1、OEE: Overall Equipment Efficiency.IntroductionOEE DefinitionOEE measurementOEE case studyOEE analysis and improvementNew investment requestsContents.OEE measurement and improvement must be implemented:For heavy and expensive means that are a bottleneck comparing to the customer demand in order to de
2、liver, then, in order to provide datas to request a new investment.IntroductionOEE DefinitionOEE measurementOEE case studyOEE analysis and improvementNew investment requestsContents.OEE rate Calculation (%)Added value Operating time = Nb of good parts produced x Standard Cycle TimeNominal opening ti
3、me = Days of the week when the factory is open on a regular basis (ie including management, support functions,.)OEE =Added value Operating timeNominal opening timeStandard Cycle Time = The best ever observed respecting quality criteria.IntroductionOEE DefinitionOEE MeasurementOEE case studyOEE analy
4、sis and improvementNew investment requestsContents.OEE : Category of losses1 Planned stops (meals, breaks, training, meeting, planned maintenance, tests)2 Machine breakdowns and no planned maintenance6 Micro-stoppage and Slow down (what is left over after deducting the 6 other causes of losses) 5 No
5、 Quality (Parts manufactured but not good and rework)No OEE losses4 Organizational stops (Lack of tool, material, worker, punctual lack of load) 3 Change over timeTotal Available Time365 days x 24 hoursValue added operating time *Factory not opened on a regular basisOEE (%)100 (%)Nominal opening tim
6、e7 Equipment not open but factory open* Nb of good parts produced x Standard cycle time).What are Cycle time and Change over time?PRODUCT A1st PRODUCT BQuality not yet OKPRODUCT BQuality OKCycle Time (CT) = Time spent between I load part A until I load next part ACTCTChange Over time (C/O) = time be
7、tween last good part “A and first good part “BC/O timeUnloadingLoadingPRODUCT ATransformationCTUnloadingLoadingTransformation.How to track losses? “Production tracking formStandard form to be used: ATDPRO_APS_production tracking form_FC_*.xls.IntroductionOEE DefinitionMeasurementOEE case studyOEE an
8、alysis and improvementNew investment requestsContents.OEE case studyThursday AM:.Machine data recorded during one week:Part TypeABCGood parts753Rejects110Cycle Time5h2h1hNo OEE ReasonsNo instruction to work :8 hChange over1 h per C/O, 5 C/O per weekMaintenance for breakdown 3 hLack of worker1 worker
9、 during one shiftMachine breakdowns2 hMissing parts 1 hBreak30 min per shift.OEEAvailable Time : OEE calculation for one week :7535 h2 h1 h35 h10 h3 h48 h120 h= 5 x 24 h 40Openning Time?.OEE analysis :1 Planned stops (meals, breaks, training, meeting, planned maintenance, tests)2 Machine breakdowns
10、and non planned maintenance6 Micro-stoppage and Slow down (what is left over after deducting the 5 other causes of losses) 5 No Quality (Parts manufactured but not good and rework)4 Organizational stops (Lack of material, tool, operator, punctual lack of load) 3 Change over time 7 Time during which
11、the equipment isnt open and thus not supposed to work/Recorded by using: “Production tracking formCalculated/小的停机或速度减缓Recorded at mana-gement level1,5 h / day x 5 days方案停机时间1 h breakdown + 3h repair 非方案停机时间5 x 1h产品转换时间4 h + 1h管理缺失停机时间 1 A, 1 B and 0 C1 x 5 + 1 x 2 + 0 x 1质量不合格时间No work on third shif
12、t = 5 x 8h方案停产时间.No-OEE analysis :6 Micro-stoppage and Slow down (what is left over after deducting the 6 other causes of losses) =40 h=7,5 h=4 h=5 h=5 h=7 h68,5 h120 h 48 h 68,5 h3,5 h1 Planned stops (meals, breaks, training, meeting, planned maintenance, tests)2 Machine breakdowns and non planned
13、maintenance5 No Quality (Parts manufactured but not good and rework)4 Organizational stops (Lack of material, tool, operator, punctual lack of load) 3 Change over time 7 Time during which the equipment isnt open and thus not supposed to work1,5 h / day x 5 days1 h breakdown + 3h repair 5 x 1h4 h + 1
14、h 1 A, 1 B and 0 C1 x 5 + 1 x 2 + 0 x 1No work on third shift = 5 x 8h=.No-OEE Pareto34%6%6%4%4%3%3%Open time not usedNo-OEE = 60%Planned stopsNo qualityChange overOrganiza-tionnal stopsBreak downMicroStoppage.IntroductionOEE DefinitionOEE measurementOEE case studyOEE analysis and improvementNew inv
15、estment requestsContents.How to improve OEE ?Decrease no quality?Decrease break down?Decrease organisational stops?Decrease change over time?/.How to improve OEE ?No way ! It is by increasing customer demand So : increase equipment available time.Step 1 : Decrease CT, by decreasing loading and unloa
16、dingTransformationCTUnloadingLoadingTransformationCTUnloadingLoading.Step 2 : OEE compared to potential100 %(basis = Factory nominal opening time) OEE (%)Losses .Step 3 : No-OEE = Pareto 1%Total = No-OEE (%).Step 4 : Select the main causes and make a new Pareto if it is worth%.Step 5 : Decrease No-O
17、EE2 types :Changer OverOthers no-OEE .Step 5 : Decrease No-OEE Change OverX %Change over timeProduction time / dayAvailable time to Change Over is a DECISION.SMED action is needed to reach the time decidedNothing needed to doStep 5 : Decrease No-OEE Change OverIf daily C/O time Decision.Organization
18、They are unacceptableStep 5 : Decrease No-OEE Others no-OEESet up simple actions considering analysis and follow results by monitoringWhen main loss cause is Organizational Stops.Step 5 : Decrease No-OEE Others no-OEESet up simple actions considering analysis and follow results by monitoringWhen main loss cause is No QualityNo QualityMRPG action is needed.BreakdownTPM action is neededStep 5 : Decrease No-OEE Others no-OEESet up simple actions considering analysis and follow resu
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2023年陕西煤业新型能源科技股份有限公司招聘考试真题
- 2023年内蒙古日报社招聘工作人员笔试真题
- 2023年梅州市市直机关遴选公务员考试真题
- 2024年电器附件真空断路器项目申请报告范文
- 2023年河池市东兰县参加师范类毕业生就业笔试真题
- 病毒与人类研究报告
- 病房封闭管理实施方案
- 2024年刀杆项目提案报告
- 玻璃铸造问题研究报告
- 玻璃纤维格栅施工方案
- 清欠工作管理制度管理办法
- 三甲评审文件盒资料--终稿
- 铁路项目桥梁墩台身施工方案
- 工作岗位风险评估工作规程
- 智能存包柜(储物柜)产品技术说明书
- 常见化学式大全
- 電鍍技術資料大全
- 偏拉墙体配筋分析及建议课件
- 消防电气检验批质量验收记录表(共18页)
- 部编初中语文教材介绍(课堂PPT)
- 控轧控冷技术在钢材生产中的应用
评论
0/150
提交评论