已阅读5页,还剩4页未读, 继续免费阅读
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
外文翻译bridge construction techniquesthe final cost of a bridge is the sum of the cost of permanent materials,the proportionate cost to the project of plant and temporary works and the cost of labor .the cost of permanent materials can be estimated reasonably correctly.with experience,a bridge contractor can deal completely with cost of plant and temporary works .but the labor cost does not lend itself to exact analysis .recent competitive designs have attempted to introduce innovations in construction methods with a view to effect economy in the cost on labor by reducing temporary works and by minimizing the duration of site work.the suitable techniques of construction of bridge superstructure will vary from site to site,and will depend on the spans and length of the bridge, type of the bridge,materials used and site conditions. for instance, cast-in-site concrete construction could be adopted for short spans up to 40 m, if the river bed is dry for a considerate portion of the year, whereas free cantilever construction with prestressed concrete decking would be appropriate for long spans in rivers with navigational requirements. the current trend is towards the avoidance of staging as much as possible and to use precast or prefabricated components to maximum extent.also , construction machinery such as cranes and launching girders are coming into wider use . these are greater savings to be effected by paying attention to the method of construction even from the design stage than by attacking permanent materials .short span bridgesfor bridges involving spans up to 40 m , the superstructure may be built on staging supported on the ground . alternatively , the girders may be precast for the full span length and erected using launching girders or cranes,if the bridge has many equal spans.in the latter procedure , the additional cost on erection equipment should be less than the saving in the cost of formwork and in the labour cost resulting from faster construction .long span concrete bridgeslong span concrete bridges are usually of post-tensioned concrete and constructed either as conditions beams types or as free ver cantile structures . many methods have been developed for continuous deck construction . if the clearance between the ground and bottom of the deck is small and the soil is firm , the superstructure can be built on staging . this method is becoming obsolete . currently , free-cantilever and movable scaffold systems are increasingly used to save time and improve safety .the movable scaffold system employs movable forms stiffened by steel frames . these forms extend one span length and are supported by steel girders which rest on a pier at one end and can be moved from span to span on a second set of auxiliary steel girders .an economical construction technique known as incremental push-launching method developed by baur-leonhard team is shown schematically in figure 22.1. the total continuous deck is subdivided longitudinally into segments of 10 to 30 m length depending on the length of spans and the time available for construction . each of these segments is constructed immediately behind the abutment of the bridge in steel framed forms , which remain in the same place for concreting all segments .the forms are so designed as to be capable of being moved transversely or rotated on hinges to facilitate easy stripping after sufficient hardening of concrete. at the head of the first segment ,a steel nose consisting of a light truss is attached to facilitate reaching of the first and subsequent piers without including a too large can yilever moment during construction . the second and the following segments are concreted directly on the face of the hardened portion and the longitudinal reinforcement can continue across the construction joint . the pushing is achieved by hydraulic jacks which act against the abutment .since the coefficient of friction of teflon sliding bearings is only about 2 percent, low capacity hydraulic jacks would suffice to move the bridge even over long lengths of several hundred metres . this method can be used for straight and continuously curved bridges up to a span of about 120 m . the free-cantilever system was pioneered by dyckerhoff and willmann in germany .in this system , the superstructure is erected by means of cantilever truck in sections generally of 3.5 m .the cantilever truck ,whose cost is relatively small and which is attached firmly to permanent construction , ermits by repeated use the construction of large bridges . the avoidance of scaffold from below ,the speed of work and the saving in labour cost result in the construction being very economicdal . the free-cantilever system is ideally suited for launched girders with a large depth above the pier cantilever system is ideally suited for launched girders with a large depth above the pier cantilevering to the middle of the span .another technique is the use of the pneumatic caisson .the caisson is a huge cylinder with a bottom edge that can cut into the water bed . when compressed ar is pumped into it ,the water is forced out .caissons must be used with extreme care .for one thing, workers can only stay in the compression chamber for short periods of time .for another , if they come up to normal atmospheric pressure too rapidly ,they are subject to the bends ,or caisson disease as it is also called , which is a crippling or even fatal condition caused by excess nitrogen in the blood .when the eads bridge across the mississippi river at st.louis was under construction between 1867and 1874 , at a time when the danger of working in compresed air was not fully understood ,fourteen deaths was caused by the bends .when extra strength is necessary in the piers ,they sometimes keyed into the bedrock-that is ,they are extended down into the bedrock .this method was used to build the piers for the golden gate bridge in san francisco ,which is subject to strong tidies and high winds ,and is located in an earthquake zone .the drilling was carried out under water by deep-sea divers .where bedrock cannot be reached ,piles are driven into the water bed .today ,the piles in construction are usually made of prestressed concrete beams .one ingenious technique ,used for the tappan zee bridge across the hudson river in new york ,is to rest a hollow concrete box on top of a layer of piles .when the box is pumped dry ,it becomes buoyantenough to support a large proportion of the weight of the bridge (see fig.22.3). each type of bridge ,indeed each individual bridge ,presents special construction problems.with some truss bridges ,the span is floated into position after the piers have been erected and then raised into place by means of jacks or cranes .arch bridges can be constructed over a falsework ,or temporaryscaffolding.this method is usually employed with reinforced concrete arch bridges .with steel arches ,however ,a technique has been developed whereby the finished sections are held in place by wires that supply a cantilever support .cranes move along the top of the arch to place new sections of steel while the tension in the cables increases . with suspension bridges ,the foundions and the towers are built first .then a cable is run from the anchorage-aconcrete block in which the cable is fastened-up to the tower and across to the opposite tower and anchorage .awheel that unwinds wire from a reel quns along this cable .when the reel reaches the other side ,another wire is placed on it ,and the wheel returns to its original position .when all the wires have been put in place ,another machine moves along the cable to campact and to bind them .construction begins on the deck when the cables are in place ,with work progressing toward the middle from each end of the structure .the loads to be considered in the design of substructures and bridge foundations include loads and forces transmitted from the superstructure, and those acting directly on the substructure and foundation .aashto loads . section 3 of aashto specifications summarizes the loads and forces to be considered in the design of bridges (superstructure and substructure ) . briefly , these are dead load ,live load , impact or dynamic effect of live load , wind load , and other forces such as longitudinal forces , centrifugal force ,thermal forces , earth pressure , buoyancy , shrinkage and long term creep , rib shortening , erection stresses , ice and current pressure , collision force , and earthquake stresses .besides these conventional loads that are generally quantified , aashto also recognizes indirect load effects such as friction at expansion bearings and stresses associated with differential settlement of bridge components .the lrfd specifications divide loads into two distinct categories : permanent and transient .permanent loads dead load : this includes the weight dc of all bridge components , appurtenances and utilities, wearing surface dw and future overlays , and earth fill ev. both aashto and lrfd specifications give tables summarizing the unit weights of materials commonly used in bridge work .transient loads vehicular live load (ll) vehicle loading for short-span bridges :considerable effort has been made in the united states and canada to develop a live load model that can represent the highway loading more realistically than the h or the hs aashto models . the current aashto model is still the applicable loading.桥梁施工方法一座桥梁的最终造价是建造桥梁结构物的材料费用与这项工程相关的机械费用和临时工程及劳动力的费用的总和。材料的费用能够被预算的相当准确的,承包商们借助施工经验是能够估算施工机械和劳动力的费用的。但是劳动力的费用是不能够精确分析的。最近的一项比较有竞争力的设计试图通过减少临时工程和工程的工期来革新施工方法。桥梁上部结构比较适宜的施工方法将随施工场地不同而不同,并主要取决于桥梁的长度和跨度、桥梁的类型、基础条件及其所使用的材料。例如:现场浇注混凝土的施工方法适用于40米以下的短跨径桥梁,如果河床在一年中的大部分时间是干燥的,那么预应力混凝土悬臂施工方法在有通航要求的大跨桥梁中是比较合适的。现在的发展趋势是尽可能避免使用台架施工,而在最大程度上采用预制构件;另一方面,起重机、滑拽梁等施工机械的应用范围也越来越广。这些都是从对施工方法的密切关注甚至是设计过程的密切关注而取得的巨大收获,而不是在善于解决永久材料。小跨度桥梁当桥梁的跨度小于40米左右时,它的上部结构可以通过支承在地面上的趾甲施工。其它的施工方法中的梁可以整体预制,然后利用顶推梁或起重机架设。如果这座桥梁是等跨的,在后一种施工方法中,由于架设设备而增加的费用和由于施工工期短而减少的费用之和将会比前一种施工方法的模板制作费用低。大跨度桥梁大跨度桥梁经常是连续梁形式或悬臂梁形式的预应力混凝土桥梁。以前许多的施工方法已发展为连续梁桥的施工方法。如果模板和地面之间的距离较小并且土质坚硬,桥梁的上部结构可以使用支架施工方法。不过这种施工方法已经越来越过时了。目前,自由悬臂法和移动模架法的应用渐广并能节省时间和提高安全性。移动模架法是利用固定在钢制台架上的移动系统而形成,这种系统能够达到一跨长并支承在一端支承在桥墩上并借助于第二根钢导梁逐跨移动的钢梁上。一种经济的施工方法是被广泛知晓的由baur-leonhard团队所发展的使用广泛的顶推法。整个的连续梁被划分成10-30米长度的节段,这种划分主要依据跨径和能够利用的施工时间。每个节段在桥台后面的钢模上能够快速浇注,钢模可以周转使用而浇注所有的节段。这样设计模板是为了能够横向移动或在铰上转动,以便在混凝土充分硬化后脱模。在第一节段的顶端安装上一个由轻型桁架组成的钢导梁,以实现第一节段以后的节段顺利架设而防止在施工出现过大的悬臂部分。第二节段及以后的节段可以直接在第一节段的硬化面上浇注并在施工过程中将节段连接起来。顶推是通过支承在桥台上的液压千斤顶实现的,由于聚四氟乙烯的滑块的摩擦系数只有0.02,低效能的千斤顶就足够完成长度甚至达数百米的桥梁的顶推。这种方法可以应用在长度在120米左右的直线桥梁或曲线桥梁上。自由悬臂法是由法国的dyckerhoff和willmann所创始。这种施工方法中,桥梁的上部结构是通过节段长度基本在3.5米的悬臂机上施工,悬臂机的费用相对比较低并且固定在桥梁承重结构上,由于它的重复利用性使它能在长桥上使用。由于施工速度的加快和时间的节省使得这种施工方法的费用比较低从而避免了使用台架施工,自由悬臂法比较适用于桥墩较高并且悬臂能伸到跨径中部的桥梁上。另一种施工方法是整体沉箱法。沉箱是一种底边有刃脚的大型圆筒,其刃脚可以切入水底。当压缩空气进入沉箱内部时水就会被排出。沉箱的利用必须严加注意。首先,工人们只能在这种压缩空气的空间里呆很短
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 《诊断学胸部评估》课件
- 2024年黑龙江省《消防员资格证之一级防火考试》必刷500题标准卷
- 中级微观经济学范里安课件ch
- 2024年高考生物必修全部和选修1基础知识清单(以问题串形式呈现)含答案
- 单位管理制度集粹汇编【人事管理】十篇
- 《盆景制作与欣赏》课件
- 单位管理制度汇编大合集【人力资源管理篇】
- 高中语文文言文阅读部分
- 单位管理制度范例选集【职工管理】十篇
- 单位管理制度范例合集【人员管理】十篇
- 水利水电工程安全管理制度例文(三篇)
- 2025四川宜宾市南溪区属国企业招聘融资人员6人管理单位笔试遴选500模拟题附带答案详解
- DB45T 2048-2019 微型消防站建设管理规范
- SCTP大云云计算PT2题库【深信服】认证考试题库及答案
- 外研版(2024新版)七年级上册英语期末质量监测试卷 3套(含答案)
- 《测土配方施肥》课件
- 人教版2024-2025学年第一学期八年级物理期末综合复习练习卷(含答案)
- 职业健康检查管理制度
- 电梯维保管理体系手册
- 2024年国家电网招聘之通信类题库及参考答案(考试直接用)
- 第12课《词四首》课件+2023-2024学年统编版语文九年级下册
评论
0/150
提交评论