1、抱闸调整程序Precaution: All lock-out tag-out procedure must be strictly adhered to.Electrical and mechanical energy must be removed before commencement of adjustment work.注意:必须严格执行锁闭程序。在抱闸调整工作开始前,确保不存在任何的电能和机械能。Sky-1 brake adjustment procedureSky-1 抱闸调整程序1.Preparation 准备工作a)Put the lift under inspection m

2、ode将电梯转成检修模式b)Move the carhe up direction and land the counterweight on the prop-up pole向上开轿厢,使对重落在支撑物上c)Check the transformer voltage of the brake circuit, ensure the AC voltage is withhe limitspecifyhe wiring diagram检查制动回路的变压器电压,确保交流电压符合原理图要求d)Check and confirmt the safety chain circuit are all ef

3、fective检查并确认安全回路有效e)Switch off the mainer and apply the lock-out tag-out procedure切断主电源并执行锁闭程序f)Activate the controller safety switch and/or the safety switch第1页 / 共11页政策 / 程序 / 指引Policy / Procedure / Working Instruction适用范围:安装 / 维修文件名称:抱闸调整程序取代:0编制部门:FOD2007年01月29日编制人:文件:FOD (IN)-07-04更新日期:批准人:Chew

4、 Yengfook按下控制柜的急停开关和/或其他急停开关Remove the machine guard拆下机器保护罩Clean the machine清洁主机g)h)i)Check and ensuret the brake arm, and all other moving parts are free of rust. All movingparts must be able to move or roe freely. If nesary, disassemble the brake, cleanthoroughly and apply lubricant. Reassemble th

5、e brake with its original settings.检查抱闸臂和所有其它的运动部件没有生锈,所有能够运动的部分必须能够移动和转动,必要拆卸抱闸并彻底清洁和润滑。拆卸后按照原来状态重新组装抱闸。Note: Make sure the brake drum and brake pad are totally free of oil or lubricant注意:确保抱闸轮毂和闸瓦不要沾上油脂和润滑剂2)Adjusting the brake assembly调整抱闸步骤a)Check the stroke of the brake core检查铁芯的行程i.Remove the

6、brake switches on both side of the brake coil housing拆下抱闸线圈盒两边的抱闸开关ii.Loosen the bolts 3 and 4 as indicate in figure 1 below松开顶杆3和4,如图1所示The bolt 4 must be compley off the striking bolt 2 of the brake core顶杆4必须彻底离开抱闸铁芯的螺栓2iii.iv.Manually push the brake core inward until it reachesof its stroke and r

7、elease it.Measure the stroke length of the brake core. It should be moren 5mm. While pushingthe brake core, care should be taken in ensuringt the brake core does not strike againsthe brake coil housing. Otherwise, shouldthe manual release devicet is housed withcheck the brake based on step 2-a-V, if

8、 still cant meet the stroke requirement, the brakeshould be replaced with new one.第2页 / 共11页手内推动铁芯(图中2#部件)直到底部,观察搬手是否能够在手的推力下自动复位,并测量铁芯移动的最大行程,该行程应该大于5mm.如果搬手无法自动复位,或者在搬手能够自动复位但行程小于5mm,应该先做如下步骤2-a-V的检查,如仍不能满足行程要求的,制动器需要更换.v.If the stroke length is not correct, loosen the bolt 5. By turning the bolt

9、1lockwise, thestroke length can be increased. Conversely, turning bolt 1 clockwise will reduce the stroke length.如果行程不正确,拧松螺栓5。通过逆时针旋转圆缺螺母1可增大铁芯行程,相反地顺时针旋转螺母1则能缩短铁芯行程.vi. Adjust the bolt 4 sot the brake core moves in by about 3.0 mm (Max. allowable distanceis 3.5mm). Do the same adjustment in other

10、side of brake arm. (The pure of thisadjustment is to ensure to fully open brake arms). The final adjustment of the stroke shouldto make sure the brake lining clearance according to the procedure of 2-e.粗调整螺栓4,并使得抱闸铁芯被压进3.0mm (最大过3.5mm),相同的方法调整另一侧(这样做的目的是为了确保抱闸能够打开).但最终的调整位置以保证按2-e步骤保证闸衬和制动轮之间的间隙为准.b

11、)Brake pad and brake drum concentricity第3页 / 共11页图示151342间隙抱闸瓦和轮毂抱闸同心度调整Referring to figure 2, on each of the brake arm, there are 2 bolts (bolt 6) which is used toi.adjust the contacting area betn the brake pad and the brake drum参考图2,在抱闸臂的两侧,每侧有两个螺栓(螺栓6)用来调整抱闸瓦和轮毂的接触面.ii.of all, loosen all the four

12、 bolts. This will allow the brake shoes to move freely on itspivot pin. The spring force will thus ensurebrake drum.t the brake shoes are fitted snugly on the首先松开这四个螺栓。这将使得抱闸瓦可以在它的轴心方向上转动,在抱闸弹簧的作用力下,抱闸瓦会贴紧轮毂表面Adjust the bolts 6 by hand until the bolts are rested against the brake shoes, and make sur

13、e the brake lining clearance is even.手动调整螺栓6直到螺栓接触到抱闸瓦圆弧架,保证间隙均匀后将锁母锁紧固iii.6图示2c)Spring rod adjustment弹簧杆调整i.Refer to figure 3, check and ensuret the spring rod screw up the whole screw holeindicate as figure (10). (In some cases, the spring and spring rod should be disassembly and remove the Nylon

14、washer A on figure 3-1 to ensure spring rod crew up and go through thewhole crew hole.)参考图3,检查,如图中的10所示. (部分机器无法保证旋弹簧杆与螺纹第4页 / 共11页平,应拆开制动弹簧和拉杆,拆除尼龙垫 A (按图 3-1所示)If the rod is not flush, loosen the bolt 11 as indicated in figure 4. Adjust bolt 9 until the spring rod screw up and go through the whole

15、 crew hole.ii.如果没有旋平,松开图4中的螺母11,调整螺栓9直到弹簧杆和抱闸的底座厚度不同则以厚度少的螺栓旋进深度为准.)(如果两边iii.Tightened bolt 11. (Important reminder! If the bolt is not tightened, there is potential riskfor brake to loose braking function)紧固螺母11(重要提示!: 如果没有紧固,存在抱闸失效的)尼龙垫 A图示3-1第5页 / 共11页图示3d)Temporary spring force adjustment抱闸弹簧压力的

16、临时调整i.Loosen the bolt 9 until the spring is compley loose松开螺母9直到弹簧完全松开Turn the bolt 9 by hand until the spring is just start to be compressed手动旋转螺母9直到弹簧刚好被压缩ii.iii.Atof the measuring indicator, draw a line on the brake arm as shown in figure 4.以标尺的非螺母一端为准,在抱闸臂上画一条线,如图4所示Tighten bolt 9 until the spri

17、ng is compressed by 12.514 mm. This is a temporary setting toiv.ensuret the brake could hold the car properly under sic condition. The final springadjustmens to be dith full load.Reminder: The experienced spring compres various tolerance, even the spring comprest the indication of scale are the same

18、.is betn 12.6mm to 13.2mm. Due toat both sides are the same, this doesnt mean两端弹簧被压缩12.514mm后紧固螺母9,这是个临时的设置用来保证抱闸可以控制住时的轿厢,最终的弹簧调整必须在满负载的情况下进行。提示: 按正确的调整方法,弹簧的压缩量的经验值为:12.6mm到13.2mm之间. 另外, 由于第6页 / 共11页图示4各种误差的存在,即使左右弹簧的压缩量相同,也并不意味两边的标尺的指示值相同.v.Make sure both spring are equally compressed.确认两侧的弹簧压缩长度

19、相等e)Brake shoes gap adjustment抱闸瓦间隙调整Release the brake manually, inspect lining clearance by gauge: make sure gauge with 0.15mm thickness can go thorough smoothly 0.25mm cant go through. (Reminder: this clearance isrequired under brake released by manually,he real operation when brake released bycon

20、troller, the clearance will be slightly bigger)手动打开抱闸,使用塞尺检查闸衬间隙:保证0.15mm厚度的塞尺能非常顺利地通过,0.25mm厚度的塞尺能不能通过. (提示: 此间隙为手动打开抱闸时的要求,电梯运行时的实际间隙会大于该值)f)Inspection and adjustment for brake switch抱闸开关触发圆盘的检查和调整:plateTheswitplate of brake switch roes during normal operation, if the plate is not flat, the brakea

21、y not be triggered and cause elevator shut down.抱闸开关触发圆盘在电梯运行过程中将会旋转,如果圆盘不平,将会导致在制动开关不被触发而引起停梯故障.Brake switch adjustment制动开关调整:g)Disassembly the rubbrotection of the brake switch (if available), assembly the switch to thebracket, make adjustment to ensure the switch has 0.51.0mm over travel aftrende

22、rmanually release the brake. The adjustment procedure see figure 4-1, 4-2 and 4-3.拆下制动开关外面的橡胶保护套(如果有的话),并将开关安装支架上,调整制动开关固定位置,保证手动打开抱闸时开关受压动作后仍然有0.51.0mm的行程. 调整顺序按图示4-1, 4-2, 4-3进行。第7页 / 共11页图示4-1 :橡胶防护套在安装支架和开关之间,开关无法完全紧固图示4-2 :拆下橡胶防护套在,先将开关固定在安装支架上.Difficult to fix protection betthe switch due rubb

23、er n switch and bracketDisassembly the rubbrotection, ly.fixswitchtothe bracket图示4-3 :将拆下的橡胶防护固定在安装好的开关外面.Fix the rubb siwtchrotectionhe outside of theh)Important safety check重要的安全检查i.For the Sky-1 Bluelight machine, it is very importantt the brake core does not obstructthe movement of the brakn, an

24、d ensure brake lining apply brake force to brake drum对于SKY1的主机,非常重要的是抱闸手动搬手不能抱闸靴和抱闸轮毂(不能妨碍抱闸的彻底)ii.To ensure safe brake operation after the afore-mentioned adjustment, perform this check:为了保证按照上述方法调整后的抱闸能够安全的动作,必须检查:Activate the emergency stop switch on the controller控制柜上的急停开关有效Push the brake core i

25、nward by hand as shown in figure 5 below第8页 / 共11页如图5所示,用手向里推动抱闸芯There must a gap of about 22.5 mm betn bolt 4 and bolt 2 as shown in figure 5如图5所示,在螺栓4和2之间必须有大约22.5mm的间隙When the brake ischeck the operationered, brake core at both sides operate synchronized, espehermal condition.lly在通电吸合时,制动器两侧铁芯同步动

26、作,尤其要检查制动器热态下的吸合情况.After adjustment, the brake stroke (the movement distance of the brak er on) should not exceed 3.5mm.调整完成后制动器的行程(制动器顶杆在通电时的移动距离)最大n during过3.5mm.242-2.5mmi)Final test after brake spring adjustment抱闸弹簧调整后的制动测试(不得省略):i.Dynamic brake slip test动态抱闸滑试The brake slip test must be done af

27、ter all initial adjustment are completed such asFLFS safety test, counterweight overbalance, etc在所有初调完成以后必须进行抱闸滑试,例如满载满速安全钳测试,对重的平衡系数等等第9页 / 共11页Put full loadhe cab, run the car down from the top floor. Once the lift reach contractspeed, activate the emergency stop switch to apply the braking at bot

28、h brake shoes.使轿厢满载,从井道顶部向下运行电梯,达到合同速度后,用急停开关使轿厢紧急停止, 使抱闸动作,此时两个制动臂同时起作用.Record the brake slip distance下抱闸滑行距离Check with the tabelow to ensure compliance使滑行距离(使用PMT测试)符合下表Table 1 : Sky 1 machine brake slip distance表1:SKY1抱闸滑行距离ii.Brake sic load test抱闸静态测试Bring the car to the lowest landing把轿厢开到最底层Carefully load the cab with 150% duty load在轿厢内放入150的负载Wait for

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论