模具验收检查表(出口模具)_第1页
全文预览已结束

下载本文档

版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领

文档简介

1、星诺奇科技 Sinnotech TechnologyQP-MD-01-27A 模模具具验验收收检检查查表表 Tool Check and Acceptance Checklist产产品品名名称称 PartName:PartName:模模具具编编号号Mold No: 产产品品图图号号 DrawingDrawing No:No: 版版本本号号 Version:Mould supplier has to certificate the following items:Yes NoAction01Is the mould number on the mould?模具上刻有与客户公司内部标识一致的模具编

2、号 02Mould fit on the injection machine and dimension on for the mounting wholes is ok? 模具外型尺寸及各安装孔位、尺寸与相应的注塑机台匹配03Are the opening strokes concerning the assembly drawing? 模具打开的行程及推板顶出行程和水口板开模距离(仅适用于三板结构)与模具装配图纸上是否一致04Is a lifting block on the mould? 模具带有与模具外形尺寸匹配的锁模扁担05Is draw bars balance good?模具有锁

3、模扁担和起吊孔并能够保证模具平稳起吊 06Can tool open and close smoolthly?模具打开和闭合过程轻松、安全、平稳 07Is the diameter of the locating rings ok?定位圈的直径尺寸正确并与相应的注塑机台匹配 08Is there insulating plate ?有隔热板 09Is the right radius on the sprue bushing/nozzle?浇口套进料处的球面直径与相应的注塑机台匹配 10Is there counter?有无计数器 11Are all big movable parts hav

4、ing lubricated groove?所有大的移动部件都有油槽 12Is the ejector unit moving easily?顶出系统运动足够的轻松 13Correct screw thread on the ejector rod?顶出杆上的螺纹尺寸正确 14Is ejector pins fixed if it is not allowed to be rotated?所有头部为非平面的顶针都有采取防转措施 15Are all slides secured?所有滑块的运动安全可靠(有限位装置及防止脱出装置) 16Can slider be moved by hand smo

5、othly and stably? 滑块部件可以在用人手操作的情况下运动自如平稳17Connection for water/oil/hydraulic and air are labeled? 18各个种类的所有接口(包括水路、油路、液压缸、气压)都有标示 19Cooling connector meet Customers requirement.水管连接头符合客户标准 20Is cooling plug pipe according to Customers spec?冷却系统的水路堵丝符合客户要求 21Did you test the cooling system for any le

6、aks (15 bar)?已经测试过冷却系统的渗漏情况(15bar压力下) 22Whether use Viton O-Ring which can be used on hign mold temperature ? 使用耐高温的Viton材质的O形环 23All transition in the runner system must be round流道系统中所有过渡点(转弯、交叉)都必须倒圆角 24Is the runner system vented?流道系统是否有排气 25Is partline venting system good模具分型面的排气是否良好 26Are the c

7、avities numbered (not on ejectors)? 所有模具型芯上都刻有相应的模穴号,此号码应与模穴产品号相一致27Whether family mold have mold part list?Whether engrave marks on mold part? 共模的模仁有无部件清单?是否在模仁上刻上标识以区分? 28Are the hydraulic connectors at the cylinders ok?液压缸头部与模具部件连接处完好,尺寸正确 29Is the function of any end switches tested? 模具上所有的非机械式开

8、关(电气、磁性限位)及传感器都经过功能测试并确保能够正常使用30Is the function and the end switch for the unscrewing system tested? 31脱螺纹系统的功能及距离都经过测试并确保能够正常使用 32Hot runner system: connecting line should be coved for preventing damage. 热流道系统的电线应被覆盖在模具内部以确保生产情况下不会被损害33If have hot runner,please fill value on below list 如有热流道的模具请把加热及感温阻值填写在下表中.序 号1 - 23 - 45 - 67 - 8加热阻值感温阻值34Whether Customers got latest mold drawing? 客户是否收到最终的硬拷贝及电子档模具图 35Whether have spare part list?是否有备件清单 备注 Remarks:钳钳工工 Tool Maker生生产产部部 Workshop 项项目目 Project确确认认是是否否可可以以走

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论