版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、测量员:技术负责人:测量员:技术负责人:监理工程师:年月日工程名称OPPO(重庆)智能生态科技园项目一期工程(C区)工程部位区地下室序号桩位设计参数实测误差备注桩径桩径桩径C1-35373785.3581364.121C1-35473795.22581362.6312000C1-35573806.50181360.3752000C1-35673818.17581357.5561600C1-35773829.94281355.2031600C1-35873841.21981352.9471400C1-35973851.51581350.8881400C1-36073853.96681350.39
2、81200C1-36173862.10581348.771400C1-36273869.58281347.2742000C1-36373880.34481345.1221400C1-36473891.62181342.8671400C1-36573903.38781340.5131400C1-36673915.24881338.6252000C1-36773926.52481336.372000C1-36873933.78581334.4331200C1-36973783.58581355.2962000C1-37073793.36681353.342000C1-37173804.643813
3、51.0842000C1-37273816.4181348.7312000C1-37373828.17781346.3782000C1-37473839.45481344.1222000结论:实测共点,合格点,合格率桩位复测记录建设单位:桩位复测记录建设单位:(重庆)智能科技有限公司监理单位:中咨工程建设监理有限公司合同号:施工单位:中国建筑一局(集团)有限公司仪器名称编号编号:测量员:技术负责人:测量员:技术负责人:监理工程师:年月日工程名称OPPO(重庆)智能生态科技园项目一期工程(C区)工程部位区地下室序号桩位设计参数实测误差备注桩径桩径桩径C1-37573849.7581342.063
4、1800C1-37673852.20181341.5721200C1-37773860.3481339.9451800C1-37873867.81781338.4492000C1-37973878.57981336.2971800C1-38073889.85581334.0411800C1-38173901.62281331.6881800C1-38273913.38981329.3351800C1-38373924.66681327.0791800C1-38473932.0281325.6081400C1-38573781.8281346.4712000C1-38673791.6018134
5、4.5152000C1-38773802.87881342.2592000C1-38873814.64581339.9062000C1-38973826.41281337.5522000C1-39073837.68981335.2972000C1-39173847.98581333.2381800C1-39273850.43681332.7471200C1-39373858.57581331.1191800C1-39473866.05181329.6242000C1-39573876.81481327.4721800结论:实测共点,合格点,合格率工程名称OPPO(重庆)智能生态科技园项目一期工
6、程(C区)工程部位区地下室序号桩位设计参数实测误差备注桩径桩径桩径C1-39673888.0981325.2161800C1-39773899.85781322.8631800C1-39873911.62481320.5091800C1-39973922.90181318.2541800C1-40073930.25581316.7831400C1-40173780.52181337.5521400C1-40273789.83681335.6892000C1-40373801.11381333.4342000C1-40473812.8881331.0812000C1-40573824.64781
7、328.7272000C1-40673835.92481326.4722000C1-40773846.2281324.4121800C1-40873848.67181323.9221200C1-40973856.8181322.2941800C1-41073864.28681320.7992000C1-41173875.04981318.6461800C1-41273886.32581316.3911800C1-41373898.09281314.0381800C1-41473909.85981311.6841800C1-41573921.13681309.4291800C1-41673928
8、.4981307.9581400结论:实测共点,合格点,合格率工程名称OPPO(重庆)智能生态科技园项目一期工程(C区)工程部位区地下室序号桩位设计参数实测误差备注桩径桩径桩径C1-41773778.75681328.7271400C1-41873788.07181326.8642000C1-41973799.34881324.6092000C1-42073811.11581322.2552000C1-42173822.88281319.9022000C1-42273834.15881317.6462000C1-42373844.45481315.5871800C1-42473846.9068
9、1315.0971200C1-42573855.04581313.4691600C1-42673862.52181311.9732000C1-42773873.28481309.8211800C1-42873884.5681307.5661800C1-42973896.32781305.2121800C1-43073908.09481302.8591800C1-43173919.37181300.6031800C1-43273926.72581299.1331400C1-43373776.37881319.262400C1-43473786.30681318.0392000C1-4357379
10、7.58381315.7842000C1-43673809.3581313.432000C1-43773821.11681311.0772000结论:实测共点,合格点,合格率工程名称OPPO(重庆)智能生态科技园项目一期工程(C区)工程部位区地下室序号桩位设计参数实测误差备注桩径桩径桩径C1-43873832.39381308.8212000C1-43973842.68981306.7621600C1-44073845.14181306.2721200C1-44173853.2881304.6441200C1-44273860.75681303.1482000C1-44373871.51881
11、300.9961800C1-44473882.79581298.7411800C1-44573894.56281296.3871800C1-44673906.32981294.0341800C1-44773917.60681291.7781800C1-44873924.9681290.3081400C1-44973774.68681314.244C1-45073775.13281310.61C1-45173784.44881308.748C1-45273795.72481306.492C1-45373807.49181304.1392000C1-45473819.25881301.785200
12、0C1-45573830.53581299.532000C1-45673840.83181297.4712000C1-45773843.28281296.982000C1-45873851.42181295.3522000结论:实测共点,合格点,合格率工程名称OPPO(重庆)智能生态科技园项目一期工程(C区)工程部位区地下室序号桩位设计参数实测误差备注桩径桩径桩径C1-45973858.89881293.8572000C1-46073869.6681291.7052000C1-46173880.93781289.4492000C1-46273892.70481287.0962000C1-463
13、73904.47181284.7422000C1-46473915.74781282.4872000C1-46573923.10281281.0162000C1-46673773.26481301.271C1-46773782.5881299.408C1-46873793.85681297.152C1-46973805.62381294.7991800C1-47073817.3981292.4461800C1-47173828.66781290.191800C1-47273838.96381288.1311400C1-47373841.41581287.6411200C1-47473849.5
14、5381286.0131200C1-47573857.0381284.5172000C1-47673867.79281282.3651800C1-47773879.06981280.111800C1-47873890.83681277.7561800C1-47973902.60381275.4031800结论:实测共点,合格点,合格率工程名称OPPO(重庆)智能生态科技园项目一期工程(C区)工程部位区地下室序号桩位设计参数实测误差备注桩径桩径桩径C1-48073913.87981273.1471800C1-48173921.23481271.6771400C1-48273771.4998129
15、2.446C1-48373780.81581290.583C1-48473792.09181288.3271800C1-48573803.85881285.9741800C1-48673815.62581283.621800C1-48773826.90281281.3651800C1-48873837.19881279.3061400C1-48973839.64981278.8151200C1-49073847.78881277.1881200C1-49173855.26581275.6922000C1-49273866.02781273.541800C1-49373877.30481271.
16、2841800C1-49473889.07181268.9311800C1-49573900.83881266.5771800C1-49673912.11481264.3221800C1-49773919.46881262.8511400C1-49873769.73481283.621C1-49973779.0581281.757C1-50073790.32681279.5021800结论:实测共点,合格点,合格率工程名称OPPO(重庆)智能生态科技园项目一期工程(C区)工程部位区地下室序号桩位设计参数实测误差备注桩径桩径桩径C1-50173802.09381277.1491800C1-502
17、73813.8681274.7951800C1-50373825.13781272.541800C1-50473835.43381270.481400C1-50573837.88481269.991200C1-50673846.02381268.3621200C1-50773853.581266.8672000C1-50873864.26281264.7141800C1-50973875.53981262.4591800C1-51073887.30681260.1061800C1-51173899.07381257.7521800C1-51273910.34981255.4971800C1-5
18、1373917.70381254.0261400C1-51473767.96981274.795C1-51573777.28481272.9321800C1-51673788.56181270.6771800C1-51773800.32881268.3231800C1-51873812.09581265.971800C1-51973823.37281263.7151800C1-52073833.66881261.6551600C1-52173836.11981261.1651200结论:实测共点,合格点,合格率工程名称OPPO(重庆)智能生态科技园项目一期工程(C区)工程部位区地下室序号桩位设
19、计参数实测误差备注桩径桩径桩径C1-52273844.25881259.5371400C1-52373851.73581258.0422000C1-52473862.49781255.8891800C1-52573873.77481253.6341800C1-52673885.5481251.281800C1-52773897.30781248.9271800C1-52873908.58481246.6721800C1-52973915.93881245.2011400C1-53073765.73881266.0632000C1-53173775.51981264.1071800C1-5327
20、3786.79681261.8521800C1-53373798.56381259.4981800C1-53473810.3381257.1451800C1-53573821.60781254.8891800C1-53673831.90381252.831800C1-53773842.49381250.7121600C1-53873849.9781249.2162000C1-53973860.73281247.0641800C1-54073872.00881244.8091800C1-54173883.77581242.4551800C1-54273895.54281240.1021800结论
21、:实测共点,合格点,合格率工程名称OPPO(重庆)智能生态科技园项目一期工程(C区)工程部位区地下室序号桩位设计参数实测误差备注桩径桩径桩径C1-54373906.81981237.8461800C1-54473914.17381236.3761400C1-54573763.97381257.2382000C1-54673773.75481255.2821800C1-54773785.03181253.0261800C1-54873796.79881250.6731800C1-54973808.56581248.3191800C1-55073819.84281246.0641800C1-551
22、73830.13881244.0051600C1-55273834.15881243.2011200C1-55373840.72881241.8871400C1-55473848.20481240.3912000C1-55573858.96781238.2391800C1-55673870.24381235.9831800C1-55773882.0181233.631800C1-55873893.77781231.2771800C1-55973905.05481229.0211800C1-56073912.40881227.551400C1-56173762.20881248.4132000C
23、1-56273771.98981246.4571800C1-56373783.26681244.2011800结论:实测共点,合格点,合格率工程名称OPPO(重庆)智能生态科技园项目一期工程(C区)工程部位区地下室序号桩位设计参数实测误差备注桩径桩径桩径C1-56473795.03381241.8481800C1-56573806.881239.4941800C1-56673818.07681237.2391800C1-56773828.37381235.181600C1-56873832.39381234.3751200C1-56973838.96381233.0611400C1-57073
24、846.43981231.5662000C1-57173857.20281229.4141800C1-57273868.47881227.1581800C1-57373880.24581224.8051800C1-57473892.01281222.4511800C1-57573903.28981220.1961600C1-57673910.64381218.7251200C1-57773902.26981215.0971200C1-57873909.7881213.9011200C1-57973760.44281239.5882000C1-58073770.22481237.6311800C
25、1-58173781.50181235.3761600C1-58273793.26881233.0221600C1-58373805.03581230.6691600C1-58473816.31181228.4141600结论:实测共点,合格点,合格率工程名称OPPO(重庆)智能生态科技园项目一期工程(C区)工程部位区地下室序号桩位设计参数实测误差备注桩径桩径桩径C1-58573826.60781226.3541600C1-58673837.19881224.2361600C1-58773844.67481222.7412000C1-58873855.43781220.5881600C1-58
26、973866.71381218.3331600C1-59073878.4881215.981600C1-59173890.24781213.6261800C1-59273901.52481211.3711200C1-59373758.87481231.7432000C1-59473768.65581229.7871600C1-59573779.93281227.5311600C1-59673791.69981225.1781600C1-59773803.46681222.8241600C1-59873814.74281220.5691600C1-59973825.03881218.511600
27、C1-60073835.62981216.3921600C1-60173843.10581214.8962000C1-60273853.86881212.7441600C1-60373865.14481210.4881400C1-60473876.91181208.1351400C1-60573888.53181205.3011400结论:实测共点,合格点,合格率工程名称OPPO(重庆)智能生态科技园项目一期工程(C区)工程部位区地下室序号桩位设计参数实测误差备注桩径桩径桩径C1-60673900.17181205.371800C1-60773757.30581223.8982000C1-60
28、873767.08681221.9421600C1-60973778.36381219.6871600C1-61073790.1381217.3331600C1-61173801.89781214.981400C1-61273813.17381212.7241400C1-61373823.4781210.6651600C1-61473833.96281208.0572200C1-61573841.56681207.1992200C1-61673852.56381206.4781400C1-61773864.18381205.9381400C1-61873876.34281205.5461400
29、C1-61973756.0181216.9172200C1-62073765.72381215.1271400C1-62173777.12781213.5091400C1-62273789.06181211.9891400C1-62373801.41681210.5382000C1-62473812.06581209.4792000C1-62573823.04281208.3371200C1-62673534.74681296.966结论:实测共点,合格点,合格率工程名称OPPO(重庆)智能生态科技园项目一期工程(C区)工程部位区地下室序号桩位设计参数实测误差备注桩径桩径桩径C1-62773540.22981295.869C1-62873530.76881288.931C1-62973537.003812
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 《正弦量的基本概念》课件
- 《多层厂房设计》课件
- 《GIS程序设计》课件
- 天津市 二手房合同范本
- 2025年许昌道路货运输从业资格证模拟考试题库
- 2025年黄冈道路运输从业人员从业资格考试
- 2025年马鞍山货运从业资格模拟考
- 2025年三门峡道路运输从业资格证考试题和答案
- 2025年牡丹江年货运从业资格证考试从业从业资格资格题库及答案
- 2025年日喀则货运模拟考试
- 浙江省嘉兴市2023-2024学年八年级上学期期末英语试题
- 水泵维护保养方案
- 库存管理中的供应与需求平衡
- 空表机械加工工艺过程卡片-工序卡片-工序附图
- 信息化作战平台
- 有机硅合成革行业报告
- 个人劳动防护用品的使用和维护安全培训课件
- 城市营销方案书
- 9205-2015版铁路工程试验报告表
- 《森林病虫害防治》课件
- 辽宁省沈阳市铁西区2023-2024学年七年级上学期期末考试英语试题(含听力)
评论
0/150
提交评论