钻井常用词汇英汉对照表.doc_第1页
钻井常用词汇英汉对照表.doc_第2页
钻井常用词汇英汉对照表.doc_第3页
钻井常用词汇英汉对照表.doc_第4页
钻井常用词汇英汉对照表.doc_第5页
已阅读5页,还剩3页未读 继续免费阅读

下载本文档

版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领

文档简介

NH5平台岗位描述(第一版) 附件9钻井常用词汇英汉对照表打捞工具和常用词语spear打捞矛back pressure回压side wall core井壁取芯drill out cement钻水泥塞casing scraper套管清刮器explosive炸药mill磨鞋squeeze cement挤水泥die stamp铅印fast line spooler快绳排绳器pin tap公锥shallow gas浅层气box tap母锥panels面板packer封隔器bridge plug桥塞openner扩眼器well kick and 50BBLs pits gain井涌增量50桶junck sub 打捞杯kelly guard方钻杆保护接头fishing over shot打捞筒blow out井喷cutter割刀guideline导向绳blades刀臂guide rail导轨pony D.C短钻鋌pick up weight上提重量pup joint短钻杆sluck off weight下放重量slick M.D.C光滑防磁钻鋌rotating weight总重量fishing neck打捞短节max torque最大扭矩perforate射孔rotating HRS纯钻井时间no accident无事故total BHA length总BHA长度HRS on swivel水龙头时间check crown o matic检查防碰天车below jar W.T震击器以下重量total BHA weiht总BHA重量HRS on jar震击器时间held safety metting on rig floor钻台举行安全会seal assembly密封总成wear bushing抗磨补芯total mud cost泥浆总消耗量bridge crane of the BOPBOP叉车centrifical pump灌注泵liner尾管brine饱和盐washpipe packing冲管盘根sub sea camera水下电视sand traps沉沙池core barrel岩芯筒compensator补偿器travly block游车crown block天车drawworks钻井绞车stabilizer扶正器port左舷starboad右舷annurlar prevent万能防喷器choke/kill line阻流和压井管线shear ram剪切闸板choke manifold阻流管汇trip tank计量罐gas peak气测值plug back打水泥塞dart sub投入式止回阀nozzle水眼jetter喷射冲洗器boost line加速管线core point取芯点marine swivel水下水龙头trip gas后效气prepare准备after effect后效break CIRC短时循环mud cleaner泥浆清洁器degasser除气器desilter除泥器desander除沙器prior/before在-之前shale shaker震动筛helicopter直升飞机gas cut mud气侵泥浆special tool特殊工具open hole裸眼No.4 guide line brocken四号导向绳断掉tubing油管fix修理testing测试caving垮塌plugged bit泥包钻头D.c twist off钻鋌折断well off set井口位移tugger气动绞车recover survey回收测斜仪picth纵摇rig heading平台首向后sweel涌wind speed风速wave浪roll横摇heave升沉visib能见度dir方位钻井常用短语Last anchor on rack at 0600HR六点最后一个锚上架Start of contract at 1530HR下午三点半合同开始End of contract at 0300HR早上三点合同结束Rig on tow平台拖航Rig arrived well location at 1000HR早上十点到达井位Run anchors and frist anchor on bottom at 1100HR抛锚。第一个锚11点到底Ballast rig to 70ft draft压载到70英尺deballast rig平台卸载adjust well location with pull No .1 and No.2 anchors gain拉1和2号锚调整井位anchor tension test No.3 and No4-ok1和2号锚张力试验-OKwait slack tide等待平潮replace upper felly cock替换方钻杆上阀spuded time开钻时间arrived time到达井位时间drill 36hole from 120m to 200m & pump 50bbls mud each connection and ream each connection once钻36井眼从120米至200米,每接一拄前滑眼一次并泵入50桶泥浆open 17-1/2hole from 250m to 500m用17-1/2钻头扩眼从250米至500米leak off test at 500m.MW 1.2SG leak off 625psi破裂试验.井深500米、泥浆比重1.2SG.泄漏压力为625PSIream hole from 450m to 500m倒划眼从450米至500米core drill from 1300m to 1320m取芯钻进从1300米至1320米collect/remove core and service core equipment收集/甩下岩芯并包装处理sweep hole with 100bbl HI-VIS mud用100桶高粘泥浆清洗井slug the hole with viscous mud泵送一段稠泥浆进井pump 6000stks HI-VIS mud 泵6000冲高沾泥浆circulate and working on pipe循环并活动钻杆circulate and wash from 100m to 200m循环清洗100米至200井段circulate bottom up循环井底出来circulate for sample循环取样flow check at 2300m due to drilling break流量观察因钻至2300米时突变circulate for flow check 循环观察circulate and condition mud循环处理泥浆reverse circulate反循环pooh no rotary and no drag起钻不用转盆也不拖挂run in W/26 x 36BHA tag seabad 117m.下26领眼钻头和36扩眼器至117米探海底泥面RIH to wipe trip下钻通井RIH to tag top of cement at 1000m下钻探水能面在1000米处short trip over pull 50klbs短起过提50千磅make up new bottom hole assy组合新的下部钻具drop survey pump slug and POOH投测打重泥浆.起钻retrieve/return survey回收测斜仪inside BOP drill at casing shoe在套管鞋进行防喷演习POOH circ & fill annulars W/TR.TK.P no good. Suspect mud problems.W/pull out every 5 Stands&fill a time okW/Pull out every 5 Stands&fill a time ok.起钻灌浆不正常,怀疑是泥浆问题.每起五柱灌浆-正常POOH due to change bit因要换钻头所以起钻POOH due to lost pump pressur supect washout D.C泵压下降起钻,怀疑钻鋌刺漏POOH due to plan change计划改变起钻POOH for changing bottom hole assy起钻更换下部钻具组合POOH wet pipe and no slug起钻喷泥浆因没打重泥浆POOH no rotary 起钻不转转盆POOH and tight hole at 2500m max over pull 100klbs起钻在2500米处遇阻最大过提100千磅slip and cut off drill line 110feet滑移切割钻井大绳110英尺RIH at casing shoe then service rig下钻至套管鞋后保养钻机POOH casing shoe adjust break&wait hole stabilize起钻至套管鞋待井稳定后调整剎带pull back 5 stands5drillpipe and rick back derrick起出5柱5钻杆并立回井架attempt retreive9-5/8wire bushing but fail试图回收9-5/8抗磨补芯没成功50bbls pit gain shut in well observe pressure 0-SIDPP 175psi SICP50桶泥浆增量,关井后钻杆压力为0,套管压力为175psikill well as NHWOC,s requst按西部公司压井程序压井CIRC and COND .mud.CIRC out gas show from returns max gas 1700units循环处理泥浆,最大气测值为1700个单位D.P hang off on L.P.R.CIRC.through wide open choke while W.T up mud钻杆悬挂在下闸板,循环通过全开阻流阀同时加重泥浆moniton will on trip tank 3 bbls gain in 2HRS在泥浆计量罐观察两小时有3桶的增量.circulate and inspect due to pressure lost 200psi循环检查因泵压下降200PSIcirc through choke holding 600psi back press on annulars while WT up mud保持600PSI套管循环压力通过阻流管汇同时加重泥浆bleed off shut in pressure 20bbls return still fiowing卸压后有20桶回流,井内依然有回流.stuck pipe at 2534m and work on pipe with 100kibs over pull fire jar max pull 500klbs free500klbs free.钻具卡在2534米上提下放活动钻具,过提100千磅震击器工作,最大上提500千磅解卡over pull 450klbs the D.P twist off and lost weight 280 klbs total 2999m in hole过提450千磅钻杆折断,失去悬重280千磅落鱼总长为2999米weld guide shoe onto 8-1/8 overshot焊接8-1/8打捞筒和引鞋rig up pin tap RIH to top of fish and engage the fish -no succss and POOH组合公锥下钻打捞落鱼不成功,起钻work overshot onto fish w/max overpull 50klbs free & POOH打捞落鱼过提50千磅活动&起钻observe well on trip tank.well static倒向泥浆计量罐观察井内稳定jump ROV and work for guide problems下放潜水器帮助处理导向绳问题attempt to re-establish guideline No.4试图回接4号导向绳ballast rig and pull anchors stable into 36hole压船并拉锚对36井眼rig up run9-5/8casing tools and running 9-5/8casing安装下9-5/8套管的工具和下9-5/8套管pick up 9-5/8casing hanger and R/tool mack up and torque up lay out same组合9-5/8套管头和送入工具连接并上好扭矩然后甩下pick up casing shoe jiont and float M/U inspect ok RIH拉起套管鞋和浮阀单根并连接,检查好后下入井run stinger string下内管柱run 9-5/8 casing fill mud for each 10 joints每下10根9-5/8套管灌满泥浆一次P/U and M/U 9-5/8casing head joint continue RIH W/5drillpipe接好9-5/8套管头,继续用5钻杆送入井hanger off 9-5/8casing 悬挂9-5/8套管M/U cment line to the unit and pressure test same 2000psi-ok连接水泥管线到固井泵并压力测试管线至2000psi-OKpressure test casing 2000psi hold 10mins-ok压力测试套管至2000PSI并稳压10分钟-OK line up to cement unit & set cement plug as per phillips programes管线连接到固井装置&按phillips(作业者)程序打水泥塞back off running tools and POOH then break lay down same倒开送入工具起出卸掉甩下rig up run / pull B.O.P stack准备下/起防喷器组run TGB W/rig camera to seabed.land on seabed.inspect W/cemera appeared all ok.release R/tool用水下电视协助下永久性导向架。座在海底并检查合格后倒出送入工具inspect and repair B.O.P stack检查和修理防喷器组S.C.R about choke line 100psi with 1.26M.with 30 spm and No.1 pump阻流管线的压力降是100PSI。泵速为此30冲/分钟,泥浆比重为1.26SG用一号泵B.O.P test as phillips,s request -ok.按PHILLIPS的要求进行防喷器组测试pressure test inside BOP gray valve and kelly upper/lower valve -ok压力测试方钻杆上下阀、钻杆内防喷器阀门-OKinspect and repair yllow / blue pod function test BOP -ok检查和修理黄/蓝盒并对防喷器组进行功能测试-OKcrew working on moon pool and spider deck钻井班在月亮池和完井甲板工作pick up 3 joint risers and R/tool make up install L.M.R.P组合三根隔水管和送入工具并连接好插入总成.run stack slip pressure testn choke/kill line each 3 joint riser下防喷器组和隔水管并每三根试压一次pick up slip joint.rig up choke/kill goosnecks install rucker ring下伸缩节及组装阻流/压井的鹅颈管和支撑环节jump R.O.V to watch and check well head well放潜水器去观察井口状况良好land stack . Lock connector check with 30 klbs over pull -ok座封和连接井口并关连接器后过提30千镑-OKscope out slip jt pick up diverter and install same rig down BOP running tools拉出伸缩节内筒坐转喷器以及甩下所有防喷器组的送入工具pull out diverter.slip joint.riser and BOPstack.起出转喷器.伸缩节.隔水管和防喷器组rotary torque 250amps on bottom 100amps off bottom钻具在井底钻盆扭矩为避免250安培,离开井底为100安培.No1pump for drilling and No2pump use for boost riser一号泵钻进,二号泵导向隔水管,增加隔水管处的上返速度.rig evacuat for typhoon平台撤离防台风first chopper land rig at pm1700HR下午1700第一班飞机到平台crew come back form SAN YA by nanhai211 boat at am0700HR早上0700人员从三亚乘南海211船回平台.常用英文缩略语L/D-lay down 甩下HWDP-hight weight drill pipe加重钻杆BHA-bottom hole assembly 下部钻具组合T.G.B-temporary guide base临时基板L/O-lay out甩出P.G.B-permanent guide base永久性基板L.M.R.P-lower marining riser package插入总成AFT-after船首M/U-make up上紧FWD-forward船尾SIDPP-shut in drillpipe pressure关井钻杆压力PPG-pound per gallon磅/加仑P/U-pick up上提SG-specific gravity克/立方厘米S/OFF-sluck off下放TBG-tubing油管SICP-shut in casing pressure关井套压pres-pressure压力CIRC-circulate循环AFT.-after在。后POOH-pull out of hole起钻surfaceline

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论