1、Good is good, but better carries it.精益求精,善益求善。w收费岛施工方案(Construction scheme for toll island)收费岛施工方案(Construction scheme for toll island)收费岛施工方案(Construction scheme for toll island)The construction organization design scheme (2007-01-24 17:03:06) has been reproduced in the highway toll collection stat

2、ionHighway plan recharging renovation worksConstruction organization design1. Quality control before constructionIs mainly refers to the construction preparation stage before construction, we mainly grasp the following several aspects: open clarificaiton will design units, supervision units, constru

3、ction units, mechanical and electrical contractor, weighing equipment suppliers to attend the meeting, interpretation of the meter weight principle, make construction personnel understand weight charge equipment on the island of lane toll plaza, charge, charge.The construction unit to evaluate compo

4、und Examining construction units of recent performance, engineering command system, engineering quality level, the number of the workers and technicians, check whether the key type of work has the mount guard qualification certificate, instrument and meter is national metrology inspection certificat

5、e of quality supervision department, understand the state of machinery, vehicles, equipment equipped with can meet the construction requirements, etc.Review the construction organization's design to review the quality assurance system, quality site management measures, project schedule and safet

6、y protection measures to meet the requirements of the project.Audit equipment and order the construction unit of the specifications of the equipment procurement contract, model, technical indicators should be carefully checked whether conform to the requirements of the provisions of the contract, th

7、e main material before entering the construction site for information about the test and certificate of quality inspection.The construction site investigation of communication pipelines have been completed, power line, people (hand) hole based, transformer room, computer room, and so on carries on t

8、he detailed investigation, review construction design drawings is complete and correct.2. Quality control of construction process2-1 in the construction supervision project, the supervision office will start from the organizational leadership, scientific management, update supervision philosophy and

9、 bold innovation, so that the quality, safety and environmental protection of the project will be strictly controlled.The inspection and inspection supervision office of the strict procedure shall compile the quality acceptance standards for the key processes according to the design standards and pr

10、ocess requirements. This time we process the acceptance variable construction units according to the project construction process to apply for inspection to active inspection, in accordance with the construction process quality inspection earnestly, to meet the requirements of the quality of the sce

11、ne to sign to recognize, is not in conformity with the quality requirements in a timely manner, construction units rectification required. The above procedure can not enter into the next process construction. Great extent eliminates the active supervision engineering quality hidden danger and accide

12、nt, and also a one-time qualified for completed process inspection and sign recognition in time, make the project smoothly under the process of construction, control the quality and speed up the construction schedule.Build system of "model project" key disciplines engineering or process, t

13、o select a heavy toll lane, a toll station as a model project for demonstration, through summarizing, construction unit put forward the construction technology standard of specification, with the approval of the owner, supervision after all. Each process of this project was first conducted in ningli

14、an high-speed huaian mainline toll booth, and summarized the experience. It was a good result to organize the visit and study.Adhere to the supervision engineer of the sidelines, according to the work order of the construction unit, the general procedure will not leak the prison,Key position key sup

15、ervision. If the weight equipment foundation pit size is strictly according to the manufacturer's drawings, the concrete marking and curing time of the water shall be satisfied.2-2-2 this project should improve the precision of weighing equipment and the stability of the charging system, and for

16、m the following points in the process of quality supervision.2-2-1 control the speedSpeed is directly related to the precision of weighing equipment. By measuring instrument for testing, to test the vehicle static weighing equipment accuracy is above 99%, and the speed of 5 km/h when weighing equipm

17、ent precision reaches 95%, and when the speed is greater than 5 km/h when weighing equipment precision would be badly affected. Measures are as follows: in the highway exit, before weighing about 500 meters, set up the logo "vehicle deceleration within 5 km/h, not to accelerate, decelerate and

18、slamming on the brakes", to ensure the accuracy of weighing system measurement, reducing the possibility of dispute; Set the deceleration line and decelerate block, and when installing the deceleration block, it should be noted that when the vehicle passes the deceleration block, it will also h

19、it the brake symmetric platform to impact the precision (variable speed) when passing the weighing platform. Normally not less than 18 meters in front of the weighing equipment.It is recommended to display the speed on the lane control display (according to the current interface provided by the weig

20、hing device). In this way, the toll collector can report the speed of the vehicle on the basis of the actual situation, and it is very convincing to some drivers who want to take advantage of it.2 2-2-2 civil engineering requirementsTo ensure that the test is completed before the vehicles arrive at

21、the toll booths, the length of the charging island should be extended appropriately, and the speed control of the driver through the platform shall be considered for the convenience of the pilot. Rebuilt charging island: demolition reconstruction island head tail (island), within the scope of cuttin

22、g excavation toll plaza concrete pavement, the construction of the island itself lengthening period and the new island head tail (island), and adjust the affected by the alteration of equipment is designed according to the new arrangement and set up new equipment foundation; New entrance unidirectio

23、nal charge island: the entrance unidirectional charge island has fog lamps, manual railings, lane cameras, traffic lights, automatic railings; New export one-way charge island: export fog lamps on the island of one-way charge hand hole, hand railings, heavy equipment, control box, raster vehicle lan

24、e separator, weighing display, traffic signal, camera, the traffic signal lamp, automatic rail; The toll island and toll booth foundation: the charging island and the toll booth foundation are horizontal in the cross-section direction, and the longitudinal section is the same as the longitudinal slo

25、pe of the road, the lowest side of the top surface is 25cm from the surface of the road. Charge island protection: ahead of the toll booths set up 2 root 219 * 10.0 mm steel pipe anticollision column, on both sides of toll booths set up cold bending square steel crash barriers, to ensure that the to

26、ll collector, charge craft and equipment safety; The paving of the toll island: the paving of the toll island shall be made of colored cement squares, and the colors, specifications and old islands shall be unified or determined by the construction unit; Charge island facade sign: island facade tag

27、should be used by GB5768-1999 ordinary paint yellow black or red and white alternate with, line 15 cm intervals, charging island head aluminum reflective film, monochromatic 15 cm width, to increase the reflective effect of the night.The position of the installation platform cannot span the expansio

28、n joint of the cement plate, in case the hot and cold shrink will be called the decca death, guaranteeing the safety of the platform. The platform is installed in the middle of the driveway.The horizontal, vertical and vertical slope of the table should be consistent, but the slope should not be gre

29、ater than 2%. If said before and after the road slope is greater than 2% should be broken cement road surface, large heavy pouring cement pavement, leveling, control according to the slope, and the road smooth transition and weighing table, fight said passing vehicles of vehicle, the turbulence.An a

30、dditional control box, a weighing screen foundation and a hand hole are added on all the export side charging island, with a horizontal drainage pipe in the hand hole leading to the side slope. Special attention should be paid to the horizontal drainage pipe center along the road and slope direction

31、 must have Angle, Angle to 15 ° to facilitate drainage. The bottom elevation of the hand hole should be base on the platform (if the water tank is set at the bottom of the hand hole, the drain pipe can also be reached into the water tank). If the water in the table can affect the precision of w

32、eighing equipment.From the base of toll booth to the front hand hole of the island, the steel tube was installed in the front hand hole of the island, and the base of the weighing screen was added before the end of the island, and connected with the steel pipe on the basis of the toll booth. If the

33、distance between the traffic signal and the toll booth is not long enough, the weighing screen and the traffic signal will be fitted to the same post.2-2-3 installation of equipmentFreight vehicle standard in our country is not greater than the total length of 18 meters, so weighing equipment instal

34、led in 18 meters distance charge window location, short distance will lead to some super long car arrived in charge the window to the rear of the vehicle is not all by weighing mesa, long distance, in general the speed will be relatively faster, or vehicles in the variable state probability is bigge

35、r, affect the weighing precision. Because of the irregularity of individual vehicles, so weighing installation mesa is apart from the toll booths window than 18 meters, 18 to 23 metres or so commonly, so also facilitate vehicle queue, ensure that say a car, to pay the cost of a car. The glass surfac

36、e of the infrared vehicle separator is easy to frost in winter. It is recommended that the windshield of the car should be used to heat the windshield to remove the frost. The weighing display shall include at least the model, the excess capacity, the amount and the standby two lines. The display sc

37、reen should work all day long, with dust proof, rain protection and sun protection. The brightness should be guaranteed to be clearly visible to the division crew within a range of 20 metres under various lighting and natural environment conditions; Now displays are generally LED, so best can turn 15 °, when installation is this display of the passenger, is easy to see.3. Equipment installation3-1 person (hand) hole and square cameraTo increase the charge fee of lane toll plaza, t

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论