文档简介
1、核电厂系统及其设备复习题一、根据系统图,简要解释核能发电原理。二、名词解释1)质能关系2)裂变3)临界状态4)反应性5)半衰期6)一回路7)PWR8)蒸汽发生器9)稳压器三、选择题1. The nuclear power station provides _ for the utility grid.· expensive electricity · base load· peak load · full load2. _specify the steps required to go from one operating state to anothe
2、r.· The codes· The NRC· The operators· The procedures3. When large decrease in turbine load the steam from the steam generators is sent to the_.· steam condenser· atmosphere· steam dump system· heat exchanger4. An excess of coolant inventory can result in a_.&
3、#183; power increase· temperature increase· reactor trip· turbine trip5. Following the coastdown of the coolant pumps, the core residual heat will be removed by_.· condensers· natural circulation· boiling heat transfer· emergency power6. The operation of a nuclear
4、plant is _than operating a modern fossil fuel power station.· easier· more difficult· rather· more complex7. The heat is transferred by the reactor coolant from the core to the_.· cecondary loop· outlet nozzles· steam generators· pressurizer8. The fuel rod pro
5、vides_to the escape of fission products.· two barriers· three barriers· seals· a barrier9.The CEA guide tubes are made of_.· stainless steel· ceramic· zircaloy· B4C10. The helium inside the fuel cladding improves the _.· characteristic· gap heat cond
6、uctivity· gap heat convection· clad strain11. The CEA guide tubes are arranged_.· in the fuel assembly· around the fuel assembly· in the center of fuel assembly· outside the fuel assembly12. The coolant can _through the guide tubes.· not flow· be· flow
7、83; pass13. There _ steam generator(s) in each primary loop.· is one· are two· are there· is no14. At the top of the tube bundle shroud, _ are mounted.· eggcrates· steam-water separators· plates· baffles15. There _ in the system 80+ steam generator.· is o
8、ne feedwater inlet· are two feedwater inlets· are three feedwater inlets· are many feedwater inlets16. The flywheel on the motor is to provide_.· energy· water· coastdown flow· torque17. The temperature of the water in the seal assembly is maintained within accepta
9、ble limits by_.· water· oil· steam· water and oil18. In accordance with the coolant temperature program,the average reactor coolant temperature is _ when steam demand is increased.· constant· fall· raised· high19. In pressurized water reactors water is used as
10、_.· moderator· coolant· both a and b· neither a nor b20. The thermal efficiency of PWRs is_.· more than 40%· about 30%· less than 10%· about 70%21. The space between the reactor vessel and the core barrel is the _.· fuel rods· control rods· down
11、comer· plenum22. The ECCS is provided to_.· cool the core· control reactivity· control volume· drive pump23. There are_ successive barriers in PWR to prevent radioactivity escape.· two· three· four· five24. The containment enclose the_.· reactor·
12、; reactor and pressurizer· primary system and secondary system· entire primary system25. From the text the safest nuclear power plant may be a _.· expensive one · cheap one · big one · small one26. Following a decrease in turbine load, the water pressure and temperature
13、 in the reactor_.· will increase· increase· decrease· will be unchanged27. A temperature decrease of reactor vessel water results in an_.· insertion of control rods· power decease· power increase· increase of reactivity28. Loss of power is a _.· upset con
14、dition· abnormal increase· reactor trip· reactor shutdown accident29. Inadvertent auxiliary spray will result in_.· temperature decrease · power decrease· pressure decrease· abnormal condition30. The long-term control of core reactivity means adjustment of_.·
15、control rods· boric acid· power output· coolant 31. The burnable absorber rod assembly provides the capability of high absorber strength_.· in all its life· at the beginning of refueling· at the end of refueling cycle· during operation32. The fuel assemblies used i
16、n a reactor are_.· similar· different· three types· same33. In the fuel rod the spring is set on the_.· pellet column· spacer disc· end cap· top34. The CEA guide tubes are welded to the_.· spacer grids· lower end fittings· control rods· end
17、 cap35. The fuel spacer grids are made of_.· stiff arches· springs· plates· zircaloy strips36. After long time radiation the boron carbide will_.· decrease in mass· be swelling· increase in mass· be dissipated37. The economizer increases the cold leg side _ be
18、fore coolant leaving the steam generator.· flow rate · temperature· temperature difference· relative flow38. The water from the steam separators flows down into the _.· economizer· shroud· bundle· evaporator section39. In the downcomer the water is_.· sat
19、urated· boiling· very cold· subcooled40. The pump is connected with the motor by a_.· diaphragm· tube· coupling· casing41. _ pressurizer heaters are connected to proportional controllers.· A few· The remaining· Most of the· Many42. The fluid fro
20、m economizer section is _.· two-phase flow· boiling water· subcooled water· saturated water43. The amount of heat that has been converted in steam turbine is _ that removed in condenser.· more than· less than· same as· similar to44. The hot primary fluid exchanges its heat with the secondary fluid in the_.· pressurizer· condenser· header· steam generators45. Residual heat-remov
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 交通设施养护维修制度
- 2026湖北省定向西北工业大学选调生招录参考题库附答案
- 2026湖南财政经济学院招聘劳务派遣性质工作人员参考题库附答案
- 2026福建泉州市面向北京科技大学选优生选拔引进参考题库附答案
- 2026福建省面向华中师范大学选调生选拔工作考试备考题库附答案
- 2026福建福州第十九中学招聘编外行政人员(劳务派遣)1人考试备考题库附答案
- 2026西藏林芝市察隅县农村公益电影放映人员招聘1人备考题库附答案
- 2026辽宁大连产业园社招招聘备考题库附答案
- 2026陕西省面向南开大学招录选调生备考题库附答案
- 2026鲁南技师学院第一批招聘教师8人参考题库附答案
- GM-T 0130-2023 基于SM2算法的无证书及隐式证书公钥机制
- 美术教师季度考核总结
- GB/T 4074.2-2024绕组线试验方法第2部分:尺寸测量
- 液氨储罐区安全评价
- 生物必修一-高中生物课件
- 慢性肾脏病课件
- TOC制约法纵览高德拉特企管公司
- 配电网工程施工方案模板
- 港口集装箱运输AGV项目规划设计方案
- YY/T 1919-2023超声造影成像性能试验方法
- 国际私法(鲁东大学)智慧树知到课后章节答案2023年下鲁东大学
评论
0/150
提交评论