塑料制品质量问题英文描述_第1页
塑料制品质量问题英文描述_第2页
塑料制品质量问题英文描述_第3页
塑料制品质量问题英文描述_第4页
塑料制品质量问题英文描述_第5页
已阅读5页,还剩12页未读 继续免费阅读

下载本文档

版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领

文档简介

1、Surface Appearance外观G 0Surface Appearance外观Glossiness/gloss finish光洁度Matt finish/matt surface毛面Glass fiber rich surface/glass emergence on the surface玻纤外露Blooming/surface blooming表面析出White patches on surface表面白斑Silver marks/silver streak银纹Splay mark水纹Flow mark流纹Weld line溶结纹Brittle/brittleness脆Bubble

2、s/trapped gas气泡Void孔Burn marks烧伤FR failed阻燃不合格Flame rating V-2阻燃V-2Poor dispersion分散不好FR/PTFE agglomerates etc阻燃剂/PTFE结块Pellet porous粒子不密/蜜蜂窝Low impact/tensile etc物理性能低High flow/filler content etc流动性/填充过高Longs/fines/doubles长粒/碎屑/连粒Poor cut粒形不好Bristle/voids表面有小气泡/孔Glass bundles玻纤结团Product was rejecte

3、d due to产品不能接受因为 High moisture level高水分Warpage/warped翘曲Shrinkage/shrink收缩Sink marks缩影Short shot/short molding打不满Distortion变形Over dimension尺寸过大Under dimension尺寸过小Flashing飞边Discoloration变色Off color颜色差异Flow r 0Off color颜色差异Flow rate流动率Viscous粘High flow高流动Low flow低流动Sticky粘Mold release脱模Antioxidant抗氧剂Fl

4、ame retardant agent阻燃剂Heat stabilizer热稳定剂Chopped glass fiber短切玻纤Roving glass fiber粗纱/长玻纤Glass beads玻璃微珠Milled fiber碾磨纤Molybdenum disulfide/moly/MoS2二硫化钼Colorant着色剂Pigment颜料Dye染料Accepted product specification接受产品规格Approved our product认可我们的产品Re-set spec重新定标准Add in extra 添加多一点Reduced content减少含量Dropped

5、/reduced by x%减少含量%Confirmed color standard确认颜色标准Approved color standard认可颜色标准Re-confirmed color standard重新确认颜色标准Qualified our product认可我们的产品Undergoing heat aging test在做热老化实验Product is under testing产品在测试当中Received first order接了第一个定单Expected to finish by 预计在完成Expected order is xMT预计定单量吨Estimated annu

6、al/monthly consumption预计年/月用量外向型塑料制品企业常用的英语词汇一来源:中国塑料产业链网    我要评论:0    时间:2009-7-6 一、组织机构及职位 XX电子有限公司XX Electronics CO., Ltd 总经理办公室General managers office 企管部Enterprise management department (EM) 行政部Administration department (AD) 

7、销售部Sales department (SD) TodayHot 财务部Financial department (FD) 技术部Technology department (TD) 物控部Production material control department (PMC) 生产部Production department(PD) 模具部Mold manufacturing department, Tooling manufacturing department (TM) 品管部Quality Assurance departm

8、ent (QA) 冲压车间Stamp workshop, press workshop 注塑车间injection workshop 装配车间Assembly workshop 模具装配车间Mold and die Assembly workshop 金属加工车间metal machine workshop HotTag 电脉冲车间Electric discharge process workshop 线切割车间wire cutting process workshop 工磨车间Grinding workshop&

9、#160;总经理General manager (GM) 副总经理Vice-general manager 经理manager 董事长president 副董事长Vice-president XX部门经理Manager of XX department 主任、主管supervisor 拉长Line leader 组长Foreman, forelady 秘书secretary 文员clerk 操作员operator 助理assistant 二、产品 连接器c

10、onnector 端子terminal 条型连接器bar connector 阴连接器Housing 阳连接器wafer 线束wire harness 间距space TodayHot 额定电压 rated voltage 额定电流 rated current 接触电阻contact resistance 绝缘电阻insulation resistance 超声波焊接ultrasonic welding 耐压withstand voltage 针pin 物

11、料编号part number 导线wire 基体金属Base metal 电缆夹cable clamp 倒角chamfer 接触面积contact area 接触件安装孔contact cavity HotTag 接触长度contact length 接触件电镀层contact plating 接触压力contact pressure 接触件中心距contact space 接触簧片contact spring 插孔socket contact 法兰、凸缘Flang

12、e 界面间隙interfacial gap 键Key 键槽keyway 过渡段ramp 屏蔽套shielding 定位基准Datum reference 扁平电缆flat cable ,Ribbon cable 柔性印刷电线Flexible printed wiring 多层印制电路Multilayer printed circuit 焊盘pad 图形pattern 间距pitch 负极Negative pole 正极positive pole 

13、回流Reflow 原理图Schematic diagram 单面板single sided board 双面板Two-sided board,Double-sided board 表面安装surface Mounting 翘曲warp, bow 波峰焊wave soldering 编织层braid 同轴电缆coaxial cable 电介质dielectric 电缆中导线的头数ends 外部干扰external interference 填充物filler 护套ja

14、cket 比重specific gravity 电阻的温度系数Temperature coefficient of resistance 三、模具 塑料模具mould of plastics 注塑模具injection mould 冲压模具die 模架mould base 定模座板Top clamping plate Top plate Fixed clamp plate 水口推板stripper plate TodayHot A板A plate B板B plate

15、 支承板 support plate 方铁 spacer plate 底针板 ejector plate 面针板 ejector retainer plate 回针 Return pin 导柱 Guide pin 有托导套 Shoulder Guide bush 直导套 Straight Guide bush 动模座板Bottom clamp plate Moving clamp plate 基准线datum line 基准面datum plan HotTag 型芯

16、固定板core-retainer plate 凸模固定板punch-retainer plate 顶针ejector pin 单腔模具single cavity mould 多腔模具multi-cavity mould 多浇口multi-gating 浇口gate 缺料starving 排气breathing 光泽gloss 合模力mould clamping force 锁模力mould locking force 挤出extrusion 开裂crack 

17、;循环时间cycle time 老化aging 螺杆screw 麻点pit 嵌件insert 活动镶件movable insert 起垩chalking 浇注系统feed system 主流道 sprue 分流道runner 浇口gate 直浇口direct gate , sprue gate 轮辐浇口spoke gate , spider gate 点浇口pin-point gate 测浇口edge gate 潜伏浇口submarine gat

18、e , tunnel gate 料穴cold-slug well 浇口套sprue bush 流道板runner plate 排飞槽vent 分型线(面)parting line 定模stationary mould,Fixed mould 动模movable mould, movable half 上模upper mould, upper half 下模lower mould, lower half 型腔cavity 凹模cavity plate,cavity block 

19、拼块split 定位销dowel 定位销孔dowel hole 型芯core 斜销angle pin, finger cam 滑块slide 滑块导板slide guide strip 楔紧块heel block, wedge lock 拉料杆sprue puller 定位环locating ring 冷却通cooling channel 脱模斜度draft 滑动型芯slide core 螺纹型芯threaded core 热流道模具hot-runner

20、mould 绝热流道模insulated runner mould 熔合纹weld line (flow line) 三板式模具three plate mould 脱模ejection 换模腔模具 interchangeable cavity mould 脱模剂release agent 注射能力shot capacity 注射速率injection rate 注射压力injection pressure 差色剂colorant 保压时间holdup time 闭模时间clo

21、sing time 定型装置sizing system 阴模female mould,cavity block 阳模male mould 电加工设备Electron Discharge Machining 数控加工中心CNC machine center 万能铁床Universal milling machine 卧式刨床Horizontal planer 车床Engine lathe 平面磨床Surface grinding machine 去磁机Demagnetization machine

22、 万能摇臂钻床Universal radial movable driller 立式钻床Vertical driller 超声波清洗机Ultrasonic clearing machine 四、品管 SPC statistic process control 品管保证Quality Assurance 品管控制Quality control 来料检验IQC Incoming quality control TodayHot 巡检IPQC In-process quality control 校对

23、calibration 动态试验dynamic test 环境试验Environmental test 非破坏性试验non-destructive test 光泽gloss 击穿电压(dielectric) breakdown voltage 拉伸强度tensile strength 冷热骤变试验thermal shock test 环境试验炉Environmental chamber 盐雾实验salt spray test 绝缘电阻测试验仪Insulating resistance meter

24、 内应力internal stress 疲劳fatigue HotTag 蠕变creep 试样specimen 撕裂强度tear strength 缩痕shrink mark, sink mark 耐久性durability 抽样sampling 样品数量sample size AQL Acceptable Quality level 批量lot size 抽样计划sampling plan OC曲线operation curve 试验顺序sequence

25、 of tests 环境温度ambient temperature 可焊性solderability 阻燃性flame resistance 五、生产 注塑机injection machine 冲床Punch machine 混料机blender mixer 尼龙nylon 黄铜 brass 青铜 bronze TodayHot 紫(纯)铜 copper 料斗hopper 麻点pit 配料compounding 涂层coating 飞边

26、flash 预热preheating 再生料reworked material 再生塑料reworked plastics 工艺设计process design 紧急停止emergency stop 延时time delay 六物控 保质期shelf life ABC分类法ABC Classification 反常需求Abnormal Demand 措施信息Action Message 活动报告标志Action-report-flag 基于活动的成本核算Activi

27、ty-based Costing (ABC) 实际能力Actual Capacity 实际成本Actual Costs 调整现有库存量Adjust-on-hand 已分配量Allocation TodayHot 替代工序Alternative Routine 装配订单Assembly Order 装配零件表Assembly Parts List 装配Assembly 计划自动重排Automatic Rescheduling 可达到库存Available Inventory 可用材料Av

28、ailable Material 达到库存Available Stock 可利用工时Available Work 可签约量Available-to-promise 平均库存Average Inventory 欠交订单Back Order 倒序计划Back Scheduling 倒冲法Back flush HotTag 未完成订单Backlog 现有库存余额Balance-on-hand Inventory 批号Batch Number 批量生产Batch Production 

29、;标杆瞄准Benchmarking 工时清单Bill of Labor 提货单Bill of Lading 物料清单Bill of Material 分库Branch Warehouse 经营规划Business Plan 采购员Buyer 能力管理Capacity Management 能力需求计划Capacity Requirements Planning (CRP) 保管费率Carrying Cost Rate 保管费Carrying Cost 单元式制造Cellular Man

30、ufacturing 修改批量日期Change Lot Date 修改工序Change Route 修改产品结构Change Structure 检查点Check Point 闭环物料需求计划Closed Loop MRP 通用工序标识Common Route ID 计算机集成制造Computer-integrated Manufacturing (CIM) 配置代码Configuration Code 约束管理/约束理论Constraints Management/Theory of Constrain

31、ts (TOC) 依成本的材料清单Costed Bill of Material 急需零件Critical Part 累计提前期Cumulative Lead Time 现有运转时间Current Run Hour 现有运转数量Current Run Quantity 周期盘点Cycle Counting 调整日期Date Adjust 有效日期Date Available 修改日期Date Changed 结束日期Date Closed 截止日期Date Due 生产日期D

32、ate in Produced 库存调整日期Date Inventory Adjust 作废日期D ate Obsolete 收到日期Date Received 交付日期Date Released 需求日期Date Required 发货日期Date to Pull 空负荷Dead Load 需求管理Demand Management 需求Demand 实际能力Demonstrated Capacity 非独立需求Dependent Demand 直接增减库存处理法Direc

33、t-deduct Inventory Transaction Processing 发料单Disbursement List 派工单Dispatch List 分销资源计划Distribution Resource Planning (DRP) 鼓缓冲绳子Drum-buffer-rope 经济订货批量Economic Order Quantity (EOQ) 工程变更生效日期Engineering Change Effect Date 工程变更生效单Engineering Change Effect Work Order&#

34、160;工程停止日期Engineering Stop Date 例外控制Exception Control 呆滞材料分析Excess Material Analysis 急送代码Expedite Code 加工订单Fabrication Order 补足欠交Fill Backorder 总装提前期Final Assembly Lead Time 确认的计划订单Firm Planned Order 固定订货批量F ixed Order Quantity 集中预测Focus Forecasting 

35、完全跟踪Full Pegging 通用生产管理原则Generally Accepted Manufacturing Practices 毛需求Gross Requirements 在制品库存In Process Inventory 独立需求Independent Demand 投入/产出控制Input/ Output Control 检验标识Inspection ID 厂际需求Interplant Demand 库存周转率Inventory Carry Rate 仓库库位类型Inventory Locat

36、ion Type 库存周转次数Inventory Turnover 发送订单Issue Order 项目记录Item Record 物料项目Item 加工车间Job Shop 准时制生产Just-in-time (JIT) 看板Kanban 人工工时Labor Hour 最后运输日期Last Shipment Date 提前期Lead Time 层Level 负荷量Load Leveling 负荷报告Load Report 负荷Load 仓位代码

37、Location Code 仓位备注Location Remarks 仓位状况Location Status 按需订货Lot for Lot 批量标识Lot ID 批量编号Lot Number 批量Lot Size 低位码Low Level Code 机器能力Machine Capacity 机器加载Machine Loading 外购或自制决策Make or Buy Decision 面向订单生产的产品Make-to-order Product 面向库存生产的产品Make-

38、to-stock Product 制造周期时间Manufacturing Cycle Time 制造资源计划Manufacturing Resource Planning (MRP II) 主生产计划Master Production Schedule (MPS) 物料成本Material Cost 物料发送和接收Material Issues and Receipts 物料需求计划Material Requirements Planning (MRP) 登陆标志MPS Book Flag MPS 多重仓位Mult

39、iple Location 净改变式MRP N et Change MRP 净需求Net Requirements 新仓位New Location 新组件New Parent 新仓库New Warehouse 不活动报告No Action Report 现有库存量On-hand Balance 未结订单Open Order 订单输入Order Entry 订货点Order Point 订货方针Order Policy 订货承诺Order Promising 订货备注

40、Order Remarks 双亲Parent 零件清单Part Bills 零件批次Part Lot 零件编号Part Number 零件Part 反查Pegging 领料单Picking List 领料/提货Picking 计划订单Planned Order 后减库存处理法Post-deduct Inventory Transaction Processing 前减库存处理法Pre-deduct Inventory Transaction Processing 发票价格Pr

41、ice Invoice 采购订单价格Price Purchase Order 优先计划Priority Planning 产品控制Product Control 产品线Production Line 生产规划编制Production Planning 产品率Production Rate 产品结构树Production Tree 预计可用库存Projected Available Balance 采购订单跟踪Purchase Order Tracking 已分配量Quantity Allocat

42、ion 仓位数量Quantity At Location 欠交数量Quantity Backorder 完成数量Quantity Completion 需求量Quantity Demand 毛需求量Quantity Gross 进货数量Quantity In 排队时间Queue Time 队列Queue 重生成式MRP Regenerated MRP 重排假设Rescheduling Assumption 资源需求计划Resource Requirements Planning

43、0;粗能力计划Rough-cut Capacity Planning 工艺路线Routing 安全库存量Safety Stock 保险期Safety Time 预计入库量Scheduled Receipt 残料率Scrap Factor 发送零件Send Part 维修件Service Parts 发货地址Ship Address 发货单联系人Ship Contact 发货零件Ship Date 发货单Ship Order 工厂日历Shop Calendar 车间作

44、业管理Shop Floor Control 损耗系数Shrinkage Factor 标准产品成本Standard Product Cost 标准机器设置工时Standard Set Up Hour 标准单位运转工时Standard Unit Run Hour 标准工资率Standard Wage Rate 状况代码Status Code 库存控制Stores Control 建议工作单Suggested Work Order 约束理论Theory of Constraints (TOC) 时间

45、段Time Bucket 时界Time Fence 单位成本Unit Cost 采购计划员Vendor Scheduler 采购计划法Vendor Scheduling 工作中心能力Work Center Capacity 工作中心Work Center 在制品Work in Process 工作令跟踪Work Order Tracking 工作令Work Order 工作进度安排Work Scheduling 零库存Zero Inventories 经济订货批量Squat(

46、2*年订货量*平均一次订货准备所发生成本/每件存货的年储存成本) 美国生产和库存控制协会APICS,American Production & Inventory Control Society 七QS-9000中的术语 APQP Advanced Product Quality Planning and Control Plan,产品质量先期策划和控制计划 PPAP Production Part Approval Process,生产件批准程序 FMEA Potential Failure Mode and Effects Anal

47、ysis,潜在失效模式及后果分析 MSA Measure System Analysis,测量系统分析 SPC Statistical Process Control,统计过程控制 审核 Audit 能力 Capability TodayHot 能力指数 Capability Indices 控制计划 Control Plans 纠正措施 Corrective Action 文件 Documentation 作业指导书 Job Instruction, work instruction 不合格品 Nonconformance 不合格 Nonconformity 每百万零件不合格数 Defective Parts Per Million, DPPM 预防措施 Preventive Action 程序Procedures 过程流程图 Process

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

最新文档

评论

0/150

提交评论