《建筑师的英文自我评价 》_第1页
《建筑师的英文自我评价 》_第2页
《建筑师的英文自我评价 》_第3页
《建筑师的英文自我评价 》_第4页
已阅读5页,还剩6页未读 继续免费阅读

下载本文档

版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领

文档简介

1、建筑师的英文自我评价 建筑师,是指受过专业教育或训练,以建筑设计为主要职业的人。下面是由我们分享相关人员的英文自我评价,希望对你有用。 建筑师的英文自我评价篇一 during the four years of the university, i have worked hard and pragmatized and innovated. i have constantly strengthened my comprehensive ability while perfecting my professional knowledge structure, so as to continuou

2、sly enrich myself, mold myself and improve myself. this has laid a solid foundation for me to enter society. in the mind, i am strict self-discipline, and actively requested progress, outstanding performance in all aspects, in november 2006 to join the communist party of china - and the party, and p

3、articipate in preparatory party training courses, won the cpc xxx university committee twenty-two preparatory party training course outstanding students honorary title. at work, i always maintain a passionate heart and a high sense of responsibility, work conscientiously, and can do the best, after

4、careful summary. during the university, i have served as a member of the class organization, monitor, the organization department of the ministry of communist youth league, the third phase of the preparatory party training class and other duties. during his tenure, i seriously carry out the work of

5、the college, the party layout and successfully completed. during the holidays, i also actively participate in social practice. these exercises make my social adaptability, management, organization and coordination ability to be greatly improved, team spirit and competitive consciousness has been fur

6、ther strengthened, also let me in dealing with matters of the ways and means more flexible, and was named 2006 xxx outstanding league cadres. in learning, i study the correct attitude, learning objectives clear, good academic performance. especially familiar with the use of computerized accounting s

7、oftware, uf software, and proficiency in the operation of the windows family of operating systems and office series of office software, can use visual foxpro basic skills to operate, for the future onto the work to lay a solid foundation, in addition, i also seriously study the professional knowledg

8、e. in life, i am strict with oneself, wider than others, adhere to principles, dare to criticize and self-criticism. in life, i care about students, helpful, as i can enthusiastic to help students, usually actively participate in party life and college classes and collective activities, spare time a

9、ttention to strengthening the body. 建筑师的英文自我评价篇二 engaged in the construction industry for many years, were in the construction of five units, the construction industry project management has accumulated rich experience, and participated in the system of theoretical study, the purpose is to do more a

10、nd better things for this industry, then , found himself the shortest piece of board, looking for a breakthrough for their own has become a top priority. general job responsibilities to complete the content of the provisions of the maintenance of a gas atmosphere of popularity, eat past the capital,

11、 it is more superficial, but also relatively small, whether for people or people, need to seriously grid matter had just worked. first, adhere to the ideological and political learning so that my ideological and theoretical qualities continue to be improved. over the past year, i have attached great

12、er importance to studying deng s theory of building socialism with chinese characteristics and the various lines, principles and policies of the party, insisting on studying the important thinking of the three represents, understanding the establish the spirit of righteousness, build and harmonious,

13、 and give top-notch theme of education, through the purchase of books, internet, study tours to learn a variety of professional and technical knowledge. through continuous learning and exchange, so that their ideological and theoretical literacy has been further improved, firmly established the whol

14、eheartedly serve the people of life, values. the people of respect, respect to germany; people of the intersection, to pay to the situation; people get along with the heart; people believe that the letter to sincerity. among the respect to germany, the most important, reflected in the image, reflect

15、ed in personnel work, reflected in the top-notch performance. love and respect their jobs, motivated professional ethics is the quality of each job smoothly and ultimately the success of the protection. over the past year, i consciously practice the above-mentioned purpose in action, with a warm and

16、 enthusiastic, serious and meticulous manner to complete each task, strictly abide by the laws, regulations and units of the rules and regulations, adhere to the principle of fairness and justice, seek truth from facts principle, adhere to the principle of open and transparent. unity of life in norm

17、al life comrades, decent style, put an end to eat and take cards and other illegal behavior, and consciously resist the erosion of a variety of bad habits, in the grass-roots to win a better reputation, problem-solving ability to continuously improve. second, the hard work of the construction practi

18、ce so that my business skills continue to grow, the ability to work continuously strengthened. with the shijiazhuang city, three years of great changes in the favorable opportunity, science and technology center building budget has repeatedly adjusted, increasing scientific and technological content

19、, according to the leadership of the deployment, specifically responsible for planning, implementation of the led lighting demonstration project. this project is in the building after the completion of the main building decoration phase of the planning, design, development, installation, the absorpt

20、ion of four research and design units r d, with a dozen units.during the study tour a dozen times, brainstorming topics will be organized several times, contact a large number of the industry leader, developed dozens of special lighting and control products. through numerous sleepless nights, and ul

21、timately formed a certain size of the demonstration project, several experts and industry units to visit the evaluation, the scale of the project and the level of r d in the country at the leading level. through this practice, their ability to solve practical problems and organizational skills have

22、also been a good exercise, work style to further improve the understanding of building electrical more thorough, further enhance the ideological realm. due to the engineering staff tension, this spring the beginning of the outdoor pipe network engineering and residential environmental engineering al

23、so i have to be responsible for this is the first time since the full responsibility for outdoor engineering, two units of design, nearly 10 units involved in the construction, unit construction workers theoretical level is poor. in view of this situation, there is no such, rely on, to give full pla

24、y to a wide range of knowledge, coordination and strong advantage to take the initiative to extend working hours, the night before the implementation of telephone work the next day, the encryption on-site guidance, review and other measures, the successful completion of the leadership to the task, a

25、t the same time experienced a rainstorm test, the rain stopped the ground without water good engineering quality, while the introduction of high-tech flowers, the use of huai an road construction of advanced technology and construction program, with the same period of construction of the qilian stre

26、et project seamless docking, of which the outdoor pipe network project by the development zone to the drainage department acceptance once. in the industry have a better reputation. the implementation of this project is a comprehensive test of previous knowledge and experience, but also on their own

27、coordination and control of the evidence, no doubt, to improve their knowledge structure has important significance. 建筑师的英文自我评价篇三 review of my work in the 20xx years, although some results, but there are some shortcomings, is my work in the 20xx years from the following aspects to do a brief summary

28、: 1, to strengthen the safety of the new approach to staff education: the workers did not enter the labor service security personnel before the request, the staff in time after the entry into the staff of the roster and id card copy of the project department, i and labor team safety after the staff

29、members have agreed on the time for safety education, they will be responsible for the preservation of the education materials and image materials of the staff members after the safety and fire safety examinations of the staff and workers are conducted in the conference room of the project departmen

30、t. 2, do a good job in sub-sub-item security technology to disclose the information: in the sub-sub-construction of the project before the combination of the relevant regulatory requirements and the construction site environment and operational safety precautions for targeted security to the end, af

31、ter review by the chief engineer issued to the labor team. safety at the end of the main against the labor team security officer, in the security at the end of the labor team must be marked again to each team, and then in the construction work supervision team operators can work in accordance with t

32、he ministry of the ministry of security. 3, safety information: in accordance with the construction site in hebei province safety data management procedures and relevant regulatory requirements for safety data collection and collation, a total of 12 safety information, in accordance with safety info

33、rmation requirements of the regular sub-items for security checks, and labor units in accordance with the safety inspection problems rectification period, and within the specified time for the rectification of labor service units review. 4, construction site safety and on-site civilized construction situation: in the field of safety inspections to strengthen the monitoring of major hazard sources, and to develop a list of major construction site safety hazard, such as foundation sup

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论