降水施工方案_第1页
降水施工方案_第2页
降水施工方案_第3页
降水施工方案_第4页
降水施工方案_第5页
已阅读5页,还剩17页未读 继续免费阅读

下载本文档

版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领

文档简介

1、PAGE PAGE 22目 录 TOC o 1-2 h z HYPERLINK l _Toc305337303 一、编制依据 PAGEREF _Toc305337303 h 2 HYPERLINK l _Toc305337304 二、工程概况 PAGEREF _Toc305337304 h 2 HYPERLINK l _Toc305337305 三、工程地貌及水文地质概况 PAGEREF _Toc305337305 h 3 HYPERLINK l _Toc305337306 3.1、场地地层概况 PAGEREF _Toc305337306 h 3 HYPERLINK l _Toc3053373

2、07 3.2、水文地质条件 PAGEREF _Toc305337307 h 5 HYPERLINK l _Toc305337308 四、基坑降水方案设计 PAGEREF _Toc305337308 h 6 HYPERLINK l _Toc305337309 4.1、设计综述 PAGEREF _Toc305337309 h 6 HYPERLINK l _Toc305337310 4.2、降水方案设计 PAGEREF _Toc305337310 h 7 HYPERLINK l _Toc305337311 五、施工组织设计 PAGEREF _Toc305337311 h 14 HYPERLINK l

3、 _Toc305337312 5.1、施工准备 PAGEREF _Toc305337312 h 14 HYPERLINK l _Toc305337313 5.2、施工部署和施工工期 PAGEREF _Toc305337313 h 15 HYPERLINK l _Toc305337314 5.3、施工工艺 PAGEREF _Toc305337314 h 15 HYPERLINK l _Toc305337315 5.4、施工方法 PAGEREF _Toc305337315 h 16 HYPERLINK l _Toc305337316 5.5、抽水 PAGEREF _Toc305337316 h 1

4、9 HYPERLINK l _Toc305337317 5.6、基坑内深井封井措施 PAGEREF _Toc305337317 h 19 HYPERLINK l _Toc305337318 5.7、技术要求和质量保证措施 PAGEREF _Toc305337318 h 20 HYPERLINK l _Toc305337319 5.8、安全保证措施 PAGEREF _Toc305337319 h 21 HYPERLINK l _Toc305337320 5.9、文明施工管理规定 PAGEREF _Toc305337320 h 22 HYPERLINK l _Toc305337321 5.10、应

5、急预案 PAGEREF _Toc305337321 h 22附图:1、降水平面布置图2、明排水沟位置图一、编制依据二、工程概况本降水方案对整体基础开挖水位降深进行预测。拟建物为不规则矩形组合,根据总平面图按比例用计算机测量地下车库轮廓线以内开挖面积15432.35m2,开挖深度主楼从地面算起19.8m裙楼从地面算起17.5m,降水水位距离基坑底要求的深度为0.5m,主楼水位从地面算起应为20.3m。裙楼从地面算起18.0m,为了方便计算主楼降水井水位叠加计算选用A点,裙楼降水井水位叠加计算选用B点。然后计算降水井在同步排水时各计算点需要多少天才能达到地基开挖设计的深度。在降水工程布置时还要考虑

6、地基支护和开挖放坡原理,当降水需布在距开挖基坑外2.8m处,这样经推算降水井工程控制面积可达到18400m2,基础开挖和预测设计降水布井方案见“基础开挖降水施工布置图”。三、工程地貌及水文地质概况3.1、场地地层概况根据岩土工程勘察报告场地地层结构较为复杂,层序稳定,除地表浅部有填土地层外,其下均为第四系冲、湖湘地层,以粉质黏土、粉土、粉沙及细砂为主。在本场地勘察深度范围内(120m)场地土自上而下分为8层,现以层序分述如下: 第 eq oac(,1)层杂填土(Q4ml):杂色,主要由砖块,炉渣、建筑垃圾、生活垃圾等组成,稍湿,结构松散,均匀性差。平均厚度在1.92m,层底埋深0.504.80

7、m。 第 eq oac(,2)层粉土(Q4al):褐黄色,局部夹有粉质粘土透镜体活或薄层。稍湿,呈密实状态,摇振反应中等,无光泽反应,干强度及韧性低,具中等压缩性。平均厚度2.46m,层底埋深2.709.60m。 第 eq oac(,2)1 层粉土(Q4al):褐黄色,局部夹薄层粉土层,湿,呈硬塑状态,无摇振反应,稍有光泽反应,干强度中等,韧性中等,具中等压缩性。平均厚度2.08m,层底埋深2.5010.30m。 第 eq oac(,3)层粉土(Q4al):褐黄色,局部夹有粉质粘土透镜体活或薄层。饱和,呈密实状态,具低压缩性。平均厚度6.25m,层底埋深8.0026.5m。 第 eq oac(

8、,3)1 层粉土(Q4al):褐黄色,局部夹有粉质粘土透镜体活或薄层。稍湿,呈密实状态,摇振反应中等,无光泽反应,干强度及韧性低,具中等压缩性。平均厚度1.38m,层底埋深10.3013.60m。 第 eq oac(,3)2层粉土(Q4al):褐黄色,局部夹薄层粉土层,湿,呈硬塑状态,无摇振反应,稍有光泽反应,干强度中等,韧性中等,具中等压缩性。平均厚度0.88m,层底埋深12.4015.70m。 第 eq oac(,4)层粉土(Q4al):褐灰色,局部夹有粉土、粉质粘土透镜体或薄层。饱和,呈密实状态,具低压缩性。平均厚度10.02m,层底埋深17.3038.20m。 第 eq oac(,5)

9、层粉土(Q4al):褐灰色,局部夹有粉土、粉质粘土透镜体或薄层。饱和,呈密实状态,具低压缩性。平均厚度10.77m,层底埋深35.3055.20m。 eq oac(,5)1层粉土(Q4al):褐黄色,局部夹薄层粉土层,湿,呈硬塑状态,无摇振反应,稍有光泽反应,干强度中等,韧性中等,具中等压缩性。平均厚度3.90m,层底埋深41.2047.50m。 第 eq oac(,6)层粉土(Q4al):褐灰色,局部夹有粉土、粉质粘土透镜体或薄层。饱和,呈密实状态,具低压缩性。平均厚度17.96m,层底埋深66.0078.40m。 第 eq oac(,7)层粉土(Q4al):褐黄色,局部夹薄层粉土层,湿,呈

10、硬塑状态,无摇振反应,稍有光泽反应,干强度中等,韧性中等,具中等压缩性 。平均厚度9.82m,层底埋深75.586.5m。 第 eq oac(,8)层粉土(Q4al):褐灰色,局部夹有粉土、粉质粘土透镜体或薄层。饱和,呈密实状态,具低压缩性。平均厚度30.82m,层底埋深80.00120.00m。 第 eq oac(,8)1层粉土(Q4al ):褐灰色,饱和,呈密实状态,摇振反应中等,无光泽反应,干强度及韧性低,具中等压缩性。平均厚度2.00m,层底埋深92.60m。3.2、水文地质条件1、区域条件:根据当前人文地质成果资料,银川平原是一呈南北向延伸的地埑式断陷盆地。第四系以来在基底构造及新构

11、造运动的控制下,盆地内堆积了巨厚的松散沉积物。具地热钻探资料,在盆地中心第四系厚度到了1009m。在以细砂为主的地中层,间夹着多层粘砂土、砂粘土。结构松散、颗粒均匀的细砂,是地下水赋存好运动的良好介质。本次建筑物场区正地处银川冲湖积平原中段西部,地貌类型属黄河冲湖积二级阶地,上部地层结构较为单一,成因类型上为第四系松散沉积。含水层主要由第四系冲湖积细砂、粉细砂组成。上覆地下水以潜水的形式存在,水位埋深在7.27.89m左右,具微承压性质,区域上划分为第一含水组,下伏第二含水组均为承压水。第一含水组岩是本次降水的目的层,区域含水层厚度为5065.0m,下部有较为稳定的隔水 层,单井出水量6001

12、500m3/d左右,渗透系数3.018.87m/d,导压系数780996m2/d,地下水位埋深在丰水期小于8m,年水位变幅在0.51.0m。 2、场地降水条件:根据岩土工程勘察报告(1)目的层:上覆含水潜水层,钻孔深度120m已揭穿第一含水岩组,即第一含水层底板埋深在67.878.4m,含水层厚度经统计计算62.78m,物质成分多为细砂层,透水性较强。(2)静止水位:水文地质勘察报告(抽水试验)提供水位埋深在7.2-7.89。平均埋深在7.60m。(3)渗透系数:根据野外抽水试验资料,各种计算方法统计取平均值,细砂渗透系数为5.94m/d。与开挖区东侧的银川凯宾斯基饭店地基开挖降水索取渗透系数

13、5.18m/d基本相符。(4)水位降深设计值:根据自然地面起算高层主楼底层开挖深度-19.8m,开挖区内的水位降深必需在大于12.2m(即水位降至地面-20.3m以下)。裙楼底层开挖深度-17.5m,开挖区内的水位降深必须在大于10.5m(即水位降至地面-18.0m以下)。3、基坑开挖条件:自然地面其算底层开挖深度A点-19.8m,B点开挖深度-17.5m,基坑周边严格采用降水基坑边坡支护。四、基坑降水方案设计4.1、设计综述依据建筑物地基开挖的要求,场地地层的水文地质特征及场地周围建筑物状况,降水方案设计应满足以下要求: 1、首先应考虑到降水工作实施后对周围建筑物的影响。由于降水系统开始工作

14、后,将形成一个以施工场地为中心的地下降水落漏斗,其范围将随着水位的下降而不断扩大,这样原有建筑物地基的受荷载传导方式必定改变,且随地下水位的下降,地基土的可压缩性增大,建筑物的稳定性将受到影响,因此,地下水降落漏斗的范围应受到控制,降水井的水位应稳定慢速下降,且控制在一定的区间内。 2、以节约投资为宗旨,投入最少工作量,合理的井距,适宜的井深和井径,达到水位降深12.2m和10.5m,地面以下-20.3m和18.0m的目标值。 3、为确保降水工程不受基坑开挖工作干扰,以保证水位降深的持续稳定。因此,降水井的布置应在地基开挖线外扩2.8m处成井。 4、排水井布设在开挖区上边沿以外,并保留一定的放

15、坡位置,利用非稳定流理论计算排水井同步开采时需要几天才能达到开挖的目的深度。4.2、降水方案设计1、降水井的深度确定 HW=HW1+HW2+HW3+HW4+HW5+HW6 式中:HW降水深度(m); HW1基坑深度(m); HW2降水水位距离基坑底要求的深度(m); HW3降水井分布范围按水力坡度计算影响深度(m); HW4降水期间的地下水位变幅(m); HW5降水井过滤器工作长度(m); HW6沉砂管长度(m); HW=19.0+0.5+7.5+1+6+1 =35.0m 2、水文地质参数的选取和确定 如前所述,该工程施工场地为不规则矩形形状,经综合计算,降水井控制面积为18400m2。 根据

16、区域水文地质条件和现有水文地质资料,同时为了准确取得本次地基开挖降水设计取得的水文地质参数,在场地内布设了抽水主孔和三个观测孔的稳定流、非稳定流的抽水试验,第一落程下入50m3/h潜水泵,抽水24h。进行了稳定流抽水试验,并进行了水位恢复24h。第二落程下入65m3/潜水泵,进行了稳定流抽水试验,抽水24h,并进行了水位恢复24h。第三落程下入85m3/h潜水泵,按非稳定流完整井抽水试验程序进行,抽水时间100h,最后也进行了水位恢复观测工作。本次降水工程所利用的水文地质参数主要用于个落程计算的参数进行统计,认为可信程度较低的较大值和较小值均舍去,最后选取和周边水文地质参数接近的值的平均值进行

17、利用。 渗透系数取细砂抽水试验统计值K=5.94m/d,含水层导水系数T=769.5m2/d。给水度采用细砂参数0.18,推算出导压系数a=4275m2/d。降水井半径d=0.25m,开挖区A点水位降水为S=12.7m(由静止水位算起),B点水位将为S=10.4m(由静止水位算起),又根据降水的水力坡度和距离,推算出抽水井的水位降深应为S主=20.4m时,开挖区内A点水位才能降到12.7m,B点水位才能降到10.4m,含水层有效厚度经计算Ha=62.78m。3、降水方案计算(1)大口井引用半径的确定 ro=0.564 ro=76.5m(2)影响半径的确定 R=2S=788m(3)开挖基坑日总出

18、水量计算 Q=16577m3/d (4)试算法求出布井数(n为布井数) Q=Nq=.=16920m3/d n=47眼安全系数取1.28共需60眼井水。根据基坑边周边建筑物的条件,基坑内的水位应均匀下降,才能对周边已有建筑物地基稳定性不产生影响,考虑水泵距离抽水扬程实际出水量和水泵定额出水量现实有一定的差距,因此,用总出水量同水泵小定额15m3/h(360m3/d)之比计算出实际布设井数,共需47眼。(5)单井允许出水量15m3/h(360m3/d),实际采用的井的数和单井出水量nQ。大于基坑总出水量Q,因而热为布井数计算和推理是合理的,方案是可行的。(6)水位降深预测和抽水时间推算根据所布设的

19、降水井测量出各抽水井离地基开挖区中心的距离,利用潜水完整并非稳定流理论,各抽水井分别采用以下公式计算,最终求得抽水井连续抽水14天时,开挖区计算点A点水位能降到12.7m(地面算起20.32m),B点在抽水井连续16天时水位能降到10.52m(从地面算起18.12m),以满足于地基开挖的水位降水要求。可以推测出降水12天时地基可以开挖。公式:S=Ha-式中:S降水场区中心点的水位降深(m); Ha含水层有效厚度(m); Q单井允许抽水量m3/d; K含水层渗透系数(m/d); W(u)井函数(无钢量); = r抽水井距中心点的距离(m); a含水层导压系数m2/d t试算的抽水时间(天)。抽水

20、井布设距离、参数及抽水叠加降深计算见以下 A点井号距中心点距离R2W()S1.00158.0024964.000.101.783924.130.142.00142.0020164.000.081.983922.240.153.00124.0015376.000.062.233919.800.174.00107.0011449.000.052.513917.110.195.0092.008464.000.042.803914.310.226.0080.006400.000.033.073911.690.247.0070.004900.000.023.333909.170.268.0066.004

21、356.000.023.453908.060.279.0060.003600.000.023.633906.250.2810.0054.002916.000.013.843904.240.3011.0054.002916.000.013.843904.240.3012.0062.003844.000.023.573906.870.2813.0075.005625.000.023.203910.480.2514.0077.005929.000.023.153910.970.2415.0066.004356.000.023.453908.060.2716.0050.002500.000.014.0

22、03902.770.3117.0037.001369.000.014.593897.010.3518.0029.00841.000.005.083892.330.3919.0034.001156.000.004.763895.380.3720.0050.002500.000.014.003902.770.3121.0064.004096.000.023.513907.480.2722.0082.006724.000. 033.023912.160.2323.00102.0010404.000.042.603916.220.2024.00122.0014884.000.062.263919.51

23、0.1725.00137.0018769.000.082.043921.600.1626.00154.0023716.000.101.833923.680.1427.00156.0024336.000.101.813923.900.1428.00162.0026224.000.111.743924.560.1329.00136.0018496.000.082.063921.470.1630.00113.0012769.000.052.413918.110.1931.0091.008281.000.032.823914.100.2232.0070.004900.000.023.333909.17

24、0.2633.0052.002704.000.013.923909.520.3034.0040.001600.000.014.443898.500.3435.0040.001600.000.014.443898.500.3436.00131.0017161.000.072.133920.800.1637.00106.0011236.000.052.533916.930.1938.0083.006889.000.033.003912.380.2339.0059.003481.000.013.673905.930.2840.0036.001296.000.014.653896.480.3641.0

25、016.00256.000.006.263880.870.4842.0022.00484.000.005.633887.010.4343.0038.001444.000.014.543897.520.3544.0020.00400.000.005.823885.170.4545.009.0081.000.007.413869.770.5746.0030.00900.000.005.013892.980.3947.0053.002809.000.013.883903.890.30合计12.27抽水井布设距离、参数及抽水叠加降深计算见下表 B点井号距中心点距离R2W()S1.00100.00100

26、00.000.043.033912.070.232.0078.006084.000.023.523907.380.273.0065.004225.000.023.883903.910.304.0065.004225.000.023.883903.910.305.0078.006084.000.02 3.523907.380.276.00100.0010000.000.043.033912.070.237.001250015625.000.062.603916.240.208.00155.0024025.000.092.193920.170.179.00178.0031684.000.121.9

27、43922.650.1510.00201.0040401.000.15 1.713924.790.1311.00221.0048841.000.181.543926.420.1212.00243.0059049.000.221.383928.010.1113.00268.0071824.000.261.213929.620.0914.00275.0075625.000.281.173930.030.0915.00254.0064516.000.241.303928.740.1016.00225.0050625.000.191.513926.720.1217.00196.0038416.000.

28、141.763924.350.1418.00165.0027225.000.102.083921.300.1619.00137.0018769.000.072.433917.920.1920.00112.0012544.000.052.813914.200.2221.0083.006889.000.033.403908.560.2622.0068.004624.000. 023.793904.770.2923.0068.004624.000.023.793904.7702924.0077.005929.000.023.543907.140.2725.0097.009409.000.03 3.0

29、93911.500.2426.00100.0010000.000.043.033912.070.2327.0092.008464.000.033.193910.510.2528.0098.009604.000.043.073911.700.2429.0058.003364.000.014.103901.740.3230.0027.00729.000.005.623887.050.4331.0027.00729.000.005.623887.050.4332.0061.003721.000.014.003902.700.3133.0097.009409.000.033.093911.500.24

30、34.00133.0017689.000.062.483917.380.1935.00171.0029241.000.112.013921.940.1536.0013158.003364.000.01 4.103901.740.3237.0027.00729.000.005.623887.050.4338.0029.00841.000.005.483888.420.4239.0061.003721.000.014.003902.700.3140.0096.0092160.000.033.113911.310.2441.00134.0017956.000.072.473917.520.1942.

31、00171.0029241.000.112.013921.940.1543.00208.0043264.000.161.653925.380.1344.00126.0015876.000.062.583916.380.2045.00162.0026224.000.102.113920.970.1646.00200.0040000.000.15 1.723924.700.1347.00238.0056644.000.211.423927.670.11合计10.52 4、降水系统方案 本着经济、合理、切实可行的原则,根据理论计算及本地区的降水经验,布设降水井60眼(见附图),井距在基坑外围约2.8

32、m,井深36m,共布设42眼井,本工程由于场地跨度较大,基坑中部水位下降很慢,根据降水工程面积和以往降水工程经验,本工程需要在基坑内布设二排降水井,基坑内布设井数18眼,其中排距30m,井深30m,井距30m,该方案共布降水井60眼。所有水井成孔直径为650,滤水管采用内径350,外径450的无砂水泥滤管,滤料选用1mm3mm干净石英砂,以保证降水井内不会产生大量涌沙确保降水效果。 单井允许出水量15m3/h(360m3/d),实际采用的井点数和单排出水量大于16577 m3/d,并且考虑水泵远距离输水,因而认为布井数60眼日排水量超过了16577m3/d是合理的,方案可行。五、施工组织设计5

33、.1、施工准备1)、施工技术准备 . 施工前,应做好平面定位基准点和高程测量控制点的测设和复核工作。. 开工前根据地质勘察报告对各施工部位地段进行详细的了解,并召开技术交底会,将技术要求及时传达到机台班组。. 施工前各项准备工作完毕后,报审降水设计及施工方案。2)、施工现场准备工作 作好施工现场的平整和临时道路、临时供水、供电等管线的敷设;临时设施的搭设;现场照明设备的安装;材料堆放和储放; 3)、施工材料准备 .采购合格施工材料,质量证明资料齐全。 .进场材料全部进行复检,合格后方可使用。 .分阶段、分批次组织材料进场,保证施工进度要求。 eq oac(,4)、加强进场材料管理,避免不必要的

34、材料损失、浪费。4)、主要施工机械设备序号名 称型 号数 量1正(反)循环钻机FXHJ304台2潜水泵QS(R)40-39/3-7.538台3潜水泵QS(R)20-42/3-422台说明:为保证降水速度和质量,水位能迅速下降,在预定的时间内达到降水深度,并考虑基坑周围建筑物的安全,基坑周圈降水井内采用“大泵小泵隔一放一”的原则,基坑内的降水井全部采用大功率水泵。. 机械设备进场进行检修,确保机械设备运行时安全可靠。 . 机械设备进场后经常进行定期或者不定期的检查,经常对机械设备进行维护、保养。 . 配备足够的机械设备零部件,以备换用。5)劳动力准备本工程具有工期紧、规模大、标准高等特点。为保证

35、本工程顺利施工,将调集精干的队伍,性能良好的大型专用机械设备来组织施工。用我们类似工程的施工经验精心组织,精心施工,确保工程如期竣工,为后期结构施工创造条件。降水施工管理和主要技术人员配备如下:序号职务人数序号职务人数1管理人员3人4机械操作手20人2质检员1人5综合工40人3安全员1人5.2、施工部署和施工工期本工程的降水为整个工程的前期工程,后期须与土方挖运、结构施工相配合,此工序的质量和工期直接影响到后续工程的进度和质量。为了保证工期,根据地质勘察报告,安排降水井施工在高压旋喷后进行,第一步挖土深度为3.03.9m,第二层挖土深度为6.06.9m,在第二层挖土前,周边降水系统具备出水能力

36、。为此应合理安排施工顺序,科学组织和管理。本工程抽降水的周期是制约工期的关键。为缩短工期,充分利用场地开阔的有利条件组织多台钻机平行流水施工,成井、洗井、布置排水管、下泵等多道工序同步进行。降水井用4台套循环钻机施工,每天完成8口降水井施工,60口降水井施工总工期10天左右,降水管随后铺设完成。5.3、施工工艺降水井采用正(反)循环钻机成孔,以保证成孔质量。1、降水井施工工艺:施工准备井点定位机械设备就位成孔下管滤料填充洗井试运行运行。 2、排水施工工艺:施工准备放线沟槽开挖集水井、沉淀池砌筑管网安装试水土方回填。5.4、施工方法1、降水井施工:(1)施工准备:做好场地的“三通一平”工作,组织

37、施工人员、施工材料、施工进场设备。(2)井点定位: eq oac(,1)根据建设单位给定建筑物红线、建立降水井点平面控制网。 eq oac(,2)利用全站仪、经纬仪定位井点位置,并做好标记。 eq oac(,3)请相关单位进行验线,并做好记录。(3)机械设备就位: eq oac(,1)平整机械设备就位的场地,保证机械设备安装的水平度。 eq oac(,2)对机械设备安装前检查、有专业人员进行安装。 eq oac(,3)安装完毕后对机械设备进行水平度、垂直度、稳定性检查。 eq oac(,4)验收、试运行。(4)成孔:管径采用钻孔成孔,直径650,井管内径340,井深36米,当钻孔达到设计深度后

38、,加大进水量冲孔,将空内泥浆冲出,保证井内水的含泥量不大于5%。(5)下管: eq oac(,1)井管采用外径为420的水泥砂管。 eq oac(,2)将水泥砂管固定在托盘中,将托盘与井管放入井中。 eq oac(,3)井管之间采用土工布缠好并绑扎牢固。 eq oac(,4)滤水管采用双层滤网管包裹。 eq oac(,5)井管高出地面500mm,以防止地面杂物涌入井内。(6)滤料填充:填充料为优质砾石,井管下孔后彻底换浆,然后从井管四周均匀填料,开始时速度不宜过快,等降水管内出水后加快填料至自然地坪下1米,以上部分粘土回填至地面。(7)洗井:滤料填充完毕后进行洗井,在降水内沉入污水泵,污水泵沉

39、入水面3米以下,洗井时间部少于12小时。(8)试运行:降水井洗井后,安装潜水泵进行试运行,在抽水过程中测定抽水量、工作水压力等,并做好记录,校核实际抽水量与设计计算值是否相符,如有较大偏差时应及时调整降水方案。(9)运行: eq oac(,1)组织专人进行看护,保持水泵、供电系统正常运行。 eq oac(,2)派专人测量水位,水位降至设计水位前每天两次,水位降至设计水位时每天一次,并做好记录。 eq oac(,3)根据水位观测情况指导水位的开挖。 eq oac(,4)降水周期由设计单位确定。2、暗埋排水系统施工:(1)施工准备: eq oac(,1)组织人员、机械设备、施工材料进场。 eq o

40、ac(,2)熟悉图纸、方案、明白设计意图和施工要点。 eq oac(,3)进行施工人员的安全技术交底。 eq oac(,4)现场布置及水、电准备。(2)放线:根据给定控制线利用全站仪、经纬仪、水准仪、卷尺定位出施工井点、管沟、沉淀池位置标高,并做好标识记录。(3)土方开挖:土方开挖采用小型机械开挖,挖出的土方就近堆放,以便回填。(4)集水井、沉淀池砌筑: eq oac(,1)人工平整土方、浇注100厚C10混凝土垫层 eq oac(,2)集水井、沉淀池砌筑采用粘土砖砌筑。集水井要满足上人要求,并设置钢筋上下人梯,长1600mm,厚240mm,M5水泥砂浆砌筑,高出地面200mm。 eq oac

41、(,3)井(池)内壁用1:3的防水砂浆抹20mm厚做找平层,其内表面要抹平压光,阴阳角做半径为50mm圆弧后做两道1mm厚JS型防水涂料,防水涂料表面抹20mm厚砂浆保护层;流水槽使用混凝土,且高度不小于排水管径的四分之三;现场设三个排水出口,使用三级沉淀池后排入市政管网。(5)管网安装: eq oac(,1)降水井内至集水井采用管径110mm聚乙烯塑料管,利用喷灯、铁丝捆扎接头。 eq oac(,2)集水井以内采用内径400mm波纹管,管道底部铺200mm厚细砂,接缝部位打入发泡胶,保证密实,接口部位外灌C20细石混凝土防止渗漏。排水管道坡度为0.1%0.3%,坡向沉淀池。波纹管地埋,考虑到

42、冬季施工,埋设深度不小于1.1米。集水井与波纹管接头部位采用细石混凝土灌注,管子四周砼厚度不小于100mm(6)闭水试验:管网安装完毕后利用降水井向排水系统内注水,灌满水后浸泡24小时,进行闭水试验,检查是否渗漏,对渗漏点进行修复。(7)土方回填:闭水结束后,进行土方回填,第一层细砂,回填厚度高于灌顶200,不进行夯实。以上每层厚度300,利用平板夯夯实。3、明排水沟施工:基坑降水方案中以暗埋排水系统为主,考虑到暗埋排水系统在使用过程中不宜监测,系统失效时返修处理的时间长,且处理期间降水工作不能停止;万一暗埋排水系统失效后处理不及时,导致基坑涌水,影响基坑锚索支护体系,不仅安全隐患大,而且对地

43、下结构的危害性也极大。故,考虑到暗埋排水系统的这一弊端及提高应急处理的能力,冠梁边做一套备用的明排水系统,排水能力不低于暗埋排水系统。在2011年冬期施工和地下两层结构施工期间,采用明排水系统。冠梁边做一套备用明排水沟:明沟宽400mm,沟深700mm,明沟采用M5水泥砂浆砌筑粘土砖,壁厚240mm;为防止降水过程中因不均匀沉降导致沟底开裂渗水,故沟底需加强处理。沟底原土夯实后做500厚3:7灰土垫层,再浇筑200mm厚C20细石混凝土垫层;沟壁内侧抹1:3防水砂浆找平层,其上刷2道1mmJS防水涂料,表面再做20mm厚1:3水泥砂浆保护层。排水沟上覆盖成品混凝土篦子,尺寸为400X600X3

44、5。具体位置及做法见附图。5.5、抽水本工程降水时间长,降水施工期间成立由机电部负责的降水施工队,昼夜24小时监护,确保降水的连续性和降水施工的成功。降水井开始抽水时水泵不能一次性放到井底进行大降深抽水,否则井中水跃值过大,反复几次将破坏井管和所填滤料,造成井内大量涌沙现象,抽出的水中含沙量太大,深井淤积而报废。抽水电泵应每次下放3m5m。5.6、基坑内深井封井措施基坑内的降水井在降水任务完成后进行回填封井,具体措施如下:1、在施工底板砼前井口放置3mm厚直径为400mm的钢护筒,安装高度为高出底板顶面5厘米,保证降水井继续抽水。钢护筒外围预设两道钢圈,第二道钢圈设防水密封橡胶垫、压紧钢板,防水层施工压其上。具体做法见下图,底板砼达到一定强度后吊出水泵开始封井。 封井示意图2、封井时井内采用级配砂石回填,填至底板底标高

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论