PAGEPAGE26目录一、编制依据··········································································3二、工程概况··········································································31、项目概况·······································································332、地质地貌概概概况································································43、设计概况····································································444、施工特点·······································································44三、施工安排··········································································5四、主要施工方方方法···································································51.施工测量·········································································52.施工流程·········································································53.护坡开挖方方方案·································································554.排水方案·········································································65.土方开挖方方方案·································································666.基坑开挖挖挖后成型型图及及边坡稳稳定性性计算·······································87、土方堆放··········································································1118、桩基础开挖挖挖····································································1129、独立柱基础础础开挖·······························································12五、质量保证措措措施···································································133六.安全保证措措措施···································································1441.安全管理制制制度····································································1152.安全技术措措措施····································································1153.施工防护管管管理····································································1164.施工用电···········································································1165.施工机械···········································································1176、施工道路···········································································118七、雨期施工··········································································188八、应急预案··········································································1991、突发事件应应应急准备····························································2002、突发事件分分分析及应急急预预案···················································222九、基坑监测监监监控···································································233十、文明施工、环环境保护措施施·············································244一、编制依据序号名称编号备注1图纸2岩土工程勘察报报报告3建筑施工手册(第第四版)4建筑地基基础工工工程施工工质量量验收规规范GB5020222-2000225混凝土结构工程程程施工质质量验验收规范范GB5020444-2001556建筑工程施工质质质量验收收统一一标准GB5030000-2001337建筑施工安全检检检查标准准JGJ59201119施工现场临时用用用电安全全技术术规范JGJ46-222005510建筑地基基础设设设计规范范GB5000777-20002211建筑施工土石方方方工程安安全技技术规范范JGJ1802000912建筑基坑工程监监监测技术术规范范GB5049777-20009913建筑机械使用安安安全技术术规程程JGJ33-222012214建筑基坑支护技技技术规程程JGJ12000-20122二、工程概况1、项目概况本工程为裕达···绿水仙城城澳澳洲青青青,位位于来宾宾市武武宣县城城东新新区,规规划用用地面积积为3003322.03㎡,总建建筑筑面积15977663.550㎡,其中1#~7#楼设计为为高高层住宅宅楼,基基础为桩桩基,8#~11#楼设计为为低低层商铺铺,基基础为独独立柱柱基础。地地下下一层,地地下下室底部部设计计标高61.0000m。参建单位建设单位:武宣宣宣裕达房房地产产开发有有限公公司勘察单位:核工工工业桂林林工程程勘察院院设计单位:湘潭潭潭市规划划建筑筑设计院院监理单位:广东东东广信建建筑工工程监理理有限限公司施工单位:广西西西裕达工工程有有限公司司
2、地质地貌貌概况况现场地已基本开开开挖至地地下室室底板,根根据据岩土工工程施施工勘察察报告告显示,本本工工程场地地上覆覆土层土土质情情况自上上而下下主要为为:杂杂填土(第第①层Qnl),耕耕表表土(第②层Qpd),坚坚硬硬状红黏黏土(第③层Qel),强强风化白云云质灰岩(第④层C2h),微风化白云质灰岩(第⑤层C2h)。3.设计概况根据工程勘察院院院提供《岩岩土土工程勘勘察报报告》资资料显显示,基坑可放放坡坡开挖,放放坡坡系数可可采用用1:0.75~1:1.75,结合地质质及及工程实实际情情况,本本工程程采用无无支护护土方,基基坑坑放坡系系数为为1:0.75。4.施工特点点点本工程占地面积积积较大,土土方方量较大大,周周边地面面开阔阔,场地地周边边20m范围内无无建建筑物和和地下下管道,根根据据地质报报告,场地地地下水水水量贫乏,土土质较好。土方采取放坡分分分层分级级开挖挖,第一一层开开挖深度度为3m,分为2级,每级1.5m,第二层层开开挖深度度为3m,分为2级,每级1.5m,共计开开挖挖深度为6m。排水采取基坑外外外排水和和基坑坑内集排排水。三、施工安排1.施工进度2016年5月月月10开工,计计划2016年7月15完工工。2.劳动力及机机机械组织根据工程量及总总总体施工工进度度要求,计计划划安排挖挖土机机5台,运土土翻翻斗车10台,水泵4台,挖土土机机司机5名,运土土车车司机10名,普通通工10人,施工工队队长一名名,技技术员一一名;;。项目目安排排专业技技术负负责人3名,质量量员3名,安全全员3名。四、主要施工方方方法1.施工测量该工程拟投入的的的仪器主主要有有经纬仪仪和自自动安平平水准准仪、全全站仪仪等。在拟建建筑物四四四周布设设四个个水准点点,作作为建筑筑物沉沉降观测测的依依据,四四个水水准点闭闭合差差应小于±12√H,场地整整理理及土方方开挖挖时应保保护好好水准点点。2.施工流程开挖线放样→第第第一步土土方开开挖→第一步修修坡→开挖下一一步步土方→下一步修修坡→直至基坑坑底底。3.护坡开挖方方方案(1)放线员用用白白灰撒好上上上坡线及及下坡坡线,用用于控控制放坡坡角度度。根据据勘察察报告内内各土土层、土土质状状况,采采用1:0..775坡度放坡坡。(2)由于基坑坑较较深采用二二二阶开挖挖施工工,第一一阶段段挖至3m深处,第第二二阶段挖挖至6m深处,预预留0.3m人工清槽槽。(3)每一开挖挖阶阶段均从同同同方向开开始,同同时护坡坡处均均一次开开挖成成型,专专人负负责指挥挥作业业。(4)基坑四周周做做1.2米高的临临时时围栏并并挂安安全网进进行封封闭,2米以内不不得得堆土堆堆料,夜夜间设红红色警警示标志志。4.排水方案排水采取基坑外外外排水和和基坑坑内集排排水。在基坑底距坡角角角500mmm处设300××3300排水沟,6个集水坑坑。自自然降水水及部部分eq\o\ac(○,1)层土土内内存水通通过上上层排水水沟排排至于集集水井井,由潜潜水泵泵排至城城市排排水管网网,部部分eq\o\ac(○,1)层土土内内含水和和自然然雨水及及极弱弱透水层层渗水水可通过过基坑坑内排水水沟和和集水坑坑直接接由潜水水泵排排至城市市排水水管网。5.土方开挖方方方案(1)开挖流程程场地清理场地清理放灰线放灰线甲方或监理验线合格甲方或监理验线合格机械就位、开挖机械就位、开挖装渣外运装渣外运人工挖土清槽人工挖土清槽场地平整场地平整进入下道工序(桩孔及独立柱基础开挖)进入下道工序(桩孔及独立柱基础开挖)(2)施工方法法a、基坑周围地地地面堆载应应满满足以下下要求求:基坑坑周围围5m范围内堆堆载载不得超超过10kppa。b、最后留30000mm土采用人人工工挖,以以保护护原有土土层。c、挖土坡度按按按照地质勘勘察察报告的的放坡坡系数开开挖。d、测量控制:::开挖后,测量人人人员随时时进行行测量,及及时时洒灰线线,防防止超挖挖和欠欠挖,操操作人人员一律律使用用平锹进进行清清槽和护护坡。e、验收:土方方方开挖完成成后后应立即即及时时组织建建设、监监理、设设计、地地勘等部部门对对基坑进进行验验收,并并浇筑筑垫层进进行封封底,防防止水水浸和暴暴露。(3)质量标准准a、主控项目:::开挖标高、长度度度、宽度度、边边坡必须须符合合设计要要求。柱基、基坑、基基基槽、场场地的的基土土土质必必须符合合实际际要求,并并严严禁扰动动。b、一般项目:::控制好开开挖挖表面平平整度度及基底底土性性。(4)成品保护护a、挖运土方时时时应注意保保护护定位标标准桩桩、轴线线引桩桩、标准准水准准点,并并定期期复测检检查定定位桩和和水准准基点是是否完完好。b、挖土时应对对对基坑内工工程程桩做好好保护护,派专专人进进行看护护,及及时与指指挥和和开挖人人员沟沟通,以以防碰碰撞损坏坏。6、基坑开挖后后后成型图及及边边坡稳定定性计计算(1)基坑开挖挖后后成型图如下图所示:(2)土坡稳定定性性计算书a计算依据:依据《建筑基坑坑坑支护技技术规规程》(JJGGJ1220--99)、《建建筑基坑坑支护护技术规规程》(北北北京DB1111/4889--20007)、《土土力学与与地基基基础》等等编编制。b计算:计算土坡稳定性性性采用圆圆弧条条分法进进行分分析计算算,由由于该计计算过过程是大大量的的重复计计算,故故本计算算书只只列出相相应的的计算公公式和和计算结结果,省省略了重重复计计算过程程。本计算书采用瑞瑞瑞典条分分法进进行分析析计算算,假定定滑动动面为圆圆弧面面及滑动动土体体为不变变形刚刚体,还还假定定不考虑虑土条条两侧上上的作作用力。c参数信息条分方法:瑞典典典条分法法不考虑地下水位位位影响;;Ⅰ、放坡参数:::──────────────────────────────────────────序号放坡高度(((m)放坡宽度度(m)平台宽度度(m)1664..511.00─────────────────────────────────────────Ⅱ、荷载参数:::──────────────────────────────────────────序号布置方式荷荷荷载值kPPaa距距基坑边边线mm作作用宽度度m1满满布00.000──────────────────────────────────────────Ⅲ、土层参数:::───────────────────────────────────────序号土类类型型土厚度度(mm)γ(kN/mm3)CC(kPPa))φ(℃)饱容容重重(kN/mm33)11粘性性土土3.0000199.00012220022..0002填土3.000019..00022220222..00──────────────────────────────────────────表中:γ为土重重重度(kN/mm33),CC为内内聚力(kPPa),φ为内摩擦擦角角(℃)d、计算原理根据土坡极限平平平衡稳定定进行行计算。自自然然界匀质质土坡坡失去稳稳定,滑滑动面呈呈曲面面,通常常滑动动面接近近圆弧弧,可将将滑裂裂面近似似成圆圆弧计算算。将将土坡的的土体体沿竖直直方向向分成若若干个个土条,从从土土条中任任意取取出第i条,不考考虑虑其侧面面上的的作用力力时,该该土条上上存在在着:①、土条自重,②②、作用于于土土条弧面面上的的法向反反力,③、作用于于土土条圆弧弧面上上的切向向阻力力。将抗剪强度引起起起的极限限抗滑滑力矩和和滑动动力矩的的比值值作为安安全系系数,考考虑安安全储备备的大大小,按按照《规规范》要要求,安安全系数数要满满足>=11..2的要求求。e、计算公式式子中:Fs--土坡坡稳稳定安全全系数数;c土层的的粘粘聚力;;li第i条土条的的圆圆弧长度度;γ--土层的的的计算重度度;;θi--第iii条土到滑滑动动圆弧圆圆心与与竖直方方向的的夹角;;φ--土层的的的内摩擦角角;;bi--第i条土的宽宽度度;hi--第i条土的平平均均高度;;h1iii第i条土水位位以以上的高高度;;h2iii第i条土水位位以以下的高高度;;γ,--第ii条条土的平均均均重度的的浮重重度;q --第i条条土土条土上的的的均布荷荷载;;f、计算安全系系系数将数据各参数代代代入上面面的公公式,通通过循循环计算算,求求得最小小的安安全系数数Fss:─────────────────────────────────────────计算步数安全系系系数滑裂裂角αα(度)半径径R(m))圆弧弧角角2θ(度)标高高(m)第1步1.4433422.87788..4661622.8009-66.0000──────────────────────────────────────────计算结论如下:::第1步开挖内部部整整体稳定性性性安全系系数Fs==11.4333>>1.220满足要求求![标高高-6..0000m]7、土方堆放大部分土方方外外运往郊区区区,剩下下小部部分土方方堆放放在工地地附近近,用于于土方方回填。8、桩基础开挖挖挖详见人工挖孔灌灌灌注桩专专项施施工方案案。9、独立柱基础础础开挖(1)独立柱基基基础土方方开挖挖前,基基坑已已挖至基基础垫垫层,地地表基基本保持持平整整,以便便进行行独立柱柱基坑坑放线;;(2)在开挖前前前,建筑筑物位位置的标标准轴轴线桩、标标准准水准抄抄平桩桩及挖掘掘边线线,必须须经过过复测检检查,由由现场技技术员员为主办办理预预检手续续;
(3)施工工工艺
结合现有带独立立立柱基础础楼幢幢基础平平面图图,轴线线间距距为30000mmm~770000mm,独立柱柱基基础承台台为30000mmm×330000mm、34000mmm×334000mm、25000mmm×225000mm。独立柱柱基基础自基基础底底板以下下开挖挖深度在25000mmm~440000mm,扣除作作业业面及放放坡宽宽度,独独立柱柱基础承承台间间土顶部部宽度度仅剩15000mmm~550000mm,结合工工程程进度及及基坑坑排水需需要,独独立柱基基坑采采用履带带式挖挖掘机开开挖,由由机械化化施工工队负责责挖土土施工,人人工工清理坑坑底。
(4)、挖土土土范围
根据建筑平面图图图外边线线预留留600mmm宽作为施施工工操作工工作面面,根据据土质质情况和和施工工经验,独独立立柱基槽槽边坡坡按1:0.5进行放坡坡。机机械挖土土为防防止挖掘掘过程程中扰动动老土土,坑底底预留留30cm左右用人人工工挖土清清至设设计标高高。
(5)人工清理理理坑底
人工挖掘坑底33300mmm土之前,每每每隔1.0m打一个小小木木橛,在在挖至至接近坑坑底标标高时,用用塔塔尺及水水准仪仪随时以以小木木橛上口口检查查坑底标标高。由由工长检检查坑坑边尺寸寸,确确定坑宽宽标准准,据此此修整整槽帮,最最后后清除坑坑底浮浮土,修修底铲铲平。
(6)验槽
开挖至设计计深深度标高后后后,及时时通知知建设单单位,由由建设单单位出出面主持持验槽槽,参加加单位位包括监监理、建建设单位位和施施工单位位。并并向其介介绍地地基情况况,特特别是松松软土土层等不不良地地基,验验槽完完毕,由由各方方签字确确认,交交付下道道工序序。
五、质量保证措措措施1、项目经理领领领导下,由由专专职质量量工程程师和土土方作作业的工工程师师、质量量员等等组成项项目部部负责土土方工工程的质质量管管理工作作。项目部组织机构构构图:项目经理项目经理项目工程师项目工程师技术负责人技术负责人技术部质安部设备部综合办公室工程部材料部技术部质安部设备部综合办公室工程部材料部土方开挖施工队普工施工队土方开挖施工队普工施工队2、健全质量保保保证体系,落落实各类人员员的职责;确确定本项目质质量管理点,制制定相应的质质量控制措施施;确保项目目质量目标的的实现。3、工班组坚持持持“三检制”,即自检检、专专检、交交接检检。三检检中达达不到优优良等等级的工工序均均不得进进入下下道工序序。经经过“三检”的工序最最后后由项目目部质质检工程程师报报监理工工程师师验收签签认。4、施工操作过过过程中,贯贯穿穿“工前有交交底底、工中中有检检查、工工后有有验收”的“一条龙”操作管理理方方法。做做到施施工操作作程序序化、标标准化化、规范范化,确确保施工工质量量。5、施工前要做做做好各级技技术术准备和和技术术交底工工作。施施工技术术人员员、测量量员要要熟悉图图纸,掌掌握现场场测量量桩及水水准点点的位置置尺寸寸,同时时办好好验线、验验槽槽、验桩桩手续续。6、开挖时严格格格控制相邻邻区区域间的的边坡坡坡度,根根据据坡度在在基坑坑上口放放出控控制点,在在开开挖使用用全站站仪随时时观察察。为防防止超超挖和保保持边边坡坡度度正确确,应预预留300mmm厚土层,用用用人工开开挖和和修坡。土土方方明挖过过程中中,如出出现裂裂缝和滑滑坡迹迹象时,立立即即暂停施施工和和采取应应急抢抢救措施施,并并通知监监理工工程师。必必要要时,按按监理理工程师师的指指示设置置测点点,及时时观测测边坡变变化情情况,并并做好好记录。7、施工中要配配配备专职测测量量员进行行质量量控制。要要及及时复撒撒灰线线,将基基槽开开挖下口口线测测放到槽槽底,并并及时控控制开开挖标高高。8、换班时,要要要交接挖深深、边边坡、操操作方方法以确确保开开挖质量量。9、机械挖土过过过程中,要要配配备足够够的人人工,每每台挖挖土机每每班配配备五个个人,随随时配合合清槽槽修坡,将将土土送至挖挖土机机开挖半半径内内。10、验槽时,用用用水准仪监监测测,确保保不能能超挖,不不扰扰动基底底土层层。11、执行技术术、质质量管理理制度,施施工工中要注注意积积累技术术资料料。六.安全保证措措措施1、安全管理制制度度(1)、建立以以项项目经理、技技术负责人为为领导的安全全生产机构,详详见项目部组组织机构图。(2)、制定各各级级人员的安安安全生产产责任任制,签签订安安全承包包合同同,并认认真实实施。(3)、对新进进场场工人实行行行严格的的教育育考核制制度,经经考核合合格后后录用上上岗。(4)、所有特特殊殊工种人员员员一律持持证上上岗,并并严格格管理。(5)、坚持每每月月二次的安安安全专题题检查查和日常常不定定期检查查。(6)、各分部部分分项安全技技技术交底底,由由各施工工员针针对工程程的实实际情况况进行行有针对对性的的交底,由由技技术负责责人审审查签字字后交交班组负负责人人签字。(7)、对施工工班班级必须严严严格管理理,引引导班组组开展展好班前前安全全活动。2、安全技术措措施施(1)、开挖边边坡坡土方,严禁切割割坡坡脚,以防导致致边边坡失稳稳;不不得在挖挖方上上侧堆士士。(2)、机械行行驶驶道路应平平平整、坚坚实,防防止作业业时下下陷。(3)、机械挖挖土土分层进行行行,合理放坡坡,防止塌方方、溜溜坡等造造成机机械倾翻翻、淹淹埋等事事故。(4)、多台挖挖掘掘机在同一一一作业面面机械械开挖,挖掘机间间距距应大于于100m;多台台挖掘机机械在在不同台台阶同同时开挖挖,应确保边边坡坡稳定,上下台阶阶挖挖掘机前前后应应相距3300m以上上,挖掘机离离下下部边坡坡有一一定的安安全距距离,以防造成成翻翻车事故故。(5)、机械施施工工区域禁止止止无关人人员进进人场地地内,挖挖掘机工工作回回转半径径内不不得站人人或进进行其他他作业业。挖掘掘机、装装载机卸卸土,,应待整机机停停稳后进进行,,不得将将铲铲斗从运运输汽汽车驾驶驶室顶顶部越过过;装装土时人人都不不得停留留在装装土车上上。(6)、挖掘机机操操作和汽车车车装土行行驶要要听从现现场指指挥;所所有车车辆必须须严格格按规定定的开开行路线线行驶驶,防止撞车车。(7)、挖掘机机行行走和翻斗斗斗车卸土土时,,必须注注意意上空电电线,,不得在架架空空输电线线路下下工作;如在架空空输输电线一一侧工工作时,垂直与水水平平距离分分别不不得小于于2..5m与4~66mm(1110~~22OOKVV时)。(8)、基坑四四周周做1.2米高的临临时时围栏并并挂设设安全网网封闭闭,2米以内不不得得堆土堆堆料,夜夜间设红红色警警示标志志。3、施工防护管管理理(1).正确使使用用好安全帽帽帽、安全全带、安安全网及及漏电电保护器器,充充分发挥“三宝”在施工工工程程中的作作用。(2).在主要要通通道口、井井井架口、出出入入处挂上上醒目目的安全全标语语牌。(3).进入施施工工现场一律律律正确戴戴好安安全帽,任任何何人不得得例外外。4、施工用电(1)、开工前前设设计好现场场场用电设设计方方案(详详见施施工临时时用电电方案)。(2)、配电房房按按部颁标准准准设置,电电箱箱一律使使用标标准电箱箱。(3)、现场架架设设线路均按按按三相五五线制制的要求求架设设,实行行三级级配电两两级保保护,并并做到到一机一一闸一一保险。(4)、各种电电箱箱、漏电保保保护器等等设备备均选用用国家家有关部部门认认可的产产品。(5)、正确配配置置漏电保护护护器与电电箱熔熔断丝,不不超超负荷。(6)、现场所所有有施工用电电电和生活活用电电均由现现场专专职电工工管理理,任何何人不不得乱拉拉乱接接。(7)、配电箱箱内内各开关应应应标上用用途标标志。(8)、在潮湿湿空空间照明应应应用366V以以下安全全电压压。5.施工机械(1).潜水泵泵应安装可靠的漏漏漏电保护护器,使使用前应应检查查其灵敏敏程度度。电缆缆线应应采用四四芯软软线。使使用过过程中应应经常常检查安安全装装置及绝绝缘情情况是否否良好好,发生生故障障需检查查时,应应先拉掉掉电源源开关。(2)挖土机及及翻翻斗车a、操作人人人员必须须持有有效上岗岗证件件,严格格规范范施工,驾驾驶驶员必须须遵守守交通规规则。b、操作人人人员必须须按照照安全操操作规规程的规规定,严严格执行行工作作前的检检查制制度和工工作中中注意观观察及及工作后后的检检查保养养制度度。c、驾驶室或操操操作室应保保持持整洁,严严禁禁存放易易燃、易易爆物品品,严严禁酒后后操作作机械,严严禁禁机械带带故障障运转或或超负负荷运转转。d、翻斗车等运运运输车辆,向向沟槽边运卸卸土方时,应应缓慢行驶,停停车车轮与槽槽之距离应根根据土质、边边坡、埑(槽槽)深度确定定,且不得小小于1.5m。车轮应挡挡掩牢固。e、机械在边坡坡坡、边沟作作业业时,应应与边边缘保持持必要要的安全全距离离,机械械作业业时,机机械上上面禁止止站人人,机械械回转转位置严严禁站站人。在在危险险地段作作业时时设置安安全警警告标志志并设设置专人人监察察指挥。f、作业后,挖挖挖土车、运运输输车辆应应停止止在坚固固、工工整、不不积水水的地方方。g、机械制动动装装置必须完完完好可靠靠、有有效,必必须经经常检查查制动动装置,发发现现问题及及时处处理。6.施工道路(1)、道路应应平平整、坚实实实,能满满足运运输安全全要求求。(2)、道路宽宽度度应根据交交交通量和和运输输车辆或或行驶驶机械的的宽度度确定,汽汽车车运输时时,宽宽度不小小于3.5m。(3)、道路纵纵坡坡应根据运运运输车辆辆情况况而定,机机动动车不宜宜陡于于10%。(4)、道路圆圆曲曲线半径,汽汽车运输时不不宜小于15m,机动翻斗斗车不宜小于于8m。(5)、机动车车道道路的路面面面宜进行行硬化化处理。(6)、现场应应根根据路况和和和环境状状况确确定行驶驶速度度,并与与道路路明显处处设禁禁令标志志及限限速标识识。七、雨期施工措措措施1、为为为保证雨雨期施施工基坑坑安全全,确保保地下下结构正正常施施工,要要成立立防汛领领导小小组,建建立健健全组织织机构构和制定定规章章制度,在在基基坑施工工中要要严格按按雨期期施工要要求组组织施工工。2、配备足够的的的防雨、防防潮潮材料和和设备备,包括括潜水水泵、塑塑料薄薄膜、彩彩布条条、雨衣衣、雨雨鞋等。3、安排好雨期期期施工项目目,提提前做好好防范范措施,做做好好安全、质质量量管理及及技术术交底。4、做好现场地地地面排水系系统统,主要要暂设设道路应应将路路基碾压压坚实实,确保保雨期期道路循循环通通畅,不不淹不不冲、不不陷不不滑。5、进入现场的的的设备和材材料料避免堆堆放在在低洼处处,露露天存放放的要要垫高加加塑料料布盖好好。6、雨期进行土土土方工程施施工工时,边边坡坡坡度应适适当减减缓,坡坡边设设围堰,严严防防滑坡和和塌方方。避免免大面面积开挖挖,采采取分段段突击击施工,减减少少基底土土层暴暴露时间间。7、雨期施工期期期间,一要要配配备足够够的排排水设备备保证证在强暴暴雨情情况下,具具有有强行排排水能能力;二二要配配备足够够的沙沙包防止止雨水水瀑入基基坑造造成淹槽槽。8、汛期到来必必必须安排人人员员24h值班。八、应急预案根据土方工程特特特点及施施工工工艺的实实际情情况,我我部制制定了由由项目目经理为为主的的应急抢抢险小小组。并并认真真组织了了对挖挖孔桩危危险源源和环境境因素素的识别别和评评价,制制定本本项目发发生紧紧急情况况或事事故的应应急措措施,对对广大大员工开开展应应急知识识教育育和应急急演练练,提高高现场场操作人人员的的应急能能力,减减少突发发事件件造成的的损害害和不良良影响响。应急准备和响应应应工作程程序如如下图危险源及环境因素辩识、评价危险源及环境因素辩识、评价编制抢险应急预案成立抢险领导小组组织抢险队伍配备应急物资、设备定期进行应急培训实施应急预案对应急预案评审、修订1、突发事件应应应急准备(1)成立抢险险领领导小组,明明确责任分工工应急抢险领导小小小组人员员组织织机构如如下::组长:李克克明组长职责:负责责责全面管管理和和协调工工作、负负责本专专项应应急预案案的启启动实施施、小小组人员员分工工等。副组长:殷韬、冼冼学军副组长职责:协协协助组长长工作作,在组组长不不在场的的情况况下行使使组长长职责、协协助助处理相相关工工作,具具体负负责挖孔孔桩生生产安全全的现现场管理理,恢恢复和保保证生生产正常常进行行。组组组员:谭绍绍茂茂、覃就就业、黄黄以当等(2)组建抢险险队队,进行应应应急知识识教育育培训项目部组建抢险险险队,发发现险险情时首首先抢抢险队进进行抢抢险,需需用较较多人时时可由由各工班班进行行汇集,对对抢抢险队和和项目目部所有有人员员均进行行针对对性的应应急知知识培训训。(3)进行应急急演演练,提高高高应急救救援能能力为了在出现险情情情时处理理迅速速,项目目部对对预设险险情进进行实地地演练练,由项项目部部及公司司综合合办公室室负责责组织安安排,时时间为2016年5月13日~5月20日,使所所有有人员参参与其其中,并并填写写应急演演练记记录表,记记录录演练内内容,人人员分工工,方方案及处处理程程序等。(4)紧急情况况发发生和上报报报程序施工过程中施工工工现场或或驻地地发生无无法预预料的需需要紧紧急抢险险处理理的危险险时,应应迅速逐逐级上上报,次次序为为现场、办办公公室、抢抢险领领导小组组、上上级主管管部门门。由项项目部部、综合合办公公室负责责收集集、记录录、整整理紧急急情况况信息并并向小小组及时传递,由由小小组组长长或副副组长主主持紧紧急情况况处理理会议,协协调调、派遣遣和统统一指挥挥所有有车辆、设设备备、人员员、物物资等实实施紧紧急抢救救和向向上级汇汇报。事事故处理理根据据事故大大小情情况来确确定,如如果事故故特别别小,可可以根根据上级级指示示可以由由施工工单位自自行直直接处理理,如如果事故故较大大或施工工单位位处理不不了可可以由施施工单单位向建建设单单位主管管部门门请示,启启动动建设单单位的的救援预预案,建设单位的的救援预案案如果仍不不能处理则则由建设单单位的质安安部向建委委或政府部部门请示启启动上一级级救援预案案。紧急情况发生后后后,现场场要组组织好警警戒和和疏散工工作,保保护好现现场,及及时抢救救伤员员和财产产,并并由在现现场的的项目部部最高高负责人人指挥挥,在三三分钟钟内电话话通报报到值班班室,主主要说明明紧急急情况性性质,地地点,发发生时时间,有有无伤伤亡事故故,是是否需要要派救救护车,消消防防车或警警力到到现场实实施抢抢险工作作,如如需要可可以直直接拨打打1220、110、119等求求救救电话。值班人员在接到到到紧急情情况报报告后要要在2分钟内将将情情况报告告到紧紧急情况况领导导小组组组长和和副组长长。小小组在组组织讨讨论后在在最短短时间内内发出出如何处处理现现场的指指令。分分派人员员车辆辆等到现现场进进行抢救救、警警戒、疏疏散和和保护现现场等等。由综综合办办公室在30分钟内以以小小组名义义打电电话向上上级有有关部门门报告告情况。遇到紧急情况,全全体职工应特特事特办,急急事急办,主主动积极的投投入到紧急情情况的处理中中去,各种设设备、车辆、器器材、物资等等要统一调遣遣,各类人员员必须坚决无无条件服从组组长或副组长长的命令和安安排,不得拖拖延、推委、阻阻碍紧急情况况的处理。与与相关单位建建立快速联系系通道,以便便及时处理问问题.2、突发事件分分分析及应急急预预案(1)基坑开挖挖施施工阶段防防防土方坍坍塌措措施考虑到广西来宾宾宾武宣处处于亚亚热带地地区,降降水十分分丰富富,雨季季多发发生在4月至8月,为了了确确保工程程不受受影响,拟拟采采取以下下措施施:a、根据士质情情况况确定分段段段分层开开挖,每每层开挖挖深度度不宜超超过44.5m。b、基坑周围土土土体的加固固当施工过程中出出出现裂缝缝、坑坑壁松塌塌或遇遇涌水、涌涌砂砂时,在在基坑坑内外一一定范范围进行行土体体加固,可可取取得防止止隆起起、稳定定坑壁壁、减少少位移移,加固处处理理后,方方可继继续施工工。c、当发现支撑撑变变形或折断断断时,应应立即即加固。d、基坑采用排排水水法降低水水水位时,对对降降低水位位区域域的建(构构)筑筑物可能能产生生沉降,应应加加强观测测,必必要时采采取防防范措施施。e、加强对土方方方开挖施工工工工艺的组组织与与管理f、对开挖过程程程实施跟踪踪监监测,并并将信信息及时时反馈馈。监测测基坑坑边壁的的位移移,绘制制位移移时程曲曲线,分分析变形形速率率和位移移量,确确定其对对边坡坡稳定。对对地地面建筑筑物和和地下管管线的的影响程程度,随随时调整整施工工参数,或或采采取相应应措施施,以确确保施施工安全全,顺顺利进行行。g、施工人员严严禁禁在基坑内内内休息。(2)、高温中中暑暑的预防夏季气温高,工工工人劳动动强度度大,较较易发发生工人人中暑暑,为保保证施施工安全全,特特制定如如下预预防措施施:调节工作时间,错错开气温最高高时段。购买保温桶,为为为工人准准备绿绿豆汤、凉凉茶茶等防暑暑降温温饮品,并并加加适量食食盐,以以防工人人脱水水。(3)、触电事事故故的预防基坑开挖期间,为保证施工安全,必须严格遵守用电规范,必须采用三相五线制,三级配电、二级保护;所有设备必须按一机一闸一漏电保护装置进行安装;施工场地的电缆要架空,离地面不小于2米,严禁拖地和压埋土中。一旦发生触电伤伤伤害事故故,首首先使触触电者者迅速脱脱离电电源(方方法是是切断电电源开开关,用用干燥燥的绝缘缘木棒棒、布带带等将将电源线线从触触电者身身上拨拨离或将将触电电者拨离离源),其其其次将触触电者者移至空空气流流通好的的地方方,情况况严重重者,边边就地地采用人人工呼呼吸法和和心脏脏按压法法抢救救,同时时就近近送医院院。(4)、高处坠坠落落事故的预预预防为保证施工安全全全,特制定定如如下预防防措施施:基坑开挖作业区区区采取警警戒色色钢管防防护隔隔离,并并设安安全标志志;进进入现场场必须须佩戴安安全帽帽及相应应的劳劳动保护护用品品;不
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 中国政法大学《工程中的数值方法C》2023-2024学年第一学期期末试卷
- 郑州西亚斯学院《现代通信原理》2023-2024学年第一学期期末试卷
- 长江工程职业技术学院《公共服务质量管理》2023-2024学年第一学期期末试卷
- 消费级3D打印机打印精度改进
- 保险行业基础讲解模板
- 业务操作-房地产经纪人《业务操作》名师预测卷4
- 开学晨会发言稿
- 二零二五年政府形象广告服务合同规范
- 二零二五版国际学校外教引进与团队建设协议3篇
- 2024-2025学年新疆乌鲁木齐四十一中高二(上)期末数学试卷(含答案)
- 《道路交通安全法》课件完整版
- 向女朋友认错保证书范文
- 五分数加法和减法(课件)-数学五年级下册
- 2024年四川省绵阳市中考语文试卷(附真题答案)
- 设计材料与工艺课程 课件 第1章 产品设计材料与工艺概述
- 幼儿园反恐防暴技能培训内容
- 食品企业质检员聘用合同
- 中医诊所内外部审计制度
- 自然辩证法学习通超星期末考试答案章节答案2024年
- 2024年国家危险化学品经营单位安全生产考试题库(含答案)
- 护理员技能培训课件
评论
0/150
提交评论