2020年商务英语BEC中级阅读问答模拟试题_第1页
2020年商务英语BEC中级阅读问答模拟试题_第2页
2020年商务英语BEC中级阅读问答模拟试题_第3页
全文预览已结束

下载本文档

版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领

文档简介

1、2020 年商务英语 BEC 中级阅读问答模拟试题Questions 8-12l Read this memorandum.l Choose the best sentence from the list A I to filleach of the blanks.l For each blank (8 - 12) mark one letter (A - I) on your Answer Sheet.l De not mark any letter twice.l One answer has teen given as an example.MEMORANDUMTo: Filma Wil

2、liams, school of ArchitectureFrom: Ram S. Johnson, Physical Plant OperationsSubject : Air-conditioning Installation Costs for EastHall.Date: 4.4.94As you requested in your memo of March 15, we have studied the costs of installing air conditioning for the seven offices and two studio classrooms in Ea

3、st Hall Example Office and Classroom installationEstimates were obtained from three contractors on the costs of covering the offices and classrooms 8 Thework would take about three weeks.Because the central unit would be installed on the roof, some noise problems might occur during a four-or five-da

4、y period 9 Sheet metal work to build out lest in theclasses could be dine on weekends, and the overtime labour costs of about $ 1,500 have been included in the estimates.Arrangements were not made to do the office spaceinstallation on weekends10 Additional InstallationBecause a larger installation,

5、including a more powerful central unit, would be necessary to handle the halls and stairways, an additional $6,000 would be required for the equipment. 11 If this additional work were delayeduntil a later time, a new central unit would be required along with changes in the pipe way 12 SummaryThe tot

6、al job for the building would be about $ 35,000 if done at one time. A two-stage installation would cost about $55,000. I can get official bids at your request.Example: AA. As you suggested, we also sought information on the additional cost of air conditioning in the entrance halls and stairways.B.

7、All these three were in the $ 20,000 to $ 25,000 range.C. This later installation would cost about $20,000.D. However, class interruption should be minimal.E. In the same way, each of these three would take at least one month.F. Therefore, the total cost was this $6,000 plus another $5,000.G. Labour costs would be an additional S 5,000, bringing the total cost of the addition to $11,000.H. Each faculty member could expect to have workers in o

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论