




版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、.Quantification of Microstructure and Texture5. Volume Fraction from Planar SectionsVolume FractionThe volume fraction of phases in a microstructure can be very important to assess the effect of processing and the likely properties. Although it is obvious that microstructures are inherently three di
2、mensional structures, we generally examine them by looking at planar sections. Measurement of volume fraction (VV) of second phase particles may be made from such planar sections using a variety of methods because of the following fundamental relationships:VV = (1)VV = (2)VV = (3)where is the mean p
3、oint fraction, the mean line fraction, and is the mean area fraction of a second phase in a planar section. There are a number of possible ways in which one of these 3 parameters might be measured, giving the volume fraction. One of the earliest microscopists to examine materials, Henry Sorby, who w
4、orked in Sheffield, determined volume fractions of different phases in rock samples by cutting up an image and weighing the various parts.The three methods that will be considered in this lecture are point counting, lineal analysis and areal analysis. For making measurements “by hand” point counting
5、 to obtain a point fraction is generally the most efficient method but either areal or lineal analysis may be carried out using automatic image analysis systems.Point CountingVolume fraction determination can be carried out either in the microscope, or, more commonly, on a micrograph or series of mi
6、crographs taken for a particular sample. The method of point counting lends itself particularly well to manual application in either of these cases (although a graticule would be needed to carry out the assessment in the microscope), and is generally the quickest and most statistically efficient way
7、 to collect data.Point counting is based on counting the fraction of points that fall in the phase of interest in a random array of points. This could be, for example, pearlite in steel, b phase grains in a titanium alloy or recrystallised grains in a deformed and annealed structure. In this method
8、points are distributed at the intersection of the horizontal and vertical lines of a grid randomly placed on the image, and it is decided how many fall in each phase. Those in the phase of interest (usually the minor phase) are counted as 1, those in the other phase as 0. Points lying on the phase b
9、oundary are counted as 0.5. Simple calculation of the point fraction gives the volume fraction under Eqn. (1) above. In selecting the grid size, it is important in order to maintain the validity of the statistical approach used, that no feature is measured more than once. That is, the grid spacing s
10、hould be as large as the largest second phase region present. This has the effect that the scale of the structure influences the area of the section needed. For example, a grid containing 1000 points at a separation of 50 µm would require a total area of about 2.5 mm2 to be examined.A worked ex
11、ample of volume fraction determination by the point counting method using an artificial microstructure is given below.Worked Example Part 1Figure 1 shows a simulated material microstructure, with the black circles representing second phase particles.Figure 1 A simulated 2 phase microstructure.The an
12、alysis proceeds as follows, using the procedures shown in Figure 2, and in Table 1.1) Identify an appropriate grid size for the image (with spacing large enough that no feature is sampled more than once), and draw this grid randomly on the image, Figure 2a.2) Taking either the vertical or horizontal
13、 lines, go along the line assessing in which phases the intersections of the grid are located, and assign them the values 1 for the second phase, 0 for the primary phase, and 0.5 for the interphase boundary. Total the count for the line (Figure 2b).3) Repeat for all of the lines (Figure 2c). The rea
14、son for treating each line like this is that we will later use the results from each line as one “measurement” of the volume fraction, which allows us to perform statistical analysis on the result.4) For each line, i, divide this total by the total number of points per line to get the point fraction
15、, PPi (Table 1, column 3).5) These point fractions are summed, and divided by the total number of lines to get the mean point fraction (Table 1, column 3).6) The difference of the point fraction of each line PPi from the mean point fraction is calculated and squared (Table 1, column 4).7) This data
16、is then used to calculate the standard deviation of the measurements using the equation given in the Statistics lecture (Table 1, column 4).8) From the standard deviation, the standard error can be calculated using:where n is our number of lines.9) From the standard error, the 95% confidence limit c
17、an be calculated using the relevant t-value (e.g. from the table given in the Statistics lecture) and the result of the measurement expressed according to:Figure 2 The method of analysis used for point counting.Line Number, iNo. Points in Minor Phase Point Fraction, PPiDifference from sample mean120
18、.2500.000222.50.3130.0062300.0000.0550420.2500.0002510.1250.0120620.2500.000272.50.3130.0062830.3750.0197SPPi = 1.876= 0.0142= SPPi / 8 = 0.2345s = 0.1193Table 1 The calculation of volume fraction by point countingIn this case the actual volume fraction of the second phase in the image is 0.18, so o
19、ur result calculated above is not very accurate. This is reflected in the large value of the standard deviation. Using the equation for standard error, this can be calculated to be S(PP) = 0.0422, which, as t(95, n-1) is 2.365 for n=8, gives us a result that we can express with 95% confidence limits
20、 as VV = 0.235 ± 0.100.The true value evidently does lie inside these bounds, but the measurement has not given us a much better idea than we could have obtained from visual estimation of the volume fraction. The reason for this is linked to the small number of lines we looked at, and the small
21、 number of test points per line. Later on we will look at how this could have been predicted, and how the number of measurements required to get a certain value of the 95% confidence limit can be calculated.Lineal AnalysisLineal analysis provides an alternative to point counting as a method of deter
22、mining the volume fraction. If the microstructure is anisotropic, then a series of linear traverses can be laid across the image at any angle, and the length of line occupied by the second phase may be identified following a similar procedure to point counting, but where the length of each intersect
23、ion with the second phase is measured. If the microstructure is not isotropic, e.g. as might be found in rolled material, then a series of different images with rows of lines placed at random angles and locations should be used. Calculation of the line fraction gives the volume fraction under Eqn. (
24、2). Just as for the grid with point counting, care must be taken that the lines are not so close that the same region of second phase is not intersected by adjacent lines.Areal AnalysisAreal analysis was one of the earliest methods proposed for volume fraction determination, but is tedious, requirin
25、g detained scrutiny of images. In it the image is divided up into a grid, this time much smaller than the second phase features, and the number of grid squares lying wholly in the second phase are counted as a proportion of the total number. As for point counting, squares that lie on the boundary ma
26、y be counted as 0.5. It is now the method most frequently employed by automatic systems, as the pixel format of the image makes this particularly suitable.Experimental PlanningWhen planning to determine the volume fraction of a second phase in a microstructure using one of the above methods, it is i
27、mportant to consider the required accuracy, as it will have a big impact on the number of measurements, and therefore the size of the imaged area, that is required. As was seen in the Statistics lecture, the accuracy of experimental measurements will improve as the square root of the number of measu
28、rements made, while the effort to carry out measurements increases linearly with their number. It is therefore necessary that a compromise be found between the accuracy required and the time available to perform the measurement.In order to plan how many measurements need to be made to achieve certai
29、n error tolerances, we need equations that allow us to estimate the likely error. Fortunately, as the errors we are dealing with are random, it is possible to formulate such equations for the different measurement methods from statistical considerations.It should be noted that all of these equations
30、 give us an estimated value for the standard error. This quantity was defined in the Statistics lecture as:(4)and is a term giving us information on the variability of the sample mean (the mean of the measurements made relative to the true mean of the population). This is calculated using Eqn. (4) a
31、fter the measurements are made from the standard deviation, s, of the individual measurements made in the sample, and their number, n, and can then be used in the equation:(5)to express the 95% confidence limits on the value of the true population mean, µ.The equations given here provide a meth
32、od of estimating this parameter in advance of performing the measurements.Expected Error in Point CountingThe expected relative standard error (the standard error as a percentage) can be estimated from the relationship of Gladman and Woodhead T Gladman and J H Woodhead, J. Iron Steel Inst. 194 (1960
33、) 189:(6)where P is the total number of points counted (the individual points, not the number of lines), and other terms as usually defined. It is interesting to note that the accuracy of the measurement depends on its result; there is a dependence on the volume fraction. This is logical, as, for a
34、lower volume fraction second phase, more points will be needed for a statistically significant number of points to be located in that phase. On a practical level, the volume fraction must also be estimated in order to use this equation. This can be done using the phase diagram and the lever rule (se
35、e .uk/glossary/index.asp?dbid=500). It is also important to note with this equation that VV must always be the minor phase. For example, when examining a phase transition, the phase to which VV refers must be swapped when the second phase passes VV=0.5.In some situations, the abs
36、olute standard error (the standard error as a value, not a percentage) may be important. Rearranging Eqn. (6) gives:(7)Eqn. (6) has been used to generate the data in Table 2 which shows the estimated number of points required for certain 95% confidence limits, for samples of different volume fractio
37、n second phase.The values in Table 2 show that the influence of the expected volume fraction is strong, and that in order to achieve a narrow confidence limit, a restrictively large number of points may be required if the point counting method is to be used. Yet, as will be seen, this method is in f
38、act the most statistically efficient of those that we will examine.Relative Error95% CLNo. of points, PVV = 0.01VV = 0.1VV = 0.50.010± 2%99000090000100000.025± 5%1584001440016000.050± 10%3690036004000.100± 20%9900900100Table 2 Number of measurement points required in order to ach
39、ieve various estimated relative errors of volume fraction in the point counting method, determined from Eqn. (6).Worked Example Part 2In our earlier measurement of the volume fraction of second phase in the simulated microstructure in Figure 1, we found that our result had very wide confidence limit
40、s, due to the small number of measurements made. Using the equations given above, we can calculate the error that would be estimated for these measurements.In the example above, we used a total of 8 lines with 8 points each, giving us 64 points. Therefore, using Eqn. (7), the predicted absolute stan
41、dard error for the volume fraction of 0.18 is S(PP) = 0.0480. This compares well with the S(PP) = 0.0422 calculated from the actual results. Using the equations we can calculate how many points we need if we want 95% confidence limits of ± 5%. First, we can assume for large n that t(95, n-1) is
42、 approximately equal to 2, and so we want the estimated standard error, S(PP) = 2.5%. Using Eqn. (6) gives a number of points for VV = 0.18 of P = 7289, considerably more than we would be able to obtain from the micrograph in Figure 1, without violating the one measurement per feature rule.Expected
43、Error in Lineal AnalysisThe expected relative standard error can be estimated using the relationship derived by Gladman T Gladman J. Iron Steel Inst. 201 (1963) 906:(8)where n is the number of second phase particles measured. Eqn. (8) has been used to generate the data in Table 3, which shows the es
44、timated number of second phase particles required for certain 95% confidence limits, for samples of different volume fraction second phase.Relative Error95% CLNo. of particles, nVV = 0.01VV = 0.1VV = 0.50.010± 2%196021620050000.025± 5%313625928000.050± 10%7846482000.100± 20%19616
45、250Table 3 Number of second phase particles needing to be measured in order to achieve various estimated relative errors of volume fraction in the lineal analysis method, determined from Eqn. (8).It can be seen from Table 3 that the values of n are less than the corresponding values of P for point counting, but n should really be compared to the number of points in the minor phase, Pminor = VVP, and on this basis point counting is statistical
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 关于培训员工的课件
- 心理学专业学生的成长路途规划
- 知识点3电导电导率摩尔电导率47课件
- 控制总量人员管理办法
- 企业家职场与事业规划手册
- 揭阳培训机构管理办法
- 支付结算管理办法调研
- 收支业务管理办法依据
- 收费行为线索管理办法
- 政企专用通道管理办法
- 国家讲解员培训课件
- 浅析图书发行企业在新形势下的财务管理策略
- GB/T 6478-2015冷镦和冷挤压用钢
- GB/T 4604.1-2012滚动轴承游隙第1部分:向心轴承的径向游隙
- 2016众泰t600运动版原厂维修手册与电路图-使用说明
- 金属缠绕垫(1002)要点课件
- 局限期小细胞肺癌放疗进展课件
- 教师情绪和压力疏导课件
- ISO-IEC 27002-2022中文版完整详细
- 医疗器械公司组织机构与部门设置说明
- C.0.3火灾自动报警系统施工过程检查记录
评论
0/150
提交评论