版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、China Nuclear Industry 23rd Construction Co.中 国 核 工 业 第 二 三 建 设 公 司Page PAGE 21 of NUMPAGES 21目 录Table of Contents TOC o 1-1 h z u HYPERLINK l _Toc173410648 1.工程概况 PAGEREF _Toc173410648 h 2 HYPERLINK l _Toc173410649 Work Overview PAGEREF _Toc173410649 h 2 HYPERLINK l _Toc173410650 2.吊装要求 PAGEREF _To
2、c173410650 h 4 HYPERLINK l _Toc173410651 Lifting Requirements PAGEREF _Toc173410651 h 4 HYPERLINK l _Toc173410652 3.施工程序 PAGEREF _Toc173410652 h 5 HYPERLINK l _Toc173410653 Construction Procedure PAGEREF _Toc173410653 h 5 HYPERLINK l _Toc173410654 4.吊装方法 PAGEREF _Toc173410654 h 6 HYPERLINK l _Toc173
3、410655 Brief Description of Lifting Method PAGEREF _Toc173410655 h 6 HYPERLINK l _Toc173410656 5.25.63m层吊梁焊接 PAGEREF _Toc173410656 h 6 HYPERLINK l _Toc173410657 6.挂设吊装用倒链 PAGEREF _Toc173410657 h 7 HYPERLINK l _Toc173410658 7.PM21-FB002的二次吊装 PAGEREF _Toc173410658 h 7 HYPERLINK l _Toc173410659 The 2nd
4、 Lifting PM21-FB002 PAGEREF _Toc173410659 h 7 HYPERLINK l _Toc173410660 8.PM21-FB001的二次吊装 PAGEREF _Toc173410660 h 10 HYPERLINK l _Toc173410661 The 2nd Lifting PM21-FB001 PAGEREF _Toc173410661 h 10 HYPERLINK l _Toc173410662 9.PM21-FB003的二次吊装 PAGEREF _Toc173410662 h 11 HYPERLINK l _Toc173410663 The 2n
5、d Lifting PM21-FB003 PAGEREF _Toc173410663 h 11 HYPERLINK l _Toc173410664 10.现场清理 PAGEREF _Toc173410664 h 16 HYPERLINK l _Toc173410665 Clear site PAGEREF _Toc173410665 h 16 HYPERLINK l _Toc173410666 11.技术安全要求 PAGEREF _Toc173410666 h 16 HYPERLINK l _Toc173410667 Technical & Safety Requirements PAGERE
6、F _Toc173410667 h 16 HYPERLINK l _Toc173410668 12.工机具及材料计划 PAGEREF _Toc173410668 h 18 HYPERLINK l _Toc173410669 Tools & Equipment, Materials Plan PAGEREF _Toc173410669 h 18 HYPERLINK l _Toc173410670 13.吊装施工人力资源计划 PAGEREF _Toc173410670 h 19 HYPERLINK l _Toc173410671 Lifting Construction Manpower Plan
7、 PAGEREF _Toc173410671 h 19 HYPERLINK l _Toc173410672 14.吊架型钢受力分析 PAGEREF _Toc173410672 h 19工程概况Work Overview编制说明Notes for Preparation概述General为了使PM21-FB001/FB002/FB003三台设备的二次吊装就位正常有序地进行,保证起重工作的安全,根据力求施工成本最低、施工周期最短、确保技术可靠的方案编制原则,根据国家、业主的规范要求,特编制此吊装方案,以说明吊装施工方法、施工用料、吊装顺序。In order to ensure normal and
8、 proper field loading, 2nd-time transportation and lifting of 3 sets of equipment PM21-FB001/FB002/FB003 safety and successful completion of the work, this lifting procedure is specially prepared as per the national standards and the Owners specification requirements in the principle of lowest const
9、ruction cost, shortest construction duration and reliable technology to elaborate the lifting construction method, construction materials and lifting sequence.我方于20007年7月19日用ATF110-5 110t吊车将PM21-FB001/002/003连带运输鞍座水平的吊装到16.4m层,暂时存放在5/6轴线与A/D轴线之间,其具体放置位置如下图所示:On July 19, 2007, CNI23 lifted the equipm
10、ents PM21-FB001/FB002/FB003 together with their transportation saddle horizontally to the 16.4m floor, placing them temporarily axis 5/6 and A/D by using ATF 110-5 (110t) crane. Specific position is shown as below:图1 第一次吊装放置平面示意图Sketch1 Primary lifting position plan view图2 第一次吊装放置剖面示意图Sketch 2 Secti
11、on view for the primary lifting position编制依据References有关设计技术文件;Relevant design documents;设备到货后的实际参数重量 Changed weight after equipment delivery to site;;国家及BAYER公司相关规程、规范、标准; National codes & standards, relevant Bayer specifications;化学工业建设起重施工规范HGJ201-83; Construction Code for Chemical Industry Constr
12、uction LiftingHGJ201-83; 我公司BAYER项目部所拥有的工具、索具; Tools and riggings owned by our Bayer project management; 吊装与运输任务Lifting & Transportation Work在本次施工中,需完成下表所列设备的装车、现场二次运输及吊装就位。During this construction, the loading, field 2nd-time transportation and lifting of the equipment listed in the following table
13、 are required to be completed.设备参数:Equipment parameters:Tag No.位号Inst. Elevation安装标高mLocation位置Dia.直径Length长度Net Wt.净重tPM21-FB00225.63BD56D=250057809.46PM21-FB00125.63BC56D=280066008.518PM21-FB00325.63BC56D=250057809.46设备位置如下图所示The equipment locations are shown as the following sketch 图3/设备就位位置图Sket
14、ch 3: Equipment in-position sketch设备吊装顺序Lifting sequence PM21-FB002-PM21-FB001-PM21-FB003 在进行二次吊装的时候,主要是确保PM21-FB001先于PM21-FB003吊装就位,否则PM21-FB003将没有翻转竖立的空间。During 2nd lifting, the in-position of PM21-FB001 should be done prior to PM21-FB003, or there will be no space for the turnover of PM21-FB003.吊
15、装要求Lifting Requirements中建已经将25.63m的钢梁安装完毕。The steel beam on 25.63m elevation has been installed by CSCEC and is qualified through acceptance. 吊装设备用的吊架制作完毕并检验合格。Lifting supports heaved fabricated and inspected rightly.将3个吊架安装到25.63m层钢梁上,吊架上的吊耳分别位于3个设备的就位中心。Lifting the three lifting supports on 25.63m
16、 steel layer beams and installation on beams, make the lug locate on each equipment position center.在每台设备吊装之前安装好顶部盲板吊具。Blind plate lifting tool should be installed properly before lifting equipment.25.63m层的钢梁与吊架上的倒链拴挂完毕。在钢梁与钢丝绳圈之间垫一层厚橡皮垫或者1/4圆钢管,胶皮垫与圆钢管用铁丝绑在钢梁上。Chain block on the 25.63m floor has be
17、en fixed properly. Pad a layer of rubber cushion or 1/4 round steel tube between the steel beam and steel rope; rubber cushion and round steel tube is fixed to the beam by iron wire. 图4 25.63m钢梁上倒链挂设示意图Sketch 4 Sketch for the chain block to be used on the beam of elevation 25.63m 注:除了标明的2个20t与4个10t倒
18、链外,其余的均为5t倒链,5t倒链可以在吊装就位完一台设备之后再安装吊装另一台设备的倒链。Note: Except the two 20t and four 10t chain blocks indicated, other chain blocks are all 5t. The 5t chain block for the lifting of next equipment can be installed after the first equipment is lifted in-position.在25.63m层钢梁上设置好生命索。Properly set the life line
19、 on the beam on the 25.63m floor. 施工程序Construction Procedure设立吊装警戒线Set alarming line for lifting 25.63m层安装吊架Install lifting supports 25.63m层挂设倒链Fix chain block on the 25.63m floor安装盲板吊具Install blind plate tool for Lifting设备翻转竖立 Lift equipment up and turn it upright设备吊装就位Lift equipment in-position安装弹
20、簧吊架Installation spring hanger清理现场House-keeping吊装方法Brief Description of Lifting Method在设备的顶部与尾部两端连接倒链,倒链的另一端连接在拴挂在25.63m钢梁上的钢丝绳圈上,通过倒链将设备翻转竖立,然后移位到安装位置就位,等安装好弹簧吊具后,拆除倒链,完成整个设备的安装就位过程。Fix chain block to the equipment top and end; connect the other end of the chain block to the iron rope ring on the 25
21、.63m steel beam; turn and set the equipment upright by chain block, then move the equipment to the installation location; after the spring lifting tool is installed, remove the chain block, then complete the entire equipment installation and in-position process.25.63m层吊架焊接Lifting support welding at
22、the 25.63m floor. 待土建钢结构复位完成,检查合格以后,我们即可25t以上吊车将3个吊架吊到PM21-FB001/002/003钢结构基础的横梁上面,吊架距离5轴线1250mm平行摆放,将吊加立柱与钢梁段接固定。安装位置如图4所示,吊架的具体计算见后。Upon completion of steel structure restoration and it is acceptable, lift 3 lifting supports onto main beams of structure foundation for PM21-FB001/002/003, fix the s
23、upport on the steel beam by welding; put them in parallel with a distance of 1250mm to the axis 5. See the sketch 4. Bearing force calculation of lifting support in the end of the plan. PM21-FB003的临时吊架需要从已经安好的钢结构支架间穿入安装,它们之间的尺寸间距如下图所示。The lifting support for PM21-FB003 need through in the steel supp
24、ort installed on 25.63m layer beams, space between of them as the following sketch.图5 PM21-FB003钢结构支撑与临时吊架之间间距示意图Sketch 5 space between of steel support and lifting support挂设吊装用倒链Fix chain block for lifting按照图4所示挂设二次吊装用倒链,除了标明的2个20t与4个10t倒链外,其余的均为5t倒链,5t倒链可以在吊装就位完一台设备之后再安装吊装另一台设备的倒链。Fix chain block
25、used for 2nd lifting according to sketch 4; Except the two 20t and four 10t chain blocks indicated, other chain blocks are all 5t. The 5t chain block for the lifting of next equipment can be installed after the first equipment is lifted in-position.PM21-FB002的二次吊装The 2nd Lifting PM21-FB002拆除N1法兰的盲板,
26、安装盲板吊具,。在N1法兰面与盲板吊具之间需垫上一层薄胶皮,防止损坏N1 法兰面。盲板吊具用28个M30的镀锌螺栓安装,锁紧垫圈与螺母。在拆除N1法兰盲板到盲板吊耳安装完毕的过程中注意不要污染设备内表面。Remove the blind plate of flange N1, and install the blind plate lifting tool. Pad a layer of thin rubber cushion between the flange N1 face and blind plate lifting tool to prevent damage to flange
27、N1 face. The blind plate lifting tool is installed by 28 galvanized M30 bolts.使用爬梯,在设备顶部的位于水平方位(设备0与180方位)的两个吊耳上分别各连接2个5t倒链,在盲板吊耳上连接一个20t倒链,在设备的尾部吊耳上连接一个10t倒链。Use ladder to fix two 5t chain blocks to each of the two horizontal lifting lugs (at direction of 0 and 180 of the equipment) on top of the e
28、quipment; fix one 20t chain block to the lifting lug of the blind plate, and fix a 10t chain block to the lifting lug at the rear of the equipment. 图6 PM21-FB002 倒链连接示意图Sketch 6: chain block fixing for equipment PM21-FB002拆除设备与运输鞍座之间的紧固绳。Remove the fixing rope between the equipment and the transport
29、ation saddle. 拉紧与设备本体连接的4个5t倒链与1个10t倒链,将设备提起200mm,移走运输鞍座。Tight the four 5t chain blocks and one 10t chain block fixed to the equipment body to lift the equipment 200mm up and remove the transportation saddle. 图7 PM21-FB002 提起200mm移走鞍座示意图Sketch 7: Lifting equipment PM21-FB002 up to remove the saddle通
30、过5个倒链的配合,将设备翻转竖立。稍微拉紧20t倒链。Turn and set the equipment upright through the joint handling of the five chain blocks. Tight the 20t chain block slightly. 图8 PM21-FB002 翻转竖立示意图Sketch 8: Setting the equipment PM21-FB002 upright 拆除尾部翻转倒链。 Remove the turning chain block at the rear通过连接在设备顶部的4个5t倒链使PM21-FB0
31、02的中心位于安装中心。 Put the equipment PM21-FB002 center in position by four 5t chain blocks fixed on the equipment top拉紧20t倒链,使其逐步承受PM21-FB002的全部重量。 Tight the 20t chain block to make it bear all the weight of PM21-FB002 gradually.调整设备方位与设备标高,使其施工图纸上的要求相一致。 Adjust the equipment location and elevation accord
32、ing to the construction drawing.在设备上的两外两个吊耳上(设备90与270方位)安装弹簧吊具。 Fix spring lifting tools to the two lifting lugs (at the direction of 90 and 270) on the equipment.挂设好安全带,拆除连接在PM21-FB002设备本体吊耳上的4个5t倒链。Fix the lifting belts securely and remove the four 5t chain blocks fixed to the four lifting lugs on
33、 the equipment PM21-FB002 body.拆除安装在25.63m层钢梁上吊装PM21-FB002的5个倒链。 Remove the five chain blocks on the beam used to lift equipment PM21-FB002 on the 25.63 floor.图9 PM21-FB002就位时倒链剩余长度示意图Sketch 9: Remaining chain block length when PM21-FB002 is in-positionPM21-FB001的二次吊装The 2nd Lifting PM21-FB001按照图4所示
34、挂设好吊装PM21-FB001的倒链,由于设备重量为8.5t,连接在设备盲板吊具上倒链载荷量为10t。Fix chain block used to left equipment PM21-FB001 as shown on the sketch 4; as the equipment weights 8.5t, the load of chain block fixed to the blind plate lifting tool is 10t.按照吊装PM21-FB002的方法完成PM221-FB001的二次吊装就位。Complete the 2nd lifting and in-pos
35、ition for equipment PM221-FB001 through the way used to lift PM21-FB002.图10 PM21-FB001就位时倒链剩余长度示意图Sketch 10: Remaining chain block length when PM21-FB001 is in-positionPM21-FB003的二次吊装The 2nd Lifting PM21-FB003按照图4所示挂设好吊装PM21-FB003的倒链。Fix chain block used to left equipment PM21-FB001 as shown on the
36、sketch 4拆除N1法兰的盲板,安装盲板吊具,。在N1法兰面与盲板吊具之间需垫上一层薄胶皮,防止损坏N1 法兰面。盲板吊具用28个M30的镀锌螺栓安装,锁紧垫圈与螺母。在拆除N1法兰盲板到盲板吊耳安装完毕的过程中注意不要污染设备内表面。Remove the blind plate of flange N1, and install the blind plate lifting tool. Pad a layer of thin rubber cushion between the flange N1 face and blind plate lifting tool to prevent
37、 damage to flange N1 face. Install the blind plate lifting tool by 28 galvanized M30 bolts, and then fix the washers and nuts. Pay attention in order not to contaminate the inner surface of equipment in the process of removing blind flange N1 and installing lifting lug for blind flange. 使用爬梯,将挂设在25.
38、63m层横梁上的4个倒链与设备本体90与270方位的两个吊耳连接,将挂设在吊架上的20t倒链与盲板吊具连接。Use ladder to connect the four chain blocks fixed to the beam on the 25.63m floor to the two lifting lugs at the direction of 90 and 270 of the equipment body, and connect the 20t chain block fixed to HW175 and the blind plate lifting tool. 图11 P
39、M21-FB003倒链连接示意图Sketch 10: Chain block fixing for PM21-FB003拆除设备本体与设备鞍座之间的紧固绳。Remove the fixing rope between the equipment body and the saddle.拉紧连接在设备顶部的4个5t倒链,配合第一次吊装时留在尾部的1个10t倒链,将PM21-FB003提起200mm,移走设备运输鞍座与临时道木。Tight the four 5t chain blocks on top of the equipment, and also use the 10t chain blo
40、ck on the equipment rear used in the first lifting to raise the equipment PM21-FB003 200mm up and remove the transportation saddle and temporary sleeper.图12 /Sketch 12 PM21-FB003提升200mm移走运输鞍座示意图Sketch 12: raise the equipment PM21-FB003 200mm up and remove the transportation saddle通过连接在设备顶部吊耳上的4个5t倒链
41、与第一次吊装时的10t倒链,将PM21-FB003向C轴方向移动。Use the four 5t chain blocks fixed to the lifting lug on top of the equipment and the 10t chain block used in the first lifting to move equipment PM21-FB003 towards axis C.图13 PM21-FB003向C轴移出示意图Sketch 13: move the equipment PM21-FB003 out of axis C通过上述5个倒链与连接在设备尾部吊耳上
42、的另一个10t倒链,将PM21-FB003 翻转45。Use the above-mentioned five chain blocks and another 10t chain block fixed to the equipment rear to turn the equipment PM21-FB003 forty-five degree.图14 PM21-FB003翻转45示意图Sketch 14: turn 45 for the equipment PM21-FB003拉紧连接设备尾部吊耳上靠近B轴的10t倒链,使其承受溜尾载荷,拆除第一次吊装时保留的10t倒链。Tight th
43、e 10t chain block fixed to the lifting lug at the equipment rear and close to axis B, to bear the tailing load and remove the 10t chain block left over by the first lifting.继续起升设备顶部的倒链,通过溜尾倒链的配合将PM21-FB003 完全翻转。Continue to lift the chain block on top of the equipment, and also use the tailing chain
44、block to turn the equipment PM21-Fm003.图15/ Sketch 15 PM21-FB003翻转竖立示意图set and turn the equipment PM21-FB003upright拆除溜尾用10t倒链。Remove the 10t tailing chain block.通过连接在设备顶部吊耳上的4个5t倒链将设备向5轴移动,使PM21-FB003的中心距离5轴1250mm。Use the four 5t chain block fixed to lifting lug on top of the equipment to move the e
45、quipment toward axis 5, to make the center of equipment PM21-FB003 has a distance of 1250mm to axis 5.图16 PM21-FB003中心就位示意图Sketch 16: Equipment PM21-FB003 center in-position同时拉紧连接在盲板吊具上的20t倒链,使其承受PM21-FB003 的全部载荷。Tight the 20t chain blocks fixed to the blind plate lifting tool to make them bear all
46、the load from PM21-FB003. 拆除与设备本体吊耳连接的4个5t倒链,将靠近6轴线两个5t倒链中的一个与盲板吊耳连接。Remove the four 5t chain blocks connected to the lugs of equipment, connect one of the 5t chain blocks that is close to the axis 6 with blind plate lug. 通过连接在设备盲板吊耳上的两个倒链将PM21-FB003拉向6轴线,偏移距离约800mm,以满足设备顺时针旋转90不碰撞5/B轴上的立柱。Get the P
47、M21-FB003 close to the axial line 6 with the assistance of two chain blocks connected to the blind plate lugs of equipment about 800mm not to touch the post on 5/B axis when rotating clockwise 90图17 /Sketch 17 PM21-FB003向6轴偏移800mm示意图在16.4m层,用爬梯在设备上拴牵引绳,将PM21-FB003 顺时针旋转90,使设备方位满足安装要求。在旋转的时候,要注意避免设备接
48、管嘴与PM21-CA001、立柱相碰撞。Fix control rope to the equipment on the 16.4 floor to turn it 90 in anticlockwise direction to meet the installation requirement. Turning should be done while lifting to prevent collision of equipment outlet with PM21-CA001.将PM21-FB003再次移到设备就位中心。Put PM21-FB003 center in-position
49、 again.通过20t倒链提升PM21-FB003,使其标高满足安装要求。Continue to lift PM21-FB003 to the appropriate elevation by using 20t chain block to meet the installation requirement.在设备本体90与270方位的两个吊耳上安装弹簧吊具。Install spring lifting tool to the two lifting lugs at the direction of 90 and 270 with the equipment body.拆除连接在25.63
50、m层的4个5t倒链。 Remove the four 5t chain blocks on the 25.63m floor.现场清理Clear site用三防布包裹好挂设在吊架上的2个20t倒链和1个10t倒链。Parcel two 20t chain blocks and one 10t chain block hang over lifting supports with three guard cloths.拆除其他所有的倒链。Remove other chain blocks.恢复第一次吊装时拆除的灯具与报警器。Resume the lumps and alarm removed f
51、or the first lifting.清理吊装现场,整理清理吊装工机具设备。Clear lifting site, clean up lifting tools.注:吊架与挂设在其上的3个倒链需要等到PM21-FB001/002/003上的管道安装完毕之后才能拆除。Notice: lifting supports and chain blocks hang over them dont remove until PM21-FB001/002/ 003connect with pipes.技术安全要求Technical & Safety Requirements钢丝绳圈与棱角接触处必须根据具
52、体情况垫上胶皮或半圆钢管,半圆钢管上打孔,穿孔用铁丝固定住;Wrap the contact location of wire rope with edge and sharp corner using rubber sheet or semi-round steel tube on case-by-case basis. Drill hole on semi-round steel tube and fix the tube with iron wire;吊装过程中必须根据分工,有专人控制设备在空中的方向。控向人员必须恪守职守,绝对不能发生设备碰触混凝土立柱及其它物体现象;During li
53、fting, assign special personnel to control equipment orientation in the air according job division. The orientation-controlling personnel must fulfill his duty. Collision of equipment with concrete column or other object is absolutely forbidden.吊装过程中发现问题则进行处理直到保证安全继续起吊,无问题再由总指挥发出命令,无关人员撤离吊装区,继续起吊;If
54、 any problem found during lifting, carry out treatment until the safety is guaranteed. The command of no problem shall be issued by the chief commander and the personnel irrelevant to lifting shall withdraw from lifting area, then the lifting continues.起重工通过爬梯摘掉抬尾吊索,爬梯必须有人扶住;The rigger picks off tai
55、ling sling through access ladder and the access ladder must be held by other person.设备安装就位后,起重工登高摘倒链时,必须系好安全带;After equipment installation in position, safety belt shall be worn when rigger climbs high to pick off chain blocks.起重机司机、起重工及其它参吊人员必须遵守国家有关安全规定、操作规程;Crane operator, rigger and other liftin
56、g-related personnel must observe relevant national safety rules and operation regulations;5级风以上、大雨、大雾天气禁吊;No lifting is allowed in case of wind over level 5, heavy rain and fog;指挥人员对吊装不同的设备时各倒链的动作先后顺序和步骤及吊索连接方式必须熟悉;The commanding personnel must be familiar with action sequence and steps of each chai
57、n block and sling connection method during lifting different equipment;设备正式吊装前必须移走吊装路径上及地面各种障碍物 All obstructions in the road and on the ground shall be removed from equipments locations before actual lifting; 所用工、机具及起重机用前先检查,确保使用性能良好; The tools & machines and cranes shall be inspected in advance to
58、guarantee good performance;在吊装过程中,各参吊人员必须坚守岗位,严禁擅离职守;在操作过程中,必须服从统一指挥,严禁各行其是;During lifting, all personnel involved in lifting shall hold their respective positions; during lifting, all the personnel shall abide by the uniform commanding.在施工区域周围应设立警戒线,无关人员禁止进入; Warning line shall be set up around the
59、 construction area and the personnel non-relevant with lifting shall be denied;指挥人员观察要周密,信号要清晰The commander shall observe thoughtfully and give clear signal;;在吊装过程中,应尽量避免冲击和震动;Impact and shaking shall be avoided to the furthest extent during lifting;吊装前,所有参吊人员应参加吊装技术交底。All the personnel involved in
60、lifting shall participate in lifting technical instructions prior to lifting.现场应备有良好的气割工具、足够气割用氧气、乙炔气等There shall be enough oxygen and acetylene gases on site;吊装前请通知相关施工单位撤离警戒线范围外;Prior to lifting, inform relevant construction parties to withdraw out the area around by warning line;施工现场附近应配有符合国家消防要求
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 严考促学安全类初级复习测试卷附答案
- 合资经营中药材合同范例
- 中学教学仪器采购合同模板
- 公司厂房装修合同范例
- 2024信息技术外包服务分包合同
- 2024年工程劳务合作:施工分包专项协议
- 2024年供应商管理与采购合同规定质量标准
- 2024年婚前协议书(非婚姻登记用)
- 2024年口罩生产设备升级改造合同
- 2024年变电站接地线路安装合同
- 分层次教学与个性化辅导计划
- 基于物联网的农业无人机高效配送方案
- 毛细支气管炎护理查房课件
- EHS(环境健康安全)管理制度
- (2024年)传染病培训课件
- 漂流项目规划设计书
- 中国花鸟画各个时期艺术特点探析
- 木霉菌生防综述
- 【教案】《认识计算机硬件设备及作用》教学设计
- 卧式车床电气控制电路设计毕业设计
- 十一种不合理信念和与之相应的合理信念
评论
0/150
提交评论