版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、装置-MDA & UATSite Safety Practice现场安全规定forEmergency Response Plan紧急事件响应计划INDEX目录PURPOSE目的SCOPE范围LEVELS OF RESPONSE响应等级ACTIONS / REQUIREMENTS行动4.1GENERAL通则4.2RESPONSE TO EMERGENCIES 对紧急(事件)的响应EMERGENCIES紧急事件FIRE火灾VEHICLE ACCIDENTS 交通事故WEATHER EMERGENCIES 气候方面的紧急事件ENVIRONMENTAL RELEASE/RESPONSE ACTIONS
2、 环境性释放SECURITY INCIDENTS安保事故SITE EVACUATIONS现场疏散TRAINING / RESPONSE DRILLS 培训/应急演习TELEPHONE NUMBERS 应急电话号码APPENDICES附录Appendix 1 EMERGENCY RESPONSE CHECKLIST 附录 1 应急响应审核单PURPOSE目的The purpose of this procedure is to provide a safe system of work by the implementation of emergency response measures an
3、d to identify the responsibilities and legal requirements at worksites where Project has the prevailing influence. 本程序的目的是通过执行应急反应措施为工作提供一个安全体系,明确在项目工地的责任和法律要求。SCOPE 范围This procedure describes the actions to be taken by key personnel in the event of an emergency situation arising on Project Site and
4、 offsite construction activities associated with this project.本程序说明在项目现场及与项目有关的场外施工活动中出现紧急状况时,关键人员可以采取的措施(行动)。The procedure also caters for emergencies arising out of office hours.It is anticipated that notification of emergencies occurring during office hours will be via normalchannels. The respons
5、e arrangements will however, be as per the procedure. 本程序还考虑办公时间以外出现的紧急事件。在办公时间出现的紧急事件将由正常的渠道通知,响应安排将按本程序执行。LEVELS OF RESPONSE反应等级As emergency situations differ in severity, for the purpose of establishing the appropriate level of response required, incidents are ranked as Levels 1, 2 and 3.由于紧急事件发生
6、的严重等级各不相同,为了满足适当的响应级别的要求,将事故等级分为1, 2 和 3 级。Level 1 - This would be, but may not be limited to, a medical rescue, which is the result of illness or minor injury or minor incident.Some examples would be:级 - 包含疾病、轻微的伤害或事故导致的医疗救护在内的轻微事件。例如:An environmental spill of 1 barrel or less.1 只桶或不到 1 只桶(的化学品)溢溅至
7、环境中。A fire, that was extinguished with a hand held fire extinguisher. 可以用手提式灭火器扑灭的火灾。A single vehicle accident without injury 没有人员伤害的单独的车辆事故。 .In such instances the response would be limited to the immediate supervisor. 在这类事例中,响应(动作)应局限于直接的主管。Level 2 -This would be a medical rescue, which is the res
8、ult of an injury, caused by an accident, serious enough to require investigation and which may have beenreported to the local authority by the Contractor / Subcontractor.Some examples would be:级 -这将是一种医疗救助,是由于事故造成的伤害,它严重到足以要求调查(原因),它也可能已由承包商向当地有关部门报告,例如:An environmental spill greater than I barrel b
9、ut less than ten barrels.1 桶以上 10 桶以下的化学品溅溢至环境中。A fire requiring outside assistance. 要求外界援助的火灾。A vehicle accident resulting in minor injuries. 导致轻伤的车辆事故。In such instances, response would be limited to the Project Manager, Project / Construction HSE Manager or deputy. 这种情况响应只局限于项目经理,项目HSE安全经理或其代表。Lev
10、el 3 -This is an emergency situation, which has resulted in the mobilization of the site emergency response organization.In such instances the full ProjectEmergency Response Team will be mobilized. Some examples would be:级 -这种紧急事件会导致现场紧急事件响应组织的介入。此时,整个项目紧急事件响应小组都进入现场,例如:A major environmental spill 重
11、大的环境溢溅(事件)A major fire.重大火灾A vehicle accident resulting in fatalities or major injuries. 导致死亡和严重伤害的车辆事故The Primary Emergency Response Team is Described Below:初级紧急事故响应小组如下所述:Project Manager (Emergency Team Leader)项目经理(紧急小组领导人)Construction Manager (Alternate Emergency Team Leader)施工经理(紧急小组候补领导人)Contra
12、ctor / Subcontractor HSE Manager承包商 / 分包商 HSE经理Construction / Project HSE Manager项目 HSE经理A sufficient numbers of persons will receive Emergency Response Training to ensure that there is adequet coverage during absence periods.要有足够的人员经过紧急事故响应培训,保证有人缺席时有足够的人员可替代。Level 2 and above emergency respond mus
13、t report to owner timely and owner will attend investigation 二级和二级以上应急响应必须报告给业主,业主将参加调查ACTIONS / REQUIREMENTS行动General 通则In order that the Emergency Response Team can function properly the following will be provided: 为使紧急响应小组能正确发挥作用,必须提供如下(条件):A listing of all personnel employed and their work locat
14、ions.所有雇员的名单,及他们的工作场所。List of employees home addresses and telephone contact numbers 雇员家庭地址及联系电话号码清单 .Up-to-date roster list of Emergency Response Personnel and management personnel.紧急响应人员和管理人员的最新名册。Telephone numbers of Emergency Response Personnel. 紧急响应人员电话号码Contractors / Subcontractor emergency co
15、ntact numbers. 承包商 / 分包商的紧急联系(电话)号码。The allocation of an Emergency Response Center.紧急响应中心所在地Training for Emergency Response Team members.紧急响应小组成员的培训Periodic drills and simulation exercises. 周期性的练习和仿真实践Emergency Response FlowchartOutbreak of unplanned event on siteWithin controlFire or Explosion Chem
16、ical Spillage Structure Collapse or loss of stability Transport EmergencyNoActivation of Evacuation/Rescue PlanEvacuate through nearest exit / staircaseAll Emergency Personnel and Teams carry out dutiesAssemble at Designated Place状态在控制范围内 不需要疏散安全部门评估状态 决定采取的改正行动是状态是否在控制范围之内工人是否需要从建筑物或工作区域疏散状态失去控制需要疏
17、散紧急状态宣布项目经理或应急控制者宣布进入紧急状态Typical Facilities and Equipment for Emergency Response Centers 典型的紧急响应中心设施和设备Location: Toyo s site office 紧急响应中心的位置 :东洋现场办公室Arrangements and fittings布置和装备? Boardroom-style table and chairs桌子和椅子?Digital clock (day/date/24 hours)数字钟(星期 /日期 /24小时)?White board to record a centr
18、al log of events用来记录事件的白板?Additional white boards or flip charts (plain or pre-printed) to record specific categories of status information such as personnel at site, casualties, and external organisationsnotified额外的白板或卡片簿(普通或预印的)以记录特殊类别的情况信息,诸如在现场人员,人员伤亡,通知外界组织等。Communications通讯Equipment to include
19、:包括以下设备:Radios on an emergency frequency紧急频率上的无线电Dedicated mobile telephone移动电话,包括一只专门设置的“热线”电话,用来联系事故现场。 PC for word-processing, electronic mail, FAX machine etc. 一台用于文字处理、收发电子邮件的电脑和传真机等 Access to photocopier影印机Documents and stationery文件和文具To include:要包括:? Emergency telephone directories紧急通讯电话簿?Com
20、pany and area telephone directories公司和现场电话簿?Maps and diagrams at appropriate scales, . topographic maps, aerial photos, plans, flow schemes, drainage diagrams, firewater and electrical diagrams以适当比例画的地图和图表,如地形图、航摄照片、流程草图、排水系统图、消防水和电气(连接)图?Site plot plans (all major sites/locations/facilities)现场平面图,包
21、括所有主要的工地/位置 /设施Emergency response plans/procedures 紧急响应计划 / 程序Contractor and subcontractor emergency response plans 承包商和合作者的紧急响应计划Log sheets, together with any other standard forms 记录纸及其它各种标准表格Paper, pens, pencils, markers, etc 纸、钢笔、铅笔、记号笔 Organisation diagrams 组织(结构)图Material Safety Data Sheets (MS
22、DS). 物料安全数据表call.The Construction Management will carry a mobile phone at all times while on duty or when on 值班工程师在其当班时将随时身带移动电话和呼机。Out of office hours a telephone answering machine may be activated to provide callers with Project out-of-hours emergency telephone numbers. 下班后,应使电话应答机处于工作状态,以向来电者提供项目
23、下班时用的紧急电话号码。The identified conference room at Project will also serve as the Emergency Co-ordination Room, to provide a base from which the Emergency Response Team can co-ordinate efforts to help resolve any arising crisis. 项目的指定会议室也将用作紧急事故协调室,成为紧急响应小组的指挥中心,进行协调作业,协助解决出现的危机。Response to Emergencies 对
24、紧急事故的响应Level 1 1级The immediate supervisor has the responsibility to contact the Contractors HSE Manager /Engineer to provide full particulars of the emergency. The ContrHSE Manager / Engineer shall then take appropriate actions.直接的主管有责任与承包商HSE经理/工程师联系,向 (其)提供紧急事件的全部详情。然后承包商的HSE经理 /工程师必须采取适当行动。If for
25、 any reason the Contractors HSE Manager / Engineer cannot be contacted the call should be directed to the Areac tCioonn Mstarunager or designate, who caneither deal with the matter directly or contact other suitable personnel.如果由于种种原因,联系不上承包商的HSE经理 / 工程师,应直接打电话给区域施工经理或其指定人员,他可以处理这种事情或者能联系上其它合适人员。Lev
26、el 22级Above actions will also apply to Level 2 emergencies but in the event of a more serious accident or incident, Project/Construction HSE Manager, or his deputy, and the Area Construction Manager must be informed.Project/Construction HSE Manager shall commence incident investigation activities.对这
27、一级的紧急事件也要采取上述行动,但若事故较为严重,还应通知项目HSE经理或其副手、区域施工经理。项目HSE经理必须开始事故调查活动。Level 33级All calls concerning a level 3 emergency should be made to the Project Manager.On receipt of a call indicating that a Level 3 Emergency has arisen the followingactions shall be taken. Project Manager shall immediately contact
28、 all Emergency Response Team Members advising them of the situation and instructing them to proceed to the site of the emergency and if necessary to mobilize the Emergency Co-ordination Room. Once contact has been made the Project Manager should immediately proceed to the scene of the emergency.凡涉及
29、3 级的紧急事件均应打电话给项目经理。一旦收到出现 3 级的紧急事件的电话,应采取下列行动。项目经理应立即与全体紧急响应小组成员联系,告诉他 们发生的情况,并指示他们去事故现场,必要时将紧急事故协调室搬过去。一旦联系完毕,项目经理应立即去事故现场。HSE Manager that -tohred Einmateiorgne Rnocoy mC oIf the Emergency Co-ordination Room has been mobilized the Project Manager shall advise the Contractorshas been mobilized and
30、that all communications should be between the two centers. 一旦紧急协调室已经搬迁,项目经理应通知承包商HSE经理紧急协调室已完全搬好,所有的通信可在两个中心之间进行。Once the nature of the emergency has been established, the Project Manager must determine the extent of back-up and support required.He must also liaisewith the Contractors HSE Manager an
31、d establish whePthroejre ac t Representative is required at the Contractors premises, Police Headquarters, Hospital, etc.一旦紧急事件的性质已经确定,项目经理必须决定后援和支持的程度(范围) 。他还必须与承包商 HSE经理保持联系,以明确项目高级代表是在承包商办公室、 警察总部还是在医院等(为好) 。The Project Manager may require the Contractor to provide a print out of the up-to-date P
32、ersons on site list, for the affected location. 项目经理可要求承包商提供一份受害地点更新的“现场人员”名单。Anyone involved in an emergency response shall maintain a log of all information, (issued and received) and of all actions taken. For this purpose clear and legible notes on plain paper are acceptable.At the conclusion of
33、the emergency, the notes must be collated and stored for possible future scrutiny by management or authorities.A full de-brief meeting will be carried out as soon as practicable after the incident. 涉及到紧急事件的任何人应保留所有(发出的和收到的)信息的日记以及采取的行动记录。为此,可以接受在普通纸张上作明确而易读的笔记。事件结束后,笔 记必须加以分类保管,以备将来管理层或有关机关查阅。事故后应尽快
34、进行汇报会议。Should it be necessary for a Project Representative Team to attend the contractors prem ises, the nominated person must be equipped with all Project Persons-on-Site family names and contact telephone numbers plus mobile telephone numbers. 如果必须要有项目代表到承包商办公室,该指定人员必须配备以项目所有“在现场人员”集体名字、联系电话和手机号。M
35、edia - Media calls must be referred to Project Manager and Construction Manager If this proves to be impractical due to the contractor delaying release of information, the Project Manager may release a statement acknowledging awareness of the emergency, the location of the emergency and stating the
36、fact that Project Emergency Response Team has been mobilized and is working with the contractor to co-ordinate the response.媒体 -媒体的来电必须提交项目经理和施工经理。假如由于承包商推迟发布信息而使之不能进行时,项目经理可发布一项声名,告知对突发事件的注意、突发事 件的位置并指出事实上项目应急小组已调动,正与承包商一起工作以协调应对。Once the initial statement and further statements have been released,
37、 the Project Manager or his designate may be subjected to receiving numerous calls from the media. Only approved information given to them by Senior Project Management shall be issued. 一旦最初的声明和进一步的声明公布后,项目经理或其委派人可能会收到大量来自于媒体的电话。只有经高级项目管理部门同意提供给他们的信息方可发布。On no account should anyone dealing with the e
38、mergency, assume or surmise anything. 媒体应对小组决不能推测,假定或臆想任何事情。Emergency Evacuation - In the event that the emergency results i n the evacuation of personnel from the site, the contractors HSE Manager shall ensure thead count is conducted and that all employees have been accounted for and to arrange fo
39、r the evacuees to be cared for as appropriate.应急疏散 -在突发事件造成人员从现场疏散的情况下,承包商的HSE经理应确保进行“人头清点” ,所有雇员均有下落,对被疏散者安排相应的照料。Should personnel, (staff, agency, seconded), become hospitalized, the appropriate personnel department shall ensure arrangements are made for the injured parties family to be informed.一
40、旦有人员(职员、代理、临时调任的)住院,有关人员的部门应确保通知受伤方家属,并做好安排。EMERGENCIES紧急事件This section will outline procedures for addressing various emergency situations 这一部分将概述解决各种不同紧急情况的程序The Security Team is responsible for maintaining clear emergency routes and to assist in directing emergency equipment and personnel to an a
41、ffected area of the site.They willalso keep unauthorized personnel away from an emergency scene. 保安小组负责维持畅通的应急通道,并协助指挥应急设备和人员至现场的事发区域。他们还应使未授权的人员离开应急现场。FIRE 火灾Equipment: The Site HSE Team will inspect and maintain the site fire fighting equipment.设备: 现场 HSE小组将检查并保管消防器材。An appropriate number of site
42、personnel will be trained in the proper use of fire fighting equipment. The training will include hands on use of fire hoses and fire extinguishers. Site personnel must be informed to always use their individual judgment as to whether it is safe to attempt to fight a fire with available fire fightin
43、g equipment and they should never hesitate to leave the fire scene if they feel they are in imminent danger. 对适当数量的现场人员进行正确使用灭火设备的训练。训练将包括消防水管和灭火器的传递使用。现场人员须被告知在试图用现有的灭火设备进行灭火时,应始终判断 他们自己是否安全,并且他们在感到自身将陷于危险时千万不应犹豫,要立即离开火灾现场。When a fire is detected, personnel must be able to alert the Project HSE per
44、sonnel . By using an air horn and signally the international distress (SOS) three short blasts, a pause, followed by three long blasts). The person detecting the fire must alert personnel in the immediate area of the fire and those personnel can either attempt to use the portable fire extinguishers
45、and hoses to fight the fire or immediately evacuate the area. Once the Project HSE personnel arrive on the scene they will determine whether the local fire department or mutual agreement partners need to be summoned.Site personnel are not allowed to attempt to fight any fire using equipment brought
46、to the site by a local firedepartment or mutual aid partner.火灾发现时,人员首先必须使用现有的报警系统向项目HSE人员发出火灾出现的信号。例如,用汽喇叭(两声短促的响声,停顿,再接着三声短促的响声)。他们还必须说明伤害响应小组是否需要作出响应。发现火灾的人员必须向在火灾直接现场的人员报警,而这些人员既可以尝试用手提灭火器和水管灭火,也可以立刻从现场疏散。项目 HSE人员一旦抵达现场就应决定是否需要召唤当地消防部门或共同协议的合作方。现场人员不得试图用当地消防部门或者互援合作方带到现场的设备进行任何的灭 火。Once the fire
47、has been extinguished the affected Project Manager will ensure that a thorough incident investigation is conducted and that an incident report is prepared and duly communicated. The written report shall be sent to Project HSE department as soon as reasonably possible. 一旦火灾被扑灭,则事发的项目经理应确保进行彻底的事故调查,并准
48、备一份事故报告及时传达。报告应立即送达 HSE部门。VEHICLE ACCIDENTS车辆事故The individuals involved in or witness to a vehicle accident must immediately alert the Construction Manager and Project HSE Department. They must indicate whether there are actual or suspected injuries that require the attention of the Injury response
49、Team or local medical services. The Construction Manager may call for the dispatch of Security personnel and/or the Injury Response Team to the accident scene as required.涉及或目睹车辆事故的个人必须立即向施工经理和 HSE 部门报警。他们必需指出是否有实际或可疑的伤员需要引起伤害响应小组或当地医疗服务部门的注意。施工经理 可以在需要时要求派遣保安人员或伤害响应小组到事故现场。If summoned Security will
50、 secure the accident scene and determine whether the Construction Manager and the Manager of the Contractor affected by the accident should be notified. Once the scene is secured, Security will gather information and issue a written report. The Security Chief will initiate an investigation and with
51、the assistance of Project HSE Department will determine the causes and develop appropriate preventative measures. 保安部门在得到召唤后应保护事故现场并决定是否应通知事故相关的施工经理和承包商经理。现场一旦得到保护,保安部门应汇总信息并发表书面报告。保安部门主管在项目HSE部门的协助下认定原因,提出相应的预防措施。5.3WEATHER EMERGENCIES 气候方面的紧急事件Project HSE Department is responsible for drawing up c
52、ontingency plans for Typhoons and other inclement weather.Weather monitoring software is recommended to providehourly update reports to the Project Managers and Construction Managers; however, a formalized agreement with a local weather station may also be made to serve the purpose of attaining time
53、ly and accurate weather information.项目 HSE 部门将负责制订对于台风和其它恶劣天气的应急计划。建议预先安装天气监控软件,便于向项目经理和施工经理提供每小时的最新报告。然而,也可以和当地 气象站签订一个正式的协议,通过定期的服务获取正确的气象信息。Typhoons : The site will be made secure starting 48 hours prior to the potential arrival of a system that has winds greater than 75 kilometers per hour makes
54、 landfall.Within 12hours of the anticipated arrival of the system the site must be completely secure.台风 :现场将在风速每小时 75 公里的这一类大风可能抵达陆地之前48 小时开始进行保护。在预期抵达的十二小时之内,现场必须做好全部的安全防范措施。Securing the project site entails the following: Construction work will stop and focus on tying down loose material and equip
55、ment, disposal of rubbish / trash and garbage, securing objects and equipment that could become airborne, disconnecting electrical power to non-essential areas, lowering of crane booms and evacuation of non-essential personnel from the project site to a secure area. On an occurrence basis, the Proje
56、ct Manager will deal with other arising weather emergencies. 项目现场的安全要求如下:施工工作停止并捆住松散的材料和设备,处理垃圾/残屑和废料,固定那些可能被风刮走的物体和设备,切断不重要区域的电源,降下起重机的起重臂,并将无关紧要的人员从项目现场疏散到安全的区域。以此为基础,项目经理将处理其它的气象紧急事件。5.4 ENVIRONMENTAL RELEASE/RESPONSE ACTIONS 环境性泄漏 / 响应行动In the event of an Environmental Release the Project / Cons
57、truction HSE Manager must be notified immediately, who will in turn notify Emergency Response personnel. The type and magnitude of release and current weather conditions must be considered and the hazards thoroughly assessed before mobilizing emergency personnel. All Emergency Response personnel ent
58、ering the release area must wear the proper personnel protective clothing and respiratory protection.在环境性泄漏的情况下,必须立即通知项目HSE 经理,并由其通知应急小组成员。泄漏的类型和量度以及当时的天气状况必须予以考虑,并在调动应急人员之前对危险作出完全的评价。所有进入泄漏区域的应急小组成员必须穿戴合适的人身防护衣服和防毒面具。Non-Hazardous materials should be stopped at the source of release.Containment and
59、 clean up should begin as soon as reasonably possible.非危险性材料 应停放在释放原地。装封和清扫应尽快开始。Hazardous materials This site practice does not cover any significant Hazardous release. In case of significant release all personnel are to be evacuated from the immediate area and that area is to be cordoned / barrica
60、ded off.Containment must not proceed until the associated hazards are assessed and worker safety is assured.Clean up must not proceeduntil a Job Hazard Analysis and Safe Work Plan is developed that will assure the well-being of clean up personnel.危险性材料 这一现场操作不包括重大的危险性泄漏。在发生重大的泄漏时,所有人员均应从直接区域疏散且该区域应予
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2025年中考语文一轮复习:文学类文本阅读 讲义
- 河北省邢台市2024-2025学年高二上学期期末英语测试试题【含答案】
- 2025届江西省等九师联盟高三上学期1月期末联考英语试题【含答案】
- 2024-2025学年高中历史 第三单元 欧美资产阶级革命时代的杰出人物 第1课 英国革命的领导者克伦威尔(2)教学教学实录 新人教版选修4
- 2 丁香结 第二课时 教学设计-2024-2025学年语文六年级上册统编版
- 电影娱乐产业在线票务系统开发
- 电子元器件基础知识与选购操作手册(含图解)
- 区块链技术在环保领域的应用预案
- 2023一年级数学上册 八 认识钟表(小明的一天)配套教学实录 北师大版
- 本科毕业论文完整范文(满足查重要求)人工智能时代行政执法监督的变迁与应对
- 心理危机干预指导手册
- 抖音:短视频与直播运营全套教学课件
- 部编小学语文单元作业设计二年级下册第七单元
- 【真题】2023年镇江市中考化学试卷(含答案解析)
- 小米创始人雷军的创业经历
- 2023年江苏省苏州市吴江区中考一模数学试题
- 海南中维生物科技有限公司 蝗虫微孢子虫生物制剂项目 环评报告
- 房地产市场报告 -【年报】2023年全国总结与展望-易居克而瑞
- 【广西农产品出口东盟的现状、问题及优化建议分析11000字(论文)】
- 中国旅游地理(高职)全套教学课件
- 护理安全警示案例及分析
评论
0/150
提交评论