版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、安哥拉投标文件须知参考资料网站United Nations Global CUniversal Declaration of Human R/en/rightsInternational Labour Standards (ILO)/global/standards/lang-len/index.htmOHSAS 18001 Healthy & Safety Standardwww.ohsas-18001-occupational-health-and-Internationa
2、l Organization for Standardization (ISO)General The OSH Program is part of CONTRACTORs quality management which describes the project organisation as well as contains all the procedures, instructions, specifications to steer the project execution. The purpose of the OSH Program is to defi
3、ne the OSH project organisation and the OSH performance criteria following CONTRACTORs “Integrated Management Manual for quality, health, safety and environment at ThyssenKrupp Industrial Solutions”. It comprises the OSH objectives and requirements transformed into observable and auditable parameter
4、s and procedures, customised to the Project adapting COMPANYs OSH requirements and procedures as stated by the CONTRACTThe OSH Program The first issue mainly determines the basic OSH requirements for the site. Additional supportive procedures/instructions will be implemented in the course of the pro
5、ject as required by the sequences of construction and subsequent commissioning works. The OSH Program is preliminary and subject to approval by COMPANY, if necessary.2.3 Corporate PolicyCONTRACTOR recognises OSH as a fundamental mission and expresses his commitment in the Quality, Health and Safety
6、Policy which is part of Contractors Integrated Management Manual and consistent with the ThyssenKrupp OSH policy. Both will be available to all concerned. (see next page)OSH personnel within the SUB-CONTRACTOR Site Organization: 1 OSH Manager (fulltime) Appointed by SUB-CONTRACTOR · Minimum 1 O
7、SH Supervisor (fulltime) Appointed by SUB-CONTRACTOR (Only where the workforce employed is below 50 worker may a Safety Supervisor be a responsible with other duties in addition to that of Safety Representative) · Site OSH Officer Appointed by each SUB-CONTRACTOR depending on the number of empl
8、oyees at the construction site according to the table below: Note: · OSH Site Personnel shall have ability to speak and understand ENGLISH. · Minimum one Safety Representative must be on site at all times (day shift / night shift) during the execution of the works. SUBCONTRACTOR's Site
9、 Representatives/Managers are responsible for OSH of their own activity, personnel and property on site assigned to their scope of work. They shall also be responsible for compliance with all local statutes, rules, regulations and orders applicable to the conduct of the Work and for ensuring that CO
10、NTRACTORs OSH requirements, as referenced above, are read, understood and implemented throughout the duration of the Contract.Subcontractors shall submit their own OSH Program, complying with this OSH Program and all COMPANY requirements as per section 2.5 (table), for approval prior start of work t
11、o CONTRACTOR. Where applicable, method statements shall be submitted to CONTRACTOR for comments. Method statement related to works performed in commissioning or live facilities and/or critical activities shall be prepared in advance in close co-ordination with CONTRACTOR. Subcontractors, in addition
12、 to working according to their own approved standards, shall meet the requirements of CONTRACTORs OSH Program. SUBCONTRACTOR's Construction Site Manager shall be supported by an OSH team composed by OSH Supervisors and OSH Officers assigned to the construction areas. Lacks of agreement shall be
13、reported to the Site Manager for resolution. SUBCONTRACTOR's Site Representatives/Managers are responsible for OSH of their own activity, personnel and property on site assigned to their scope of work. They shall also be responsible for compliance with all local statutes, rules, regulations and
14、orders applicable to the conduct of the Work and for ensuring that CONTRACTORs OSH requirements, as referenced above, are read, understood and implemented throughout the duration of the Contract.3.3.2 SUBCONTRACTOR's OSH Responsibility The SUBCONTRACTOR shall have in place, dedicated health and
15、safety management systems that ensure that appropriate standards of health, safety and environment are maintained. SUBCONTRACTOR shall implement policies, procedures and an appropriate culture to meet the following core requirements: · A senior person is designated with the responsibility for O
16、SH; · Roles and responsibilities regarding OSH are clearly defined throughout the SUBCONTRACTOR organisation; · The SUBCONTRACTOR has access to appropriate levels of expert health and safety advice; · Appropriate systems and processes are in place, together with the allocation of adeq
17、uate resources to identify and address the risks associated with the delivery of the products and services by its employees, Subcontractors, further sub-contractors and any other third parties; · The health and safety training needs of its employees, Subcontractors and further subcontractors ar
18、e assessed and the appropriate level of training delivered to ensure that all persons are trained to perform their tasks in a safe manner; · OSH performance is continually monitored and reviewed through programmes of inspections, testing and audits; and · The regular submission of OSH data
19、 to CONTRACTOR, attendance at meetings and participation in audits as required by CONTRACTOR acting reasonably. SUBCONTRACTOR's Site Representatives/Managers are responsible for OSH of their own activity, personnel and property on site assigned to their scope of work. They shall also be responsi
20、ble for compliance with all local statutes, rules and regulations applicable to the conduct of the Work and for ensuring that CONTRACTORs OSH requirements, as referenced above, are read, understood and implemented throughout the duration of the Contract. Subcontractors shall submit their own OSH Pla
21、n for approval prior start of work to CONTRACTOR. Where applicable, method statements shall be submitted to CONTRACTOR for comments. Method statements related to works performed in commissioning or live facilities and/or critical activities shall be prepared in advance and in close co-ordination wit
22、h CONTRACTOR. Subcontractors, in addition to working according to their own approved standards, shall meet the requirements of CONTRACTORs OSH Plan. SUBCONTRACTOR's Construction Site Manager shall be supported by an OSH team composed by OSH Supervisors and OSH Officers assigned to the constructi
23、on areas. Lacks of agreement shall be reported to the Site Manager for resolution.4.11 Subcontractors OSH Plan SUBCONTRACTOR shall prepare and implement their own OSH Plan, in co-ordination with CONTRACTOR. These OSH Plans shall include all the pertinent OSH topics as stated by COMPANY and CONTRACTO
24、R. Each SUBCONTRACTOR shall assign an OSH Supervisor/Officer to participate in the implementation of the OSH Committee activities. SUBCONTRACTORs OSH Officers will specifically participate in the Safety Pool Meetings.5.5 Competent / Qualified Person Designations Definition of Competent Person: An in
25、dividual who by experience and training is knowledgeable of the work activity and all potential hazards and safe work practices related to this activity. A list shall be prepared, and forwarded to the Site OSH Manager, of competent persons for the major activities associated with the work of every S
26、UBCONTRACTOR. In particular, the list shall include: · excavation · scaffolding · rigging · hot tapping tie-ins · permit receiver Also a list of qualified/specialised persons shall be drafted including: · welders · hot tapping tie-ins welders · cranes and lift
27、ing equipment operators · mechanical equipment operators · electricians · ionising equipment operators (if applicable) 5.6 Conduct Personal behaviour must be exemplary for all employees and shall not offend the normal code of conduct established by National laws, good moral habits and
28、 CONTRACTORs rules. No activity outside the scope of work shall be done unless authorised by CONTRACTOR/COMPANY.5.10 Housekeeping . 35 5.11 Signs and Tags . 36 5.12 Flagmen . 37 5.13 Excavation and Trenching . 37 5.14 Fall Protection . 38 5.15 Barriers. 39 5.16 Scaffolds and Platforms . 39 5.17 Floo
29、r, Roof, Wall and Platform Openings . 39 5.18 Ladders . 40 5.19 Hand, Air, and Electrical Tools . 40 5.20 Machinery . 41 5.21 Cartridge Operated Tools . 41 5.22 Welding and Burning . 42 5.23 Liquefied Petroleum Gas and Acetylene . 43 5.24 Compressed Gas Cylinders . 43 5.25 Radiography . 44 5.26 Cran
30、es and Material Handling . 44 5.26.1 Construction Plant . 44 5.26.2 Cranes . 44 5.26.3 Control of Non-Conforming Equipment. 445.27 Rigging . 45 5.28 Lifting and Rigging Plans . 46 5.29 Suspended Personnel Platform . 46 5.30 Elevators for passengers and freights . 46 5.31 Articulating Boom Platform .
31、 47 5.32 Forklift Trucks (Powered Industrial Trucks) . 48 5.33 Vehicle Operation . 48 5.34 Roll-Over Protective Structures (ROPS) . 49 5.35 Fire Prevention and Protection . 49 5.36 Fire Watches . 50 5.37 Hazard Communication . 50 5.38 Emergency Flushing, Eyes and Body . 51 5.39 Electrical Equipment
32、and Temporary Power Supply on Site . 51 5.40 Lockout / Tagout Procedure . 52 5.41 Colour Code Procedure . 52 5.42 Flexible Cords and Cables (Extension Cords) . 52 5.43 Guarding . 53 5.44 Identification . 53 5.45 Listing and Labelling . 53 5.46 Openings . 53 5.47 Safety-Related Work Practices. 53 5.4
33、8 Splices . 54 5.49 Steel Erection . 54 5.50 Concrete and Masonry Work . 54 5.51 Slip Formworks . 56 5.52 Underground Construction . 56 5.53 Office Safety. 57 5.54 Temporary Heating and Ventilation Devices . 58 5.55 Drinking Water . 58 5.56 Washing Facilities . 58 5.57 Lunch Rooms . 59 5.58 Toilets
34、on construction site . 59 5.59 Exits . 59 6 HEALTH . 606.1 Medical screenings . 60 6.2 First Aid Facilities and Emergency Medical Services . 60 6.3 Alcohol and Drugs . 60 6.4 Health and Hygiene . 61 6.5 Sanitation . 61 6.6 Pest Control . 62 6.7 Eating and Drinking Facilities . 62 6.8 Camp Safety, Hygiene, and Provision of Drinking Water . 62 6.9 Labour accommodation requirements . 63 6.10 Noise and Vibration Control .
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 课题申报书:新时代高校辅导员阶段性发展特点与支持策略研究
- 课题申报书:新课改背景下初高中生物学课堂教学模式及教学效果提升研究
- 随机网络建模与应用-全面剖析
- 织机及其辅助机械零件企业数字化转型与智慧升级战略研究报告
- 绿色环保型产品研发-全面剖析
- 量子中继技术在长距离通信中的应用-全面剖析
- 随机微分方程在金融数学中的前沿应用-全面剖析
- 风电场全生命周期管理方法-全面剖析
- 租赁车辆全生命周期管理-全面剖析
- 会计工作感悟(3篇)
- GB/T 16955-1997声学农林拖拉机和机械操作者位置处噪声的测量简易法
- GB/T 15593-2020输血(液)器具用聚氯乙烯塑料
- GB 16410-2007家用燃气灶具
- 铁碳合金的相图解读
- 2023年复旦大学博士研究生入学考试专家推荐信模板
- 中小学教师资格证面试课件讲义
- 全国初中英语优质课大赛一等奖《八年级Unit 6An old man》说课课件
- 云南省饮用水生产企业名录534家
- 湖北地区医院详细名单一览表
- 麦肯锡入职培训第一课:让职场新人一生受用的逻辑思考力新员工培训教材
- 金属压铸机的plc控制