1、土建造价员岗位实务(参考答案)二零一五年三月土建造价员岗位考核练习题答案(2007年6月)序号定额编号工程项目单位计算式工程数量建筑面积m216.8×7.2120.96116-9工程水电费m2同建筑面积120.96217-1脚手架搭拆100m2120.96÷1001.21317-2脚手架租赁100m2天1.21×实际租赁天数1.21 417-158垂直运输m2同建筑面积120.96土石方工程51-1人工场地平整m2同首层建筑面积120.9661-20人工挖基坑m 3挖土深度=2.1-0.45=1.65m174.45体积=(2.8×2.8×1.6
2、5+2.8×4×0.48×1.65) ×8=174.4571-16人工挖沟槽m 3JL1、JL3净长=(16.2-2.8×3) ×2+(6.6-2.8) ×2=23.2m26.03JL2、JL4净长=4.8-(0.15+0.3)×2 +(6.6-2.8) ×2=11.5m挖土深度=1.2-0.45=0.75m体积=(0.45+0.6) ×23.2+(0.3+0.6) ×11.5 ×0.75=26.0381-34房心回填土m 3(16.2-0.24×2) ×
3、6.6-0.24×(4.8-0.24) ×(0.45-0.133)=102.66×0.31732.54砌筑工程94-1砖基础m 3【(7.2-0.6×2)×2+(4.8-0.12×2)】×0.6×0.242.38104-27240mmKP1多孔砖内砌筑高度3.6米以下墙m 3(4.8-0.24) ×3.6 ×0.24=3.943.43扣:M2=0.9×2.1×0.24=0.4536 m 3M2过梁=0.18×0.24 ×(0.9+0.3×2)=0
4、.06 m 3体积=3.94-0.4536-0.06=3.43 m 3114-27换人×1.3240mmKP1多孔砖内墙砌筑高3.6米以上m 3(4.8-0.24) ×(3.9-0.12-3.6) ×0.24=0.20.2124-27240mmKP1多孔砖框架间墙m 32×(6.6-0.6) × (3.9-0.5) ×0.24=9.798.75扣:2M2=0.9×2.1×0.24×2=0.9072m 32M2过梁=0.18×0.24 ×(0.9+0.3×2) ×2=
5、0.13 m 3体积=9.79-0.9072-0.13=8.75m 3混凝土工程135-150C15砼垫层m 3体积=2.2×2.2×0.1×83.87145-2C30独立基础m 3(2×2×0.3+1.2×1.2×0.3) ×813.06155-7C30框架柱m 30.6×0.6×(1.4+3.9) ×815.26165-13C30框架梁m 3梁长=(6.6-0.6) ×2=121.8体积=0.3×0.5×12=1.8175-22C30有梁板m 3(16
6、.2-0.3×2) ×6.6×0.12=102.96×0.1212.36门窗工程188-13松木带亮自由门m 21.8×2.44.32198-4胶合板门m 20.9×2.1×35.67208-69塑钢双玻平开窗m 22.4×1.8×3+1.5×1.8×423.76218-81纱窗m 22.37×1.77×3+1.47×1.77×422.99228-142水泥砂浆后塞口m 24.32+5.679.99238-143填充剂后塞口m 2同窗23.76屋
7、面及防水工程249-32屋面保护涂料m 2(16.8-0.3) ×6.9+0.25×(16.5+6.9) ×2125.55259-54改性沥青聚酯胎卷材防水3mmm 2同上125.552611-3120mmDS砂浆找平层m 2同上125.552710-15水泥粉煤灰页岩陶粒找坡层m 3(16.8-0.3) ×(7.2-0.3)×0.0353.982810-1保温层50mmm 2(16.8-0.3) ×(7.2-0.3)113.852910-3×2每增5mmm 2同上113.85楼地面工程305-151C10混凝土垫层m 3(
8、4.8-0.24)×(2.4-0.12)×0.1=10.397×0.11.043111-3120mmDS砂浆找平层m 210.397+0.12×0.9×3+0.15×1.8-0.3×0.18×210.883211-43地砖面层m 2同上10.883311-79踢脚(门厅)m净周长:(4.8-0.24+2.4-0.12)×2=13.689.8扣门M2:0.9×3=2.7门M1:1.8增加门侧:M1=2×(0.3-0.1)÷2=0.2M2=3×2×(0.24-
9、0.1)÷2=0.42合计:13.68-2.7-1.8+0.2+0.42=9.83411-98台阶DS砂浆面层m22.4×0.92.163511-1台阶平台DS砂浆面层m22.4×0.61.443611-111换C15混凝土散水m2(16.8+7.2)×2+4×0.6-2.4×0.628.8墙面工程3712-12DP 砂浆打底5mmm22×(16.8+7.2)×0.6=28.8m 227.45扣除:台阶=2.4×0.45=1.08 m 23812-13×5每增1mmm2M1=1.8×0
10、.15=0.27 m 2合计:28.8-1.08-0.27=27.453912-143外墙裙金属釉面砖勾缝m 22×(16.8+0.02×2+7.2+0.02×2)×0.6=28.89627.55扣除:台阶=2.4×0.45=1.08M1=(1.8-0.02×2)×0.15=0.264合计:28.896-1.08-0.264=27.5524012-233零星块料金属釉面砖勾缝m 2门侧边= 0.15×(0.1+0.02)×2=0.0360.0364112-12门厅DP 砂浆打底5mmm2(4.8-0.24
11、+2.4-0.12)×2×(3.2+0.2)=46.51 m 236.52扣除:门3M2=0.9×2.1×3=5.67m 24212-13×5每增1mmm2M1=1.8×2.4=4.32 m 2合计:46.51-5.67-4.32=36.52 m 2天棚工程4313-43T型铝合金单层吊挂式龙骨m 2(16.2-0.24×2) ×6.6-0.24×(4.8-0.24)=102.66102.664413-71装饰石膏板面板m 2102.66-0.6×0.6×1298.344513-112
12、嵌顶灯槽附加龙骨m0.6×4×1228.8油漆涂料工程4614-730办公室耐擦洗涂料面层m 2墙面垂直投影面积:(16.2-0.24×2+6.6×2+4.2-0.12)×2×(3.2-0.12)=203.28179.03扣减门窗:3C1+4C2+3M2=2.4×1.8×3+1.5×1.8×4+3×(2.1-0.12)×0.9=29.106增加门窗洞口侧壁:3C1+4C2=【3×(2.4+1.8×2)+4×(1.5+1.8×2)】
13、15;(0.3-0.1)÷2=3.843M2=3×0.9+(2.1-0.12)×2×(0.24-0.1)÷2=1.02合计:203.28-29.106+3.84+1.02=179.03模板工程4717-44垫层模板m 22.2×4×0.1×87.044817-48独立基础m 2(2×4×0.3+1.2×4×0.3)×830.724917-75矩形梁模板m 2(0.5-0.12)×2+0.3×6×212.725017-91梁模板超高m 2
14、同梁模板12.725117-113板模板m 2同板面积102.965217-130模板超高费m 2同板面积102.96土建造价员岗位考核练习题答案(2007年11月)序号定额编号工程项目单位计算式工程数量建筑面积m221.48×13.68-6×6.6254.25116-10工程水电费m2同建筑面积254.25217-1脚手架搭拆100m2254.25÷1002.54317-2脚手架租赁100m2天2.54×40101.6417-158垂直运输m2同建筑面积254.25土石方工程51-1人工场地平整m2同首层建筑面积254.2561-20人工挖基坑m 3挖
15、土深度=2.6-0.45=2.15m体积=(3.4×3.4×2.15+3.4×4×0.82×2.15) ×10=488.31488.3171-16人工挖沟槽m 3净长1=(13.2-3.4×2) ×2+(6-3.4) ×2+(6.6-3.4)=21.2m净长2=(15-3.4×2)×2=16.4m挖土深度=1.6-0.45=1.15m体积=【(0.3+0.6) ×21.2+(0.35+0.6) ×16.4】×1.15=39.8639.8681-30基础回填
16、土m 3扣室外地坪以下的垫层=2.8×2.8×0.1×10=7.84基础梁=(15-0.48×2)×0.35×0.5×2+(13.2-0.48×2)×0.3×0.5 ×2+【(6-0.48) ×2+6.6-0.48】×0.3×0.4=10.65墙=(15-0.48×2+13.2-0.48×2) ×2×(1.1-0.45) +【(6-0.48) ×2+6.6-0.48】×(1.2-0.45)
17、15;0.24=(52.56×0.65+17.16×0.75) ×0.24=11.29柱=0.48×0.48×(1.8-0.45) ×10 =3.11体积=488.31+39.86-7.84-35.64基础-10.65-11.29-3.11=459.64459.6491-34房心回填土m 3【15×13.2+(6-0.24) ×6.6】×(0.45-0.19)=(198+38.016) ×0.2661.36砌筑工程104-27换240mmKP1多孔砖墙墙砌筑高度3.6米以下,M7.5混合砂浆m
18、3营业厅墙垂直面积:(13.2-0.48×2)×3.6=44.064(6.6-0.48)×3.6+(6.6-0.48)×(3.6-0.4)=41.616A轴、C轴(15-0.48×2)×3.6×2=101.088办公室:(三段) (6-0.48) ×2+(6.6-0.48)×(3.3-0.4)=49.764墙毛体积=(44.064+41.616+101.088+49.764)×0.24=56.768扣:M1+2 M2=(1.8×2.4+1.2×2.4×2)
19、5;0.24=2.4196C1+3C2+2C3=(1.5×1.5×6+3×1.8×3+2.4×1.5×2) ×0.24=8.856 过梁=0.18×0.24 ×(2.3+1.7×2+2.0×6+3.5×3+2.9×2) =1.47m 3体积=56.768-2.419-8.856-1.47=44.023 44.02114-27换人×1.3240mmKP1多孔砖墙砌筑高度3.6米以上,M7.5混合砂浆m 3【(15-0.48×2)×2
20、15;(4.5-0.5-3.6)+(13.2-0.48×2)×2×(4.5-0.55-3.6)】×0.244.752混凝土工程125-2C30独立基础m 3【2.6×2.6×0.4+1/3×0.3×(2.62+0.582+2.62×0.582)】×1035.64135-7C30框架柱m 30.48×0.48×(6.3 ×8+5.1×2)13.96145-13C30框架梁m 3梁长1=(13.2-0.48×2) ×2=24.48梁长2=(
21、15-0.48×2) ×2=28.08梁长3=13.2-0.48=12.72梁长4=(6.6+6-0.48×2) ×2=23.28体积=0.3×0.55×24.48+0.3×0.5×28.08+0.4×0.6×12.72+0.3×0.4×23.28=14.1014.10155-22C30有梁板m 3(15-0.12-0.4)(13.2-0.12)×0.12+(6-0.3)(6.6-0.12) ×0.1=189.3948×0.12+36.936
22、215;0.1=26.4226.42门窗工程168-13松木带亮自由门m 21.8×2.44.32178-1镶板门m 21.2×2.4×25.76188-69塑钢双玻平开窗m 21.5×1.5×6+3×1.8×3+2.4×1.5×236.9198-142水泥砂浆后塞口m 24.32+5.7610.08208-143填充剂后塞口m 2同窗36.9屋面及防水工程219-32屋面保护涂料m 215×13.2+(6-0.24)×6.6+0.3×(15+13.2+5.76+6.6) &
23、#215;2=198+38.016+24.336260.35229-59聚酯胎改性沥青卷材防水3mm(热熔)m 2同上260.35239-60每增一层m 2同上260.352411-3220mmDS砂浆找平层保温层上m 2同上260.352511-33每增5mmm 2同上260.352610-6干铺岩棉板保温层100mmm 215×13.2+(6-0.24)×6.6236.022710-8每增10mmm 2同上236.022810-17陶粒砼找坡层m 3236.02×0.0614.16楼地面工程294-723:7灰土垫层m 315×13.2-0.24
24、215;0.24×4-0.48×0.24×4+0.12×(1.8+1.2)×0.1=197.67×0.119.77305-151C10混凝土垫层m 315×13.2×0.059.93111-3120mmDS砂浆找平层m 215×13.2-0.24×0.24×4-0.48×0.24×4+0.12×(1.8+1.2)197.673211-38大理石面层m 2同上197.673311-78大理石踢脚m(15+13.2)×2-1.8-1.2+0.24
25、215;8+ (240-100)÷2 ×455.63411-11160mm混凝土散水m2 (21.48+0.8+13.68+0.8)×2-3.6-3 ×0.853.54墙面工程3512-143外墙裙金属釉面砖勾缝m 22×(21.48+13.68)×0.9=63.288m 2扣除:台阶1=0.15×(3.6+3+2.4)=1.35 m 2台阶2=0.15×(3+2.4+1.8)=1.08 m 2M1=1.8×0.45=0.81 m 2M2=1.2×0.45=0.54 m 2合计:63.288-1
26、.35-1.08-0.81-0.54=59.50859.513612-233零星块料金属釉面砖勾缝m 2门侧边= 0.45×(240-100)÷2 ×4=0.126m 20.133712-10聚合物水泥砂浆修补基层(未考虑低跨梁突出部分)m2(15+13.2)×2×(3.6+0.2)=214.32 m 2扣除:M1=1.8×2.4=4.32 m 2M2=1.2×2.4=2.88 m 26C1=1.5×1.5×6=13.53C2=3×1.8×3=16.2增加:柱侧面=0.24×
27、3.8×8=7.296合计:214.32+7.296-4.32-2.88-13.5-16.2=184.716 m 2184.723812-18混合砂浆底灰5mmm2同上184.723912-19×2每增1mmm2同上184.72天棚工程4013-27T型烤漆龙骨m 215 ×13.2=1981984113-73矿棉吸音板面层m 2同上198模板工程4217-113板模板m 2同板面积=189.3948+36.936226.334317-130模板超高费m 2同低跨板面积36.944417-130×2模板超高费m 2同高跨板面积189.39土建造价员岗位考
28、核练习题答案(2008年6月备)序号定额编号工程项目单位计算式工程数量建筑面积m220.1×13.8277.38116-10工程水电费m2同建筑面积277.38217-1脚手架搭拆100m2277.38÷1002.77317-2脚手架租赁100m2天2.77×80221.6417-158垂直运输m2同建筑面积277.38土石方工程51-1场地平整m2同建筑面积277.3861-20人工挖基坑m 3挖土深度=2.2-0.45=1.75m体积=【(2.2+0.3×2)×(2.2+0.3×2)×1.75+(2.2+0.3×
29、;2)×4×1.75×0.48】×12=277.536277.5471-16人工挖沟槽m 3挖土深度=1.3-0.45=0.85m梁宽360挖宽=0.3×2+0.36=0.96梁宽360挖长: 1、4轴挖长:【13.2-(2.2+0.3×2)×2】×2=15.2A、C轴挖长:【19.5-(2.2+0.3×2)×3】×2=22.2梁宽240挖宽=0.3×2+0.25=0.85梁宽240挖长: 3轴挖长:【13.2-(2.2+0.3×2)×2】×2=
30、15.2B轴挖长:19.5-(2.2+0.3×2)×3=11.11/A轴挖长:6.3-0.125-0.3-0.06-0.3=5.515体积=【(15.2+22.2)×0.96+(15.2+11.1+5.515)×0.85】×0.85=53.553.581-34房心回填土m 3【(13.2-0.06-0.12)×(13.2-0.06×2)+(6.3-0.12-0.06)×(13.2-0.06×2-0.24×2)】×(0.45-0.19) =64.3364.3391-30基础回填土m 3挖
31、土总体积:277.54+53.5=331.04扣除:垫层+独立基础+柱+基础梁=5.81+19.58+0.6×0.6×(1.5-0.45)×12+18.34=48.266-0.45以下砖基础=(13.8-0.6×3+6.3×2-0.6-0.12-0.06)×(0.75-0.45)×0.24+(20.1-0.6×4+13.8-0.6×3)×2×(0.75-0.45)×0.365=8.219合计:331.04-48.266-8.219=274.56274.56混凝土工程105-1
32、50C15砼垫层m 32.2×2.2×0.1×125.81115-2C30独立基础m 3(2×2×0.3+1.2×1.2×0.3)×1219.58125-7C30框架柱m 30.6×0.6×(1.5+4.6)×9+0.6×0.6×(1.5+3.4)×325.06135-12C30基础梁m 30.36×0.55×【(19.5-0.6×3)×2+(13.2-0.6×2)×2】+0.25×0.
33、55×【(19.5-0.6×3)+(13.2-0.6×2)×2+(6.3-0.125-0.06)】18.34145-13C30框架梁m 30.3×0.6×(13.2-0.6×2)×5+0.24×0.6×(13.2-0.6×2)+0.3×0.5×(6.3-0.6)×3+(13.2-0.6×2)+0.24×0.5×(13.2-0.6×2)18.33155-16C30过梁m 30.36×0.18×(2.
34、3+1.7+2.3×7+2×8)+0.24×0.18×(1.7+1.4×2)2.53165-22C30有梁板m 3(13.2-0.3-0.12)×(13.2-0.3)×0.14+(6.3-0.12)×(13.2-0.3)×0.14=164.862×0.14+79.722×0.14=34.2434.24砌筑工程174-1砖基础m 3(13.8-0.6×3+6.3×2-0.6-0.12-0.06)×0.75×0.24+(20.1-0.6×4
35、+13.8-0.6×3)×2×0.75×0.365=20.5520.55184-27240mmKP1多孔砖框架间墙砌筑高度3.6米以下m 3【(6.3-0.6)×(3.4-0.5)+(13.8-0.6×3)×(3.6-0.5)】×0.24=12.8952扣M2+2M3=(1.2×2.4+0.9×2.4×2)×0.24=1.728M2+2M3过梁=0.24×0.18×(1.7+1.4×2)=0.1944合计:12.8952-1.728-0.1944
36、=10.9710.97194-27换人×1.3240mmKP1多孔砖框架间砌筑高度3.6米以上m 3(13.8-0.6×3)×(4.6-0.6-3.6)×0.24=1.1521.15204-27240mmKP1多孔砖内墙m 3(6.3-0.12-0.06)×(3.4-0.14)×0.244.79214-28365mmKP1多孔砖框架间墙砌筑高度3.6米以下m 3【(13.2-0.6×2)×3×3.6+(6.3×2-0.6×2+13.2-0.6×2)×(3.4-0.5
37、)】×0.365=72.0729扣:M1+M2=(1.8×2.4+1.2×2.4)×0.365=2.6287C1+8C2=(1.8×1.8×7+1.5×1.8×8)×0.365=16.1622过梁=0.36×0.18×(2.3+1.7+2.3×7+2×8)=2.339合计:72.0729-2.628-16.1622-2.339=48.9450.94224-28换人×1.3365mmKP1多孔砖框架间墙砌筑高度3.6米以上m 3(13.2-0.6×
38、2)×3×(4.6-0.6-3.6)×0.365=5.2565.26234-29KP1多孔砖女儿墙m 30.74×0.24×【(20.1-0.24+13.8-0.24)×2+13.8-0.24×2】14.24门窗工程248-15硬木带亮自由门m 21.8×2.4+1.2×2.4×210.08258-1镶板门0.9×2.4×24.32268-69塑钢双玻平开窗m 21.8×1.8×7+1.5×1.8×844.28278-142水泥砂浆塞口
39、m 210.08+4.3214.4288-143填充剂塞口m 244.28屋面及防水工程299-32保护涂料屋面面层m 2水平面积=(20.1-0.24×3)×(13.8-0.24×2)=258.1416上卷面积=(20.1-0.24×3)+(13.8-0.24×2)×2×2×0.25=23.01合计:258.1416+23.01=281.15281.15309-59SBS改性沥青卷材热熔聚酯胎防水层(3mm)m 2同上281.15319-60每增一层(3mm)m 2同上281.153211-32DS砂浆找平层(保
40、温层上)m 2同上281.153311-33每增5mmm 2同上281.153410-7粘贴岩棉板保温层100mmm 2同上水平面积258.143510-17陶粒混凝土找坡层70mmm 3258.14×0.0718.07楼地面364-723:7灰土垫层m 3净空面积=(13.2-0.06-0.12)×(13.8-0.36×2)+(6.3-0.12-0.06)×(13.8-0.36×2-0.24×2)=247.41扣柱垛:0.6×0.6+0.24×0.24×4+0.24×0.6×3+0.
41、18×0.6+0.18×0.18×2+0.24×0.18×6=1.4544增门下:1.8×0.18+1.2×0.18+1.2×0.24+0.9×0.24×2=1.26面积合计:247.41-1.4544+1.26=247.22垫层体积=247.22×0.124.72375-151C10砼垫层m 3(247.41-0.6×0.6)×0.0512.353811-31DS砂浆找平层m 2净空面积=(13.2-0.06-0.12)×(13.8-0.36×
42、2)+(6.3-0.12-0.06)×(13.8-0.36×2-0.24×2)=247.41扣柱垛:0.6×0.6+0.24×0.24×4+0.24×0.6×3+0.18×0.6+0.18×0.18×2+0.24×0.18×6=1.4544增门下:1.8×0.18+1.2×0.18+1.2×0.24+0.9×0.24×2=1.26合计:247.41-1.4544+1.26=247.22247.223911-39大理石
43、面层600×600m 2同上247.224011-50大理石面层养护m 2同上247.22411-78大理石踢脚m房间净周长:(13.2-0.06-0.12+13.8-0.36×2)×2+(6.3-0.12-0.06)×6+(13.8-0.36×2-0.24×2)×2=114.12扣门洞长:1.8+1.2×3+0.9×4=9增门侧:0.13×4+0.07×12=1.36增垛侧:0.24×6+0.18×2=1.8增独立柱踢脚:0.65×4=2.6合计:114
44、.12-9+1.36+1.8+2.6=110.88110.88补11-101大理石台阶面层m 2 3.6×1.8+3×1.8-1.8×0.9-1.2×0.99.18补11-39大理石台阶平台面层m 2 1.8×0.9+门下1.8×0.18+1.2×0.9+门下1.2×0.183.244211-111混凝土散水面层m 2【(20.1+13.8)×2-3.6-3+4×0.8】×0.8=51.5251.52天棚工程4313-43T型铝合金龙骨(单层吊挂式)m 2同地面净空面积247.4144
45、13-73矿棉吸音板600×600m 2247.41-0.6×0.6247.05墙面涂料工程4512-1内墙DB砂浆处理m 2垂直投影面积:(13.2-0.06-0.12+13.8-0.36×2+0.24×3+0.18)×2×(3.8+0.2)+【(6.3-0.12-0.06)×6+(13.8-0.36×2-0.24×2)×2】×(2.9+0.2)=407.952扣门窗面积=M1+3M2+4M3+7C1+8C2=1.8×2.4+3×1.2×2.4+4
46、15;0.9×2.4+7×1.8×1.8+8×1.5×1.8=65.88工程量=407.952-65.88=342.07342.074612-12内墙5mmDP砂浆打底m 2同上342.074714-730内墙耐擦洗涂料面层m 2垂直投影面积:(13.2-0.06-0.12+13.8-0.36×2+0.24×3+0.18)×2×(3.8-0.12)+【(6.3-0.12-0.06)×6+(13.8-0.36×2-0.24×2)×2】×(2.9-0.12)=
47、370.8576扣门窗面积=M1+3M2+4M3+7C1+8C2=1.8×(2.4-0.12)+3×1.2×(2.4-0.12)+4×0.9×(2.4-0.12)+7×1.8×1.8+8×1.5×1.8=64.8增门窗侧:M1+M2+7C1+8C2=(1.8+2.28×2)+(1.2+2.28×2)+1.8×3×7+(1.5+1.8×2)×8×0.13=11.7936内墙门侧=M2+2M3=【1.2+2.28×2+(0.9+2
48、.28×2)×2】×0.14=2.3352工程量=370.8576-64.8+11.7936+2.3352=320.19320.194812-67独立柱DB砂浆处理m 20.6×4×(3.8+0.2)=9.69.64912-74独立柱5mmDP砂浆打底m 2同上9.65014-730×1.1独立柱耐擦洗涂料面层m 20.6×4×(3.8-0.12)=8.838.835112-1外墙DB砂浆处理m 2垂直投影面积:(20.1+13.8)×2×(4.14+0.45)+(13.2+0.3+0.12+1
49、3.8)×2×(5.34-4.14)=377.01扣门窗面积=M1+M2+7C1+8C2=1.8×2.4+1.2×2.4+7×1.8×1.8+8×1.5×1.8=51.48扣台阶垂直投影面积=3×0.45+2.4×0.45=2.43工程量=377.01-51.48-2.43=323.1323.15212-12外墙5mmDP砂浆打底m 2同上323.15312-143外墙裙DTA砂浆粘贴金属釉面砖m 2(20.1+13.8)×2×0.9-(1.8+1.2)×0.45-
50、2.43+0.45×0.13×4=57.4757.475414-712外墙平壁型涂料面层m 2外墙门窗侧壁= M1+ M2+7C1+8C2=(1.8+2.4×2)+(1.2+2.4×2)+1.8×3×7+(1.5+1.8×2)×8×0.13=11.856工程量=323.1+11.856-57.47=277.486277.49模板工程5517-44垫层模板m 22.2×4×0.1×1210.565617-48独立基础组合钢模板m 2(2×4×0.3+1.2&
51、#215;4×0.3)×1246.085717-59柱组合钢模板m 20.6×4×(1.5+4.6)×9+0.6×4×(1.5+3.4)×3167.045817-71柱模板超高1米内m 20.6×4×(0.45+3.4-3.6)×31.85917-71×2柱模板超高2米内m 20.6×4×(0.45+4.6-3.6)×931.326017-73基础梁组合钢模板m 2【(19.5-0.6×3)×3+(13.2-0.6×
52、2)×4(6.3-0.125-0.06)】×0.55×2117.946117-75矩形梁组合钢模板m 2WKL1:(0.6+0.3+0.46)×(13.2-0.6×2)×3=48.96WKL2:(0.3+0.46×2)×(13.2-0.6×2)×2=29.28WKL3:(0.6+0.24+0.46)×(13.2-0.6×2)=15.6WKL4:(0.5+0.24+0.36)×(13.2-0.6×2)=13.2WKL5:(0.5+0.3+0.36)×
53、;(13.2-0.6×2+6.3×2-0.6×2)=27.144WKL6:(0.36×2+0.3)×(6.3-0.6)=5.814合计:48.96+29.28+15.6+13.2+27.144+5.814=139.9981406217-91梁模板超高1米内m 213.2+27.144+5.81446.166317-91×2梁模板超高2米内m 248.96+29.28+15.693.846417-86过梁组合钢模板m 20.18×2×(2.3+1.7+2.3×7+2×8)+0.36×(1
54、.8+1.2+1.8×7+1.5×8)+0.18×2×(1.7+1.4×2)+0.24×(1.2+0.9×2)25.276517-113有梁板组合钢模板m 2164.862+79.722244.586617-130模板超高费1米内m 279.726717-130×2模板超高费2米内m 2164.86装修脚手架6817-27大厅脚手架搭拆100m 2(13.2-0.06-0.12)×(13.2-0.06×2)÷1001.706917-28大厅脚手架租赁100m 2.天1.7×2
55、0347017-29大厅脚手架搭拆每增高1米100m 21.707117-30大厅脚手架租赁每增高1米100m 2.天34土建造价员岗位考核练习题答案(2008年11月)序号定额编号工程项目单位计算式工程数量建筑面积m218.48×8.58-(3-0.24×2)×2.1153.27116-10工程水电m2153.27217-1脚手架搭拆100m2153.27÷1001.53317-2脚手架租赁100m2天1.53×4061.2417-158垂直运输m2同建筑面积153.27土石方工程51-1场地平整m2同首层建筑面积153.2761-16人工挖
56、沟槽m 31-1剖中心线长:(18.48-0.36+8.58-0.36+2.1)×2=56.882-2剖净长线:(8.1-0.59×2-0.3×2)×2=12.64挖深:2.1-0.3=1.8挖土总宽:1-1:1.3+0.6+0.59=2.49 2-2:1.2+0.6+0.59=2.39工程量=(56.88×2.49+12.64×2.39)×1.8=309.32309.3271-34房心回填土m 3主墙间净面积153.27-56.88×0.36-(8.1-0.12×2)×2×0.24=
57、129.02填土厚度0.3-0.19=0.11工程量=129.02×0.11=14.1914.19混凝土工程85-150换C10砼垫层m 31-1剖:1.3×0.1×56.88=7.3942-2剖:1.2×0.1×(8.1-0.59×2)2=1.2×0.1×13.84=1.661合计:7.394+1.661=9.069.0695-1C30带型基础m 31-1剖:1.1×0.4×56.88=25.0272-2剖:1×0.4×(8.1-0.49×2)×2=1&
58、#215;0.4×14.24=5.696合计:25.027+5.696=30.7230.72105-7C30框架柱m 30.36×0.36×(1.6+3.6)×128.09115-13C30框架梁m 3WKL1=0.24×0.4×(7.86×4)=0.24×0.4×31.44=3.018WKL2=0.24×0.3×(1.74×2)=0.24×0.3×3.48=0.251WKL3=0.24×0.3×(6.9×2)=0.24
59、15;0.3×13.8=0.994WKL4=0.24×0.3×(2.52)=0.181WKL5=0.24×0.4×(17.04)=1.636合计:3.018+0.251+0.994+0.181+1.636=6.086.08砌筑工程124-27240mmKP1多孔砖框架间墙m 3墙体体积:(8.1-0.24)×2×(3.6-0.4)×0.24=12.073扣M2体积:0.24×0.9×2.1×2=0.9072扣M2过梁:0.24×0.18×(0.9+0.5)×
60、;2=0.12合计:12.073-0.9072-0.12=11.045811.05134-28365mmKP1多孔砖框架间墙m 3墙体体积:(18-0.36×2-0.24)+(8.1-0.24)×2×(3.6-0.4)+(18-0.36×4-0.24)+(2.1-0.36)×2×(3.6-0.3)×0.365=62.113扣M1、C1、C2:0.365×(1.2×2.4+2.1×1.8×4+1.8×1.8×5)=12.483扣M1、C1、C2过梁:0.365
61、5;0.18×(1.7+2.6×4+2.3×5)=1.529合计:62.113-12.483-1.529=48.10148.1门窗工程148-2企口板门m 21.2×2.42.88158-1镶板门m 20.9×2.1×23.78168-69塑钢双玻平开窗m 22.1×1.8×4+1.8×1.8×531.32178-142水泥砂浆塞口m 22.88+3.786.66188-143填充剂塞口m 231.32屋面及防水工程199-32保护涂料屋面面层m 2(18×8.1-3×2.1
62、)+(18+8.1)×2+2×2.1×0.2=139.5+11.28=150.78150.78209-69三元乙丙橡胶卷材防水层(1.5mm)m 2同上150.78219-70每增一层(1.5mm)m 2同上150.782211-32DS砂浆找平层(保温层上)m 2同上150.782311-33每增5mmm 2同上150.782410-920mmFS憎水膨珠保温砂浆m 218×8.1-3×2.1139.52510-10每增10mmm 2同上139.52610-17陶粒混凝土找坡层60mmm 3139.5×0.068.37楼地面274-723:7灰土垫层m 3净面积=7.86×4.26×2=66.967(66.967+0.12×0.9×2)*0.1=6.726.72285-151C10砼垫层m 366.967×0.05=3.353.3529
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2025年涂料项目立项申请报告模板
- 土木工程专业实习报告4篇
- 下车间实习报告模板十篇
- 2025年数字电视有条件接收设备项目申请报告模范
- 小学生演讲稿集合4篇
- 难忘那份爱初二作文600字5篇
- 转作风提效能心得体会三篇
- 新员工转正述职报告15篇
- 九年级化学下册 第十单元 酸和碱 课题1 常见的酸和碱 10.1.3 几种常见的碱教学实录 (新版)新人教版
- 个人实习自我鉴定范文10篇
- 2023年MCU销售工程师年度总结及下年工作展望
- 国家开放大学2023年7月期末统一试《11130卫生法学》试题及答案-开放本科
- 管网工程施工方案
- 2023年1月高考真题浙江卷地理试卷
- 商店进销存管理系统
- 《mc入门教程》课件
- 广东省深圳市六年级上学期语文期末试卷(含答案)
- 刑法学(上册)(第二版) 教案全套 第1-15章 刑法概说-刑罚制度
- 泡沫沥青就地冷再生
- 公关专业团队建设方案
- 玻璃幕墙更换玻璃施工方案
评论
0/150
提交评论