供应商管理[1]_第1页
供应商管理[1]_第2页
供应商管理[1]_第3页
供应商管理[1]_第4页
供应商管理[1]_第5页
已阅读5页,还剩22页未读 继续免费阅读

下载本文档

版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领

文档简介

1、供应商管理1Dell Computer Corporation IPO On Board TrainingSupplier Quality StandardPrepared by: Eric Hoh供应商管理1ContentQuality System RequirementsContract ReviewDesign ControlDocument ControlSupplier Quality ControlProduct Identification and Lot TraceabilityProcess ControlInspection and TestingCalibrationI

2、nspection and Test StatusControl of Nonconforming ProductHandling, Storage, Packaging, and DeliveryQuality RecordsDeliverables供应商管理1Supplier Quality StandardA high level standard to outline the quality program requirements for Dell SupplierRFQ/Contract shall take precedent if conflict with the SQS r

3、equirementsExceptions to SQS requirements must be approved by GSQE供应商管理1Quality System RequirementsQuality ProgramnConsistent with ISO 9001 and 9002 requirements Management ResponsibilityDevelop company-wide quality policyEnsure the continuing suitability and effectiveness of the quality systemMonit

4、or compliance to the system, and to ensure corrective/preventive measures are implemented供应商管理1Quality System Requirements - ContinuedOrganizationnSupports, implements and maintains the quality system at all levels.Quality Policies, Procedures, and Work InstructionsnDocumented quality program to ens

5、ure product and/or services comply with the requirementsQuality Management PlanQuality program used for the design, manufacture, test, and inspection of product delivered to Dell供应商管理1Quality System Requirements - ContinuedInternal Audit ProgramnGap Analysis (Audit)nSystem AuditsnProcess/Product Aud

6、itsDell AuditsnPeriodic basis, including sub-contractor facilitiesTrainingIdentify training requirementsQualification based on education, training and/or experienceQualification, re-qualification, and disqualification供应商管理1Contract ReviewSupplier Should Assure:Dell requirements are understoodConflic

7、ts between specifications, drawings, and contract requirements are resolvedAssure that any requirements differing from those in the tender are resolvedThe Supplier has the capability to meet contractual requirements.供应商管理1Design ControlDesign Development and PlanningnOutlines activities and define r

8、esponsibility for implementationDesign InputnEnsure customer requirements, statutory and regulatory are clearly identified, documented, and reviewedDesign OutputMeets all design input requirements.Contains acceptance criteria per specifications.Identify safety and functional characteristics供应商管理1Des

9、ign Control - ContinuedDesign ReviewnReview at appropriate levels/key milestonesDesign VerificationnDesign meets defined requirements at different design stages (i.e. EVT, DVT, PVT)Design ValidationnDesign conforms to defined requirementsDesign ChangesIdentified, documented, researched and approved

10、by authorized personnel at the Supplier. Final approval by Dell GSQE prior to implementation供应商管理1Document ControlRevision controlled and available to all necessary personnelUpdate/remove obsolete documentationRed Line documentation can be accepted only if:nHave been clearly markednReviewed and appr

11、oved by appropriate authorized personnel with original signatures on every copynDate of issue and expiration dates are specifiedAll Red Lined documentation must be replaced by formal/controlled revision within 30 days供应商管理1Supplier Quality ControlThe plan should covers:Quality goalsSurveys/auditsQua

12、lity program requirementsChange control requirementsTest and inspectionsFirst article inspectionsQuality data/information供应商管理1Product Identification and Lot TraceabilityTraceability through the finished product serial number during the below stages:IncomingStorageMaterial IssuingProductionDeliveryI

13、nstallation供应商管理1Process ControlControlled ConditionsDocumented work instructionsIdentification of critical parameters, implementation of statistical process controls, and initiation of corrective actionProofing out the manufacturing, inspection and test processes prior to mass productionManufacturi

14、ng equipment validationWorkmanship criterionPreventive maintenance program供应商管理1Process ControlProcess QualificationAll processes shall be qualified by DellChange to qualified manufacturing process or material must obtain written approval from Dell.Process qualification shall include Supplier-genera

15、ted process capability assessmentsProcess stability to be demonstrated and maintained via statistical methods供应商管理1Process ControlQuality MetricsIncoming Quality Assurance (IQA) resultsManufacturing YieldsTest Station YieldsInspection YieldsMean Time Between Failures (MTBF) demonstration dataOut of

16、Box Audits (OBA)Annualized Failure Rate (AFR)/Annualized Return Rate (ARR) performanceReliability test resultsDell Initial Field Incident Rate (IFIR) and Line Reject Rate (LRR)供应商管理1Process ControlContinuous Improvement Process (CIP)A documented, systematic approach for identifying CIP focus areasDe

17、sign for quality initiative (i.e., HALT, FMEA, Margin Analysis, Tolerance Stack-up Analysis)Supplier management strategyManufacturing process controlsLRR and IFIR reduction plans to achieve Dell goals供应商管理1Inspection and TestingSource/Receiving Inspection and TestsnWork instructionsnSampling planIn-

18、Process Inspections and TestingnProcesses, and instructionsnWorkmanship and functionalityFinal Inspection and TestingDell specific requirementsWorkmanship, assembly verification, and functionality供应商管理1Inspection and Testing - continuedShipping Inspection (OBA Testing/Inspection)nFunctionality, Appe

19、arance, Accessories, labeling, packaging, .Reliability TestingnFailures to be containednControls for identification and recall if requiredMaintain Inspection and Test RecordsEvidence for acceptance供应商管理1CalibrationCalibration ProceduresnMeasurements, Accuracy, Equipment, Environmental conditionsReca

20、ll List (Calibration Schedule)nCalibration notificationCalibration RecordsnCalibration procedure applied, inspector, status/result, Standard traceabilityOut of Tolerance (Calibration) NoticesTraceability for product produced and accepted by the defective instrument供应商管理1Inspection and Test StatusIde

21、ntification of the inspection and test statusTrack the acceptance statusSegregation of non-conforming product供应商管理1Control of Nonconforming ProductReview and Disposition of Nonconforming ProductsMaterial Review Board (MRB)nDesign Engineering, Manufacturing Engineering, Procurement, and Quality Engin

22、eeringDispositionRework, Use as Is, Repaired, Scrap, ScreenNote: “Use as Is” requires final approval from Dell SQE供应商管理1Control of Nonconforming ProductCorrective Action ProcessUse 8-D principles to track and close the CAInvestigate root causes, and identify corrective actionEliminate potential caus

23、es of nonconformingEnsure corrective actions are effectiveImplement and record change in procedure8-D : Specific defect, Technical investigation/analysis, Root cause, Containment for defect, Corrective action plan, Preventive actions to preclude a recurrence, Verification of effectiveness of actionsCorrective actions shall be closed within 30 days unless otherwise directed by Dell SQE供应商管理1Control of Nonconforming ProductPrinciple for Corrective Action S M A R TPECIFICEASURABLECHIEVABLEELEVANTIME BOUND供应商管理1Handling, Storage, Packaging, and DeliveryHandlingnP

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论