![国际土木工程建筑承包合同[页8]_第1页](http://file3.renrendoc.com/fileroot_temp3/2022-1/30/9cf8543e-0107-4917-968d-11a3b935786b/9cf8543e-0107-4917-968d-11a3b935786b1.gif)
![国际土木工程建筑承包合同[页8]_第2页](http://file3.renrendoc.com/fileroot_temp3/2022-1/30/9cf8543e-0107-4917-968d-11a3b935786b/9cf8543e-0107-4917-968d-11a3b935786b2.gif)
![国际土木工程建筑承包合同[页8]_第3页](http://file3.renrendoc.com/fileroot_temp3/2022-1/30/9cf8543e-0107-4917-968d-11a3b935786b/9cf8543e-0107-4917-968d-11a3b935786b3.gif)
下载本文档
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、国际土木工程建筑承包合同 (中英文对照) 页 8国际土木工程建筑承包合同 (中英文对照) 国际土木工程建筑承 包合同(中英文对照)10 为正常履行,在标书中,承包人应承诺按要求取得保险公 司或银行的保单或保函, 或其他业经认可由承包人向业主负连带责任 的担保,其数额不超过验收证书中规定的保单或保函额, 上述保险公 司、银行或担保以及上述保单或保函的条款必须经业主认可。 此种保 单或保函的取得或担保的提供, 以及缔结保单或保函的费用应全部由 承包人承担,合同中另有规定的除外。11 the employer shall have made available to the contractor w
2、ith the tender documents such data on hydrological and sub-surface conditions as shall have been obtained by or on behalf of the employer from investigations undertaken relevant to the works and the tender shall be deemed to have been based on such data,but the contractorshall be responsible for his
3、 own interpretation thereof11 业主必须在招标文件中向承包人提供由业主或其代理人在 进行工程考察时获得的水文及地质情况资料, 标书必须视为是基于此 种资料所制定的,但承包人必须对资料的理解自行负责。the contractor shall also be deemed to have inspected and examined the site andits surroundings and informationavailable in connection therewith and to have satisfied himself ,so far as i
4、s practicable ,before submitting his tender,as to the form and nature thereof, including the sub-surfaceconditions , the hydrological and climatic conditions , the extent and nature of work and materials necessary for the completion of the works, the means of access to the site andthe accommodation
5、he may require and,in general , shall bedeemed to have obtained all necessary information,subject asabove mentioned ,as to risks , contingencies and all other circumstances which may influence of affect his tender承包人也必须被视为已视察了工地及周围环境,查阅了可获得 的有关工地资料, 且在提交标书前, 对一切实际情况, 从形式到性质, 包括地质条件、 水文和气候条件、 工程范围和性质
6、以及完成工程所必 需的材料、到达工地的交通工具和所需的食宿等感到满意,总之,承 包人必须被视为已得到所有必要的资料, 除涉及上述情况外, 还涉及 风险、意外事件及其他一切可能影响其投标的情况。12 the contractor shall be deemed to have satisfied himself before tendering as to the correctness and sufficiency of his tender for the works and of the rates and prices stated in the priced bill of quan
7、tities and the schedule of rates andprices ,if any ,which tender rates and prices shall , except insofar as it is otherwise provided in the contract, cover all hisobligations under the contract and all matters and things necessary for the proper execution and maintenance of the works if , however ,d
8、uring the execution of the works the contractor shall encounter physical conditions , other than climatic conditions on the site,or artificial obstructions,whichconditions or obstructions could,in his opinion ,not have beenreasonablyforeseen byan experienced contractorthecontractorshall forthwithgive written notice thereoftotheengineersrepresentativeand if , in the opinionoftheengineer , such conditions or artificial obstructions could nothave been reasonably foreseen by an experienced contractor , then the engineer shall certify and the employer shall
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 小学生词语教学课件背景
- 36 选择性必修1 第七单元 第30讲 人体的内环境与稳态
- 尊重国旗班会课件
- 02 必修1 第一单元 第2讲 细胞中的无机物、糖类和脂质
- 毕洁与李阳的离婚协议书财产分割及子女共同成长计划
- 采石场矿产资源勘查与承包管理协议
- 专业代养托管服务合同书
- 抵押贷款合同范本适用于设备融资
- 产业园区配套设施场地租赁意向书模板
- 矿山爆破作业安全责任协议书
- 施工现场平面布置及临时设施、临时道路布置
- 小学六年级课后服务:scratch少儿编程 四阶第19课:BMI指数(上)
- 科技人才评价规范
- 《短视频编辑与制作(第2版)》-第9章
- 医院无菌操作知识培训
- 年产500吨40gL烟嘧磺隆可分散油悬浮剂农药项目环境影响评价报告表样本
- 介绍方志敏(修订版)
- 《操作风险管理》课件
- (完整文本版)新概念英语第一册单词表默写版1-144
- 医师入职测考试试题答案(临床)
- 钢结构门头专项施工方案
评论
0/150
提交评论