下载本文档
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、.(The Gold Series) Plural, 1.7 pound Insulating Spray Foam*;3 DESCRIPTION SPEC Technologies 1.7 GOLD is an HFC 245 fa blown, liquid spray system which cures to a low density rigid polyurethane insulation developed for application to sidewalls, cavity fill and tanks at substrate temperatures as low a
2、s minus 40°F (4°C). It is available in three reactivity variations to meet a broad range of surface temperature conditions. SPEC Technologies 1.7 GOLD has undergone preliminary testing and should meet a Class I Fire Rating standard. Polyurethane foam used on the interior of a structure int
3、ended for human occupation must be protected by an approved 15 minute thermal barrier. When used on the exterior of structures and on structures that are not intended for human occupation these restrictions do not apply. Please check local codes for further information. When exposed to open flame, c
4、ured polyurethane foam may present a serious fire hazard.Product DescriptionSPEC Technologies 1.7 GOLD is a fast set polyurethane spray insulation system. SPEC Technologies 1.7 GOLD is a premium construction product, and is environmentally friendly. It exhibits superior insulation properties compare
5、d to other conventional insulation materials. SPEC Technologies 1.7 GOLD meets the highest flame retardancy standards for construction materials. SPEC Technologies 1.7 GOLD is easy to apply and its fast reaction time allows the contractor to complete difficult jobs quickly. UsesSPEC Technologies 1.7
6、 GOLD is a superior insulation material designed specifically for residential and commercial construction projects. SPEC Technologies 1.7 GOLD is flexible, accommodating movement of the substrate. SPEC Technologies 1.7 GOLD is designed interior applications only. SPEC Technologies 1.7 GOLD is recomm
7、ended for new construction and retrofit of existing structures. AdvantagesFast set, allows quick job turn-around, contains no Ozone Depleting substances. Seamless, expands to fill voids and prevents air movement. Flexible, allows for some building movement. Excellent Thermal Stability, and dimension
8、al stability, will not shrink under adverse weather conditions. Odorless, No Toxic Vapors after application, Class I Fire Retardancy rating.LimitationsSPEC Technologies 1.7 GOLD should not be used for exterior applications as the sunlight will rapidly degrade foam. It should not be used where foam w
9、ill stay submerged in water. Applicable codes must be strictly adhered to. .Typical Liquid PropertiesPROPERTY TEST METHOD TYPICAL VALUEViscosity “A”ASTM D-2196200-250 cps 77ºFViscosity “B”ASTM D-2196350-400 cps 77ºFWeight Per Gallon “A”ASTM D-147510.20 LBS/GallonWeight Per Gallon “B”ASTM D
10、-1475 9.80 LBS/GallonTypical ReactivityCream time3-4 seconds 25ºCRise Time12-16 seconds 25ºCTypical Physical PropertiesPROPERTY TEST METHOD TYPICAL VALUEDensityASTM D-16221.70±0.10 Lbs/ft3k-FactorASTM C-177.219 BTU in/ºFR-ValueASTM C-5186.75 ºF/BTU inFlame Spread IndexASTM E
11、-84-1”<20Smoke Generation IndexASTM E-84-1<200Water Vapor TransmissionASTM E96-952.55 Perm InchDimensional StabilityASTM D-2126-9400.3 % 28 Day, 158ºF, 97% RHService Temp Range-40 to 200 degrees FWater Absorbtion Rate0.055 lbs/ sq ft, 2” headTensile StrengthASTM D-1623-7825 PSIParallel to
12、 riseC-273-9421 PSIClosed Cell ContentD-2856C-490% by volumeWinter regular and summer grades availablePackagingOne Thousand Pound Kit: 500 Pounds of 'A' side and 500 Pounds of 'B' side.One Hundred Pound Kit: 50 Pounds of 'A' side and 50 Pounds of 'B' side.MixingPrior
13、to designing and installing a spray polyurethane foam interior insulation system, code officials should be consulted for recommendations and approvals. Federal, local and state building codes vary. All require that spray applied polyurethane foam insulation be covered with an approved 15 minute fire
14、 rated thermal barrier. One typically approved material is ½" (1 cm) gypsum wallboard applied over the spray polyurethane foam insulation. However, always check with local officials for recommendations and approvals. It is recommended that the approved thermal barrier be installed the same
15、 day the foam is applied. All hot work, i.e., welding, torches and open flame work, must have been completed prior to commencing the installation of the polyurethane foam insulation. Smoking in the same area while the spray polyurethane foam insulation is being applied shall be strictly prohibited.S
16、PEC Technologies 1.7 GOLD cannot be applied when substrate temperatures are below 40°F (4°C). Ambient conditions, component temperatures, spray gun mix efficiency and foam thickness also influence reactivity. Technical Service Personnel should be consulted whenever conditions are marginal.
17、 The aforementioned information on this product is to be used as a guide and is subject to change without notice. They are offered in good faith, but without guarantee, as conditions and methods and use of our products are beyond our control. Any obligation of the seller or manufacturer shall have n
18、o force or effect unless it is in writing and signed by officers of the manufacturer.SPEC Technologies 1.7 GOLD must be spray applied using approved equipment. Use 1:1 ratio pump, with appropriate material heaters, as required for individual application. Minimum Parameters for Processing SPEC Techno
19、logies 1.7 GOLDWorking Pressure1000-1500 psiWorking Temperature 120-140 ºFTYPICAL PHYSICAL PROPERTIES Properties shown are for materials sprayed onto a surface at room temperature and removed for physical testing. The values presented were derived from polyurethane foam, which was adequately mi
20、xed and properly metered at the specific ratio. If the polyurethane foam is not adequately mixed and properly metered at the specified ratio, the resulting values will not conform to the listed specifications.Prior to designing and installing a spray polyurethane foam interior insulation system, cod
21、e officials should be consulted for recommendations and approvals. Federal, local and state building codes vary. All require that spray applied polyurethane foam insulation be covered with an approved 15 minute fire rated thermal barrier. One typically approved material is ½" (1 cm) gypsum
22、 wallboard applied over the spray polyurethane foam insulation. However, always check with local officials for recommendations and approvals. It is recommended that the approved thermal barrier be installed the same day the foam is applied. All hot work, i.e., welding, torches and open flame work, m
23、ust have been completed prior to commencing the installation of the polyurethane foam insulation. Smoking in the same area while the spray polyurethane foam insulation is being applied shall be strictly prohibited.SPEC Technologies 1.7 GOLD cannot be applied when substrate temperatures are below 40&
24、#176;F (4°C). Ambient conditions, component temperatures, spray gun mix efficiency and foam thickness also influence reactivity. Technical Service Personnel should be consulted whenever conditions are marginal. The aforementioned information on this product is to be used as a guide and is subje
25、ct to change without notice. They are offered in good faith, but without guarantee, as conditions and methods and use of our products are beyond our control. Any obligation of the seller or manufacturer shall have no force or effect unless it is in writing and signed by officers of the manufacturer.
26、The information herein is believed to be reliable but unknown risks may be present. ALL WARRANTIES OF ANY KIND, EXPRESSED OR IMPLIED, INCLUDING WARRANTIES OF FITNESS FOR A PARTICULAR PURPOSE AND THAT GOODS ARE OF MERCHANTABLE QUALITY, ARE SPECIFICALLY DISCLAIMED. Contact SPEC Technologies for inform
27、ation concerning its limited warranty and its availability. Disclaimer: The data presented herein is not intended for use by nonprofessional applicators, or those who do not purchase or utilize this product in the normal course of their business. The potential user must perform any pertinent tests i
28、n order to determine the products performance and suitability in the intended application, since final determination of fitness of the product for any particular use is the responsibility of the buyer.This information and technical advice provided herein are believed to be reliable and accurate to t
29、he best knowledge of SPEC Technologies Inc. as based on tests and should serve only as recommendation. As the seller, SPEC Technologies Inc. makes no representation or warranties of any kind, expressed, implied or statutory, including but not limited to all implied warranties of merchantability or f
30、itness for use or a particular purpose for the product. SPEC Technologies Ilc. makes no representations or warranties as to the result of the use of the product and assumes no obligation or liability in the connection therewith. SPEC Technologies Ilc. is not liable for any incidental or consequentia
31、l damages of any sort from the use of this product. The information provided herein is subject to change ant any time without notice. Information changes may include, but are not limited to, commercial and technical changes, changes in pricing, Physical characteristics and packaging.All guarantees and warranties as to the products supplied by SPEC Technologies Ilc. shall have only those guarantees and warranties expressed by the manufacturer. The
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 二零二五版智能家居安防系统试用合同3篇
- 二零二五版办公家具租赁与办公空间智能化改造合同2篇
- 二零二五年度国际商务考察合同范本3篇
- 二零二五年度金融机构贷款合同风险评估与管理指南3篇
- 二零二五年度某零售商与第三方支付平台就支付服务合作合同2篇
- 敬老院二零二五年度土地承包及社区服务一体化合同3篇
- 二零二五年船舶通信设备维护船员聘用合同3篇
- 二零二五年智慧交通项目合作开发合同范本3篇
- 二零二五年度搬家搬运服务合同范本2篇
- 二零二五版导游人员旅游活动组织聘用合同3篇
- 深圳2024-2025学年度四年级第一学期期末数学试题
- 中考语文复习说话要得体
- 《工商业储能柜技术规范》
- 华中师范大学教育技术学硕士研究生培养方案
- 医院医学伦理委员会章程
- 初中班主任案例分析4篇
- 公司7s管理组织实施方案
- Q∕GDW 12147-2021 电网智能业务终端接入规范
- 仁爱英语单词默写本(全六册)英译汉
- 公园广场绿地文化设施维修改造工程施工部署及进度计划
- 塑料件缺陷汇总
评论
0/150
提交评论