1、强强 夯夯 施施 工工 记记 录录Dynamic Compaction Record 工程名称Project博世汽车部件(南京)有限公司扩产项目停车场区域地基处理施工单位Contractor陕西建工集团机械施工有限公司SMCC施工区域Constructionarea试夯区Trialramming area机号MachineNo.1#机锤重Heavyhammer(t)14.50夯锤尺寸Rammersize(m)0.60落距Fallingdistances(m)11.16水准高程Level elevation(m)8.97后视Backsight(m)0.00日期Date2011.8.11(第一遍)
2、夯号The firsttime(Rammer)每 击 夯 沉 量 Settlement of the each compaction (m)最后二击平均下沉量Averagesettlement of thelast twocompaction(cm)总沉量Totalsettlement(cm)夯前高程Elevationbeforecompaction(m)夯后高程Elevationaftercompaction(m)012345678910111213A10.200.500.780.961.181.42231228.176.95A20.250.580.881.1629918.127.21A30
3、.270.570.891.1730908.107.20A40.210.721.141.3330.51128.167.04A50.300.691.001.2226.5928.077.15A60.240.600.921.1929.5958.137.18A70.250.791.061.2824.51038.127.09施工小组Construction group: 施工员Construction crew:监理工程师(建设单位项目负责人)Supervising Engineer:强强 夯夯 施施 工工 记记 录录Dynamic Compaction Record 工程名称Project博世汽车部件(
4、南京)有限公司扩产项目停车场区域地基处理施工单位Contractor陕西建工集团机械施工有限公司SMCC施工区域Constructionarea试夯区Trialramming area机号MachineNo.1#机锤重Heavyhammer(t)14.50夯锤尺寸Rammersize(m)0.60落距Fallingdistances(m)11.16水准高程Level elevation(m)8.97后视Backsight(m)0.00日期Date2011.08.13(第一遍)夯号The firsttime(Rammer)每 击 夯 沉 量 Settlement of the each comp
5、action (m)最后二击平均下沉量Averagesettlement of thelast twocompaction(cm)总沉量Totalsettlement(cm)夯前高程Elevationbeforecompaction(m)夯后高程Elevationaftercompaction(m)012345678910111213C70.330.620.901.1225798.047.25C60.410.731.041.3229.5917.967.05C50.430.801.121.3628937.947.01C40.440.831.181.3827.5947.936.99C30.400.
6、821.111.4531.51057.976.92C20.330.610.841.0522728.047.32C10.270.600.951.2130.5948.107.16E70.350.650.871.1424.5798.027.23E60.340.600.911.1628828.037.21E50.440.901.251.6135.51177.936.82E40.510.901.231.5130.51007.866.86E30.390.721.071.3330.5947.987.04E20.370.851.341.6037.51238.006.77E10.340.670.951.2328
7、898.037.14施工小组Construction group: 施工员Construction crew:监理工程师(建设单位项目负责人)Supervising Engineer:强强 夯夯 施施 工工 记记 录录Dynamic Compaction Record 工程名称Project博世汽车部件(南京)有限公司扩产项目停车场区域地基处理施工单位Contractor陕西建工集团机械施工有限公司SMCC施工区域Constructionarea试夯区Trialramming area机号MachineNo.1#机锤重Heavyhammer(t)14.50夯锤尺寸Rammersize(m)0.
8、60落距Fallingdistances(m)11.16水准高程Level elevation(m)8.97后视Backsight(m)0.00日期Date2011.08.13(第一遍)夯号The firsttime(Rammer)每 击 夯 沉 量 Settlement of the each compaction (m)最后二击平均下沉量Averagesettlement of thelast twocompaction(cm)总沉量Totalsettlement(cm)夯前高程Elevationbeforecompaction(m)夯后高程Elevationaftercompaction
9、(m)012345678910111213G70.300.630.941.1124818.077.26G60.380.590.811.0221.5647.997.35G50.400.681.001.3433947.977.03G40.360.771.081.45341098.016.92G30.411.021.451.68331277.966.69G20.350.891.401.63371288.026.74G10.310.590.881.1930888.067.18施工小组Construction group: 施工员Construction crew:监理工程师(建设单位项目负责人)Sup
10、ervising Engineer:强强 夯夯 施施 工工 记记 录录Dynamic Compaction Record 工程名称Project博世汽车部件(南京)有限公司扩产项目停车场区域地基处理施工单位Contractor陕西建工集团机械施工有限公司SMCC施工区域Constructionarea试夯区Trialramming area机号MachineNo.1#机锤重Heavyhammer(t)14.50夯锤尺寸Rammersize(m)0.60落距Fallingdistances(m)11.16水准高程Level elevation(m)8.97后视Backsight(m)0.00日期
11、Date2011.08.20(第一遍)夯号The firsttime(Rammer)每 击 夯 沉 量 Settlement of the each compaction (m)最后二击平均下沉量Averagesettlement of thelast twocompaction(cm)总沉量Totalsettlement(cm)夯前高程Elevationbeforecompaction(m)夯后高程Elevationaftercompaction(m)012345678910111213F70.350.600.881.1025758.027.27F60.320.630.941.2330918
12、.057.14F50.300.620.821.1024808.077.27F30.330.721.001.40341078.046.97F40.330.740.961.2425918.047.13F20.370.801.151.4934.51128.006.88F10.351.211.651.89341548.026.48D70.330.741.001.38321058.046.99D60.380.721.031.3632987.997.01D50.350.811.091.39291048.026.98D40.370.831.181.3023.5938.007.07D30.370.791.10
13、1.49351128.006.88D20.300.690.921.2729978.077.10D10.280.530.741.0727798.097.3施工小组Construction group: 施工员Construction crew:监理工程师(建设单位项目负责人)Supervising Engineer:强强 夯夯 施施 工工 记记 录录Dynamic Compaction Record 工程名称Project博世汽车部件(南京)有限公司扩产项目停车场区域地基处理施工单位Contractor陕西建工集团机械施工有限公司SMCC施工区域Constructionarea试夯区Trialr
14、amming area机号MachineNo.1#机锤重Heavyhammer(t)14.50夯锤尺寸Rammersize(m)0.60落距Fallingdistances(m)11.16水准高程Level elevation(m)8.97后视Backsight(m)0.00日期Date2011.08.20(第一遍)夯号The firsttime(Rammer)每 击 夯 沉 量 Settlement of the each compaction (m)最后二击平均下沉量Averagesettlement of thelast twocompaction(cm)总沉量Totalsettleme
15、nt(cm)夯前高程Elevationbeforecompaction(m)夯后高程Elevationaftercompaction(m)012345678910111213B70.380.831.051.41291037.996.96B60.350.600.821.0623718.027.31B50.300.580.710.9418648.077.43B40.270.550.771.0324768.107.34B30.240.570.811.0122778.137.36B20.200.610.961.31351118.177.06B10.290.660.941.30321018.087.07
16、施工小组Construction group: 施工员Construction crew:监理工程师(建设单位项目负责人)Supervising Engineer:强强 夯夯 施施 工工 记记 录录工程名称南京港铜井港区四期地基处理工程施工单位陕西省机械施工公司施工区域一区机号1#机锤重(t)16.86夯锤尺寸(m)0.50落距(m)10.68水准高程(m)8.31后视(m)0.39日期2010.05.11(第二遍)夯号每 击 夯 沉 量 (m)最后二击平均下沉量(cm)总沉量(cm)夯前高程(m)夯后高程(m)012345678910111213J720.430.841.131.371.50
17、1.61121187.776.59K720.390.871.151.361.471.58101247.816.57L720.370.801.091.301.411.50101137.836.70M720.300.741.101.311.421.509.51207.906.70N720.330.801.141.371.481.59111267.876.61P720.290.711.071.321.431.54111257.916.66Q720.250.731.101.381.501.6111.51367.956.59R720.290.801.171.411.531.61101327.916.59
18、S720.370.781.201.401.511.6110.51247.836.59U720.320.741.131.381.501.5910.51277.886.61T720.470.841.251.491.601.69101227.736.51G720.530.941.291.511.621.709.51177.676.50F720.500.931.271.481.601.68101187.706.52H720.590.980.341.531.651.7191127.616.49E720.470.891.231.471.601.69111227.736.51E740.690.941.301
19、.531.641.73101047.516.47F740.630.981.241.431.541.63101007.576.57G740.590.961.251.421.531.62101037.616.58 施工小组: 施工员: 记录员: 强强 夯夯 施施 工工 记记 录录工程名称南京港铜井港区四期地基处理工程施工单位陕西省机械施工公司施工区域一区机号1#机锤重(t)16.86夯锤尺寸(m)0.50落距(m)10.68水准高程(m)8.31后视(m)0.39日期2010.05.11(第二遍)夯号每 击 夯 沉 量 (m)最后二击平均下沉量(cm)总沉量(cm)夯前高程(m)夯后高程(m)01
20、2345678910111213H740.570.931.241.431.551.63101067.636.57J740.510.901.231.421.521.619.51107.696.59 施工小组: 施工员: 记录员: 强强 夯夯 施施 工工 记记 录录工程名称南京港铜井港区四期地基处理工程施工单位陕西省机械施工公司施工区域一区机号1#机锤重(t)16.86夯锤尺寸(m)0.50落距(m)10.68水准高程(m)8.31后视(m)0.46日期2010.05.12(第二遍)夯号每 击 夯 沉 量 (m)最后二击平均下沉量(cm)总沉量(cm)夯前高程(m)夯后高程(m)012345678
21、910111213K740.590.931.241.411.521.61101027.686.66L740.671.051.401.601.711.80101137.606.47M740.631.001.341.571.681.7810.51157.646.49N740.570.961.231.421.521.619.51047.706.66P740.520.931.251.441.561.64101127.756.63Q740.470.911.221.401.491.599.51127.806.68U740.530.881.301.511.621.7210.51197.746.55T740.
22、571.021.371.601.721.80101237.706.47S740.510.941.231.451.561.65101147.766.62R740.420.841.191.381.491.579.51157.856.70U780.570.971.251.441.531.639.51067.706.64U760.590.971.251.471.501.6171027.686.66S780.420.801.091.271.401.5011.51087.856.77S760.480.791.081.291.421.55131077.796.72T760.560.901.211.431.5
23、41.6410.51087.716.63T780.530.911.271.461.581.6911.51167.746.58Q780.590.951.241.471.571.67101087.686.60Q760.630.981.271.481.601.6910.51067.646.58 施工小组: 施工员: 记录员: 强强 夯夯 施施 工工 记记 录录工程名称南京港铜井港区四期地基处理工程施工单位陕西省机械施工公司施工区域一区机号1#机锤重(t)16.86夯锤尺寸(m)0.50落距(m)10.68水准高程(m)8.31后视(m)0.46日期2010.05.12(第二遍)夯号每 击 夯 沉 量
24、 (m)最后二击平均下沉量(cm)总沉量(cm)夯前高程(m)夯后高程(m)012345678910111213R760.630.991.341.531.651.7410.51117.646.53R780.580.941.181.401.491.60101027.696.67N780.671.001.281.451.571.6510987.606.62N760.691.071.351.541.651.739.51047.586.54P780.711.071.391.561.671.78111077.566.49P760.620.981.271.501.651.78141167.656.49L7
25、60.791.141.351.521.621.719.5927.486.56L780.701.031.251.411.521.609.5907.576.67M780.630.971.231.401.501.6010977.646.67M760.670.961.201.371.481.569.5897.606.71E780.831.151.421.561.661.759.5927.446.52F780.861.211.491.681.811.9312.51077.416.34J760.681.001.271.421.511.609927.596.67J780.590.921.141.301.39
26、1.489897.686.79K760.530.901.181.341.451.54101017.746.73K780.580.891.131.301.411.5010927.696.77H760.630.971.201.361.471.5811957.646.69E760.871.081.371.601.731.8412977.406.43 施工小组: 施工员: 记录员: 强强 夯夯 施施 工工 记记 录录工程名称南京港铜井港区四期地基处理工程施工单位陕西省机械施工公司施工区域一区机号1#机锤重(t)16.86夯锤尺寸(m)0.50落距(m)10.68水准高程(m)8.31后视(m)0.46
27、日期2010.05.12(第二遍)夯号每 击 夯 沉 量 (m)最后二击平均下沉量(cm)总沉量(cm)夯前高程(m)夯后高程(m)012345678910111213F760.731.071.291.481.601.7111.5987.546.56G760.681.031.321.501.621.7110.51037.596.56G780.711.021.301.471.601.6911987.566.58H780.741.051.371.541.651.739.5997.536.54U800.470.801.141.351.471.6012.51137.806.67T800.430.811
28、.181.411.531.6411.51217.846.63U840.320.711.021.301.431.56131247.956.71T840.380.811.091.341.501.6314.51257.896.64S840.430.901.191.431.571.6812.51257.846.59R840.490.881.201.391.521.63121147.786.64Q840.570.931.211.431.541.65111087.706.62Q800.490.911.241.411.531.63111147.786.64R800.540.870.151.341.451.5
29、4101007.736.73S800.450.841.201.391.521.6412.51197.826.63T820.400.771.051.311.461.59141197.876.68U820.340.751.071.341.501.62141287.936.65R820.430.801.091.301.411.5110.51087.846.76S820.370.781.111.321.441.54111177.906.73 施工小组: 施工员: 记录员: 强强 夯夯 施施 工工 记记 录录工程名称南京港铜井港区四期地基处理工程施工单位陕西省机械施工公司施工区域一区机号1#机锤重(t)
30、16.86夯锤尺寸(m)0.50落距(m)10.68水准高程(m)8.31后视(m)0.47日期2010.05.12(第二遍)夯号每 击 夯 沉 量 (m)最后二击平均下沉量(cm)总沉量(cm)夯前高程(m)夯后高程(m)012345678910111213P800.430.801.131.341.451.5711.51147.856.71N800.390.781.101.321.441.58131197.896.70M800.500.891.131.301.411.50101007.786.78Q820.340.700.931.141.231.34101007.946.94P840.390
31、.750.961.131.251.3611.5977.896.92N840.470.841.171.401.531.62111157.816.66M840.580.971.251.461.591.70121127.706.58L840.490.871.241.451.571.7012.51217.796.58K840.530.921.231.461.601.7313.51207.756.55J840.590.871.101.321.431.5210937.696.76N820.480.841.051.231.341.429.5947.806.86P820.410.781.041.201.291
32、.389977.876.90L800.430.750.971.151.241.349.5917.856.94K800.480.811.081.251.381.4711997.806.81J800.510.871.121.301.421.5512.51047.776.73H800.550.901.191.371.501.6212.51077.736.66G800.620.971.231.451.571.65101037.666.63E800.731.051.371.561.681.7911.51067.556.49 施工小组: 施工员: 记录员: 强强 夯夯 施施 工工 记记 录录工程名称南京港
33、铜井港区四期地基处理工程施工单位陕西省机械施工公司施工区域一区机号1#机锤重(t)16.86夯锤尺寸(m)0.50落距(m)10.68水准高程(m)8.31后视(m)0.47日期2010.05.12(第二遍)夯号每 击 夯 沉 量 (m)最后二击平均下沉量(cm)总沉量(cm)夯前高程(m)夯后高程(m)012345678910111213F800.690.891.171.381.501.6011917.596.68L820.500.841.131.341.431.54101047.786.74M820.530.891.201.371.481.6011.51077.756.68J820.600
34、.971.251.461.571.68111087.686.60K820.570.921.231.451.581.69121127.716.59E820.781.151.431.601.731.82111047.506.46F820.711.081.371.591.721.8211.51117.576.46G820.671.041.321.501.591.70101037.616.58H820.590.971.231.421.541.6511.51067.696.63H840.630.981.251.491.621.71111087.656.57E840.761.141.431.621.741
35、.8511.51097.526.43F840.701.081.371.551.671.8012.51107.586.48G840.590.971.251.491.621.7412.51157.696.54E880.751.091.411.611.731.8411.51097.536.44F880.681.031.341.531.651.7410.51067.606.54G880.651.001.291.481.601.7111.51067.636.57 施工小组: 施工员: 记录员: 强强 夯夯 施施 工工 记记 录录工程名称南京港铜井港区四期地基处理工程施工单位陕西省机械施工公司施工区域一区
36、机号1#机锤重(t)16.86夯锤尺寸(m)0.50落距(m)10.68水准高程(m)8.31后视(m)0.51日期2010.05.15(第二遍)夯号每 击 夯 沉 量 (m)最后二击平均下沉量(cm)总沉量(cm)夯前高程(m)夯后高程(m)012345678910111213H880.651.031.341.601.741.8713.51227.676.45J880.590.981.301.521.641.76121177.736.56K880.550.941.271.501.631.7713.51227.776.55L880.530.871.221.411.531.6411.51117.
37、796.68M880.470.861.271.481.611.72121257.856.60N880.480.851.231.441.561.6510.51177.846.67P880.520.891.241.471.601.7212.51207.806.60U880.270.701.031.251.401.53141268.056.79T880.300.731.021.231.371.5013.51208.026.82S880.360.751.071.301.441.56131207.966.76R880.400.831.171.421.551.66121267.926.66Q880.430
38、.841.151.401.531.64121217.896.68T860.280.691.031.241.391.52141248.046.80U860.220.670.981.221.341.4511.51238.106.87R860.310.721.071.311.451.57131268.016.75S860.360.771.101.341.481.6113.51257.966.71P860.340.741.091.311.451.57131237.986.75Q860.390.801.101.341.481.5912.51207.936.73 施工小组: 施工员: 记录员: 强强 夯夯
39、 施施 工工 记记 录录工程名称南京港铜井港区四期地基处理工程施工单位陕西省机械施工公司施工区域一区机号1#机锤重(t)16.86夯锤尺寸(m)0.50落距(m)10.68水准高程(m)8.31后视(m)0.51日期2010.05.15(第二遍)夯号每 击 夯 沉 量 (m)最后二击平均下沉量(cm)总沉量(cm)夯前高程(m)夯后高程(m)012345678910111213M860.470.851.091.301.421.5311.51067.856.79N860.550.941.231.421.551.64111097.776.68K860.600.971.201.401.491.641
40、21047.726.68L860.630.951.191.371.481.6011.5977.696.72J860.650.981.241.431.561.6812.51037.676.64H860.691.071.351.541.671.7912.51107.636.53G860.731.091.401.591.701.81111087.596.51F860.701.051.371.581.691.82121127.626.50E860.781.181.501.721.861.9913.51217.546.33 施工小组: 施工员: 记录员: 强强 夯夯 施施 工工 记记 录录工程名称南京港
41、铜井港区四期地基处理工程施工单位陕西省机械施工公司施工区域一区机号6#机锤重(t)13.20夯锤尺寸(m)0.70落距(m)13.63水准高程(m)8.35后视(m)0.46日期2010.06.02(第二遍)夯号每 击 夯 沉 量 (m)最后二击平均下沉量(cm)总沉量(cm)夯前高程(m)夯后高程(m)012345678910111213V450.280.630.931.181.361.4513.51177.836.66V430.300.650.941.171.341.43131137.816.68U450.350.721.051.271.421.5212.51177.766.59U430.
42、320.670.981.201.381.46131147.796.65T450.290.650.991.241.401.48121197.826.63T430.250.600.941.191.351.45131207.866.66S450.270.630.981.221.391.48131217.846.63S430.240.600.951.201.361.4512.51217.876.66R450.280.640.971.231.401.49131217.836.62R430.230.590.901.151.321.39121167.886.72Q450.260.620.951.221.39
43、1.4913.51237.856.62Q430.240.610.961.191.341.41111177.876.70P450.300.650.981.211.351.45121157.816.66P430.270.640.951.181.331.4312.51167.846.68N450.250.600.921.151.311.4012.51157.866.71N430.290.650.981.231.381.4611.51177.826.65M450.280.630.961.201.351.44121167.836.67M430.350.711.041.281.411.50111157.7
44、66.61 施工小组: 施工员: 记录员: 强强 夯夯 施施 工工 记记 录录工程名称南京港铜井港区四期地基处理工程施工单位陕西省机械施工公司施工区域一区机号6#机锤重(t)13.20夯锤尺寸(m)0.70落距(m)13.63水准高程(m)8.35后视(m)0.45日期2010.06.03(第二遍)夯号每 击 夯 沉 量 (m)最后二击平均下沉量(cm)总沉量(cm)夯前高程(m)夯后高程(m)012345678910111213L450.260.640.931.161.321.42131167.846.68L430.290.650.921.171.341.45141167.816.65K45
45、0.240.590.881.131.301.3812.51147.866.72K430.270.630.941.181.351.4513.51187.836.65J450.320.690.971.211.381.47131157.786.63J430.280.640.951.201.361.44121167.826.66H450.250.600.901.121.271.3511.51107.856.75H430.220.550.821.051.221.3012.51087.886.80G450.270.590.851.081.241.34131077.836.76G430.240.540.80
46、1.031.181.25111017.866.85F430.280.590.831.041.181.2611987.826.84E430.250.550.791.001.151.2311.5987.856.87V410.290.610.831.051.191.2811.5997.816.82V390.240.540.750.981.131.2011967.866.90U410.270.580.801.021.161.2511.5987.836.85U390.220.520.730.931.081.1611.5947.886.94T410.260.570.811.001.151.2412987.
47、846.86T390.300.600.851.031.201.3013.51007.806.80 施工小组: 施工员: 记录员: 强强 夯夯 施施 工工 记记 录录工程名称南京港铜井港区四期地基处理工程施工单位陕西省机械施工公司施工区域一区机号6#机锤重(t)13.20夯锤尺寸(m)0.70落距(m)13.63水准高程(m)8.35后视(m)0.45日期2010.06.03(第二遍)夯号每 击 夯 沉 量 (m)最后二击平均下沉量(cm)总沉量(cm)夯前高程(m)夯后高程(m)012345678910111213S410.280.580.831.051.211.3012.51027.826.
48、80S390.250.560.801.021.171.2511.51007.856.85R410.290.600.851.061.201.2811997.816.82R390.240.560.821.031.191.29131057.866.81Q410.270.570.811.021.181.2612997.836.84Q390.250.570.791.001.161.2512.51007.856.85P410.280.590.841.051.201.29121017.826.81P390.280.570.811.031.191.3013.51027.826.80N410.240.550.7
49、81.001.171.26131027.866.84N390.270.590.831.051.201.3012.51037.836.80M410.350.700.961.261.331.48111137.756.62M390.560.861.101.321.481.509947.546.60L410.440.830.901.001.101.178.5737.666.93L390.360.680.881.061.211.3213967.746.78K410.440.801.001.201.351.4512.51017.666.65K390.390.781.011.171.361.45141067
50、.716.65J410.350.650.841.051.251.3816.51037.756.72J390.400.740.951.151.261.3510957.706.75 施工小组: 施工员: 记录员: 强强 夯夯 施施 工工 记记 录录工程名称南京港铜井港区四期地基处理工程施工单位陕西省机械施工公司施工区域一区机号6#机锤重(t)13.20夯锤尺寸(m)0.70落距(m)13.63水准高程(m)8.35后视(m)0.45日期2010.06.03(第二遍)夯号每 击 夯 沉 量 (m)最后二击平均下沉量(cm)总沉量(cm)夯前高程(m)夯后高程(m)012345678910111213
51、H410.380.731.011.211.361.4411.51067.726.66H390.400.751.051.241.381.46111067.706.64G410.350.681.001.191.331.43121087.756.67G390.430.781.021.201.341.4211997.676.68F410.330.660.901.051.181.2811.5957.776.82F390.300.640.941.101.241.32111027.806.78E410.360.690.961.111.241.3311977.746.77E390.450.770.981.15
52、1.301.3912947.656.71S370.400.741.001.201.341.4110.51017.706.69S350.320.660.941.121.271.3511.51037.786.75R370.420.761.031.221.361.4310.51017.686.67R350.370.700.961.151.301.37111007.736.73Q370.330.680.921.131.281.35111027.776.75Q350.390.720.941.151.301.3811.5997.716.72P370.350.670.891.141.291.38121037
53、.756.72P350.420.771.001.241.381.4711.51057.686.63N370.370.710.921.141.281.3711.51007.736.73N350.390.740.971.191.341.4211.51037.716.68 施工小组: 施工员: 记录员: 强强 夯夯 施施 工工 记记 录录工程名称南京港铜井港区四期地基处理工程施工单位陕西省机械施工公司施工区域一区机号6#机锤重(t)13.20夯锤尺寸(m)0.70落距(m)13.63水准高程(m)8.35后视(m)0.46日期2010.06.03(第二遍)夯号每 击 夯 沉 量 (m)最后二击平均下
54、沉量(cm)总沉量(cm)夯前高程(m)夯后高程(m)012345678910111213M370.380.700.951.191.341.4211.51047.736.69M350.430.781.021.241.391.48121057.686.63L370.370.690.921.141.281.3611997.746.75L350.400.751.001.221.371.4712.51077.716.64K370.360.680.941.181.331.42121067.756.69K350.390.751.031.281.431.5312.51147.726.58J370.440.7
55、81.021.221.381.46121027.676.65J350.380.710.961.191.351.4412.51067.736.67H370.420.761.001.231.371.45111037.696.66H350.370.720.971.201.361.44121077.746.67G370.350.700.961.191.341.43121087.766.68G350.390.741.011.231.371.45111067.726.66F370.430.761.041.291.431.5211.51097.686.59F350.380.721.001.251.401.5
56、012.51127.736.61E370.440.790.961.111.251.3411.5907.676.77E350.350.680.941.121.271.3511.51007.766.76Q330.320.650.931.101.251.3311.51017.796.78P330.390.740.961.131.271.3410.5957.726.77 施工小组: 施工员: 记录员: 强强 夯夯 施施 工工 记记 录录工程名称南京港铜井港区四期地基处理工程施工单位陕西省机械施工公司施工区域一区机号6#机锤重(t)13.20夯锤尺寸(m)0.70落距(m)13.63水准高程(m)8.3
57、5后视(m)0.46日期2010.06.03(第二遍)夯号每 击 夯 沉 量 (m)最后二击平均下沉量(cm)总沉量(cm)夯前高程(m)夯后高程(m)012345678910111213N330.360.731.011.191.311.39101037.756.72M330.340.711.031.341.471.56111227.776.55L330.310.660.961.161.301.3911.51087.806.72K310.420.791.081.251.391.47111057.696.64K330.390.771.051.231.371.4611.51077.726.65J3
58、10.330.680.951.151.301.3811.51057.786.73J330.370.700.981.171.321.41121047.746.70H310.300.670.971.141.271.36111067.816.75H330.270.630.931.121.261.3511.51087.846.76G310.350.731.021.221.371.44111097.766.67G330.390.751.001.201.341.4110.51027.726.70F310.330.670.961.131.261.33101007.786.78F330.360.690.971
59、.171.301.39111037.756.72E310.300.640.921.101.251.34121047.816.77E330.340.700.971.131.261.3310997.776.78K290.310.680.951.121.251.34111037.806.77J290.400.761.051.251.391.4610.51067.716.65H290.370.710.971.161.311.38111017.746.73 施工小组: 施工员: 记录员: 强强 夯夯 施施 工工 记记 录录工程名称南京港铜井港区四期地基处理工程施工单位陕西省机械施工公司施工区域一区机号6
60、#机锤重(t)13.20夯锤尺寸(m)0.70落距(m)13.63水准高程(m)8.35后视(m)0.46日期2010.06.03(第二遍)夯号每 击 夯 沉 量 (m)最后二击平均下沉量(cm)总沉量(cm)夯前高程(m)夯后高程(m)012345678910111213G290.350.721.021.221.371.44111097.766.67G270.310.660.931.121.251.3511.51047.806.76F290.370.731.031.241.401.4711.51107.746.64F270.300.650.921.111.271.35121057.816.7
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 茶店品牌授权经营合同-2025年度市场推广计划
- 二零二五年度个人手房车位使用权转让及车位租赁管理服务合同
- 二零二五年度食堂食品安全监控用工合同
- 二零二五年度能源管理文件传输与监控合同
- 二零二五年度房地产项目股权回购转让协议书
- 二零二五年度人工智能助手免责任协议书
- 二零二五年度学生宿舍租赁管理服务合同
- 二零二五年度农业科技园区经营权合作书
- 二零二五年度教育机构贷款担保合同
- 2025年度蔬菜大棚温室租赁与农产品质量安全追溯系统建设合同
- 《土地管理法》课件
- 网络安全技术服务方案
- 地铁站务员职业发展规划
- 文旅项目招商方案
- 统编版小学语文一年级下册全册教学课件(2024年春季版)
- 2024届湖南省高三九校联盟第一次联考数学试卷(含答案)
- 医疗器械经营质量管理制度范本
- 【基于近些年数据的千禾味业公司盈利能力分析案例(9000字论文)】
- 《国家卫生统计网络直报系统》数据填报员操作指南V1.2
- 危险性较大分部分项工程安全专项施工方案专家论证审查表
- 02区域分析与区域规划(第三版)电子教案(第二章)
评论
0/150
提交评论