版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、roc permanent monitoring systems 2010 halliburton. all rights reserved.2welldynamics: transforming reservoirs with smartwell system technology our mission to be the premier provider of intelligent completion technology, creating value for our customers by delivering fit-for-purpose, innovative and r
2、eliable solutions for zonal isolation and flow control, reservoir monitoring, fiber optic and surface digital infrastructureflow controlfiber opticspermanent monitoringdigital infrastructure 2010 halliburton. all rights reserved.3permanent monitoring: applications optimized production analyze pressu
3、re losses accelerate production obtain data from unplanned shutdowns monitor formation damage through well transients optimize artificial lift optimize sand control and stimulation reservoir management improve understanding of the reservoir and quality of reservoir description predict future product
4、ion/ recovery for various development strategies improve reserves calculation and optimize production of recoverable reserves receive early data on actual vs predicted performancepressuretemperaturesmartwell system completionscada/dcsvalvecommandsdecisionsmartwell system completionscada/dcsfirst pri
5、nciples simulation(s)predictivemodeloptimizerlandmark wellsolver 2010 halliburton. all rights reserved.4permanent monitoring components 2010 halliburton. all rights reserved.5track record & reliabilitypermanent monitoring reliability r(60)roc permanent monitoring systemssystems installed731roc pdgs
6、1164applicationsland258platform441subsea465 2010 halliburton. all rights reserved.6roc environmental operating enveloperoc-h 10k 150c9381-6010roc-h 16k 177ctbdroc-h 20k 200c9381-6012roc-h 25k 200c9381-6013roc-h 30k 200ctbdroc-hroc-150 seriesroc-175 seriesroc-200 series 2010 halliburton. all rights r
7、eserved.7roc environmental operating enveloperoc-h 10k 150c9381-6010roc-h 16k 177ctbdroc-h 20k 200c9381-6012roc-h 25k 200c9381-6013roc-h 30k 200ctbdroc-hroc-300roc-350roc-400roc-15010kroc-17516kroc-17520kroc-17525kroc-20025kroc-20020kroc-20030k 2010 halliburton. all rights reserved.8roc gauge varian
8、tsnote: fully redundant configurations contain dual electronics and dual sensors ported to a single pressure port 2010 halliburton. all rights reserved.9roc - standard gauge configurations 2010 halliburton. all rights reserved.10roc permanent downhole gaugescable termination(field-pressure testable)
9、pcb/hybridmechanical arrangement, including sealspressure/temperature quartz transducer 2010 halliburton. all rights reserved.11hpht environments: roc permanent downhole gauge quartz sensor-based design high accuracy (0.02% fs) high resolution ( 90% 5 yrs 180c 3” 2010 halliburton. all rights reserve
10、d.12roc hybrid advantageslong-term reliability at extreme temperatures excellent heat dissipation over traditional downhole electronicsimproved thermal shock resistance improved physical shock and vibration resistance compact size 2010 halliburton. all rights reserved.13qualification testing complet
11、ed electronic circuit testing verified functionality from 0c to 220c telemetry performance determined telemetry performance at 35,000ft cable length noise tolerance testing confirmed telemetry performance in high noise environment halt testing lifetime testing including combined environment testing
12、weld and seal testing testing of seal performance at elevated pressure and temperature qalt testing determine lifetime estimates as a function of temperature 2010 halliburton. all rights reserved.14roc lifetime estimates 2010 halliburton. all rights reserved.15gauge mandrels slimline design machined
13、 from solid billet no welded parts ultrasonic wall thickness test api 5ct standard body burst test gauge mandrel pressure test multiple seals full component protection line bypass slots 2010 halliburton. all rights reserved.16single gauge mandrel 2010 halliburton. all rights reserved.17dual gauge ma
14、ndrel 2010 halliburton. all rights reserved.18triple gauge mandrel 2010 halliburton. all rights reserved.19flostream venturi flowmeter mandrel 2010 halliburton. all rights reserved.20tubing encased conductor (tec) tec (tubing encased conductor) alloy 825 & stainless steel wall thickness: 0.028”, 0.0
15、35” & 0.049” up to 34,000 ft insulator ratings: 135c / 275f, 150c / 302f, 200c / 392f heavier wall options preferred reduce handling risk at tubing hanger higher pressure rating better sealing higher tensile strength higher crush resistance 2010 halliburton. all rights reserved.21 purpose supports a
16、nd protects tec / control lines from axial and compressive loads designed to suit the completion available in all cast carbon steel or pressed steel issues to consider: cast vs. pressed steel interlocking design lower angle chamber line configuration hanger terminations torque settings insulated sleeves riser centralizerscontrol line protectors 2010 halliburton.
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 畜牧兽医院校校长聘用合同
- 电动滑板车租赁合同内容
- 物流仓储聘用合同证明
- 义务教育学校标准化建设培训课件(A)
- 辽宁省辽阳市(2024年-2025年小学五年级语文)人教版专题练习(上学期)试卷及答案
- 青海省玉树藏族自治州(2024年-2025年小学五年级语文)人教版阶段练习(上学期)试卷及答案
- 小学语文国培培训心得体会5篇
- 工会拔河活动总结
- 英语期中考试总结(25篇)
- 一年级数学计算题专项练习1000题集锦
- 小学体育水平一《走与游戏》教学设计
- 秋日私语(完整精确版)克莱德曼(原版)钢琴双手简谱 钢琴谱
- 办公室室内装修工程技术规范
- 盐酸安全知识培训
- 万盛关于成立医疗设备公司组建方案(参考模板)
- 消防安全巡查记录台帐(共2页)
- 科技特派员工作调研报告
- 中波广播发送系统概述
- 县疾控中心中层干部竞聘上岗实施方案
- 急性心肌梗死精美PPt完整版
- 物业日常巡查记录表.doc
评论
0/150
提交评论