1、Process flow and raw materials of aluminum and aluminum alloy anodic oxidation tintingProcedure specification on aluminum and aluminum alloy anodic oxidation tinting1. Procedure specification(line drawing)Substrate Mounted hanging Degreasing Alkaline etching Neutralization Anodic oxidation Electroly
2、tic coloring Sealing Electrophoretic coating Curing Unloading packaging Warehousing2. Mounted hanging:2.1 preparations before mounted hanging.2.1.1 Check the conductive parts like conductive beams and bars. They should be regularly polished, cleaned or repaired.2.1.2 Get ready conductivity of alumin
3、um and aluminum wire.2.1.3 Check the pneumatic tools and related equipment.2.1.4 Check whether or not requirements like length, count, color, thickness on the flow paper or production task list are consistent with the order drawing and actual materials.2.1.5 Depending on the specifications (size of
4、circumscribed circle, external surface area, etc.) to determine the count and space. To control the pigment spacing about 1.2 times than the horizontal width of the material shaped, and the white material spacing about 1 time than the width.2.1.6 Choose the appropriate rack, and ensure that hook num
5、ber of negative and positive hangers is the same with the count of materials shaped.2.2 Mounted hanging:2.2.1 When hanging, fix the topside one first, and then the bottom one, and then arrange the remaining sections in the middle, and tighten the screws.2.2.2 Before hanging, placing one aluminum she
6、et between the material and aluminum screw p so that it can prevent poor conductivity impacting oxidation, coloring and electrophoresis.2.2.3 When hanging, it is not allowed to hang all the materials in the lower or upper rack.2.2.4 The hanged materials should recline more than 14 degrees in order t
7、o facilitate air exhausting in electrophoresis or coloring, and reduce the air bubbles.2.2.5 When hanging, considering the facing of the decorative surface and groove to prevent the color shading, bubbles, pitting appearing in the decorative surface.2.2.6 Like some flexible and easily deformed mater
8、ials, put one more rack or aluminum wire in the middle to prevent friction between the materials or touching tank plate, and that may abrade or burn the surface.2.2.7 When selecting vice-bar rack, the plug rod is preferred. When using aluminum banding, they must be evenly spaced, and the outcrops sh
9、ould be less than 25mm.2.2.8 Materials with great disparity of cross-section size and shape are prohibited to hang in the same row.2.2.9 When hanging and handling equipment, you must wear clean gloves, gently and well protecting the surface.2.2.10 When hanging or handling equipment, workers should s
10、trengthen self-examination and cross-examination, the failure materials are non-mounted, and take appropriate measures to deal with the surface stained with oil or aluminum burrs 2.2.11 After eliminating unqualified ones, you must make them up in time by order.2.2.12 In hanging area, materials shoul
11、d not be stored for too long time, to prevent corrosion of the surface.2.2.13 Filling the hanging record and oxidation process card. Accurately calculating and fill in oxidation of each linked area, checking models, count and color by orders at any time.2.2.14 Do a good job in shift procedures and k
12、eep the work area clean.3. Preparation before oxidized production units:3.1 Checking the level of the liquid in the process tank. According to test report card, to adjust the concentration of the bath solution and ensure that bath solution is always in line with technical requirements. Workers shoul
13、d frequently sweep the dirt from the bath solution.3.2 Checking the vehicle, freezer, rectifiers, circulating acid pump, water pump, transfer cars, furnace and other equipment, any exception should be immediately solved.3.3 Check PH (or conductivity) and cleanliness in the pure water washing tank an
14、d running water washing tank. If it does not meet the technical requirements, workers should change it and hydrating overflow.3.4 Open the alkaline etching, hot pure water tank, sealing the steam or cooling water tank; open the oxidation tank, coloring tank and cooling system of electrophoresis tank
15、 to ensure the uniformity of bath solution and temperature complying with requirements.3.5 Check the Roots blowers, exhaust blowers and exhaust fans. Before the production, they should be opened.3.6 Carefully check the oxidation process card, specifically confirm the production requirements, and pre
16、pare the color palette.4. General requirements for oxidation sets operation:4.1 It is not allowed to hang t more than two hangings every time. And keeping a certain distance between the two hangings to prevent collision between the materials.4.2 When materials hung into and hung out of the bath solu
17、tion, they must be inclined to 30°.4.3 Materials falling into the tank must be removed promptly and hung up in rafts, the damage ones must be promptly notified to group-to-order equipment to make them up.4.4 In addition to alkaline etching and coloring, the sections should be hung out after the
18、 bath solution drained away to reduce the flow of waste and pollution.4.5 When the hanging materials must cross other sections, the transferring ones must maintain the level of the degree to reduce the flow of liquid and pollute materials and conductive beam.4.6 Each process should be promptly fill
19、in the oxidation process cards, and sign them.5. Degreasing:5.1 Process ParametersComposition of bath solution: acidic degreasing agent 2 to 3%Temperature: room temperatureDegreasing time: 1 3min5.2 Operating requirements:5.2.1 Check process card, make production requirements clear. Materials with t
20、he same color, same model and same order or similar specification should be suspended into the degreasing tank simultaneously or preferentially, so that it can facilitate the operation the post-procedure.5.2.2 When the degreasing is finished, the materials should be hung out of the tank, preventing
21、the sand from the surface.5.2.3 After degreasing, the surface should be well-distributed and wet, and the materials should be washed by Level 2 water then turned into the alkaline etching process.6. Alkaline etching:6.1 Process parameters:Composition of bath solution: plain-surface alkaline etching,
22、 sand-surface alkaline etchingNaOH: 40 50g / l 45 60g / lAdditives (NaOH): 1 / 12 1 / 15 1 / 6 1 / 8Temperature: 40 45 45 55 Alkaline etching time: 1 3min 10 30min6.2 Operating requirements:6.2.1 When alkaline etching, the forced draught blowers and exhaust fans should be opened.6.2.2 When alkaline
23、etching is finished, materials should be hung out as soon as possible, finishing shedding immediately and transferring to the tank washing, so that it can prevent straying marking from the surface.6.2.3 Strictly control alkaline etching process parameters, to ensure uniform quality of the surface af
24、ter alkaline etching.6.2.4 Post-alkaline-etching materials must be washed by Level 2 overflow. The remaining alkaline liquid should be fully cleared away, so that the raffinate cant pollute other tanks.7. Neutralization:7.1 Process parameters:Composition of bath solution: HNO3: 120 150g / lTank temp
25、erature: room temperatureNeutralizing time: 2 5min7.2 Operating requirements:7.2.1. When neutralizing, the materials should be moved up and down and anti-tilt, fully neutralizing exhaust liquor in the hole and remove appearing dust.7.2.2 Post- neutralizing materials must be washed by Level 2 overflo
26、w, and turn to the anodizing tank.7.2.3 The surface quality inspection should be strengthened to check the surface of the sand surface conditions, mottling, burrs, welding lines and other surface defects, for timely processing, reworking.7.2.4 Regularly check screws are loose or not, to ensure good
27、electrical conductivity.8. Anodic oxidation:8.1 process parameters:Tank composition: H2SO4:150 180 g/l AL ion: 5 to 15 g/lTank temperature: 20 ± 1 º COxidation voltage: 14 and 18 VCurrent density: 130 150 A / The oxidized time: according to requirements film thickness calculation.8.2 Opera
28、ting requirements:8.2.1 Anodic oxidation must be open before:(a) Rectifier cooling water.(b) Bath circulation cooling system (cooling unit).(c) Send the exhaust fan.8.2.2 Anodic oxidation must be checked in advance: conductive copper conducting copper aluminum piece, hanging fixture and conductive b
29、eam in contact, and the situation of the conductive, should be often burnished.8.2.3 Anodic oxidation must be opened before a conductive copper cooling water, check and conductive beam bending, whether the conductive bending beam must be replaced, in case of burn out the conductive and impacts anodi
30、c oxidation.8.2.4 Before electricity oxidation, profile must be placed in middle of oxidation tank, ensure that with both side distances are the same.8.2.5 Before electricity oxidation link up, driving hook must be taken off conductive beam hook, when the power and oxidation end, driving hook can ha
31、ng conductive beam hook, in order to avoid short circuit, damage the equipment.8.2.6 Anodic oxidation set the current density, oxidation method should accord to the oxidation area of profiles multiplied with the current density. Shading materials for the current density of oxidation must be controll
32、ed in 130 A / .8.2.7 When Anodic oxidation, should often visited the voltage, current, temperature, etc. Various kinds of instrument, any abnormal should be promptly eliminated.8.2.8 After Oxidation of profiles, should detect the film thickness, and make records, if film thickness can not reach the
33、requirements, must be to prolong the oxidized time to film thickness to meet requirements.9, Electrolytic coloring:9.1 process parameters:Bronze is golden brown departmentBath composition: SnSO4: seven to 10 g/l GD: 35 to 45 g/lNiSO4 6 H2O: 20 30 g/l SeO2:8 10 g/lAdditives: Same amount with SnSO4 Cu
34、SO4:2 3.5 g/lH2SO4:15 20 g/l 12 to 17 g/lPH: 0.6 1.0 PH: 0.7 1.025 temperature: 15 20 25 Voltage: 14 to 18 V 14 to 16 VShading time: 20 S 15 min 2 6 min9.2 Operating requirements:9.2.1 Maintain bigger slope when putting anodic oxidated profiles into color cell, and placed at the middle of poles, ens
35、ure equal polar distances.9.2.2 When shading, driving hook must be taken off conductive beam hook, and rest for 0.5 1 minutes to color.9.2.3 Shading voltage for the same kinds of color must be equal.9.2.4 When bronze cell shading over, must be lifted immediately as soon as possible, flow bath, trans
36、fer to sink quickly, fully clean the acid water in the hole of profiles, use coloring board to compare, when color is too light, put it into coloring tank to electricity complementary color, when color is too deep, put it into coloring tank (no electricity) or acidic water behind of oxidation tank t
37、o fade (bronze series).9.2.5 Because golden not fade, and shading time should not be too long.9.2.6 The shaded profiles shall be washed adequately by level 2 water, then go on electrophoresis or hole sealing.10, Sealing:10.1 Process parameters:Bath composition: Ni ion: 0.8 1.2 g/l, F ion: 0.35 0.6 g
38、/l, PH: 5.6 6.5, pure dampening solution temperature: 20 30 Hole sealing time: oxidation film thickness (um) x 1.2 min around (subject to quality standards).10.2 Operating requirements:10.2.1 Profiles should be washed by pure water before sealing, in case the pollution of electrophoresis and sealing
39、 slots.10.2.2 When profiles enter into sealing slots, should prevent hole sealing water from splashing into electrophoresis recycling tank.10.2.3 Hole sealed profile after must be dried after being washed.10.2.4 Sealed profile should be strictly prohibited to contact with oil, electrolyte and bare h
40、ands.10.2.5 After sealing, should sport check the hole sealing quality, timely adjust hole sealing time, ensure that hole sealing quality to achieve the requirements, and prevent the over-sealing powder.11, electrophoresis11.1 process parameters:Tank composition:Solids: 5 8%Solvent: 1 5%Conductivity
41、: 550 900S/cmPH: 7.6 8.0Electrophoresis Voltage: 90 120VTemperature: 23 ± 3 Electrophoresis time: 1 2min11.2 operating requirements:11.2.1 Before electrophoresis, the ones must be gone through one pure water, two hot water, three cold water washing, fully washing the acidic water and dirt in th
42、e material surface, hole and film hole.11.2.2 Always check PH, conductivity and cleanliness in the three water, keeping PH> 5.5 in the water tank, the first pure water conductivity <120S/cm, the second and the third water conductivity <60S / cm, and often change the water.11.2.3 Temperature
43、 of hot pure water tank should be controlled between 60 80 .11.2.4 Articles in hot water tank's time between 3 5min, after the hot water wash, should be fully dried and fully wiped to get conductive beam rid of oil and acid-base water. Keep special attention on cleaning and cooling of thick-wall
44、ed tubular.11.2.5 Temperature of Cold pure water washing tank should be maintained below 30 . Articles that are washed in cold water should not be dried, preventing extra wave when electrophoresis.11.2.6 Maintain the largest tilt when profiles are in the electrophoresis tank to facilitate the exclus
45、ion of air.11.2.7 After put into the electrophoresis tank, articles should be placed in the central electrode, and ensure equal distance on both sides of the plate, and stand for one minute before electrophoresis.11.2.8 When electrophoresis, circulating pump and electrophoresis recycling equipment m
46、ust be turned on. The two pure water tanks should meet the following technical requirements:The first pure water, the second oneSolids: <1.0% <0.3%PH: 8.0 8.3 8.0 8.5Conductivity: <100S/cm <50S/cm11.2.9 Electrophoresis solution should open refined purification system at fixed period as f
47、or the increase of PH and conductivity to ensure the electrophoresis bath meet process requirements.11.2.10 After electrophoresis, articles must be passed by two pure water.11.2.11 Post-electrophoresis articles should be placed in the pre-dried area.11.2.12 keep electrophoresis area clean, non-oil,
48、no dust, no acid mist to pollute profiles and electrophoresis tank.12, Curing:12.1 process parameters:Curing temperature: 180 200 Curing time: 30 45min12.2 operating requirements:12.2.1 Before curing, check oven and curing temperature measurement system, and regularly clean the curing oven.12.2.2 Wh
49、en finished curing and cooled to room temperature, workers check the quality of the electrophoresis film.13, unloading, packaging13.1 Preparation for discharge13.1.1 Check the storage rack, transport trolley, film machine, packaging machine 13.1.2 Check the model, length, count, color on the card ar
50、e consistent with the material object or not. Make packaging requirements clear; prepare protective film, tape, wrapping paper and other packaging materials.13.1.3 Test oxidation thickness, composite thickness, sealing quality, the film hardness, film adhesion, color, color variation, appearance qua
51、lity. All of them adhere to requirements, then they can be discharged, and fill oxidation product inspection records. 13.2 unloading, packaging13.2.1 Water sealing material is not allowed to unload with water, electrophoresis materials must be cooled to room temperature before unloading.13.2.2 Profiles must be unloaded by teams, non-impacted, non-beat, and prohibited to be directly contacted with
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 网络游戏公司前台接待总结
- 2025年全球及中国神经外科分流器行业头部企业市场占有率及排名调研报告
- 2025-2030全球草坪护理CRM软件行业调研及趋势分析报告
- 2025年全球及中国导向销行业头部企业市场占有率及排名调研报告
- 2025年全球及中国古董搬运行业头部企业市场占有率及排名调研报告
- 2025-2030全球双膜储气罐行业调研及趋势分析报告
- 2025-2030全球环保EPDM颗粒行业调研及趋势分析报告
- 2025-2030全球坏死性筋膜炎药品行业调研及趋势分析报告
- 2025-2030全球车辆后备箱释放电缆行业调研及趋势分析报告
- 2025-2030全球光伏舟托行业调研及趋势分析报告
- 第十一章《功和机械能》达标测试卷(含答案)2024-2025学年度人教版物理八年级下册
- 2025年销售部年度工作计划
- 2024年苏州工业园区服务外包职业学院高职单招职业适应性测试历年参考题库含答案解析
- ESG表现对企业财务绩效的影响研究
- DB3713T 340-2024 实景三维数据接口及服务发布技术规范
- 八年级生物开学摸底考(长沙专用)(考试版)
- 车间空调岗位送风方案
- 使用错误评估报告(可用性工程)模版
- 初一年级班主任上学期工作总结
- 2023-2024年同等学力经济学综合真题及参考答案
- 农村集体土地使用权转让协议
评论
0/150
提交评论