1、Vacuum Test Procedure Procedure No.: HY-WP-M-005Revision : 1Procedure Number程序编号HY-WP-M-005Rev. No版本1Page页码1 of 7Document Status:文件状态: PRE/准备 CFC/执行Reference procedure No./Rev./参考程序编号/版本: Not applicable/不适用(This column is modified only when the numbering rule of the Procedure is changed只有当程序编号规则发生变化

2、时才修订此栏)Document Title文件名称:Vacuum Test Procedure真空试验程序Document Type/文件类型 :Working Procedure工作程序Name &Title姓名及职务Signature/Date签名及日期Approved by批准Prepared by编制Yang Zhaodong/杨照东职务:Title:Reviewed by审核Zhao Haili/赵海丽Signature/Date:签名及时期QA ReviewerQA审核Translator翻译Translation reviewer译审Copyright Declarati

3、on:版权声明 :This document is the property of the SNPEMC. It must not be used, reproduced, transmitted or disclosed without the prior written permission of SNPEMC。本程序未经山东核电设备制造有限公司书面批准不得外用、复制和泄露修改历史记录Historical Records of Modification版本Rev.发布日期Issue date修改范围及依据Scope and Basis of the Modification1第一次发布Th

4、e first issuance Table of Contents目录1.目的Purpose42.范围Scope43.工程概况Project General Survey44.参考References45.详细描述Detail Description45.1.真空盒选择Selection of Vacuum Box45.2.试验条件 Test Condition55.2.1.试件表面温度 Surface Temperature of Test-piece55.2.2.起泡溶液Bubbly Solution55.3.试验操作Test Operation55.3.1.真空盒放置Placement

5、 of the Vacuum Box55.3.2.底封头检验部位BH Test Location55.3.3.真空来源Vacuum Source55.3.4.试验压力 Test Pressure65.3.5.压力保持Pressure Maintenance65.3.6.真空盒重叠检查 Overlap of Vacuum Box65.3.7.灯光和视觉观察 Lighting and Visual Observation65.3.8.泄露指示 Leakage Indication65.3.9.清洁Cleaning65.3.10.评价Evaluation75.4.操作人员资质Operator Qua

6、lification75.5.附录Appendix71. 目的Purpose本程序适用于海阳AP1000型压水堆安全壳下封头焊缝的真空试验,为真空试验的具体操作提供理论依据,并为QC质量检查和控制提供依据。This Procedure applies to Vacuum Test of the weld seams on bottom head of AP1000 Pressurized Water Reactor (PWR), providing theoretical evidence to the vacuum test operation as well as regulating t

7、he quality inspection and control of QC.2. 范围Scope本程序只适用于海阳AP1000核电CV现场组装和安装项目。涵盖了CV安全壳下封头对接焊缝的真空试验方法及具体要求等。This procedure only applies to CV Site Assembly and Erection Project of Haiyang Nuclear Power and describes the method and detailed requirements of the vacuum test to the BH weld joints.3. 工程概

8、况Project General SurveyCV安全壳下封头在拼装车间完成拼装,之后运输到核岛现场进行安装,由于下封头安装时一部分要埋于混凝土之下,所以组装时就要完成对不能直接进行加压试验的底封头的真空试验检测,以便定位焊缝的泄露缺陷位置,及时进行返修处理。CV BH will be assembled at the workshop and then be transferred to the Nuclear Island for installation, complete the vacuum test to the BH which cannot afford direct pres

9、sure test while assembly since a part of the BH shall be imbedded under the concrete during installation operation, so that the defects shall be located and repaired in time.4. 参考ReferencesASME V(2001含2002) 无损检测 ASME V (Edition 2001, including 2002 Addenda) Non-destructive Test 海阳项目质量保证手册HY-QAM Qual

10、ity Assurance Manual for Haiyang ProjectHY-QAM All reference documents are the latest effective revision/参考文件为其发布的最新有效版本。5. 详细描述Detail Description5.1. 真空盒选择Selection of Vacuum Box真空盒选择长约750mm,宽约150mm,上部有清晰视镜的真空盒进行试验。在真空盒底部与焊缝接连处要有合适的密封衬垫,保证真空盒内形成实验所需的真空度。真空表的压力范围在0kpa-100kpa之间。示意图如下:Select a vacuum

11、box of about 750x150mm with a clear viewing glass at the top. There should be suitable cushion between the bottom of the vacuum box and the seam, which can generate the required vacuity. Pressure scope of the vacuum gauge shall be 0kpa-100kpa. Please see the sketch below:5.2. 试验条件 Test Condition5.2.

12、1. 试件表面温度 Surface Temperature of Test-piece在真空检验整个过程中,被检验焊缝的金属表面温度应不低于5 °,不高于50°。只要焊缝金属温度保持在上述范围内,对焊缝金属的加热或冷却是允许的。当前述温度条件在不可能实现的情况下,如果程序证明可行的前提下,其它温度条件也可以采纳。Metal surface temperature of tested seam shall be 5 °50°during the entire test procedure. Cooling or heating of the seams m

13、etal shall be allowed if the temperature is maintained within this scope. Other temperature condition may also be adopted provided that it be approved applicable by the procedure if the above temperature cannot be achieved. 5.2.2. 起泡溶液Bubbly Solution(1) 起泡溶液应该保证产生一层附着在被测件表面的薄膜,并且在空气风干及表面低张力的情况下气泡不会轻

14、易脱离。起泡溶液本身所含的泡泡应该保持最低,以避免在试验时要区别起泡溶液本身的气泡以及因缺陷产生的气泡。同时起泡溶液的使用条件应该与试验条件相一致。The bubbly solution should be able to generate a film covering the surface being tested and the bubble shall not divorce easily under a condition of air dry and low surface tensity. The bubbles contained by the solution itself

15、 shall be at a lowest level, so as to distinguish them from the bubbles generated by the defects while testing. At the meantime, the application condition of the bubbly solution shall be the same as the test condition. (2) 在覆盖上真空盒之前,可通过喷、刷和洒的方式将起泡溶液作用于被测表面。The bubbly solution can be sprayed, brushed

16、 or splashed onto the surface being tested before the application of the vacuum box.5.3. 试验操作Test Operation5.3.1. 真空盒放置Placement of the Vacuum Box将真空盒放置于涂满起泡溶液的试件表面,将真空盒抽成试验所需的部分真空。Put the vacuum box onto the surface being covered with solution; evacuate the box to generate a partial vacuity require

17、d by the test.5.3.2. 底封头检验部位BH Test Location为便于进行真空试验,选择底封头内表面焊缝进行真空试验。Select the weld seam on the inner surface of BH to attend the vacuum test. 5.3.3. 真空来源Vacuum Source实验所需的真空可通过任何一种方便实用的方法得到(比如空气注射机,真空泵等),真空表到时需要记录至少15Kpa的负压。The vacuity can be formed by any of the practical and convenient methods

18、 (such as air injector, suction pump), the vacuum gauge need to record at least a negative pressure of 15Kpa5.3.4. 试验压力 Test Pressure依据API620标准,试验时应保持真空盒内压力为21Kpa35Kpa的压力。 The pressure inside the box shall be kept as 21Kpa35Kpa during the test according to API620 requirements.5.3.5. 压力保持Pressure Mai

19、ntenance在试验时,真空盒要保持真空状态(负压)至少10秒钟。The vacuum condition (negative pressure) shall be maintained at least 10 sec. whilst testing.5.3.6. 真空盒重叠检查 Overlap of Vacuum Box对同一长度连续焊缝的真空试验,为保证100%试验范围及检测结果的准确,对真空盒的重叠长度应保持50mm。The overlap length shall be kept 50mm to make sure of 100% testing scope and the accu

20、racy of test result when doing a vacuum test to the continuous weld of the same length.5.3.7. 灯光和视觉观察 Lighting and Visual Observation(1) 当观察者眼睛距离被测试表面在600mm内,视线与被测表面角度在30度以内的情况下,可直接进行视觉检测。可以使用镜子来改善视觉角度或者使用放大镜来辅助检查。其中对某些特殊部位、部件、容器等的检测,合适的照明(自然的或外加的白光)是必要的。被测表面的最低光照强度可以是100lux。光照强度、所用技术、光线等级证明等需要一次性记录

21、在档案上。Direct visual inspection is doable when the testers eye is within a distance of 600mm from the surface being tested and the look angle of eye and the surface is within 30°. Mirror can be used to improve the sight angle or use loupe to assist the inspection. Suitable lighting (natural or ad

22、scititious white light) is necessary for the testing of special locations, parts and containers the lowest lighting intensity on the surface may be 100lux. The lighting intensity, technique used, light grade certificate shall be recorded in the file one-off.(2) 在某些情况下,远距离视觉观察要替代近距离视觉观察。远距离视觉检查要用到比如镜

23、子、望远镜等辅助设备。Close visual observation shall be replaced by distance visual observation in some cases. Supplementary appliances being used to the close visual observation are mirror, telescope and so on.5.3.8. 泄露指示 Leakage Indication检测区域若是有连续气泡冒出,说明被检区域表面或焊缝有孔道缺陷。There are drill-way defects on the surface being tested or at the weld seam if bubbles generated continuously from the area being tested.5.3.9. 清洁Cleaning检测完毕后要按要求将检测部位清洁使达到使用要求。Clean the tested area according to relative requirements after the testing.5.3.10. 评价Evaluation(1) 泄露缺陷Leakage De

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论