下载本文档
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、IRIS体系审核时的评分方法 Total questions:255,including 12 K.O.questions。 总共255个问题,其中包括12个K.O.问题 1.Knock-out(K.O.)questions关键性问题 2.Open questions which are assessed through a four level approach for assessing the level of maturity ofprocesses and the grade/extension of implementation(Optimized,Qualified,Define
2、d,Poor) 开放式问题:通过在审核时评分过程的成熟程度和实施的程度,设定了四种不同级别(优秀,合格。可以。差)。 3.Closed questions(Yes/No)without progressive maturity levels。 封闭式问题:只有满足/不满足,没有递进的成熟度级别。 Note:Questions indicated as Non applicable('NA')are not assessed and relevant justification shall bedocumented。 注:如果问题被指明为“不适用”(即NA),这些问题将不会被审核
3、,但要说明“不适用”的原因,并被形成文件。 knock out questions(K.O.)关键性问题(K.O.问题): A detailed pre assessment of the Knock Out(K.O.)questions shall be carried out to ascertain the readiness toundertake the audit。 对K.O.问题应逐条进行预审核,以确定能否开始正式的审核。 Fulfilment is considered as a prerequisite for IRIS certification。 满足K.O.问题的要求是
4、开始IRIS认证的前提条件。 K.O. questions are not scored。 K.O.问题不打分。 When a K.O.requirement is not met,the whole audit fails。The Certification process has to start with a newrequest(covering the full audit process again)。 一旦K.O.问题没有满足,将不能通过审核。组织需要重新递交认证申请(审核过程将重新覆盖所有要素)。 K.O.问题一共12个,其中2个只适用于信号系统的公司。 Quality Man
5、agement System - General requirements 质量管理体系-通用要求 In case of transfer or outsourcing of activity with the execution of a contract does a transfer procedureincluding:feasibility study,nsk analysis,planning,communication to customer and FALs to the appropriate levelexist? 当合同执行过程中有转让或者外包的情况发生,是否有转让的程序
6、?其内容包括:可行性研究,风险分析,策划,客户沟通和首件检验,这些内容有在适当的水平上吗? Design and development(For Signalling only)设计和开发(仅适用于信号系统) Does the organization apply the principles in developing high integrity System in line with the CENELEC standardor other agreed equivalent models?The software design process must explicitly imple
7、ment the requirements of EN50128 related to safety integrity of the intended scope of the IRIS certificate。 组织在开发高集成系统时是否应用在CENELEC标准或其它协议的等效标准?软件开发过程必须实施EN50128的要求(与IRIS证书范围的安全集成有关时)。 CENELEC-European committee for electro-technical standardization 欧洲电工技术标准委员会 Design and development inputs 设计和开发输入
8、Does the organization ensure new technologies / new products are validated before being introduced in a customerproject? 组织是否确保新技术/新产品在引入顾客项目前得到确认? Design and development validation 设计和开发确认 Does the organization ensure that reports,calculation,test results,etc,demonstrate that the productdefinition
9、meets the specification requirements for all the relevant operational conditions? 组织是否确保报告、计算、测试结果等能够展示产品定义满足所有相关的运行条件的规范要求? Design approval(For Signalling only)设计批准(仅仅适用于信号系统) Does the organization provide a documented procedure defining the safety case and approval in line with thisstandard?组织是否准备
10、了文件化的程序,用于按照这个标准要求明确安全情况和批准? Validation of processes for production and service provision 生产和服务提供过程的确认 Are special processed managed according to the contractual requirements?特殊过程是否按照合同要求进行管理? Project Management 项目管理 Does the organization implement a documented project management(PM)approach or Syst
11、em,or new productdevelopment process addressing the applicable areas of PM,describing roles and responsibilities,integrating thewhole functions of the organization in a multidisciplinary team? 组织是否实施项目管理方法或体系,或新产品开发过程,涉及项目管理的使用领域,描述职责和任务,整合组织内所有相关职能形成多功能小组? Quality management 质量管理 Does the organizat
12、ion ensure that the process is in place to manage project deliverables? 组织是否确保有过程来管理项目是可以交付的? Change management 变更管理 Are verification,validation AND APPROVAL,activities defined,to ensure compliance with customer requirements BEFORE IMPLEMENTATION? 在实施前,是否定义了验证、确认和批准活动,以确保符合顾客要求? First article inspec
13、tion(FAI)首件检验 Does the organizations System provide a documented procedure defining inspection,verification and documentationof a representative item from the first serial production run of a new part or following any subsequent change thatinvalidates the previous first article inspection result? No
14、te:if the product is a one-off or a software,FAI is meant as validation 组织的体系是否有文件化的程序,规定在新零件首次批量生产时(或任何随后的会导致先前的首件检验结果失效的变更引入时)代表性零件的检验、验证和文件化? 注:如果产品仅是一个或是软件,FAI就是指得是确认。 Commissioning / Customer service 测试/客户服务 Does the organization provide a process for field services/Do field processes provide:a
15、ctions to be taken whereproblems are identified after delivery,including investigation,reporting activities and actions or service Information。 组织是否有现场服务的过程?现场服务过程是否提供,在交付后,当发现问题时,要采取相应的措施,包括调查,报告活动和服务信息的措施? Control of nonconforming processes 不合格过程的控制 In the event of business management process vari
16、ation,does the organization have a process in place to; a)Identify and record the variation,and if the business management process is non-conform to take appropriateaction tot correct the nonconforming process? b)Evaluate whether the business management process variation has resulted in product nonc
17、onformity? c) Identify and control the non-conforming product? 当发生过程偏差时,组织是否有过程来:a)识别,记录偏差并采取适当行动,纠正不合格的过程,b)评估是否过程偏差已经导致产品不合格,并且c)识别并控制不合格的产品? Quality management/质量管理 Does the organization ensure that a process is in place to manage project deliverables? 组织是否确保有过程来管理项目是可以交付的? The organization has a
18、 structured,appropriate project related quality system in place with manuals,proceduresand quality plans to manage project deliverables 组织有结构化的、合适的与项目有关的质量体系,包括手册、程序和质量计划来管理项目是可以交付的。 Change management/变更管理 Are verification,validation AND APPROVAL activities defined,to ensure compliance with customer
19、 requirements BEFORE IMLEMENTATION? 在变更实施前,是否定义了验证,确认和批准活动,以确保符合顾客要求? Verification,validation and approval activities are defined,to ensure compliance with customer requirementsBEFORE IMPLENMTSTION。Process implemented and records are available 在变更实施前。定义了验证、确认和批准活动,以确保符合顾客要求。过程得到了实施并有记录。 Open Questio
20、ns 开放式问题项 Each individual requirement(question)shall be scored progressively using maturity levels。 每项要求(每个问题)将按照成熟度级别被评分。 Maturity levels and relevant expected evidences shall be interpreted consistently with audit scope and companycharacteristics。 等级的评定依据和相关的审核发现必须是一致的。Maturity Level成熟度级别Is the requirement met?是否满足要求?Point分数“Optimized”优秀Exceeded and continuously improved4“qualified”合格Exceeded超过要求3“defined”满足Met in full达到要求2“poor”差Partially met部分满足要求1“insufficient”不满Not met不满足要求
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2024离婚双方关于股权分配的合同
- 新课纲核心能力特色与说明课件
- 2024食品供应商销售协议简版版
- 2024年施工员考试题库附参考答案
- 2024石材行业绿色矿山建设与生态环境保护合同2篇
- 2024年劳动保障知识竞赛题库及答案(共120题)
- 2025年度10架AC311A直升机购销及售后服务保障合同3篇
- 2024年门面房屋租赁合同范本(含违约责任及赔偿)3篇
- 2025年度出租车运营管理服务合同3篇
- 2024版:内部技术交流保密协议
- 人教版八年级数学下册课件【全册】
- 新概念英语第4册课文(中英文对照)
- 七年级数学上册专题18 一元一次方程有整数解(解析版)
- 梁山伯与祝英台小提琴谱乐谱
- 酒店安全生产责任制
- 汉字文化解密学习通超星课后章节答案期末考试题库2023年
- 福建地理概况课件
- 单体浇铸尼龙
- 供应链金融大数据平台商业计划书课件
- GB/T 24476-2023电梯物联网企业应用平台基本要求
- 管线探测技术介绍
评论
0/150
提交评论