1、Insulation Requirement According to IEC60950 直線距離:直線距離:Clearance distance = CL定義:任何可能之最短路徑,且定義:任何可能之最短路徑,且CLCR。 沿面距離:沿面距離:Creepage distance = CR定義:攀爬物體表面之最短路徑。定義:攀爬物體表面之最短路徑。 如果導體之間利用絕緣作為阻隔,但是在無法確保兩個不如果導體之間利用絕緣作為阻隔,但是在無法確保兩個不同物質間之連結性,故其同物質間之連結性,故其CL/CR的計算方式如下:的計算方式如下: 利用開槽來延伸利用開槽來延伸CR,則,則X必須大於必須大於1
2、mm,例:,例: CL:輸入電壓輸入電壓150Vac的產的產品,例如輸入為品,例如輸入為100-127Vac,其基準值為:,其基準值為:B/I = 1.0mm R/I = 2.0mm;若若Peak電壓高於電壓高於210Vpk,則必須加上其額外值!則必須加上其額外值!如右圖:如右圖:例:例:Vpk=302,則,則B/I = 1.0 + 0.2 = 1.2 mmR/I = 2.0 + 0.4 = 2.4 mmCL:輸入電壓輸入電壓150Vac 300Vac的產品,的產品,例如輸入為例如輸入為100-127Vac/200-240Vac or 100-240Vac,其基,其基準值為:準值為:B/I =
3、 2.0mm R/I = 4.0mm;若若Peak電壓高於電壓高於420Vpk,則,則必須加上其額外值!必須加上其額外值! 如右圖:如右圖:例:例:Vpk=604,則,則B/I = 2.0 + 0.3 = 2.3 mmR/I = 4.0 + 0.6 = 4.6 mm CL:輸入輸入210Vdc的的DC to DC Converter,例如輸入為例如輸入為36 to 75Vdc,則基準值為:則基準值為:B/I = 1.0mm R/I = 2.0mm;如右圖:如右圖:例:例:Vdc=96,則,則B/I = 1.0 mmR/I = 2.0 mm 依據研究及依據研究及IEC60664-1的規範,越高海
4、拔的大氣壓力的規範,越高海拔的大氣壓力越小,所以必須加長直線距離,用以符合原始所需之越小,所以必須加長直線距離,用以符合原始所需之安規要求,如下圖,以海拔安規要求,如下圖,以海拔10,000英呎英呎(3,048公尺公尺)為例,為例,最終直線距離最終直線距離CL必須乘上海拔係數必須乘上海拔係數1.15倍。倍。 沿面距離可沿面距離可使用線性內使用線性內插法。插法。Vrmsor VdcLow limitVrmsHigh limitVrmsRequestCR (B/I)3763004003.8Low limitCRHigh limitCRRequestCR (R/I)3.247.6!點入試算!點入試算
5、線性內插法。線性內插法。內插法通常定義爲根據內插法通常定義爲根據”二個已知值估計出中間值二個已知值估計出中間值”。線性內插法在二個已知資料點間畫一條直線,新的資料線性內插法在二個已知資料點間畫一條直線,新的資料點就位於這條直線上,具體位置要根據其值與二個端點點就位於這條直線上,具體位置要根據其值與二個端點之一的接近程度確定。之一的接近程度確定。 ScVcVaVcVbScSaxf)()()()(例如: Vrms = 280時,沿面距離為3.0mm.5 . 2)250300()250280()5 . 22 . 3()(xf查表2H,2J及2L取得沿面(CR)及直線距離(CL)traceinsula
6、tionCRCLA-CBasic2.882.0C-EReinforced4.764.0B-EReinforced6.204.0+0.2A-BBasic2.582.0A-DBasic2.382.0B-CFuntional2.401.5+0.1C-DFunctional3.611.5+0.1A-FBasic2.402.0若兩點間的RMS電壓小於AC INPUT MAX. VOLTAGE,則兩點取MAX. INPUT VOLTAGE總結A.CL要依據以下來確定:1.絕緣類型2.INPUT VOLTAGE RANGE;3.WORKING VOLTAGE (Vpeak);4.Pollution Degr
7、ee;(Delta select Pollution Degree 3.);5.Altitude;6.計算方法:CL=A+B (A: Minimum value from Table 2H, according to the mains voltage; B: Additional value from Table 2J, according to the actual peak working voltage,A,B取值應看大)B.CR 要依據以下來確定:7.絕緣類型;8.WORKING VOLTAGE (Vrms);9.Pollution Degree;(Delta select Poll
8、ution Degree 2.);10. Material Group;11. 計算方法:利用Table 2L已知兩點列直線方程求中間點.Safety Requirements for Transformers Construction- Materials - Insulation - MarkingsPerformance- Temperature - Abnormal Tests - Electric Strength Test 1Requirements of Construction - Materials UL/CSA - Appropriate Insulation System
9、 shall be adopted - UL R/C according to UL1446- Depending on temperature performance requirement of different applications (Class B, Class F, etc.)- Materials limited to the Insulation System Other Certifiers No “Insulation System” requirement- Classification of insulation materials according to IEC
10、 60085- Material of the lowest temperature rating dominates- UL R/C materials accepted, e.g. tapes, bobbins.Requirements of Construction Materials (cond) Requirements of Construction Insulation General Based on Working Voltage- Clearance: (based on Vpk) A = Minimum value from Table 2H(page29), accor
11、ding to the mains voltage B = Additional value from Table 2J(page30), according to the actual peak working voltage Required clearance = A + B- Example: 1. Equipment rated 100-240 Vac 2. Measured maximum working voltage 600 VpkA = 4 mm, B = 0.6 mmDetermined clearance = 4.6 mm-Exception: If working en
12、vironment of altitude above 2000 m is specified, Annex G shall be considered. Requirements of Construction Insulation (cond)Example of Creepage Determination:1. Measured working voltage = 360 Vrms2. Pollution Degree 23. Material Group IIRequired creepage distance = 2X From Table 2L: (400 300)/(2.8-2
13、.2) = (360 300)/(X-2.2)X = 2.56 2.6 Required creepage = 5.2 mm Requirements of Construction Insulation (cond)Wound Components Triple-Insulated Wires- Minimum 3 construction layers shall apply for Reinforced Insulation - Passes Annex U tests (Insulated Winding Wires for Use Without Interleaved Insula
14、tion)- Where two wires cross each other at an angle between 45 - 90 , an additional physical separation shall be provided, e.g. by sheet material. 45 - 90 Requirements of Construction Insulation (cond)Core- Usually considered as “floating” all surrounding components shall keep Basic/Supplementary Insulation from core. - Some considered as primary/secondary all components on opposite side sh
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
评论
0/150
提交评论