心机安装1.5t,台,3139,2300,604,235
174,1-1174,转鼓式洗涤鼓安装12t,台,15038,9071,4615,1352
175,1-1175,扒料机安装,台,101501,57356,8912,35233
176,1-1176,压块机(带油压装置)安装10t,台,25289,20374,3245,1670
177,1-1177,压块机(带油压装置)安装15t,台,36625,28899,4722,3004
178,1-1178,压块机(带油压装置)安装20t,台,47236,36264,6081,4891
179,1-1179,自动秤安装0.6t,台,1303,881,198,224
180,1-1180,自动秤安装1t,台,1960,1325,366,269
181,1-1181,自动秤安装1.5t,台,2592,1748,486,358
182,1-1182,自动包装系统包装系统安装,台,31923,14863,5846,11214
183,1-1183,自动包装系统装车系统安装,台,14224,7530,2168,4526
184,1-1184,抽油机安装5t,台,3492,511,2046,935
185,1-1185,抽油机安装12t,台,5397,676,3318,1403
186,1-1186,抽油机安装16t,台,6985,808,4306,1871
187,1-1187,抽油机安装18t,台,8021,1146,4537,2338
188,1-1188,抽油机安装20t,台,9011,1244,5148,2619
189,1-1189,抽油机安装23t,台,10171,1316,5462,3393
190,1-1190,抽油机安装28t,台,11685,1747,5979,3959
191,1-1191,抽油机安装35t,台,12487,1945,6018,4524
192,1-1192,抽油机安装45t,台,13765,2120,6555,5090
193,1-1193,装卸油台鹤管安装DN50,台,1096,325,428,343
194,1-1194,装卸油台鹤管安装DN100,台,1589,568,536,485
195,1-1195,装卸油台鹤管安装DN200,台,2171,796,699,676
196,1-1196,加油机安装,台,1380,884,334,162
197,1-1197,加药装置橇安装,台,3617,896,1603,1118
198,1-1198,润滑油循环装置橇安装,台,6501,2496,2492,1513
199,1-1199,装袋机安装,台,5999,5079,509,411
200,1-1200,鼓式硫黄结片机安装结片能力2t/h,台,11438,6384,1438,3616
201,1-1201,鼓式硫黄结片机安装结片能力4t/h,台,17710,11022,2477,4211
202,1-1202,硫黄钢带式造粒机安装处理能力4~6t/h,台,81638,52406,18764,10468
203,1-1203,硫黄转筒式造粒机安装处理能力15~30t/h,台,163715,105034,37745,20936
204,1-1204,捕集机安装3t,台,2155,979,620,556
205,1-1205,捕集机安装5t,台,3854,1997,1108,749
206,1-1206,捕集机安装10t,台,5712,2664,1475,1573
207,1-1207,膨胀机安装1t,台,4126,2605,922,599
208,1-1208,膨胀机安装1.5t,台,4609,2956,1054,599
209,1-1209,膨胀机安装2.5t,台,5425,3474,1209,742
210,1-1210,膨胀机安装3.5t,台,7223,4813,1514,896
211,1-1211,膨胀机安装4.5t,台,8605,5741,1680,1184
212,1-1212,滑阀安装φ350,台,7211,2866,791,3554
213,1-1213,滑阀安装φ500,台,8164,3302,1132,3730
214,1-1214,滑阀安装φ600,台,11600,4180,1567,5853
215,1-1215,滑阀安装φ800,台,13802,5373,2146,6283
216,1-1216,滑阀安装φ1000,台,17113,5916,2494,8703
217,1-1217,滑阀安装φ1200,台,18539,6561,2932,9046
218,1-1218,滑阀安装φ1500,台,23479,7527,3625,12327
219,1-1219,滑阀安装φ1800,台,26820,8494,4339,13987
220,1-1220,风动阀门安装φ200,台,2251,1255,322,674
221,1-1221,风动阀门安装φ400,台,3355,1660,721,974
222,1-1222,电动高温阀门安装φ1000,台,9351,3838,1845,3668
223,1-1223,电动高温阀门安装φ1200,台,10915,4654,2228,4033
224,1-1224,电动高温阀门安装φ1400,台,13136,5346,2600,5190
225,1-1225,电(气)蝶阀安装φ500,台,4938,2132,828,1978
226,1-1226,电(气)蝶阀安装φ800,台,6209,2642,1317,2250
227,1-1227,电(气)蝶阀安装φ1000,台,7856,3025,1691,3140
228,1-1228,电(气)蝶阀安装φ1500,台,12674,4630,3379,4665
229,1-1229,电(气)蝶阀安装φ2000,台,16262,5710,4761,5791
230,1-1230,电(气)蝶阀安装φ2500,台,20616,7290,6201,7125
231,1-1231,柴油发电机组安装2t,台,1600,950,506,144
232,1-1232,柴油发电机组安装2.5t,台,1925,1082,657,186
233,1-1233,柴油发电机组安装3.5t,台,2424,1379,732,313
234,1-1234,柴油发电机组安装4.5t,台,2971,1753,895,323
235,1-1235,柴油发电机组安装5.5t,台,3624,2071,1172,381
236,1-1236,柴油发电机组安装13t,台,7749,4872,2224,653
237,1-1237,电动机及电动发电机组安装0.5t,台,594,298,166,130
238,1-1238,电动机及电动发电机组安装1t,台,716,406,172,138
239,1-1239,电动机及电动发电机组安装3t,台,1335,805,280,250
240,1-1240,电动机及电动发电机组安装5t,台,2430,1460,568,402
241,1-1241,电动机及电动发电机组安装7t,台,3301,2025,604,672
242,1-1242,电动机及电动发电机组安装10t,台,4290,2648,741,901
243,1-1243,电动机及电动发电机组安装20t,台,7539,4918,1162,1459
244,1-1244,电动机及电动发电机组安装30t,台,10975,7003,1473,2499
245,1-1245,燃气轮机非橇块上安装75t,台,234073,121099,46144,66830
246,1-1246,燃气轮机非橇块上安装100t,台,333226,176991,61684,94551
247,1-1247,燃气轮机非橇块上安装125t,台,481778,259203,84458,138117
248,1-1248,燃气轮机非橇块上安装150t,台,637907,369261,105189,163457
249,1-1249,燃气轮机非橇块上安装200t,台,793911,494614,130774,168523
250,1-1250,燃气轮机非橇块上安装250t,台,993930,630948,159100,203882
251,1-1251,燃气轮机非橇块上安装300t,台,1184018,757895,188965,237158
252,1-1252,燃气轮机橇块上安装15t,台,29508,16181,6891,6436
253,1-1253,燃气轮机橇块上安装25t,台,36675,20315,8488,7872
254,1-1254,燃气轮机橇块上安装35t,台,49436,27603,11010,10823
255,1-1255,燃气轮机橇块上安装50t,台,66440,36605,14762,15073
256,1-1256,燃气轮机橇块上安装75t,台,88620,48967,19100,20553
257,1-1257,独立搅拌装置安装1t,台,1765,1101,202,462
258,1-1258,独立搅拌装置安装2t,台,2540,1722,282,536
259,1-1259,独立搅拌装置安装3t,台,3972,2709,386,877
260,1-1260,独立搅拌装置安装5t,台,5334,3782,520,1032
261,1-1261,独立搅拌装置安装10t,台,6954,4885,689,1380
262,1-1262,独立搅拌装置安装15t,台,9053,6256,898,1899
263,1-1263,污水处理设备安装爆气机,台,4373,1977,1456,940
264,1-1264,污水处理设备安装调节堰机,台,1552,758,259,535
265,1-1265,污水处理设备安装刮沫机,台,7143,5025,1021,1097
266,1-1266,污水处理设备安装刮泥机,台,37491,19203,3529,14759
267,2-1001,100m3拱顶储罐制作安装,t,8240,2262,3373,2605
268,2-1002,200m3拱顶储罐制作安装,t,7134,1952,2715,2467
269,2-1003,300m3拱顶储罐制作安装,t,6442,1807,2294,2341
270,2-1004,400m3拱顶储罐制作安装,t,5889,1656,2073,2160
271,2-1005,500m3拱顶储罐制作安装,t,5239,1577,1698,1964
272,2-1006,700m3拱顶储罐制作安装,t,4627,1427,1399,1801
273,2-1007,1000m3拱顶储罐制作安装,t,4066,1230,1250,1586
274,2-1008,2000m3拱顶储罐制作安装,t,3620,1066,1031,1523
275,2-1009,3000m3拱顶储罐制作安装,t,3291,936,931,1424
276,2-1010,5000m3拱顶储罐制作安装,t,2956,831,896,1229
277,2-1011,10000m3拱顶储罐制作安装,t,2541,679,791,1071
278,2-1012,20000m3拱顶储罐制作安装,t,2320,619,760,941
279,2-1013,30000m3拱顶储罐制作安装,t,2154,594,711,849
280,2-1014,50000m3拱顶储罐制作安装,t,2274,406,648,1220
281,2-1015,5000m3双盘浮顶油罐制作安装,t,3505,1255,1175,1075
282,2-1016,10000m3双盘浮顶油罐制作安装,t,3278,1099,1145,1034
283,2-1017,20000m3双盘浮顶油罐制作安装,t,2945,936,1047,962
284,2-1018,30000m3双盘浮顶油罐制作安装,t,2813,929,937,947
285,2-1019,50000m3双盘浮顶油罐制作安装,t,2753,786,768,1199
286,2-1020,100000m3双盘浮顶油罐制作安装,t,2642,778,709,1155
287,2-1021,150000m3双盘浮顶油罐制作安装,t,2478,746,648,1084
288,2-1022,3000m3单盘浮顶油罐制作安装,t,4383,1540,1777,1066
289,2-1023,5000m3单盘浮顶油罐制作安装,t,3617,1309,1300,1008
290,2-1024,10000m3单盘浮顶油罐制作安装,t,3124,1127,1075,922
291,2-1025,20000m3单盘式浮顶油罐制作安装,t,2820,945,958,917
292,2-1026,30000m3单盘式浮顶油罐制作安装,t,2582,888,838,856
293,2-1027,50000m3单盘式浮顶油罐制作安装,t,2390,764,756,870
294,2-1028,200m3不锈钢拱顶罐制作安装,t,8095,2138,3887,2070
295,2-1029,300m3不锈钢拱顶罐制作安装,t,6936,1941,3129,1866
296,2-1030,500m3不锈钢拱顶罐制作安装,t,5870,1684,2503,1683
297,2-1031,700m3不锈钢拱顶罐制作安装,t,5339,1612,2165,1562
298,2-1032,1000m3不锈钢拱顶罐制作安装,t,4965,1526,2145,1294
299,2-1033,2000m3不锈钢拱顶罐制作安装,t,4575,1381,1978,1216
300,2-1034,3000m3不锈钢拱顶罐制作安装,t,4243,1223,1921,1099
301,2-1035,5000m3不锈钢拱顶罐制作安装,t,3821,1031,1840,950
302,2-1036,10000m3不锈钢拱顶罐制作安装,t,3676,920,1677,1079
303,2-1037,20000m3不锈钢拱顶罐制作安装,t,3459,828,1630,1001
304,2-1038,金属储罐制作安装搅拌器安装,台,2611,917,576,1118
305,2-1039,排管加热器制作安装加热面积24m2,m2,498,141,285,72
306,2-1039,排管加热器制作安装加热面积24m2,m2,498,141,285,72
307,2-1040,排管加热器制作安装加热面积72m2,m2,393,100,249,44
308,2-1041,排管加热器制作安装加热面积72m2以上,m2,378,111,224,43
309,2-1042,加热器蒸汽盘管制作安装,10m,456,182,191,83
,Z00074,无缝钢管,t,,,,
310,2-1043,金属储罐制作安装防火器安装DN100,个,40,26,14,
311,2-1044,金属储罐制作安装防火器安装DN200,个,69,40,29,
312,2-1045,金属储罐制作安装防火器安装DN250,个,95,53,42,
313,2-1046,金属储罐制作安装空气泡沫产生器安装PC-8,个,272,148,64,60
,Z00075,空气泡沫产生器,套,,,,
,Z00076,管道过滤器,个,,,,
,Z00077,金属软管,个,,,,
314,2-1047,金属储罐制作安装空气泡沫产生器安装PC-16,个,332,183,84,65
,Z00075,空气泡沫产生器,套,,,,
,Z00076,管道过滤器,个,,,,
,Z00077,金属软管,个,,,,
315,2-1048,金属储罐制作安装空气泡沫产生器安装PC-24,个,400,217,113,70
,Z00075,空气泡沫产生器,套,,,,
,Z00076,管道过滤器,个,,,,
,Z00077,金属软管,个,,,,
316,2-1049,立式污水沉降罐内件制作安装5000m3以内,t,5491,2220,1003,2268
,Z00078,内件组合件,t,,,,
317,2-1050,立式污水沉降罐内件制作安装10000m3以内,t,4415,2086,827,1502
,Z00078,内件组合件,t,,,,
318,2-1051,立式污水沉降罐内件成品安装5000m3以内,t,2410,1209,335,866
,Z00079,内件成品件,t,,,,
319,2-1052,立式污水沉降罐内件成品安装10000m3以内,t,1994,1156,298,540
,Z00079,内件成品件,t,,,,
320,2-2001,球罐组装120m3δ=16mm,t,9867,3556,4246,2065
321,2-2002,球罐组装120m3δ=20mm,t,8969,3170,3815,1984
322,2-2003,球罐组装120m3δ=24mm,t,7961,2767,3401,1793
323,2-2004,球罐组装120m3δ=28mm,t,7295,2481,3122,1692
324,2-2005,球罐组装120m3δ=32mm,t,6850,2283,2933,1634
325,2-2006,球罐组装120m3δ=36mm以上,t,6530,2126,2798,1606
326,2-2007,球罐组装200m3δ=16mm,t,9071,3190,3980,1901
327,2-2008,球罐组装200m3δ=20mm,t,8166,2836,3494,1836
328,2-2009,球罐组装200m3δ=24mm,t,7199,2474,3081,1644
329,2-2010,球罐组装200m3δ=28mm,t,6706,2236,2889,1581
330,2-2011,球罐组装200m3δ=32mm,t,6332,2081,2718,1533
331,2-2012,球罐组装200m3δ=36mm以上,t,5990,1925,2572,1493
332,2-2013,球罐组装400m3δ=16mm,t,8204,2909,3538,1757
333,2-2014,球罐组装400m3δ=20mm,t,7121,2565,2979,1577
334,2-2015,球罐组装400m3δ=24mm,t,6504,2305,2730,1469
335,2-2016,球罐组装400m3δ=28mm,t,6107,2108,2566,1433
336,2-2017,球罐组装400m3δ=32mm,t,5690,1937,2397,1356
337,2-2018,球罐组装400m3δ=36mm以上,t,5501,1822,2316,1363
338,2-2019,球罐组装650m3δ=16mm,t,7728,2773,3269,1686
339,2-2020,球罐组装650m3δ=20mm,t,6736,2437,2778,1521
340,2-2021,球罐组装650m3δ=24mm,t,6168,2179,2554,1435
341,2-2022,球罐组装650m3δ=28mm,t,5746,1949,2406,1391
342,2-2023,球罐组装650m3δ=32mm,t,5451,1815,2284,1352
343,2-2024,球罐组装650m3δ=36mm以上,t,5172,1689,2166,1317
344,2-2025,球罐组装1000m3δ=16mm,t,7037,2475,2892,1670
345,2-2026,球罐组装1000m3δ=20mm,t,6377,2209,2577,1591
346,2-2027,球罐组装1000m3δ=24mm,t,5817,1939,2362,1516
347,2-2028,球罐组装1000m3δ=28mm,t,5421,1767,2217,1437
348,2-2029,球罐组装1000m3δ=32mm,t,5030,1612,2050,1368
349,2-2030,球罐组装1000m3δ=36mm,t,4726,1482,1919,1325
350,2-2031,球罐组装1000m3δ=56mm以上,t,4201,1173,1734,1294
351,2-2032,球罐组装1500m3δ=16mm,t,6871,2377,2802,1692
352,2-2033,球罐组装1500m3δ=20mm,t,6081,2049,2436,1596
353,2-2034,球罐组装1500m3δ=24mm,t,5470,1824,2202,1444
354,2-2035,球罐组装1500m3δ=28mm,t,5275,1652,2157,1466
355,2-2036,球罐组装1500m3δ=32mm,t,5006,1482,2073,1451
356,2-2037,球罐组装1500m3δ=56mm以上,t,4076,1098,1693,1285
357,2-2038,球罐组装2000m3δ=16mm,t,6869,2217,2782,1870
358,2-2039,球罐组装2000m3δ=20mm,t,6221,1975,2485,1761
359,2-2040,球罐组装2000m3δ=24mm,t,5606,1759,2244,1603
360,2-2041,球罐组装2000m3δ=28mm,t,5142,1565,2055,1522
361,2-2042,球罐组装2000m3δ=32mm以上,t,4732,1401,1891,1440
362,2-2043,球罐组装3000m3δ=16mm,t,6258,2034,2653,1571
363,2-2044,球罐组装3000m3δ=20mm,t,5621,1782,2364,1475
364,2-2045,球罐组装3000m3δ=24mm,t,4942,1590,2093,1259
365,2-2046,球罐组装3000m3δ=28mm,t,4927,1520,2071,1336
366,2-2047,球罐组装3000m3δ=32mm以上,t,4396,1305,1824,1267
367,2-2048,球罐组装4000m3δ=16mm,t,5968,2020,2503,1445
368,2-2049,球罐组装4000m3δ=20mm,t,5322,1748,2205,1369
369,2-2050,球罐组装4000m3δ=24mm,t,5113,1671,2153,1289
370,2-2051,球罐组装4000m3δ=28mm以上,t,4509,1411,1881,1217
371,2-2052,球罐组装5000m3δ=16mm,t,6696,2237,2895,1564
372,2-2053,球罐组装5000m3δ=20mm,t,5979,1950,2555,1474
373,2-2054,球罐组装5000m3δ=24mm,t,5096,1614,2160,1322
374,2-2055,球罐组装5000m3δ=28mm以上,t,5016,1571,2141,1304
375,2-2056,球罐组装6000m3δ=16mm,t,6609,2209,2888,1512
376,2-2057,球罐组装6000m3δ=20mm,t,5603,1806,2392,1405
377,2-2058,球罐组装6000m3δ=24mm,t,5398,1740,2352,1306
378,2-2059,球罐组装6000m3δ=28mm以上,t,4524,1385,1935,1204
379,2-2060,球罐组装8000m3δ=16mm,t,6164,2049,2713,1402
380,2-2061,球罐组装8000m3δ=20mm,t,6025,1992,2645,1388
381,2-2062,球罐组装8000m3δ=24mm以上,t,4782,1528,2070,1184
382,2-2063,球罐组装10000m3δ=16mm,t,5552,1814,2426,1312
383,2-2064,球罐组装10000m3δ=20mm,t,5376,1750,2337,1289
384,2-2065,球罐组装10000m3δ=24mm以上,t,5146,1688,2273,1185
385,2-2066,环形喷淋管制作安装DN50,10m,935,208,659,68
,Z00080,低压碳钢管,m,,,,
386,2-2067,环形喷淋管制作安装DN80,10m,1174,230,869,75
,Z00080,低压碳钢管,m,,,,
387,2-2068,环形喷淋管制作安装DN100,10m,1451,242,1047,162
,Z00080,低压碳钢管,m,,,,
388,2-2069,环形喷淋管制作安装DN150,10m,2188,277,1716,195
,Z00080,低压碳钢管,m,,,,
389,2-2070,环形喷淋管成品安装DN50,10m,256,173,42,41
,Z00081,环形喷淋管成品,m,,,,
390,2-2071,环形喷淋管成品安装DN80,10m,291,195,48,48
,Z00081,环形喷淋管成品,m,,,,
391,2-2072,环形喷淋管成品安装DN100,10m,396,207,53,136
,Z00081,环形喷淋管成品,m,,,,
392,2-2073,环形喷淋管成品安装DN150,10m,462,238,59,165
,Z00081,环形喷淋管成品,m,,,,
393,2-3001,天然气低温储罐外罐制作安装,t,6782,2181,1131,3470
394,2-3002,天然气低温储罐内罐制作安装,t,4885,1581,675,2629
395,2-3003,天然气低温储罐铝吊顶制作安装,t,8238,4701,1959,1578
396,2-3004,天然气低温储罐不锈钢吊顶吊杆制作安装,座,328856,81704,69348,177804
397,2-3005,天然气低温储罐罐顶不锈钢接管制作安装,座,1015140,297596,253842,463702
,Z00082,各规格不锈钢管材,t,,,,
398,2-3006,天然气低温储罐低温碳钢接管制作安装,座,88685,34185,25054,29446
,Z00083,各规格低温管材,t,,,,
399,2-3007,天然气低温储罐罐内金属结构制作安装,t,3908,1927,492,1489
400,2-3008,天然气低温储罐检验试验低温罐无损检测(X射线探伤),10张,548,255,200,93
401,2-3009,天然气低温储罐检验试验低温罐焊缝渗透探伤,10m,299,60,239,
402,2-3010,天然气低温储罐检验试验水压试验、气压试验,座,252666,100062,39704,112900
,Z00084,水,m3,,,,
403,2-3011,天然气低温储罐检验试验拱顶浇注充气保压,座,78273,13855,35809,28609
404,2-3012,天然气低温储罐保冷珍珠岩混凝土块,m3,135,62,5,68
,Z00085,珍珠岩混凝土块,m3,,,,
405,2-3013,天然气低温储罐保冷干砂,10m3,95,64,5,26
,Z00086,干砂,10m3,,,,
406,2-3014,天然气低温储罐保冷泡沫玻璃砖,m3,151,119,9,23
,Z00087,泡沫玻璃砖,m3,,,,
,Z00088,黏结剂,m3,,,,
407,2-3015,天然气低温储罐保冷挂毯及铝箔布,m3,152,125,9,18
,Z00089,弹性毡,m3,,,,
,Z00090,铝箔布,m2,,,,
,Z00091,黏结剂,kg,,,,
,Z00092,缆绳,m3,,,,
,Z00093,固定件,kg,,,,
408,2-3016,天然气低温储罐保冷玻璃棉,m3,134,109,8,17
,Z00094,玻璃棉,m3,,,,
409,2-3017,天然气低温储罐保冷油毡,10m2,37,29,2,6
,Z00095,油毡,10m2,,,,
410,2-3018,天然气低温储罐保冷钉钩,1000个,915,510,37,368
,Z00096,钉钩,1000个,,,,
411,2-3019,天然气低温储罐保冷挡墙布,10m2,72,58,4,10
,Z00097,挡墙布,10m2,,,,
412,2-4001,螺旋式湿式气柜制作安装1000m3,台,481299,204202,109271,167826
,Z00098,综合钢材,t,,,,
413,2-4002,螺旋式湿式气柜制作安装2500m3,台,759151,326613,167507,265031
,Z00098,综合钢材,t,,,,
414,2-4003,螺旋式湿式气柜制作安装5000m3,台,1027027,453404,216668,356955
,Z00098,综合钢材,t,,,,
415,2-4004,螺旋式湿式气柜制作安装10000m3,台,1429103,630452,285089,513562
,Z00098,综合钢材,t,,,,
416,2-4005,螺旋式湿式气柜制作安装20000m3,台,2076062,914962,401447,759653
,Z00098,综合钢材,t,,,,
417,2-4006,螺旋式湿式气柜制作安装30000m3,台,2413436,1048681,480382,884373
,Z00098,综合钢材,t,,,,
418,2-4007,螺旋式湿式气柜制作安装50000m3,台,3403506,1482564,661921,1259021
,Z00098,综合钢材,t,,,,
419,2-4008,螺旋式湿式气柜制作安装100000m3,台,4664897,1997039,901565,1766293
,Z00098,综合钢材,t,,,,
420,2-4009,螺旋式湿式气柜制作安装150000m3,台,5529587,2343865,111806,2067653
,Z00098,综合钢材,t,,,,
421,2-4010,螺旋式湿式气柜制作安装200000m3,台,8020777,3210777,1873438,2936562
,Z00098,综合钢材,t,,,,
422,2-4011,低压干式气柜制作安装20000m3,台,1643070,800307,353708,489055
,Z00098,综合钢材,t,,,,
423,2-4012,低压干式气柜制作安装30000m3,台,1907694,931313,415366,561015
,Z00098,综合钢材,t,,,,
424,2-4013,低压干式气柜制作安装50000m3,台,2735711,1341096,600564,794051
,Z00098,综合钢材,t,,,,
425,2-4014,直升式气柜制作安装100m3,台,107868,43630,27027,37211
,Z00098,综合钢材,t,,,,
426,2-4015,直升式气柜制作安装200m3,台,153936,64629,34972,54335
,Z00098,综合钢材,t,,,,
427,2-4016,直升式气柜制作安装400m3,台,232394,100065,48479,83850
,Z00098,综合钢材,t,,,,
428,2-4017,直升式气柜制作安装600m3,台,307337,133950,61749,111638
,Z00098,综合钢材,t,,,,
429,2-4018,直升式气柜制作安装1000m3,台,418761,182297,83015,153449
,Z00098,综合钢材,t,,,,
430,2-4019,"配重块安装,混凝土预制块",m3,454,29,276,149
,Z00099,混凝土块,m3,,,,
431,2-4020,"配重块安装,铸铁块",t,354,24,212,118
,Z00100,铸铁块,t,,,,
432,2-5001,钢烟囱制作安装φ600以内,t,3012,1370,618,1024
,Z00013,钢材,t,,,,
433,2-5002,钢烟囱制作安装φ1200以内,t,3126,1119,563,1444
,Z00013,钢材,t,,,,
434,2-5003,钢烟囱制作安装φ1200以上,t,3309,977,541,1791
,Z00013,钢材,t,,,,
435,2-5004,钢烟道制作安装,t,4717,2100,782,1835
,Z00101,钢板,t,,,,
436,2-5005,钢烟囱拉线(φ600以内),座,1563,133,1425,5
437,2-5006,现场组对火炬、排气筒φ400,t,3861,1369,633,1859
,Z00102,成品件,套,,,,
438,2-5007,现场组对火炬、排气筒φ600,t,3270,1133,585,1552
,Z00102,成品件,套,,,,
439,2-5008,现场组对火炬、排气筒φ800,t,3113,1044,553,1516
,Z00102,成品件,套,,,,
440,2-5009,现场组对火炬、排气筒φ1200,t,2834,973,533,1328
,Z00102,成品件,套,,,,
441,2-5010,现场制作组对火炬、排气筒塔架<50t,t,4754,1911,1544,1299
,Z00013,钢材,t,,,,
442,2-5011,现场制作组对火炬、排气筒塔架<150t,t,3834,1659,1026,1149
,Z00013,钢材,t,,,,
443,2-5012,现场制作组对火炬、排气筒塔架<200t,t,3612,1569,945,1098
,Z00013,钢材,t,,,,
444,2-5013,现场制作组对火炬、排气筒塔架<250t,t,3427,1497,867,1063
,Z00013,钢材,t,,,,
445,2-5013,现场制作组对火炬、排气筒塔架<250t,t,3427,1497,867,1063
,Z00013,钢材,t,,,,
446,2-5014,风缆绳式火炬、排气筒高度40m,座,34434,15626,3668,15140
447,2-5015,风缆绳式火炬、排气筒高度60m,座,38648,18594,4467,15587
448,2-5016,风缆绳式火炬、排气筒高度80m,座,45366,21283,5534,18549
449,2-5017,风缆绳式火炬、排气筒高度100m,座,51410,25131,6314,19965
450,2-5018,风缆绳式火炬、排气筒高度120m,座,78631,30217,7235,41179
451,2-5019,塔架式火炬、排气筒高度40m,座,43373,21713,4774,16886
452,2-5020,塔架式火炬、排气筒高度60m,座,61823,26178,5835,29810
453,2-5021,塔架式火炬、排气筒高度80m,座,72242,32153,7119,32970
454,2-5022,塔架式火炬、排气筒高度100m,座,85158,38960,8151,38047
455,2-5023,塔架式火炬、排气筒高度120m,座,107872,49258,10473,48141
456,2-5024,火炬头安装φ400,套,2187,980,424,783
457,2-5025,火炬头安装φ600,套,2717,1168,559,990
458,2-5026,火炬头安装φ800,套,3122,1323,647,1152
459,2-5027,火炬头安装φ1200,套,3787,1609,788,1390
460,2-6001,桁架制作安装,t,2670,1192,478,1000
,Z00098,综合钢材,t,,,,
461,2-6002,管廊制作安装,t,2746,1136,598,1012
,Z00098,综合钢材,t,,,,
462,2-6003,设备框架制作安装,t,3171,1197,633,1341
,Z00098,综合钢材,t,,,,
463,2-6004,高强螺栓连接管廊制作安装,t,2900,1391,562,947
,Z00098,综合钢材,t,,,,
,Z00103,高强螺栓(按设计量),kg,,,,
464,2-6005,高强螺栓连接设备框架制作安装,t,2848,1329,510,1009
,Z00098,综合钢材,t,,,,
,Z00103,高强螺栓(按设计量),kg,,,,
465,2-6006,平台制作安装(钢格板),t,4386,1667,876,1843
,Z00104,钢格板,t,,,,
,Z00105,型钢(综合),t,,,,
466,2-6007,平台制作安装(花纹钢板),t,3933,1469,742,1722
,Z00105,型钢(综合),t,,,,
,Z00106,花纹钢板,t,,,,
467,2-6008,梯子、扶手、栏杆制作安装,t,3537,1670,584,1283
,Z00105,型钢(综合),t,,,,
,Z00107,踏步板,t,,,,
468,2-6009,铝镁合金料仓(斗)整体安装10m3以内,t,5229,2003,485,2741
469,2-6010,铝镁合金料仓(斗)整体安装20m3以内,t,2780,931,341,1508
470,2-6011,铝镁合金料仓(斗)整体安装30m3以内,t,2415,773,307,1335
471,2-6012,铝镁合金料仓(斗)整体安装40m3以内,t,2057,655,273,1129
472,2-6013,铝镁合金料仓(斗)整体安装65m3以内,t,1794,563,259,972
473,2-6014,铝镁合金料仓(斗)整体预制40m3以内,t,19520,7076,6047,6397
,Z00108,铝镁合金板材,t,,,,
474,2-6015,铝镁合金料仓(斗)整体预制65m3以内,t,18463,6684,5843,5936
,Z00108,铝镁合金板材,t,,,,
475,2-6016,铝镁料仓(斗)分段制作安装容积100m3以内,t,18616,6437,6042,6137
,Z00108,铝镁合金板材,t,,,,
476,2-6017,铝镁料仓(斗)分段制作安装容积150m3以内,t,17426,6069,5832,5525
,Z00108,铝镁合金板材,t,,,,
477,2-6018,铝镁料仓(斗)分段制作安装容积200m3以内,t,16113,5604,5496,5013
,Z00108,铝镁合金板材,t,,,,
478,2-6019,铝镁料仓(斗)分段制作安装容积250m3以内,t,14267,4877,5111,4279
,Z00108,铝镁合金板材,t,,,,
479,2-6020,铝镁料仓(斗)分片制作安装容积300m3以内,t,15606,4837,4930,5839
,Z00108,铝镁合金板材,t,,,,
480,2-6021,铝镁料仓(斗)分片制作安装容积400m3以内,t,15018,4595,4756,5667
,Z00108,铝镁合金板材,t,,,,
481,2-6022,铝镁料仓(斗)分片制作安装容积500m3以内,t,14859,4544,4756,5559
,Z00108,铝镁合金板材,t,,,,
482,2-6023,铝镁料仓(斗)分片制作安装容积600m3以内,t,14697,4468,4854,5375
,Z00108,铝镁合金板材,t,,,,
483,2-6024,铝镁料仓(斗)分片制作安装容积700m3以内,t,14271,4322,4788,5161
,Z00108,铝镁合金板材,t,,,,
484,2-6025,铝镁合金料仓掺混管及部件安装,t,7484,1985,2169,3330
485,2-6026,不锈钢料仓、料斗整体安装10m3以内,t,2049,1193,329,527
486,2-6027,不锈钢料仓、料斗整体安装20m3以内,t,2013,1022,312,679
487,2-6028,不锈钢料仓、料斗整体安装30m3以内,t,1852,989,308,555
488,2-6029,不锈钢料仓、料斗整体安装40m3以内,t,1748,955,304,489
489,2-6030,不锈钢料仓、料斗整体安装65m3以内,t,1668,897,300,471
490,2-6031,不锈钢料仓、料斗整体预制40m3以内,t,6411,2753,1527,2131
,Z00109,不锈钢板材,t,,,,
491,2-6032,不锈钢料仓、料斗整体预制65m3以内,t,6160,2577,1512,2071
,Z00109,不锈钢板材,t,,,,
492,2-6033,不锈钢料仓(斗)分段制作安装容积100m3以内,t,7892,2795,2256,2841
,Z00109,不锈钢板材,t,,,,
493,2-6034,不锈钢料仓(斗)分段制作安装容积150m3以内,t,7495,2609,2152,2734
,Z00109,不锈钢板材,t,,,,
494,2-6035,不锈钢料仓(斗)分段制作安装容积200m3以内,t,7049,2398,2042,2609
,Z00109,不锈钢板材,t,,,,
495,2-6036,不锈钢料仓(斗)分段制作安装容积250m3以内,t,6647,2206,1917,2524
,Z00109,不锈钢板材,t,,,,
496,2-6037,不锈钢料仓(斗)分片制作安装容积300m3以内,t,9273,2144,3236,3893
,Z00109,不锈钢板材,t,,,,
497,2-6038,不锈钢料仓(斗)分片制作安装容积400m3以内,t,8782,2091,3040,3651
,Z00109,不锈钢板材,t,,,,
498,2-6039,不锈钢料仓(斗)分片制作安装容积500m3以内,t,8292,2011,2870,3411
,Z00109,不锈钢板材,t,,,,
499,2-6040,不锈钢料仓(斗)分片制作安装容积600m3以内,t,7907,1916,2649,3342
,Z00109,不锈钢板材,t,,,,
500,2-6041,不锈钢料仓(斗)分片制作安装容积800m3以内,t,7389,1820,2462,3107
,Z00109,不锈钢板材,t,,,,
501,3-1001,石油化工工艺管道安装焊接钢管DN15,10m,176,145,27,4
,Z00110,管材,t,,,,
,Z00111,管件,t,,,,
502,3-1002,石油化工工艺管道安装焊接钢管DN20,10m,199,166,29,4
,Z00110,管材,t,,,,
,
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 物流车行驶规范演练
- 配电装置最小安全净距
- 气道肿物鉴别与治疗
- 智能银行解决方案
- 第五章 万有引力定律宇宙航行 2025年高考物理基础专项复习
- 2.3.1物质的量 课件高一上学期化学人教版(2019)必修第一册
- 公司七夕团建活动
- 初中中秋节教案
- 彩色世界教案反思
- 社区就业解决方案
- 奖状证书模板优秀员工3
- 教师积分考核表
- 苏教版四年级上册:7.2《含有小括号的混合运算》课件
- 高一年级政治上学期期中试题(人教含答案)
- 国际创伤生命支持培训课前测试题测试题
- 苏教版三年级数学上册《认识千克》教案(南通公开课)
- 三年级上册数学课件-7.1 认识周长 西师大版(22张PPT)
- 2021年北京农学院财务管理期末精选C试卷
- 部编版七年级上册语文 第三单元 周周清(一)
- JD-BQ(M)电动执行器技术规范书(隔爆)
- 小学《道德与法治》课堂教学生活化的研究课题实施方案
评论
0/150
提交评论