版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、Reading 1,Unit,4,The first underground in the world,Unit 4,课件描述:,本节课是阅读教学的第一课时,其目的是帮助学生获取有关世界上第一条地铁的信息并学会使用阅读旅游手册的相关技巧。,The first underground in the world.,What is used for?,a tourist brochure,When Who How Why,(dates),(famous people),(events),(reasons),The main ideas of the four parts,Part 1 reasons
2、 why the first underground in the world was developed. Part 2 developments of the first underground before World War . Part 3 some unusual uses of the first underground during World War . Part 4 expansion and popularity of the first underground system,Paragraph 1,Paragraph 2-4,Paragraph 5,Paragraph
3、6-7,This traffic problem led to ,In 1854, 1863 1938,Many underground stations functioned as ,System was enlarged, more lines were added ,reasons why the first underground in the world was developed,Trains,Only went to outer city limits( building railway tracks would have damaged ), were used to conv
4、ey people,Unfortunately, caused unbelievable traffic jams,Development of the LU system,The British government gave approval for the construction ,The initial tunnels were opened and were just beneath the surface of ground,The next section of the underground system was opened,linked up , provided , d
5、ug .,The digging was postponed because of the lack of money,Development of the LU system,A public organization was created,Many new stations were constructed,More people traveled on the underground , so the system was enlarged and more lines were added,The last line was added in honour of ,Who made
6、great contributions to improving the system?,Charles Yerkes,What did he do?,Undertook improving the system by obtaining ownership of many different lines and setting up the Underground Electric Railways of London.,Why did he do so?,Travelling on these lines was not convenient, though, as each line w
7、as possessed by a different company, many were far from each other.,Having seen the situation,Which of the followings is NOT the unusual use of the underground system during the Second World War?,A. Bomb shelter. B. An anti-aircraft centre. C. A hospital. D. Meeting rooms for the government administ
8、ration.,airplane factory,After the Second World War , more people traveled on the underground, so the system was _ and more lines were_. This included the Victoria Line which linked with other lines at almost every station. This helped made the system more _.,It means many of the lines are linked at
9、 many stations. Thus, it is very convenient for riders to go to different places.,added,user-friendly,enlarged,The last line added was the Jubilee Line in 1977, _ the twenty-fifth anniversary Elisabeth II becoming the queen.,in honour of,Now, the London underground system is very _.,The London underground system is working to transport millions of people,three million people travel on underground every day,includes twelve lines and goes twenty-six miles out of central London,popular,Consolidation,News conference about the first underground in the world,Discu
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 陕西艺术职业学院《医养康复与创业》2024-2025学年第二学期期末试卷
- 多晶硅制取工岗前生产安全培训考核试卷含答案
- 涂料涂覆工安全实践强化考核试卷含答案
- 硫漂工操作评优考核试卷含答案
- 地毯络筒工岗前技术创新考核试卷含答案
- 溶剂油装置操作工持续改进测试考核试卷含答案
- 农机服务经纪人岗前理论综合技能考核试卷含答案
- 井下采矿工岗前工作考核试卷含答案
- 电线电缆包制工岗前风险识别考核试卷含答案
- 货检值班员岗前流程考核试卷含答案
- 柴油发电机施工方案
- 药物临床试验质量管理规范(GCP)
- 《建筑工程设计文件编制深度规定》(2022年版)
- 2024NEA水性气硅涂膏隔热保温墙体构造
- 福建省预制装配式混凝土结构技术规程
- 物流外包与供应链管理课件
- 彭吉象 艺术学概论 讲义及彭吉象-艺术学概论笔记
- 角膜移植手术及护理课件
- 《热力发电厂》热力发电厂全面性热力系统
- 年产30万吨环氧乙烷建设项目可行性研究报告
- 异丁烷-安全技术说明书MSDS
评论
0/150
提交评论