The
Review
and
Prospect
of
Offshore
Wind
Development
in
China中国海上风电发展回顾与展望主要内容
Contents
中国海上风电发展状况Offshore
Wind
Development
Status中国海上风电开发建设管理流程Offshore
Wind
Development
Regulatory
Requirements
in
ProjectApproval
and
Construction
Management
中国海上风电发展前景展望Offshore
Wind
Development
Prospect结束语End一、发展状况
Status1、海上风能资源丰富,具备大规模发展海上风电的资源条件。Abundant
offshore
wind
resources
provides
possibility
of
largescale
offshore
wind
projects
development根据中国气象局风能资源详查初步成果:According
to
the
preliminary
offshore
wind
resource
survey
of
CMA:5~25米水深、50米高度风电可装机容量约2亿千瓦;
200GW
potential
in
50m
height
and
5~25m
water
depth;5~50米水深、70米高度风电可装机容量约5亿千瓦。
500GW
potential
in
70m
height
and
5~50m
water
depth;一、发展状况
Status2、开发建设了一批海上风电示范项目,为今后大规模发展海上风电积累经验Experiences
gained
by
some
pilot
offshore
wind
project目前,已建海上风电装机142.5MW,初步具备了海上风电设计、施工及设备制造的能力。其中:The
cumulative
installed
offshore
capacity
added
up
to
142.5MW
and
preliminaryexperiences
of
design,
construction
and
offshore
wind
turbine
manufacturing
are
gained.华锐3MW,金风1.5MW和2.5MW,上海电气2MW,明阳1.5MW和3MW,海装2MW,三一电气2MW,联合动力1.5MW,远景能源1.5MW等8个厂家共54台机组有海上风电运行业绩。Now
Sinovel
3MW,
Goldwind
1.5MW/2.5MW,
SEC
2MW,
Mingyang
1.5MW/3MW,
CSIC
2MW,Sanyi
2MW,
UP
1.5MW
and
Envision
1.5MW
added
up
to
totally
54
wind
turbines
from
8different
manufactures.一、发展状况
Status中国海上风电历年新增和累计装机容量变化图The
annual
newly
installed
and
cumulative
capacity
of
offshore
wind
in
China一、发展状况
Statusrdst
nd
thth一、发展状况
Status3、培养了一批专业队伍,为国家开发建设海上风电打下较坚实基础Capacity
building
for
the
future
solid
development
of
offshore
wind
projects施工方面。目前有10多家施工单位介入海上风电施工,其中:Now
more
than
10
construction
companies
are
involved
in
the
offshore
wind
projects:中交第三航务局、南通海洋水建等有承担海上风电施工经验。China
Communication
Construction
3
company
and
Nantong
Oceanic
Construction
company
have
theexperience
of
main
contractor
in
offshore
wind
projects
construction.中交第一、二、四航务局等有以主要设备参与海上风电施工经验。China
Communication
Construction
1
,
2
and
4
companies
have
the
experience
of
sub-contractor
inoffshore
wind
projects
construction.中海洋石油、江苏电建、江苏海建、天津港航、上海电建、上海港务、水电八局、中铁大桥、三一、葛洲坝、道达重工等单位,有的海洋施工比较熟悉,有的具有大型海上施工设备,有的加强海上施工技术研究。CNNOP,
Jiangsu
Electric
Construction,
Jiangsu
Oceanic
Construction,
Tianjin
Harbor
Constrction,Shanghai
Electric
Constrction,
Shanghai
Harbor,
SinoHydro
8
company,
Sanyi,Gezhouba
group
andDaoda
also
have
rich
experience
in
marine
projects.一、发展状况
Status勘测设计方面:华东院、中南院、西北院和上海院,从规划到前期、施工,配备了专业队伍,加强了科技投入研究,参与了标准技术制定,具备了海上风电专业勘测设计能力。HYDROCHINA
Huadong,
HYDROCHINA
Zhongnan,
HYDROCHINA
Xibei
and
Shanghai
Designinstitute
are
the
main
actors
in
offshore
wind
project
design
and
consulting.
They
havegreatly
involved
in
the
offshore
wind
project
development
by
attending
the
technicalstandards
discussion
and
R&D
projects.开发建设方面:以五大电源企业、中广核、国华、三峡为主,加上地方能源投资企业,开发建设了大小不一的海上风电项目,并积极推进一批大型海上风电项目预可研、可研阶段的前期工作。The
Giant
5
Electric
Power
Companies,
CGNPC,
Guohua,
Three
Gorges
Company
and
somelocal
investment
companies
formulate
the
developer
group
of
offshore
wind
projects,
ofwhich
the
pre=feasibility
studies
and
feasibility
studies
are
finished.专业队伍的初步建立和形成,将有力推进全国海上风电开发建设。All
these
stakeholders
have
built
up
their
preliminary
capacity
and
thuspromote
the
healthy
development
of
offshore
projects.一、发展状况
Status4、初步建立了海上风电标准体系,规范和指导海上风电开发建设The
Technical
Standards
Frame,
Insure
the
solid
wind
development管理方面
Management
Issues出台了《海上风电开发建设管理暂行办法》
(国能新能
[2010]29号,2010年1月22日国家能源局和海洋局联合发布)<Temporary
Management
Method
for
Offshore
Wind
Project
Development>
has
beenpublished
by
NEA
and
NOA
in
2010.将要出台《海上风电开发建设管理实施细则》(国家能源局和海洋局联合制定)<The
Detailed
Management
Rules
for
Offshore
Wind
Project
Development>
is
going
tobe
published
by
NEA
and
NOA
soon.一、发展状况
Status技术方面
Technical
Issues制定了4项标准:包括规划、预可研、可研、施工组织设计4
technical
standards
have
been
published
covering
planning,
pre-feasibility
study,feasibility
study
and
construction
design.正在编制7项标准:包括风能资源测量及海洋水文观测、风电机组地基基础、防腐蚀、工程概算定额、设计概算编制规定及费用标准、安全预评价、安全验收评价7
technical
standards
will
be
published
soon
including
wind
resource
and
oceaniccondition
monitoring
and
assessment,
offshore
wind
turbine
foundation,
corrosion,project
norm,
cost
estimation,
safety
assessment,
safety
acceptance.一、发展状况
Status5、组织海上风电特许权招标,为海上风电规模化发展进行有益探索Concession
Projects:
Lessons
and
Experiences
for
future
large
scaleddevelopment江苏四个海上特许权招标项目总规模100万千瓦,为今后大规模发展海上风电制定电价政策及管理机制进行有益探索。其中,江苏滨海近海30万kW电价为0.7370元/kW.h,射阳近海30万kW电价为0.7047元/kW.h,
东台潮间带20万kW电价为0.6235元/kW.h,大丰潮间带20万kW电价为0.6396元/kW.h。The
total
capacity
of
4
concession
project
in
Jiangsu
is
1GW.
The
concession-construction
is
the
necessary
method
to
a
suitable
management
and
feed-in-tariff
scheme.The
awarded
feed-in-tariff
are:
0.7370
RMB/kW.h
for
Binhai
300MW
project,
0.7047RMB/kW.h
for
Sheyang
300MW
project,
0.6235
RMB/kW.h
for
Dongtai
200MW
project,
0.6396RMB/kW.h
for
Dafeng
200MW
project
。海冰、海浪(风暴潮)、潮位,航道
Sea
ice,
wave,
tidal,
ship
navigation台风、盐雾、覆冰,空中航道(起落附近)、雷
达影响范围Typhoon,
salty
air,
ice,
aircraft
navigation,
radar,
etc二、开发建设管理Regulatory
Requirements茫茫大海,看似
到处可建海上风1
、海上风电需要考虑因素(技术+管理)
The
factors
(technical
and
management)电……It
seems
to
be
candidateoffshore
windsites空中Atmosphereeverywhere
onthe
sea……水面Sea
Surface洋流、潮流、海底冲刷和侵蚀、海洋生物、
盐分、海底地形及地质,管线Current,
Surge,
Scour,
Marine
lives,
Salt,
Sea
bed
contours
and
geological
conditions,
pipelines海洋功能区划、港口、码头、锚地、航道、
自然保护区等敏感海域、滩涂围垦及养殖、
军事用海、其他特殊用海,陆上交通与施工
拼装场地,技术难度Oceanic
Function
Planning,
Harbor,
Anchorage,
Sea
Route,
Nature
Reserve,
Breeding,
Military
and
other
Utilization,
the
Transportation
Requirements二、开发建设管理Regulatory
Requirements水下beneath
thesurface真正可建风电的海域有限,应加强管理,有效利用。其它The
efficientOthersutilization
ofoffshore
sites:the
availablearea
is
limited二、开发建设管理
Regulatory
Requirements全过程做好信息和资
料保密管理……
The
whole
processconfidentialrequirements2
、海上风电开发建设管理
Management
Issues规划Planning规划编制
:以省为单位进行,规划选定项目场址,确定开发布局。Planning
Compiling:The
provincial
based
siting
and
planning.规划审定
:省级职能部门把好关,国家能源局和海洋局组织水规院最终审定。Planning
Confirmed:
NEA
and
NOA
organize
HYDROCHINA
take
theappraisal
procedure
to
the
final
planning.前期○
前期工作安排
Early
Staged
Work
Proceduresarly
Stage省级能源部门征求省级海洋部门意见,拟定开展前期工作的项目和承担单位;Provincial
Energy
Authority
and
Oceanic
Authority
will
prepare
thecandidate
site
and
appoint
certain
organization
to
carry
out
the
technicalwork.报国家能源主管部门批准实施;Report
the
site
to
National
Energy
Authority
for
approval二、开发建设管理Regulatory
Requirements外
业勘查
Site
Survey测风塔设立
:县级海洋部门理海域使用权;工程区主管海事局批复通航安全评估报告,办理施工单位施工手续。Wind
Mast:
Sea
surface
utilizationapplication
goes
to
county
level
oceanic
authority,
sea
navigationassessment
goes
to
local
maritime
safety
authority.前期EarlyStage海洋水文测评:应由相应资质的单位进行。Oceanic
Condition:
A
certain
technical
classification
required.海图测量及地勘工作:方案征求县级海洋部门同意,现场测量前到工程区
主管海事局办理手续。Contour
map
and
geological
survey:
Plan
goes
to
county
leveloceanic
authority
and
procedure
needed
from
the
local
maritimesafety
authority
when
survey
is
conducted.○
预可行性研究工作Pre-feasibility
Study
预可研报告通过技术归口管理单位审查;Censored
by
National
Wind
Technical
Responsible
organization二、开发建设管理Regulatory
Requirements○
可行性研究工作Feasibility
Study预可研工作符合要求后,特许权项目通过特许权获取开发权,其余项目可进行可研阶段工作;After
the
approval
of
pre-feasibility
stage,
the前期project
could
go
to
concession
procedure
or
feasibility
study.arly
Stage由甲级勘测设计单位提出可研报告,并通过技术归口管理单位审查;TheClass
A
design
and
investigation
institute
provide
the
feasibilitystudy
report
and
National
Wind
Technical
Responsible
organizationwill
censor
the
report.开展用海(含海域使用论证)、环境影响评价、海缆路由、通航安全、安全预评价、接入电力系统等专题,并取得相关职能部门审查意见;The
seautilization
assessment,
EIA,
sea
cable
assessment,
maritime
safetyassessment,
grid-integration
reports
need
to
passed
by
specificauthorities
.开发企业编制项目申请报告,经省级能源投资主管部门初审后报国家能源投资主管部门核准。The
developer
compiles
the
project
applicationreport,
the
provincial
energy
authority
reviews
and
goes
to
national二、开发建设管理Regulatory
Requirements做好海域使用权报批手续,取得海域使用权证书;Sea
Utilization
License
from
Oceanic
Authority建设Construction落实环境保护和安全卫生设施措施;Environmental
protection
and
Safety
Requirements
need
to
be
fulfilled做好与省级电网公司接入电网配套设施建设的衔接工作;The
grid-integration
fits
the
provincial
grid
company’s
requirements按照电力调度和国家信息管理要求,落实信息化建设方案;the
developer
need
to
fulfill
the
regulate
and
dispatch
requirementsand
national
wind
data
regulatory
requirements办理施工手续,对施工质量负责;Responsible
for
construction
quality
and
send
constructionapplication
to
related
authority接受海洋行政主管部门的监督检查。The
oceanic
authority
will
supervise
the
project’s
constructionprocedure三、发展前景
Prospect1、开发建设海上风电的有利因素:Advantages
国家发展可再生能源的需求和重视;The
needs
for
renewable
energy
consumption资源丰富,具备开发条件;Abundant
wind
resource
and
construction
conditions接近负荷中心,电力消纳能力较强;Near
to
load
centre装备制造从无到有,研发制造能力不断提高;Ongoing
wind
turbine
manufacturing
capacity专业勘测设计、施工、建设队伍逐步形成;Investigation,
Design
and
Construction
capacity海上风电经济性不断提高。The
decreasing
cost
of
offshore
wind
project三、发展前景
Prospect2、开发建设海上风电需要重视的因素:The
key
elements海域综合利用,协调好各方用海;Overall
coordination
for
sea
utilization开发建设难度大,对设备制造、前期工作及施工建设需要重视;High
importance
of
manufacture、
design
and
construction开发建设和运行维护成本大,需要成规模的开发;Large
scale
development
to
decrease
the
O&M
cost
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 工作总结之护士职业道德总结
- 工作总结之地铁实习总结2000字
- 电工电子技术(第3版) 课件 3.4 变压器结构与工作原理
- 公司自查报告-企业管理
- 《让成交变得更轻松》课件
- 《计算机应用研究》课件
- 八年级《列夫·托尔斯泰》课件
- 《机械制造基础》课件 汪晓云 模块5-8 机床夹具的基础知识- 机械装配工艺的基础知识
- 《教育经济效益》课件
- 福建省三明市建宁县2023-2024学年八年级上学期期末考试数学试卷(含解析)
- 银企对接方案
- 反恐防范重点目标档案 空白模板2023年
- 科学技术中的伦理问题
- 中国子宫内膜增生管理指南(2022)解读
- 四年级上学期体育理论试卷(附答案)
- 预防物体打击安全课件
- 2024年村支书年度述职报告(四篇合集)
- 弱视斜视知识讲座
- 湖南省雅礼中学2023-2024学年高一上学期12月月考历史试卷
- 2023医院内部审计工作计划范文
- 华为招聘与人员配置
评论
0/150
提交评论