




版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
北京市地方标准
编号:DB11/TXXXX-20XX
备案号:
城市道路隧道设计标准
Designstandardsforurbanroadtunnels
20XX-XX-XX发布20XX-XX-XX实施
北京市规划和自然资源委员会
北京市市场监督管理局
目次
1总则...............................................
2术语...............................................
3基本规定...........................................
3.1隧道分类.....................................5
3.2设计速度....................................7
3.3设计年限....................................7
3.4建筑限界....................................7
4工程条件调查.......................................
4.1一般规定...................................11
4.2基础资料收集与调查.........................11
4.3工程地质、水文地质勘测.....................12
5总体设计...........................................
5.1一般规定...................................13
5.2总体设计要点...............................13
5.3横断面设计..................................15
6路线...............................................
6.1一般规定...................................18
6.2平面设计...................................18
6.3纵断面设计.................................19
6.4视距要求.................................21
7出入口.............................................
7.1一般规定.................................22
7.2出入口间距.................................22
7.3分合流设计.................................23
7.4变速车道设计...............................26
7.5隧道与地面道路衔接.........................27
8建筑...............................................
8.1一般规定...................................30
8.2总体设计...................................30
8.3建筑设计...................................31
8.4建筑结构...................................32
8.5建筑设备...................................33
8.6隧道装修设计与景观设计.....................34
9结构与防水.........................................
9.1一般规定...................................36
9.2明挖法隧道结构.............................39
9.3盾构法隧道结构.............................40
9.4矿山法隧道结构.............................46
9.5耐久性设计.................................47
9.6结构抗震...................................47
9.7结构防水...................................49
10排水系统..........................................
10.1一般规定..................................51
10.2隧道高水系统..............................53
10.3隧道低水系统..............................54
11通风系统..........................................
11.1一般规定..................................58
11.2设计标准..................................59
11.3隧道通风..................................60
11.4风道、风井、风机房........................60
11.5通风控制..................................61
11.6通风节能与环保............................61
12给水系统..........................................
13照明系统..........................................
13.1一般规定..................................64
13.2入口段照明................................65
13.3过渡段照明................................67
13.4中间段照明................................68
13.5出口段照明................................70
13.6紧急停车带和横通道照明...................70
13.7洞外引道照明..............................70
13.8光源和灯具................................70
13.9节能措施..................................71
13.10照明控制.................................71
14监控系统..........................................
14.1一般规定..................................73
14.2中央控制管理系统..........................74
14.3交通监控系统..............................75
14.4环境检测及设备监控系统...................75
14.5电力监控系统..............................76
14.6视频监控系统..............................76
14.7通信系统..................................77
15供配电系统........................................
15.1一般规定..................................79
15.2供电设施..................................79
15.3配电设施..................................81
15.4应急电源..................................82
15.5配变电所及发电机房........................82
15.6电线电缆..................................83
15.7接地和防雷................................83
16路面铺装..........................................
17交通安全设施......................................
17.1一般规定..................................87
17.2交通安全设施分级及设置标准...............87
17.3交通工程设施.............................88
17.4交通防护设施.............................94
17.5交通控制设施.............................95
18防灾、减灾........................................
18.1一般规定..................................97
18.2建筑防火..................................98
18.3疏散通道..................................99
18.4消防给水及灭火设施.......................101
18.5防烟和排烟设施...........................103
18.6火灾报警及消防联动系统...................104
18.7防灾通信系统.............................106
18.8防灾用电及应急照明.......................107
18.9隧道防淹涝...............................108
本标准用词说明...............................................
引用标准名录.................................................
条文说明..................................................
制订说明..........................................................
1总则......................................................
4工程调查条件..................................................
5总体设计......................................................
6路线.......................................................
7出入口.........................................................
8建筑.......................................................
9结构与防水....................................................
11排水系统.....................................................
12通风系统.....................................................
13照明系统.....................................................
14监控系统.....................................................
15供配电系统...................................................
16路面铺装.....................................................
17交通安全设施..................................................
18防灾、减灾...................................................
CONTENTS
1Generalprinciples...........................................................................
2Term................................................................................................
3Basicregulations............................................................................
3.1Tunnelclassification..........................................................5
3.2Speed..................................................................................7
3.3DesignLife.........................................................................7
3.4Constructionclearance.......................................................7
4Engineeringconditioninvestigation..............................................
4.1Generalprovisions............................................................11
4.2Basicdatacollectionandinvestigation..........................11
4.3Engineeringgeologyandhydrogeologicalsurvey..........12
5Overalldesign.................................................................................
5.1Generalprovisions............................................................13
5.2Overalldesignprinciples.................................................13
5.3Cross-sectionaldesign.....................................................15
6Route...............................................................................................
6.1Generalprovisions............................................................18
6.2GraphicDesign.................................................................18
6.3Profiledesign....................................................................19
6.4Sightdistancerequirements............................................21
7Entrance/Exit..................................................................................
7.1Generalprovisions............................................................22
7.2Distancebetweenentrancesandexits.............................22
7.3Splitandmergedesign.....................................................23
7.4Variablespeedlanedesign..............................................26
7.5Connectionbetweentunnelandgroundroad....................27
8Build...............................................................................................
8.1Generalprovisions...........................................................30
8.2Overalldesign..................................................................30
8.3Architecturaldesign.........................................................31
8.4Buildingstructure............................................................32
8.5Constructionequipment...................................................33
8.6Tunneldecorationdesignandlandscapedesign.............34
9StructureandWaterproofing..........................................................
9.1Generalprovisions...........................................................36
9.2Opencuttunnelstructure.................................................39
9.3Shieldtunnelingstructure................................................40
9.4Miningmethodtunnelstructure......................................46
9.5Durabilitydesign.............................................................47
9.6SeismicDesignofStructures..........................................47
9.7Structuralwaterproofing..................................................49
10Drainagesystem...........................................................................
10.1Generalprovisions.........................................................51
10.2Tunnelhighwatersystem..............................................53
10.3Tunnellowwatersystem................................................54
11Ventilationsystem..........................................................................
11.1Generalprovisions..........................................................58
11.2Designstandards............................................................59
11.3Tunnelventilation..........................................................60
11.4Airduct,airshaft,fanroom..........................................60
11.5Ventilationcontrol..........................................................61
11.6Ventilation,EnergyConservation,andEnvironmental
Protection...............................................................................61
12WaterSupplySystem....................................................................
13Lighting.........................................................................................
13.1Generalprovisions.........................................................64
13.2Entrancesectionlighting...............................................65
13.3Transitionlighting.........................................................67
13.4Intermediatelighting.....................................................68
13.5Exportsectionlighting..................................................70
13.6Emergencyparkingstripandcrosspassagelighting......70
13.7Lightingfortheapproachroadoutsidethecave...........70
13.8Lightsourceandlightingfixtures................................70
13.9Energy-savingmeasure.................................................71
13.10Lightingcontrol..........................................................71
14Monitorsystem.............................................................................
14.1Generalprovisions.........................................................73
14.2CentralControlManagementSystem............................74
14.3Trafficmonitoringsystem.............................................75
14.4Environmentaldetectionandequipmentmonitoring
system......................................................................................75
14.5Powermonitoringsystem...............................................76
14.6Videomonitoringsystem...............................................76
14.7Communicationsystem..................................................77
15Powersupplyanddistributionsystem..........................................
15.1Generalprovisions.........................................................79
15.2Powersupplyfacilities...................................................79
15.3Distributionfacilities.....................................................81
15.4Emergencysupply..........................................................82
15.5Substationandgeneratorroom.......................................82
15.6Wireandcable...............................................................83
15.7Groundingandlightningprotection..............................83
16Pavement.......................................................................................
17Trafficsafetyfacilities..................................................................
17.1Generalprovisions.........................................................87
17.2ClassificationandSettingStandardsforTrafficSafety
Facilities..................................................................................87
17.3Trafficengineeringfacilities..........................................88
17.4Trafficprotectionfacilities............................................94
17.5Trafficcontroldevice.....................................................95
18Disasterpreventionandmitigation...............................................
18.1Generalprovisions.........................................................97
18.2Buildingfireprevention.................................................98
18.3EscapeRoute.................................................................99
18.4Firewatersupplyandfireextinguishingfacilities.....101
18.5Smokepreventionandexhaustfacilities.....................103
18.6Firealarmandfirelinkagesystem..............................104
18.7Disasterpreventioncommunicationsystem................106
18.8Disasterpreventionelectricityandemergencylighting
...............................................................................................107
18.9Tunnelfloodprevention...............................................108
ExplanationofVocabularyinThisStandard.......................................................
Listofreferencestandards...................................................................................
Commentary.........................................................................................................
Developinstructions....................................................................................................
1Generalprinciples..................................................................................................
4Engineeringinvestigationconditions....................................................................
5Overalldesign.......................................................................................................
6Route......................................................................................................................
7Entrance/Exit........................................................................................................
8Build......................................................................................................................
9StructureandWaterproofing.................................................................................
11Drainagesystem....................................................................................................
12Ventilationsystem.................................................................................................
13Lighting................................................................................................................
14Monitorsystem....................................................................................................
15Powersupplyanddistributionsystem................................................................
16Pavement..............................................................................................................
17Trafficsafetyfacilities........................................................................................
18Disasterpreventionandmitigation......................................................................
1总则
1.0.1为适应北京市城市建设和发展的需要,规范城市道路隧道
工程设计,统一全市城市道路隧道工程设计主要技术指标,提高
工程设计品质,提升交通安全水平,制定本标准。
1.0.2本标准适用于北京市新建的城市道路隧道工程设计,改扩
建工程可参照执行。
1.0.3城市道路隧道工程设计应遵循安全可靠、经济合理、低碳
环保、以人为本、可持续发展的原则。
1.0.4城市道路隧道工程设计除应符合本标准外,尚应符合国家
现行有关标准的规定。
2术语
2.0.1设计工作年限designworkinglife
设计规定的结构或结构构件不需进行大修即可按预定目的使用
的年限。
2.0.2建筑限界buildingclearance
限定机动车、非机动车或行人通行的空间,即为隧道内任何设
施设置均不得侵入的轮廓线。
2.0.3紧急停车带emergencyparkingarea
隧道内供故障车辆检修或等待救援的停车区域。
2.0.4车行横通道crossforvehiclepassing
紧急情况下供救援车辆或人员出入的通道。
2.0.5人行横通道crossforpedestrianpassing
紧急情况下供人员逃生或救援人员出入的通道。
2.0.6出入口entranceandexit
在隧道主线上设置的供车辆驶出或驶入道路隧道主线的单向交
通路口,一般通过匝道与衔接道路连接。
2.0.7驼峰高度humpheight
在隧道洞口以外道路纵断凸起形成的高点与相邻低点的高差。
2.0.8高水防护系统preventionsystemofstormwater
dischargedbygravityattunnelentrance
在隧道洞口采取拦挡工程措施防止外部客水进入隧道。
2.0.9内涝防治设计重现期recurrenceintervalforurban
floodingdesign
用于应对城镇内涝防治系统设计的暴雨重现期,使地面、道路
等区域的积水深度和退水时间不超过一定的标准。
2
2.0.10设计内涝水位designfloodinglevel
在一定的设计工况条件下,结合地形、管渠、河道、泵站、蓄
涝区等排水防涝设施,采用设计降雨,经水文分析计算,并根据现
状情景和规划情景综合判断后,确定的用于指导工程规划、设计的
城镇内涝控制水位标高。
2.0.11高水系统stormwatersystemdischargedbygravity
隧道敞开段及其周边地势较高区域内可重力排出的雨水系统。
2.0.12低水系统watersystemdischargedbypump
隧道敞开段及隧道内无法重力排出,需经泵站提升排出的雨水、
冲洗废水、消防废水及结构渗漏水等的收集、调蓄、输送、提升系
统。
2.0.13雨水调蓄stormwaterdetention,retentionandstorage
雨水滞蓄、储存和调节的统称。
2.0.14防淹阻断设施floodpreventionandblocking
facilities
用于防止外水进入的设施。
2.0.15纵向通风longitudinalventilation
通风气流在行车空间沿隧道纵向的流动。
2.0.16重点排烟concentratedsmokeextraction
沿隧道长度方向设置排烟道,并间隔一定距离设排烟口。火灾
时,远程控制火源附近的排烟口开启,将烟气快速有效地排出行车
空间的排烟方式。
2.0.17应急照明emergencylighting
在隧道的正常照明电源失效时而启动的照明,并供人员疏散和
保障安全的照明。
2.0.18加强照明intensivelighting
3
为了降低车辆进出隧道时所产生的“黑洞效应”、“白洞效应”
所设置的附加照明。
2.0.19特殊灯光带speciallightstrip
为了给疏散逃生人员以醒目提示或引起驾驶人员视觉注意而设
置的特殊灯带。
2.0.20附属设施subsidiaryfacilities
为了满足使用功能或防灾而设置的通风机房、地面风亭、风塔、
变配电所、消防泵房、雨水泵房、废水泵房、管线、人行横洞、车
行横洞、避险设施、标志、标线、标牌等。
2.0.21立面标记elevationmarkers
隧道建筑限界范围以外,洞口侧墙立面或其他障碍物立面上
设置黄黑相间斜线经成的特殊标记。提醒驾驶人注意行车环境中
的结构物,以防止发生碰撞。
2.0.22实体标记entitytags
隧道建筑限界范围以内,中央分隔墩、实体导流岛及其他可
能对行车安全构成威胁的构筑物表面设置的黄黑相间斜线组成的
标记。
4
3基本规定
3.1隧道分类
3.1.1隧道根据服务对象可分为机动车专用隧道、机动车与人行
非机动车共用隧道、人行和非机动车隧道。
3.L2隧道根据服务车型可分为混行车隧道和小客车专用隧道。
3.1.3隧道可按封闭段长度分为4类,并应符合表3.1.3的规定。
表3.1.隧道长度分类
分类特长隧道长隧道中隧道短隧道
长度L(m)L>30003000^L>10001000^L>500LW500
注:L为封闭段的长度
3.1.4隧道宜根据其封闭段长度和预测单洞年平均日交通量按图
3.L4分为一、二、三、四、五5个等级。
(80000
p
/70000
n
j
d
)50000
30000
20000
10000
7000
5000
1002003005001000200030005000800010000
隧道封闭段长度5)
图3.1.4隧道工程分级图
3.1.5工程总体设计中,应根据隧道分级,按表3.1.5配置相应的
工程安全、运营管理设施。
5
表3.1.5隧道工程安全、运营管理设施配置
隧道分级
设施名称
—•二三四五备注
通风■■■■▲短隧道可不设置
排烟设施■■■■▲短隧道可不设置
通VI检测器■■■■
风co检测器■■■■
NO2检测器■■■■
风速风向检测器■■■■
正常照明■■■■■
昭应急照明■■■■▲
明洞口不设加强照
出入口亮度检测器■■■■▲
明的可不考虑
灭火器■■■■■
消火栓■■■■▲
泡沫消火拴▲▲
消
泡沫-水喷雾联用灭火系统■■▲
防
火灾探测器■■■■▲
手动报警按钮■■■■▲
火灾声光报警器■■■■▲
综应急电话■■■■▲短隧道可不设置
合有线广播■■■■▲
监视频监控■■■■▲
控可变信息标志■■■■▲
与可变限速标志■■■■▲
通车辆检测器■■■■▲
信车道指示器■■■■▲
6
续表3.1.5
隧道分级
设施名称
—•二三四五备注
计算机设备■■■■▲
显示设备■■■■▲
控制台■■■■▲
排
洪涝预警系统■■■■■
水
疏疏散救援设施详见本地标19章节
散
救疏散指示系统■■■■■
援
应设;▲——可设;/——不做要求
3.2设计速度
3.2.1隧道设计速度宜与两端衔接的地面道路采用相同的设计速
度,条件困难时,可降低一个等级,但速度差不宜大于20km/h;
除短距离隧道外,设计速度不宜大于80km/h,采用100km/h时应
开展经济性和安全性综合论证。
3.2.2隧道匝道的设计速度宜为主线的0.4倍飞.7倍。
3.3设计年限
3.3.1隧道的沥青路面结构设计工作年限不应小于15年,水泥混
凝土路面结构设计工作年限不应小于30年。
3.3.2隧道主体结构设计工作年限应为100年。
3.4建筑限界
7
3.4.1隧道的建筑限界内不得有任何物体侵入。
3.4.2隧道建筑限界宜与两端接线道路的建筑限界保持一致,不
一致时应设过渡段平顺衔接,同时应设置必要的指示、引导标志
及防撞设施等。
3.4.3当路面采用单向坡时,建筑限界底边线应与路面重合;当
采用双向坡时,建筑限界底边线应水平置于路面最高处。
3.4.4隧道建筑限界应为道路净高线和两侧侧向净宽边线组成的
空间界线(图3.4.4)o建筑限界顶角宽度(E)不应大于机动
车道或非机动车道的侧向净宽度。建筑限界组成最小值应符合表
3.4.4的规定。
8
(d)含有非机动车道和人行道(情况二)
图3.4.4隧道建筑限界
表3.4.4建筑限界组成最小值
建筑路绥带宽度(-)安全带缘石外
检修道建筑限界顶
限界设计速度设计速度宽度露高度
宽度(啊)角高度(H)
组成260km/h<60km/h(Wsc)(h)
取值0.25〜
0.500.250.250.750.50
(m)0.40
注:1当两侧设置人行道或检修道时,可不设安全带宽度。
9
2非机动车道路面宽度(Wpb)或人行道宽度(Wp)应符合现行行业
标准《城市道路工程设计规范》CJJ37的规定。
3.4.5隧道最小净高应符合表3.4.5的规定。小客车专用道最小
净高应采用一般值;条件受限时可采用最小值。
表3.4.5隧道最小净高
道路种类行驶交通类型净高(m)
•般值3.5
小客车
机动车道最小值3.2
各种机动车4.5
非机动车道非机动车2.5
人行或检修道人2.5
10
4工程条件调查
4.1一般规定
4.1.1工程条件调查应根据各设计阶段任务、目的、编制深度要
求,结合隧道结构类型、特点和规模,分阶段进行。
4.1.2工程条件调查范围应根据隧址所在区域条件和隧道工程规
模等确定。
4.1.3工程条件调查内容应包括基础资料收集与调查,工程地质、
水文地质勘测等。
4.2基础资料收集与调查
4.2.1隧道环境及场地资料收集应包括:
1.自然地理条件资料,包括隧址地区的气温气压、湿度、风
速、风向、降水量、雾日等,其中气温、风速、降水量应调查其
极端值;
2.地质资料,包括不良地质分布状况、区域地质灾害、地震
影响等;
3.现状及规划资料,包括道路交通、城市建设、港口码头、
航道运输、堤岸防护等;
4.环境资料,包括隧道附近大气环境现状、车辆废气排放要
求、噪声要求、水域生态保护要求以及隧道口外部环境亮度等;
5.现场施工条件资料,包括场地、供水供电、建筑材料来源、
装备和机械等。
4.2.2基础资料收集应包括隧址附近的已建或在建工程,尤其是
隧道和城市轨道交通等地下工程的地质和水文资料。
4.2.3基础资料应将与拟建工程有关的法律法规、方针政策要求
11
及各级政府出台的相关文件纳入收集范围。
4.2.4地形测绘应符合下列规定:
1.按设计阶段的要求,搜集或测绘地形图、线路横断面和纵
断面图等。
2.按规定设置测绘的平面及高程控制点。
3.地形测绘的范事一般应句括上下行遂道轴线外侧
50m^l00m范围,如设计有特殊要求,可调整测绘范围。
4各阶段测绘范围应涵盖隧道大型临时工程所需地形资料。
4.3工程地质、水文地质勘测
4.3.1工程地质和水文地质勘测可分为可行性研究勘察、初步勘
察和详细勘察,必要时进行补充勘察或专项勘察。
4.3.2工程地质资料应包括地形、地貌、工程地质、区域地震历
史、抗震设防烈度、设计地震分组、设计基本地震加速度等。
4.3.3水文地质资料应包括水位、波浪、流速、流向、水温、重
度、水质、河床演变等。
4.3.4隧道勘察的取样与试验需考虑施工工法的差异,进行与隧
道设计施工要求相关的非常规试验,并符合下列规定:
1.明挖法隧道宜进行标准贯入或十字板剪切等原位测试;
2.盾构法隧道宜进行岩土体的石英含量及岩石磨蚀强度测试;
3.矿山法隧道及盾构法隧道宜进行土体的渗透破坏测试;
4.3.5在钻探工作完成后,应使用特定材料和方法,对钻探孔及
时进行封孔回填。
12
5总体设计
5.1一般规定
5.1.1隧道应进行总体设计,总体设计应符合国土空间总体规划、
综合交通体系规划、地下空间规划的要求;处理好与地面交通、
城市历史风貌、城市空间环境的关系;处理好与市政管线、轨道
交通设施、综合管廊及地下文物等其他地下基础设施关系,合理
安排集约化利用地下空间。
5.1.2总体设计应贯穿于隧道设计的各个阶段,应系统、全面地
协调隧道工程项目外部与内部各专业间的关系,确定本项目及其
各分项的技术标准、建设规模、主要技术指标和设计方案,并应
符合安全、环保、可持续发展的总体目标。
5.1.3对于承担交通生命线廊道功能和应急疏散救援通道功能的
隧道,宜采用较高的技术指标,实现多灾种、多情境下的交通保
障功能。
5.1.4总体设计应包括下列主要内容:
1制定设计原则;
2确定技术标准、推荐线位、结构形式、施工工法;
3确定影响隧道施工和运营的风险源,并在设计和施工中采
取必要的技术措施,必要时开展隧道安全风险评估;
4对特长隧道应作防灾专项设计;
5对于长隧道、特长隧道及交通组织较为复杂的隧道,应进
行交通安全性评价。
6提出总体设计方案。
5.2总体设计要点
13
5.2.1隧
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 库房标识卡管理制度
- 弃土场公司管理制度
- 影像科设备管理制度
- 德州俱乐部管理制度
- 快递分拣机管理制度
- 快餐厅员工管理制度
- 急诊科设备管理制度
- 总经理提成管理制度
- 感官训练室管理制度
- 成品纸库房管理制度
- 结构动力学完整版本
- 2025年八年级数学下学期期末总复习八年级数学下学期期末测试卷(2)(学生版+解析)
- 四级阅读测试题及答案
- 农村供水水质管理制度
- 建筑工地应急预案方案
- T/CIE 208-2024儿童机器人教育评价指南
- 2025年高考英语课后续写高频考点话题分类第07讲 读后续写之成长类主题(讲义)
- 2025年广东中考百校联考语文试卷 2025年广东中考百校联考语文试卷
- 2025年公路市场调研报告
- 生物+2025云南新高考自主命题冲刺金卷及答案
- 糖尿病眼病试题及答案
评论
0/150
提交评论