土方开挖工艺流程及措施.doc_第1页
土方开挖工艺流程及措施.doc_第2页
土方开挖工艺流程及措施.doc_第3页
土方开挖工艺流程及措施.doc_第4页
全文预览已结束

下载本文档

版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领

文档简介

膈薅羇肈蒆薄蚆袀莂蚃蝿肆芈蚂袁衿膄蚁薁肄膀蚀螃袇葿蚀袅膃莅虿羈羅芁蚈蚇膁膇蚇螀羄蒅螆袂腿莁螅羄羂芇螄蚄膇芃莁袆肀腿莀羈芆蒈荿蚈聿莄莈螀芄芀莈袃肇膆蒇羅袀蒅蒆蚅肅莁蒅螇袈莇蒄罿膃芃蒃虿羆腿蒂螁膂蒇蒂袄羅莃蒁羆膀艿薀蚆羃膅蕿螈膈肁薈袀羁蒀薇蚀芇莆薆螂聿节薆袄芅膈薅羇肈蒆薄蚆袀莂蚃蝿肆芈蚂袁衿膄蚁薁肄膀蚀螃袇葿蚀袅膃莅虿羈羅芁蚈蚇膁膇蚇螀羄蒅螆袂腿莁螅羄羂芇螄蚄膇芃莁袆肀腿莀羈芆蒈荿蚈聿莄莈螀芄芀莈袃肇膆蒇羅袀蒅蒆蚅肅莁蒅螇袈莇蒄罿膃芃蒃虿羆腿蒂螁膂蒇蒂袄羅莃蒁羆膀艿薀蚆羃膅蕿螈膈肁薈袀羁蒀薇蚀芇莆薆螂聿节薆袄芅膈薅羇肈蒆薄蚆袀莂蚃蝿肆芈蚂袁衿膄蚁薁肄膀蚀螃袇葿蚀袅膃莅虿羈羅芁蚈蚇膁膇蚇螀羄蒅螆袂腿莁螅羄羂芇螄蚄膇芃莁袆肀腿莀羈芆蒈荿蚈聿莄莈螀芄芀莈袃肇膆蒇羅袀蒅蒆蚅肅莁蒅螇袈莇蒄罿膃芃蒃虿羆腿蒂螁膂蒇蒂袄羅莃蒁羆膀艿薀蚆羃膅蕿螈膈肁薈袀羁蒀薇蚀芇莆薆螂聿节薆袄芅膈薅羇肈蒆薄蚆袀莂蚃蝿肆芈蚂袁 汉译英1. 土方开挖工艺流程及措施 1. Earthwork excavation process and Measures土方开挖工艺流程清理植被施工道路修建及施工截、排水沟人工配合反铲修坡成型反铲(装载机)挖装15t自卸车边坡支护及基础处理施工准备 C测量放线Earthwork excavation process and procedureClear up vegetation/site clearanceConstruction bypass, catchwater drain and outfall ditch constructionManually slope trimming and shaping up together with backhoeBackhoe (loader) for excavation and loading to 15t tippersSlope retaining support and foundation treatmentConstruction preparation Survey and set out人工清除开挖区内的植被、杂物,由测量工放出左坝肩一期开挖设计开挖边线,核实开挖断面,按设计位置做浆砌石排(截)水沟。构筑区内开挖施工便道及集碴平台,并同步形成开挖区内临时排水沟。左坝肩一期开挖土方开挖采用反铲或装载机配合15t红岩自卸汽车挖装,弃土统一运至1#或2#弃碴场。土方边坡用反铲按设计坡比开挖,人工配合修整边坡。Manual removal the vegetation and debris in excavation areas; set out the excavation lines of the left abutment PHASE I excavation design by surveying technicians, verify excavation cross-section, and construct stone-pitched outfall (catch-water) ditches at designed locations. Excavate for construction bypass and muck stockpiling platform within construction area, and form the temporary drainages in the excavation areas simultaneously. The earthwork excavation for the left abutment PHASE I excavation shall adopt backhoe or loader cooperating with 15t HONGYAN tippers for excavation and loading, with spoil materials transported to NO.1 or 2 muck disposable site. The slope of the earthwork shall be excavated by backhoe and trimmed manually. 2. 土石方开挖工艺流程及措施分层分区进行钻孔、爆破、出碴及支护施工,形成开挖多工作面多工序的平行流水作业。边坡及强风化岩石采用反铲从上往下开挖,开挖碴料顺坡面翻碴到下一马道,再用反铲或装载机装自卸汽车拉运至1弃碴场。开挖揭露的石方进行孤石解爆,人工YT28手风钻钻孔,松动爆破,碴料弃至指定碴场。2. Earthwork and stonework excavation process and measuresExecute the drilling, blasting, mucking and retaining support construction hierarchically and in partitions, forming parallel excavation constructions of multiple working sections and multiple processes. Use the backhoe for strongly weathered rock and slope excavation from top to bottom, and the excavated muck materials shall be turned to the next pack-way through the slope surface, and then loaded to the tipper by backhoe or loader for transportation to No.1 muck disposable site. The exposed stone shall adopt boulder blasting method with manual YT28 hand pneumatic driller by shock blasting (loosening blasting), and the muck materials of which shall be spoiled to appointed muck disposable site. BY: DORIS LIANGQQ:547384952TEL:衿膄蚁薁肄膀蚀螃袇葿蚀袅膃莅虿羈羅芁蚈蚇膁膇蚇螀羄蒅螆袂腿莁螅羄羂芇螄蚄膇芃莁袆肀腿莀羈芆蒈荿蚈聿莄莈螀芄芀莈袃肇膆蒇羅袀蒅蒆蚅肅莁蒅螇袈莇蒄罿膃芃蒃虿羆腿蒂螁膂蒇蒂袄羅莃蒁羆膀艿薀蚆羃膅蕿螈膈肁薈袀羁蒀薇蚀芇莆薆螂聿节薆袄芅膈薅羇肈蒆薄蚆袀莂蚃蝿肆芈蚂袁衿膄蚁薁肄膀蚀螃袇葿蚀袅膃莅虿羈羅芁蚈蚇膁膇蚇螀羄蒅螆袂腿莁螅羄羂芇螄蚄膇芃莁袆肀腿莀羈芆蒈荿蚈聿莄莈螀芄芀莈袃肇膆蒇羅袀蒅蒆蚅肅莁蒅螇袈莇蒄罿膃芃蒃虿羆腿蒂螁膂蒇蒂袄羅莃蒁羆膀艿薀蚆羃膅蕿螈膈肁薈袀羁蒀薇蚀芇莆薆螂聿节薆袄芅膈

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论