文档简介

《特种设备安全技术》SafetyTechnologyofSpecialEquipment第一节

起重机械和塔式起重机安全技术

1.SafetyTechnologyofHoistingMachineryandTowerCrane一、起重机械安全技术1.

Safetytechnologyofhoistingmachinery

(1)起重机严禁超过本机额定起重量工作。如果用两台起重机同时起吊一件重物时,必须有专人统一指挥,两机的升降速度应保持相等,其重物的重量不得超过两机额定起重量总和的75%;绑扎吊索时要注意重量的分配、每机分担的重量不能超过额定起重量的80%。(1)Thecraneshallnotworkbeyondtheratedliftingcapacityofthemachine.Iftwocranesareusedtoliftaheavyobjectatthesametime,theremustbeaspeciallyassignedpersonforunifiedcommandtoensurethattheliftingspeedofthetwomachinesshallbekeptequalandtheweightoftheheavyobjectshallnotexceed75%ofthesumoftheratedliftingcapacityofthetwomachines.Payattentiontoweightdistributionwhenbindingslingsandtheweightsharedbyeachmachineshallnotexceed80%oftheratedliftingcapacity.

(2)在起重臂达到最大仰角和吊钩在最低位置时,卷筒上的钢丝绳应至少保留3圈以上。(2)Thesteelwireropeonthedrumshallbereservedforatleast3turnswhenthecraneboomreachesthemaximumelevationandthehookisinthelowestposition.第一节

起重机械和塔式起重机安全技术

1.SafetyTechnologyofCraneAndTowerCrane二、塔式起重机的安全装置2.Safetyequipmentoftowercrane

(1)力矩限制器-限制起重臂相应幅度起重量。(1)Torquelimiter-limittheliftingcapacityofthecorrespondingamplitudeofthecraneboom.

(2)重量限制器-限制最大起重量。

(2)Capacitylimiter-limitmaximumliftingcapacity.

(3)高度限制器-限制最大起升高度。

(3)Altitudelimiter-limitthemaximumliftingheight.

(4)变幅限制器-限制起重臂最大和最小幅度。(4)Luffinglimiter-limitmaximumandminimumamplitudeofcraneboom.

(5)回转限制器-防止塔机相同--个方向转动扭断电缆线。(5)Rotationallimiter-preventthetowercranefromrotatinginthesamedirectionandtwistingthecable.

(6)防脱绳装置-防止钢丝绳脱离工作位置。(6)Anti-droppingdeviceofrope-preventthewireropefromleavingtheworkingposition.

(7)小车防断绳装置-防止变幅绳断裂小车自由滑动。(7)Anti-rope-breakingdeviceoftrolley-preventtheluffingropefrombreakingandthetrolleyfromslidingfreely.

(8)小车防断轴装置-防止小车走轮断轴后坠落.(8)Anti-shaft-brokendeviceoftrolley-preventthetrolleyfromfallingaftertheaxleisbroken.

(9)各部位制动器-既是工作装置,又是安全装置。(9)Brakesofallparts-itisbothaworkingdeviceandasafetydevice.第一节

起重机械和塔式起重机安全技术

1.SafetyTechnologyofCraneAndTowerCrane

三、塔式起重机常见事故隐患3.Commonpotentialaccidentsofthetoweringcrane

1.违章操作造成的事故

1.AccidentsCausedbyIllegalOperation

(1)超负荷使用造成塔机事故。

(1)Towercraneaccidentscausedbyoverloaduse.

(2)违规安装、拆卸造成事故。(2)Accidentscausedbyillegalinstallationanddisassembly.

(3)基础不符合要求引发事故。

(3)Accidentscausedbydisqualifiedfoundation.

(4)塔机附着不当引发事故。(4)Accidentscausedbyimproperattachmentoftowercrane.

2.塔机疲劳和使用保养不当造成的事故

2.Accidentscausedbytowercranefatigueandimproperuseandmaintenance.

(1)钢结构疲劳造成关键部位母材产生裂纹或关键焊缝产生裂纹。

(1)Thefatigueofsteelstructurecausescracksinthekeypartsofbasematerialorcracksinkeywelds.

(2)连接螺栓疲劳、松动引发事故。(2)Accidentscausedbyfatigueandloosenessofconnectingbolts.第一节

起重机械和塔式起重机安全技术

1.SafetyTechnologyofHoistingMachineryAndTowerCrane四、塔式起重机基本安全要求

4.Basicsafetyrequirementsfortowercrane(1)起重机作业前,应检查轨道基础平直无沉陷,鱼尾板连接螺栓及道钉无松动,并应清除轨道上的障碍物,松开夹轨器并向上固定好。(1)Beforecraneoperation,thetrackfoundationshallbecheckedforstraightnessandnosubsidence,theconnectingboltsandspikesoffishplateshallnotloose,obstaclesonthetrackshallberemoved,andtherailclampshallbeloossenedandfixedupward.(2)提升重物做水平移动时,应高出其跨越的障碍物0.5m以上。(2)Whenliftingaheavyobjectforhorizontalmovement,itshallbemorethan0.5mhigherthantheobstacleitcrosses.(3)装有上、下两套操纵系统的起重机,不得上、下同时使用。(3)Cranesequippedwithupperandlowercontrolsystemsshallnotbeusedupanddownatthesametime.(4)作业中如遇6级及以上大风或阵风,应立即停止作业,锁紧夹轨器,将回转机构的制动器完全松开,起重臂应能随风转动。(4)Incaseofstrongwindorgustofforce6oraboveduringoperation,stoptheoperationimmediately,locktherailclamp,completelyreleasethebrakeoftheslewingmechanism,andthejibshallbeabletorotatewiththewind.(5)起重机作业时,起重臂和重物下方严禁有人停留、工作或通过。重物吊运时,严禁从人上方通过。严禁用起重机载运人。

(5)Duringcraneoperation,nooneisallowedtostay,workorpassunderthecraneboomandheavyobjects.Whenliftingheavyobjects,itisstrictlyprohibitedtopassoverpeople.Itisstrictlyprohibitedtocarrypeoplewithcranes.第二节

物料提升机、施工升降机安全技术

2.SafetyTechnologyofMaterialElevatorAndBuilder’sHoist

一、物料提升机的安装、使用及拆卸

1.Installation,useanddisassemblyofmaterialelevator1.安装

1.Installation

(1)提升机附墙装置的设置应符合设计要求,其间隔一般不宜大于9m,且在建筑物的顶层必须设置1组,附墙后立柱顶部的自由高度不宜大于6m。当提升机安装高度大于9m时,应及时加设一道附墙装置,并应随安装高度增加加设附墙装置,而在实际安装过程中经常是安装完后再加附墙装置,出现在安装过程中架体倒塌事故。另外,附墙装置与建筑结构的连接应采用刚性连接,并形成稳定结构,附墙架严禁连接在脚手架上。(1)Thesettingofthewallattachmentdeviceofthehoistshallmeetthedesignrequirements,theintervalshouldgenerallynotbegreaterthan9meters,andonegroupmustbesetonthetopfloorofthebuilding,andthefreeheightofthetopofthecolumnattachedtothewallshouldnotbegreaterthan6meters.Whentheinstallationheightofthehoistisgreaterthan9meters,awallattachmentdeviceshallbeaddedintime,andawallattachmentdeviceshallbeaddedwiththeincreaseoftheinstallationheight.Butintheactualinstallationprocess,thewallattachmentdeviceisoftenaddedaftertheinstallation,resultinginthecollapseoftheframeintheinstallationprocess.Inaddition,theconnectionbetweenthewallattachmentdeviceandthebuildingstructureshalladoptrigidconnectionandformastablestructure.Thewallattachmentframeshallnotbeconnectedtothescaffold.第二节

物料提升机、施工升降机安全技术

2.SafetyTechnologyofMaterialElevatorAndBuilder’sHoist

(2)提升机“四门”安装不全。物料提升机“四门”包括进料口防护门,卸料平台防护门和吊篮前门、后门,现在施工现场的物料提升机大多数只有吊篮前门,而缺少其他“三门”。为了使用安全,施工现场应保证“四门”齐全且正常使用。

(2)Incompleteinstallationof"fourdoors"ofthehoist.The"fourdoors"ofthematerialelevatorincludetheprotectivedoorofthefeedinlet,theprotectivedooroftheunloadingplatformandthefrontandreardoorsofthebasket.Atpresent,mostofthematerialhoistsontheconstructionsiteonlyhavethefrontdoorofthebasket,butlackother"threedoors".Inordertoensurethesafetyofusage,theconstructionsiteshallensurethatthe"fourdoors"arecompleteandinnormaluse.

(3)提升机在安装完毕后,必须经正式验收,符合要求后方可投人使用。同时,使用单位应对每台提升机建立设备技术档案备查,其内容应包括:验收、检修、试验及事故情况。

(3)Afterinstallation,thehoistmustacceptformalacceptanceandcanbeputintouseonlyaftermeetingtherequirements.Meanwhile,theusershallestablishequipmenttechnicalfilesforeachhoistforfuturereference,whichshallincludeacceptance,maintenance,testandaccidentconditions.第二节

物料提升机、施工升降机安全技术

2.SafetyTechnologyofMaterialElevatorAndBuilder’sHoist

2.拆卸2.Disassembly

井架式物料提升机的一般安装顺序:将底架按要求就位→将第一节标准节安装于标准节底架上→提升抱杆安装卷扬机→利用卷扬机和抱杆安装标准节→安装吊笼→穿绕起升钢丝绳→安装安全装置。物料提升机的拆卸按安装架设的反程序进行。

Generalinstallationsequenceofderrickmaterialhoist:Puttheunderframeinplaceasrequired→Installthefirststandardsectiononthestandardsectionunderframe→Hoistderrickinstallationwinch→Usethewinchandderrickforstandardsection

installation→Installthecage→Threadthehoistingwirerope→Installsafetydevices.Thedisassemblyofthematerialelevatorshallbecarriedoutaccordingtothereverseprocedureofinstallationanderection.第二节

物料提升机、施工升降机安全技术

2.SafetyTechnologyofMaterialElevatorAndBuilder’sHoist二、施工升降机的安全装置2.Safetydeviceofbuilder’shoist电缆保护架的安装间距不应大于6m。Theinstallationspacingofcableprotectionframeshallnotbegreaterthan6meters.三、施工升降机常见事故隐患3.Commonpotentialaccidentsofbuilder’shoist

(1)施工升降机装拆隐患。

(1)Hiddendangersofinstallationanddisassemblyofbuilder’shoist.

(2)施工升降机的司机未持证上岗。

(2)Thedriverofconstructionelevatordoesnotworkwithcertificate.

(3)不按设计要求及时配置配重。

(3)Thecounterweightisnotconfiguredintimeaccordingtothedesignrequirements.

(4)安全装置装设不当甚至不装。

(4)Improperinstallationorevennoninstallationofsafetydevices.

(5)楼层门设置不符要求。

(5)Thesettingofthefloordoordoesnotmeettherequirements.

(6)不按升降机额定荷载控制人员数量和物料重量。

(6)Thenumberofpersonnelandmaterialweightarenotcontrolledaccordingtotheratedloadoftheelevator.

(7)限速器未按规定进行每三个月一次的坠落试验。

(7)Thespeed-limitinggovernorfailstoconductthefallingtesteverythreemonthsasrequired.第二节

物料提升机、施工升降机安全技术

2.SafetyTechnologyofMaterialElevatorAndBuilder’sHoist

四、施工升降机的安装、使用及拆卸4.Installation,useanddisassemblyofbuilder’shoist

1.施工升降机的安装

1.Installationofbuilder’shoist

(1)安装单位的专业技术人员、专职安全生产管理人员应进行现场监督。

(1)Theprofessionaltechniciansandfull-timesafetyproductionmanagementpersonneloftheinstallationunitshallconducton-sitesupervision.

(2)当遇大雨、大雪、大雾或风速大于13m/s(6级风)等恶劣天气时,应停止安装作业。

(2)Incaseofsevereweathersuchasheavyrain,heavysnow,heavyfogorwindspeedgreaterthan13m/s(level6wind),theinstallationoperationshallbestopped.

(3)施工升降机金属结构和电气设备金属外壳均应接地,接地电阻不应大于40。(3)Themetalstructureofbuilder’shoistandthemetalshellofelectricalequipmentshallbegrounded,andthegroundingresistanceshallnotbegreaterthan40.第二节

物料提升机、施工升降机安全技术

2.SafetyTechnologyofMaterialElevatorandBuilder’sHoist

2.施工升降机的使用

2.Useofbuilder’shoist

(1)当电源电压值与施工升降机额定电压值的偏差超过士5%,或供电总功率小于施工升降机的规定值时,不得使用施工升降机。

(1)Whenthedeviationbetweenthepowersupplyvoltageandtheratedvoltageofthebuilder’shoistexceeds±5%,orthetotalpowersupplyislessthanthespecifiedvalueofthebuilder’shoist,thebuilder’shoistshallnotbeused.

(2)应在施工升降机作业范围内设置明显的安全警示标志,应在集中作业区做好安全防护。(2)Obvioussafetywarningsignsshallbesetwithintheoperationrangeofthebuilder’shoist,andsafetyprotectionshallbedoneinthecentralizedoperationarea.

(3)当建筑物超过2层时,施工升降机地面通道上方应搭设防护棚。当建筑物高度超过24m时,应设置双层防护棚。(3)Whenthebuildingexceeds2floors,aprotectiveshedshallbesetupabovethegroundpassageofthebuilder’shoist.Whentheheightofthebuildingexceeds24meters,adouble-layerprotectiveshedshallbeset.

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论