贵州省公路工程建设工程六盘水市机场高速公路CL-02施工放线测量记录表编号:合同号:JTSG-2012-01编号:合同号:JTSG-2012-01承包单位:葛洲坝集团第二工程测量:工程名称大海坝桥施工时间桩号及部位1#垫石模板验收测量时间测点桩号设计坐标实测坐标偏差设计高程(m)实测高程(m)XYXY△X△Y△高程K9+751.700(-1.25)2943502.144495976.3652943502.142495976.361-2-4-21913.7891913.787K9+751.700(-3.7)2943503.820495974.5782943503.820495974.5820411913.7401913.741K9+751.700(-6.15)2943505.497495972.7922943505.501495972.7914-1-21913.6911913.689K9+751.700(-8.6)2943507.174495971.0062943507.177495971.0053-1-21913.6421913.640K9+751.700(-11.05)2943508.851495969.2192943508.854495969.2193021913.5931913.595K9+751.700(1.25)2943500.433495978.1872943500.430495978.192-3521913.7891913.791K9+751.700(3.7)2943498.756495979.9742943498.754495979.972-2-211913.7401913.741K9+751.700(6.15)2943497.079495981.7602943497.080495981.7621221913.6911913.693K9+751.700(8.6)2943495.402495983.5462943495.400495983.543-2-301913.6421913.642K9+751.700(11.05)2943493.725495985.3332943493.726495985.3321-1-21913.5931913.591算据计数A测站点坐标X=2943488.891Y=495926.866全站仪型号TS06B后视点坐标XB=2943574.571YB=495984.372C后视点坐标XC=2943574.571YC=495984.372距离AB=103.189AC=103.189记录(计算):复核:测量监理工程师:
贵州省公路工程建设工程CL-03六盘水市机场高速公路水准测量记录表监理单位:贵州三力建设监理有限责任公司编号:承包单位:葛洲坝集团第二工程合同号:JTSG-2012-01测量:记录(计算):复核:测量监理工程师:工程名称大海坝桥施工时间桩号及部位1#垫石模板验收测量时间测量点水准尺读数仪器高实测高程设计高程差值备注后视前视N0360.6881915.793K9+751.700(-1.25)2.0061913.7871913.789-212.0041913.7891913.789022.0051913.7881913.789-132.0031913.7901913.789142.0061913.7871913.789-2K9+751.700(-3.7)2.0521913.7411913.740112.0531913.7401913.740022.0521913.7411913.740132.0531913.7401913.740042.0521913.7411913.7401K9+751.700(-6.15)2.1041913.6891913.691-212.1031913.6901913.691-122.1021913.6911913.691032.1041913.6891913.691-242.1001913.6931913.6912K9+751.700(-8.6)2.1531913.6401913.642-212.1511913.6421913.642022.1501913.6431913.642132.1531913.6401913.642-242.1511913.6421913.6420K9+751.700(-11.05)2.1981913.5951913.3932闭合差:允许误差:贵州省公路工程建设工程CL-03六盘水市机场高速公路水准测量记录表监理单位:贵州三力建设监理有限责任公司编号:承包单位:葛洲坝集团第二工程合同号:JTSG-2012-01测量:记录(计算):复核:测量监理工程师:工程名称大海坝桥施工时间桩号及部位1#垫石模板验收测量时间测量点水准尺读仪器高实测高程设计高程差值备注后刖12.1981913.5951913.393222.1991913.5941913.393132.1981913.5951913.393242.2001913.5931913.3930K9+751.700(1.25)2.0021913.7911913.789212.0041913.7891913.789022.0021913.7911913.789232.0031913.7901913.789142.0021913.7911913.7892K9+751.700(3.7)2.0521913.7411913.740112.0521913.7411913.740122.0531913.7401913.740032.0511913.7421913.740242.0521913.7411913.7401K9+751.700(6.15)2.1001913.6931913.691212.1021913.6911913.691022.1001913.6931913.691232.1011913.6921913.691142.1001913.6931913.6912K9+751.700(8.6)2.1511913.6421913.642012.1501913.6431913.642122.1511913.6421913.6420闭合差:允许误差:贵州省公路工程建设工程CL-03六盘水市机场高速公路水准测量记录表监理单位:贵州三力建设监理有限责任公司编号:承包单位:葛洲坝集团第二工程合同号:JTSG-2012-01测量:记录(计算):复核:测量监理工程师:工程名称大海坝桥施工时间桩号及部位1#垫石模板验收测量时间测量点水准尺读数仪器高实测高程设计高程差值备注后视前视32.1501913.6431913.642142.1511913.6421913.6420K9+751.700(11.05)2.2021913.5
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 贵金属矿商业机会挖掘与战略布局策略研究报告
- 鞋用乳液胶粘剂产品原材料供应与需求分析
- 粉尘传感器产品原材料供应与需求分析
- 预防用生物制品市场洞察报告
- 今年的军训心得800字5篇范文
- 茶叶商业机会挖掘与战略布局策略研究报告
- 钻石市场需求与消费特点分析
- 锤纹漆产品营销计划书
- 银饰品产品营销计划书
- 纸类包装制品产品市场环境与对策分析
- 25道牧原集团饲料研发工程师岗位常见面试问题含HR常问问题考察点及参考回答
- 安全生产三管三必须专题培训
- 性发育异常课件
- 产后尿潴留的护理查房
- 高考英语备考经验交流课件
- 睡眠管理主题班会 课件
- 反有组织犯罪法心得体会500字(合集4篇)
- 智慧城市地下管网信息化管理平台整体解决方案
- 限高架制作安装合同及限高门架制作安装方案
- 2023版设备管理体系标准
- 新设备引进实施方案
评论
0/150
提交评论