![燃气轮机技术讲座(Gas turbine technology seminar)_第1页](http://file1.renrendoc.com/fileroot_temp2/2021-1/28/91160925-e989-423c-b565-a0bdf2161885/91160925-e989-423c-b565-a0bdf21618851.gif)
![燃气轮机技术讲座(Gas turbine technology seminar)_第2页](http://file1.renrendoc.com/fileroot_temp2/2021-1/28/91160925-e989-423c-b565-a0bdf2161885/91160925-e989-423c-b565-a0bdf21618852.gif)
![燃气轮机技术讲座(Gas turbine technology seminar)_第3页](http://file1.renrendoc.com/fileroot_temp2/2021-1/28/91160925-e989-423c-b565-a0bdf2161885/91160925-e989-423c-b565-a0bdf21618853.gif)
![燃气轮机技术讲座(Gas turbine technology seminar)_第4页](http://file1.renrendoc.com/fileroot_temp2/2021-1/28/91160925-e989-423c-b565-a0bdf2161885/91160925-e989-423c-b565-a0bdf21618854.gif)
![燃气轮机技术讲座(Gas turbine technology seminar)_第5页](http://file1.renrendoc.com/fileroot_temp2/2021-1/28/91160925-e989-423c-b565-a0bdf2161885/91160925-e989-423c-b565-a0bdf21618855.gif)
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、燃气轮机技术讲座(Gas turbine technology seminar)Gas turbine technology seminarChapter 1 Structure of MS9001E type gas turbineThe first section is an overviewSimple combined cycle gas turbine power generation device generally consists of compressor, combustion chamber, turbine, generator, control system and
2、other basic auxiliary equipment. Gas turbine gas compression, after heating in turbine expansion work, drive the generator output power, thermoelectric conversion process to achieve recycling.#10 gas turbine is a PG9171E type gas turbine manufactured by GE company. The gas turbine consists of a star
3、ting motor with a rated power of 1000W, a 17 stage axial compressor, a combustion system composed of 14 combustion chambers, and a 3 stage turbine rotor. The axial flow compressor rotor and turbine rotor are connected by flanges and have 3 support bearings. The generator of the gas turbine is a sync
4、hronous generator with air cooling, three-phase, dipole, 3000rpm speed, 50HZ frequency alternating current, solid cast iron rotor. The generator has an output power of 120MW (running under the basic load). The exciter is an alternating current exciter with a rotating diode rectifier. The excitation
5、mode is brushless excitation.The air in the atmospheric pressure chamber through the air inlet filter, silencer after entering the compressor, pressure in the compressor after entering in charge of the central 14 ring arranged in the combustion chamber, the combustion is formed after high temperatur
6、e flue gas; high temperature flue gas enters the three stage turbine expansion work output shaft power, as a part of the compressor compression, the other part of the driving generator output electric energy, exhaust by annular diffuser and outlet guide vane into the boiler or directly discharged in
7、to the atmosphere.The second chapter, MS9001E gas turbine piping systemThe 9001E type gas turbine piping system mainly consists of:(1) lubricating oil system(2) hydraulic oil system(3) trip oil system(4) IGV system(5) starting system(6) atomizing air system(7) sealed cooling system(8) cooling water
8、system(9) ventilation heating system(10) front oil system;(11) liquid fuel system(12) fire protection system;(13) intake and exhaust systems(14) liquid blowing system;(15) washing systemSection 1 lubricating oil systemThe lubrication system: auxiliary gearbox in unit commitment and normal operation
9、in the process of bearing, gas turbine and generator turbine lubricating oil to provide sufficient quantity, temperature and pressure of proper and clean, prevent bearing burning, overheating caused by the bending shaft neck caused by vibration.The lubricating oil is supplied to the following sectio
10、ns:(1) provide power oil and lubricating oil for hydraulic torque converter(2) filtered as a hydraulic control oil(3) supply oil for trip oil system;(4) supply oil to the top axle oil systemThe main oil pump is driven by an auxiliary gear box, and the outlet pressure is stabilized at about 7bar afte
11、r the pressure reducing valve VR-1 is fixedThe auxiliary lubricating oil pump driven by vertical AC motor is 88QA-1 submerged centrifugal pump. The outlet pressure is about 7.4bar. The emergency lubricating oil pump driven by vertical DC motor 88QE-1 is also an immersed centrifugal pump, and the out
12、let pressure is about 1.4bar.The oil system is equipped with two oil cooler, arranged in parallel, running a standby water cooling oil cooler by the temperature control valve VTR-1 adjusts its control signal from the downstream oil cooler temperature sensor sliding tube oil bag.The lubricating oil s
13、ystem is equipped with two lubricating oil filters, which are arranged in parallel, one work and one spareThe pressure of the bearing parent pipe is adjusted by the regulating valve VPR2-1, and the setting value is about 1.8bar.In order to ensure the oil pressure and temperature in the normal range,
14、 the pipeline is equipped with some pressure switches and temperature switches, their functions are as follows:(1) 63QA-2: oil pressure low switch, installed in the oil filter screen, when the oil pressure drop 2.8barThis pressure switch opens, MKV sends lube oil pressure low, alarm, start the AC lu
15、bricating oil pump, make slipperyThe oil pressure returns to normal. When the oil pressure continues to drop to 0.42bar, the direct oil is startedPump.(2) 63QT-2A and 96QT-2A: oil pressure low trip switch, installed in generator bearing oilThe parent tube, when entering the generator slip tube on th
16、e oil pressure drops to 0.55bar, MKVLow oil pressure trip alarm.MKV received 63QA-2, 63QT-2A and 96QT-2AThree switch instructions, the 2/3 vote issued after the interdiction command.(3) ltth - 1a、1b, ltth - 2a、2b, ltth - 3a、3b: 滑油温度开关, 装在轴承母管上, 当滑油温度上升到73, 开关动作mkv发滑油温度高报警; 若滑油温度上升到80 , mkv发滑油温度高跳闸报警
17、,mkv接到这三个温度开关的跳闸报警后, 经过2 / 3表决后发出停机指令.(4) 63qq - 1: 滑油滤网压差高开关, 整定值15psi63qq - 8: 液力变扭器油滤压差高开关, 整定值 1.5bar为了使滑油系统有充足的油量和保证油的合适黏度, 在滑油箱上还设置了液位开关、液位表和温度开关, 另外为了更好的监视各瓦的滑油温度, 在各瓦的回油母管上都装有温度开关:第二节 液压油系统液压油系统是给液压执行机构提供清洁而又具有足够压力的液压油.主液压泵是可调压的变排量泵, 由辅助齿轮箱驱动, 泵上装有一调压阀vpr3 - 1, 用来调整和控制液压泵的油压.液压油供给总管上装有一只逆止阀v
18、c3 - 1、一只可调减压阀vr21 - 1和一只排气阀vab1 - 1.在启动过程以及低转速的情况下, 由辅助液压油泵给液压执行机构供油.液压油由滤网出来后进入液压油母管, 该母管分成三路: 一路oh - 3去液体燃料系统; 另一路oh - 4去igv系统; 还有一路去气体燃料系统.液压油系统中压力开关整定值:63hf - 1: 60 / 40 psi63hq - 1: 93 / 103 / /第三节 跳闸油系统跳闸油系统作用是通过电磁阀20fl - 1、20fg - 1供给燃油截止阀和燃气截止阀的执行机构用油跳闸油系统进口节流孔板作用是当跳闸油系统部件工作时, 不使机组润滑油系统的油压和油
19、量不因机组跳闸油的泄油而减少.跳闸油系统中有六只压力开关, 分别为63hl - 1、2、3,63hg - 1、2、3, 动作定值均为 1.38 / 1.65bar, 它们均采用2 / 3表决.电磁阀20fl - 1、20fg - 1、20tv - 1在正常时带电切断放油阀, 接到停机或保护遮断信号后失电接通放油路, 使机组停机.燃机的四大保护: 超温保护、超速保护、超振保护、熄火保护.另外还有喘振保护、滑油油温和油压保护、火灾保护、主变差动保护.第四节 igv系统进口可转导叶的作用:(1) 在燃机启停过程中起到防喘的作用(2) 通过调节igv角度来控制燃机的排气温度, 提高整个联合循环的效率.
20、igv系统中跳闸油来是控制进口可转导叶遮断阀vh3 - 1的动作, 液压油是作为油动机hm3 - 1的动力油.igv系统中设有两个位置反馈装置96tv - 1、2和电液伺服阀90tv - 1.可转导叶的开度通过位置反馈装置96tv - 1、2 变成一个电压信号反馈给mk -, v -, 通过mk v运算后给电液伺服阀90tv - 1线圈一放大电流, 通过90tv - 1的动作来控制可转导叶的开度.第五节 启动系统燃机的启动必须借助外力才能进行, 而停机过程中为了转子得到均匀冷却, 也必须借助外部的盘车装置, 我们把在燃机启动和停机后缓慢转动的冷态盘车的外部动力设备及其系统统称为启动系统.液力变
21、扭器能使电动机的扭转特性满足燃机在启动瞬间要求最大的启动扭矩, 而当燃机转速上升时要求的启动扭矩逐渐减少的特性.液力变扭调节电机88tm是通过调节涡轮出口导叶角度来改变变扭器的输出扭矩的目的.液力变扭器的动力油是通过电磁阀20tu - 1来控制的.启动时20tu - 1带电带开, 给液力变扭器充油; 机组达到自持转速后, 20tu - 1失电关闭, 停止给液力变扭器提供动力油.引用网址: = 4923静态链接网址|评论(11)|引用(0)燃气轮机运行lengyongnan | 04六,2005,21 |随笔|(462读)燃气轮机的运行第一节启动前的检查机组启动前我们必须对机组进行全面的检查,以
22、确认机组具备开机条件:1。输变电2,MCC柜3。火灾保护柜和发电机控制保护柜4。MKV系统5。前置油系统6。辅机间检查7。轮机间检查8。发电机间检查9。冷却水系统检查第二节启动操作与监视启机前20-30分钟重油打循环机组发启动令后轻油油泵启动(5BAR),启动马达88cr启动,盘车马达88tg退出,轻油泵88fd、辅助雾化泵88ab、辅助液压泵88hq投入,液压油压力正常(100公斤/平方厘米)当透平转速升至 10%时,转速继电器14hm动作,液力变扭器马达88tm启动,将液力变扭器角度调至35o,机组进入清吹程序,同时开始60秒清吹计时,清吹计时结束后,转速至约为17%,88tm启动,将液力
23、变扭器角度调至15O,20tu-1电磁阀失电泄油,转速逐渐下降,至12%时20tu-1电磁阀带电进油,转速上升,进入点火程序,12.1%左右点火至少两处火焰探测器探测到火焰后,点火成功,进入暖机程序,开始暖机一分钟。负荷联轴间风机88vg投入,88tk1投入,10秒后88tk2投入;将透平间风机88bt由检修位转到工作位,置“自动”方式,点着火后,88tm每30秒启动正转一次,每次持续1秒,直至液力变扭器角度开大到68暖机结束后,机组进入升速,机组加速过程中应注意监视各轴轴承的振动值和排烟温度场的分布状况。转速升至大于26%时,顶轴油泵88qb退出。机组升速至40% - 50%转时进入一阶临界
24、振动,70-80%进入二阶振动。当转速升至大于60%时,转速继电器14hc动作,燃机进入自持加速阶段,此时辅助雾化泵88ab退出,l20ab1x由“0”“1”,转辅助雾化泵进气阀va-22关闭,20tu-1失电,液力变扭器泄油,机组脱扣。95%时转速继续升至大于:1)主画面显示:“启动状态”栏目显示:加速”“栏目显示:14hs速度水平2)辅助滑油泵88qa、辅助液压油泵88hq退出3)电机自动启励,发电机控制盘上的励磁开关”“红灯亮,“关”绿灯灭4)可转导叶打开至570机组升速到空载,全面检查机组:1)画面显示:“启动状态”栏目显示:全速空载“速度级别”栏目显示:14hs(2)查滑油母管压力正
25、常约1.8bar)(3)查雾化空气压力正常约20bar)(4)查液压油压力正常约100公斤/平方厘米)(5)查燃油压力正常约5BAR)6)无异常报警第三节机组并网及带负荷进入“控制”画面的“同步”子画面,点击发电机同步模式”靶标栏目下的“自动”,“自动”灯亮。同期表正转,点击“发电机电压”栏目下的“养”或“低”靶标,调节发电机电压稍高于系统电压,机组自动同期并网,发电机出口开关“断路器”由绿转红自动同期并网成功后,机组自动带旋转备用负荷5MW,1)防喘放气阀自动关闭,四个限位开关l33cb1o、l33cb2o、l33cb3o、l33cb4o动作为“0”According to the requ
26、irements of the unit operation, with the basic load or pre load, because the joint cycle is not set up smoke baffle, in the process of load, according to specific circumstances, IGV temperature controlAfter the grid connected, the main change neutral point knife 111000.When the unit load is brought
27、to 20MW, it can be put into PF controlAfter the turbine load is brought to 50MW, the unit is allowed to start cutting heavy oilMethod for cutting heavy oil:Enter Control picture Liquid Fuel screen, click on the XFER Crude column Setpoint target, in the pop-up window, enter 160, then click the Fuel S
28、elect section under the Heavy target, Heavy target lights, began cutting oilAfter the three-way valve leaves the light oil level, the vanadium inhibitor pump starts, and the vanadium flux indicates that the FQLX1/FQLX2 has readings. As the heavy oil flow increases, this reading also increasesFourth
29、running checksTo regularly tour inspection and transcribe the parameters specified in the operationMonitoring and inspection of unit and auxiliary equipment in operation(1) on the wheel Kongpan state and data check unit(2) inspection of the electric panel;(3) examination of MCC disk;(4) check the oi
30、l system of the front switch station(5) inspection of auxiliary equipment and engine room;(6) inspection of generator room;(7) inspection of cooling water system;(8) inspection of main transformer;The main operation of the fifth unitLoad adjustment: executed on a command with a long valueIGV tempera
31、ture control of the cast back: in the process of starting or stopping, or with pre load operation, you can input IGV temperature control, when the unit is out of line or with the basic load after the introduction of IGV temperature controlSwitching operation of unit light heavy oilLubricating oil fi
32、lter switching:1. oil filter switch shall be executed by value length;2. check to make sure the spare filter is in good condition;3. connect the valve between the slow running and the standby oil filter;4. observe the oil flow window of standby unit. When the oil flow is normal, switch valve is cut
33、to standby group to close the connected valve5., the switch process should pay attention to monitoring the oil filter before and after the pressure difference changes, switching should be rapid, not in the middle of the stop, if the abnormal situation, immediately cut back to the original state, sto
34、p operationSwitching of high pressure oil filter:1. the switch of high pressure fuel filter shall be approved in advance222. check the oil and gas reserve filter of the one or two valve is closed in good standby33. slow open operation group and reserve Group oil filter connected cutting44. in order
35、to open the standby filter two of exhaust and a cutting, on standby filter oil filled gas oil to be closed after a steady flow of exhaust valve, standing for 1 to 2 minutes, once again open the exhaust two times of oil to be closed after a steady flow of exhaust gas cutting, two times of. If gas is
36、expelled, repeat this procedure until the gas in the oil filter is completely discharged55., slowly open the standby filter inlet cutting, observe the oil pressure change not more than 10%, otherwise, restore66. slowly open the backup filter outlet, observe the oil pressure change not more than 10%,
37、 otherwise restore77. slow down and run the filter outlet88. slow down, run, filter, inlet, cut99. closing connected cuttingShould pay attention to the pressure change 10. in the switching process, avoid action caused by excessive vibration, such as abnormal phenomena such as pressure fluctuations h
38、ave to sound, should immediately press reverse steps to restore the original valve, stop switching operationSwitching of heavy oil filter1. heavy oil filter switching shall be given prior to long value approval2. check to make sure that the backup filter, oil drain (HV307 or HV308) and exhaust cutti
39、ng (HV306 or HV309) are closed3. slow open alternate filter bypass (HV311 or HV308)4. slow exhaust filter of standby (HV309 or HV306), on standby filter to deflate the oil flow closed after the exhaust valve (HV309 or HV306), standing for 1 to 2 minutes, again repeatedly open and close the exhaust,
40、exhaust valve until the oil flow is stable after cutting off the exhaust5. switch the cutting HV304 quickly to the spare filter6. turn off the primary filter bypass (HV308 or HV311)7., the switch process should pay attention to monitoring the oil filter pressure changes and changes in oil pressure,
41、switching should be rapid, not in the middle of the stay,If an exception occurs, immediately cut back to the original state, stop switching operationsThe switching of light oil filter, double filter and hydraulic oil filter is similar to the switching of heavy oil filterRegulation of vanadium inhibi
42、tor1. unit operation Mg /V requirements: after washing within 16 hours to Baird spectrometer test, Mg, /V numerical control between 2.752.9, 16 hours after the control between 2.62.752., there are two ways of regulating:(1) adjust the stroke of the vanadium inhibitor pump:After adjusting the stroke
43、adjusted Mg = /V / /V * Mg unadjusted unadjusted stroke(2) adjust the speed of the vanadium inhibitor pump:The adjusted FA1/FA2= adjusted Mg /V / Mg /V * unadjusted unadjusted FA1/FA2Zero speed operation for turning.1. enter the Start-up sub screen of the Control screen, click the Off target under M
44、ode Select, and the Off light is on2. disconnect the top shaft oil pump, 88QB switch and knife switch3. click on the On target under the Cooldown Control column, and the On target light is lit. Check the auxiliary lubricating oil pump 88QA automatically start4.88QA after 2 minutes running, close the
45、 88QB knife gate, check the top axle pump automatically start, the pressure is normal5. click on the Cooldown target under Mode Select, and the Cooldown light is on1) if the extinction of less than 14 hours, then start the motor 88CR speed reached 4% after the automatic start, start the motor automa
46、tically stop, speed dropped to 3.3% after turning motor automatic input2) if this time has stalled to 14 hours, the motor will not start from the start, click on the Master Control section under the Startup target, to start, 4 seconds after the Startup lights, start the motor starting, speed up to 4
47、% and then click the Master Control section under the Stop target, hair stop that, Stop target lights, speed dropped to 3.3% after turning motor automatic inputPerformance experiment:1. record the time of the ten turns of the heavy oil flowmeter with a stopwatch2. press the stopwatch and record the
48、active power at this time. After more than 2 minutes (less than 3 minutes), press the stopwatch to record the active power at this time and the stopwatch running time3. record the local thermometer at this time and the value of the barometric pressure meter4. print the data screen at this time5. cal
49、culate the running time of heavy oil after washing6. fill in the performance test formSelf commissioning test of 88QE for emergency lubricating oil pump:1. confirm the unit in the normal state of turning, turning the motor operating handle 88TG in the AUTO position, the signal indicating normal2. ma
50、ke sure the 88QA is in normal operation, the operation knob is AUTO, and the signal is normal3. check the 88QE switch power supply has been sent, the operation of the handle in OFF bit, the signal is normal4. hit the 88QA switch handle to the OFF position5. 88QE since the 88TG has been out of normal
51、, turning motor6. switch the 88QA switch handle to AUTO, check 88QA has started7. force L4QEZ1 to 0, stop 88QE, and then remove this force, check 88QE, restore standby8. check the oil pressure is normal9. speed dropped to 3.3% after the check, turning back into motor 88TGSixth section of gas turbine
52、 outageUnit naphtha:Enter Control picture Liquid Fuel screen, click on the XFER Crude section under the Setpoint target, in the pop-up window, enter 20, began to cut oil, cut in place after the notice of heavy oil steam valve closed shop heater, stop oil pump, check the vanadium inhibitor pump has been stopped.The unit will run down for 15 minutes after the light oil is runAfter the generator stop order, put into the IGV temperature control, push the neutral 111000 on the main change neutral, and the load of the turbine is slow downWhen
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2025年度跨境电商平台合作经营合同
- 2025年度太阳能光伏发电项目承包合同-@-1
- 2025年度国际贸易货物运输合同模板及包装标准
- 2025年度国际贸易实务买卖合同标的货物安全运输协议
- 2025年度政府采购合同管理规范大全
- 2025年度智能贷款及财产保全综合服务合同
- 2025年度电子信息产品买卖与数据安全合同
- 2025年度个人运输合同违约责任明细
- 2025年度光缆产品回收与资源再利用合同
- 2025年度跨境金融服务合同担保方责任条款
- 2022年版煤矿安全规程
- 高质量社区建设的路径与探索
- 数字化时代的酒店员工培训:技能升级
- 足球守门员扑救技巧:扑救结合守护球门安全
- 《学术规范和论文写作》课件全套 第1-10章 知:认识研究与论文写作 - 引文规范
- 带式输送机滚筒出厂检验规范
- 起重机更换卷筒施工方案
- 《信息检索基础知识》课件
- 具有履行合同所必须的设备和专业技术能力的承诺函-设备和专业技术能力承诺
- 01智慧物流信息技术概述
- 茶多糖和茶多酚的降血糖作用研究
评论
0/150
提交评论