文档简介
目录
1.概述....................................................1
1.1工程概况..........................................................1
1.2场内夕卜施工条件....................................................1
1.2.1水文气象...................................................1
1.2.2工程地质....................................................1
1.2.3交通条件....................................................1
1.2.4弃料场.....................................错误!未定义书签。
1.3合同项目的内容....................................................1
1.3.1工作内容....................................................1
1.3.2工程规模...................................................2
1.3.3工程项目...................................................2
1.4工程进度计划安排.................................................2
1.5施工特点及对策...................................................2
1.6布置原则.........................................................3
1.7施工条件.........................................................3
1.R施工辅助企业及主要临建设施布置..................................3
1.8.1混凝土拌和站...............................................3
1.8.2钢筋加工与模板修理车间车间................................4
1.8.3现场生产指挥中心...........................................4
1.8.4物资仓库...................................................4
1.8.5生活营地...................................................4
1.9施工道路布置.....................................................5
1.10施工供水、供风、供电及通讯布置.................................5
1.10.1施工供水..................................................5
1.10.2施工供风..................................................6
1.10.3施工供电..................................................6
1.10.4施工通讯..................................................7
1.11围堰布置.........................................................7
2.系统设计.................................................8
2.1设计原则及设计工艺...............................................8
2.1.1设计原则..................................................8
2.1.2设计工艺..................................................9
2.2供水系统设计与布置..............................................10
2.2.1取水泵站、吸水及压水管路的设计与布置.....................10
2.2.2水处理厂的设计与布置......................................11
2.2.3加压泵站、吸水及压水管路的设计与布置.....................12
2.2.4高位水池的设计与布置......................................12
2.3主要工程量清单..................................................13
2.4本系统的设计特点................................................17
2.4.1取水泵站取水方式的选定...................................17
2.4.2对因突然停电而形成“水锤”破坏的防范措施................18
3.施工总进度计划..........................................20
3.1编制原则与依据..................................................20
3.1.1编制原则.................................................20
3.1.2编制依据.................................................20
3.2施工进度安排....................................................20
3.2.1施工准备阶段进度安排......................................20
3.2.2水厂场平开挖、回填及道路工程进度安排.....................20
3.2.3平压水池、絮凝沉淀池、调节清水池、高位水池施工进度安排.....21
3.2.4取水泵房及配套变电所施工进度安排.........................21
3.2.5取水管道安装施工进度安排.................................21
3.2.6厂外给水管线施工进度安排.............................21
3.2.7厂外电气工程施工进度安排.................................21
3.2.8室外工程施工进度安排......................................21
3.2.9系统调试及验收工作进度安排...........................21
3.3关键线路分析....................................................21
3.4进度保证措施....................................................22
4.开挖、回填和支护工程.....................................23
4.1工程概况.........................................................23
4.1.1基本地质条件..............................................23
4.1.2取水泵站地质条件.........................................23
4.1.3水厂地质条件..............................................23
4.1.4高位水池地质条件.........................................23
4.1.5工程项目和工程量.........................................24
4.2施工布置........................................................24
4.2.1施工道路..................................................25
4.2.2围堰布置..................................................25
4.2.3施工供风布置..............................................25
4.2.4弃楂......................................................25
4.3土石方明挖施工..................................................25
4.4填筑施工........................................................26
4.5围堰施工.........................................................27
4.5.1回填渣料..................................................27
4.5.2回填......................................................28
46平洞开挖施工....................................................28
4.6.1洞挖施工工艺..............................................28
4.6.2洞挖爆破技术方案..........................................29
4.7竖井开挖施工....................................................29
4.7.1竖井开挖施工程序.........................................30
4.7.2竖井施工..................................................30
4.8支护施工.........................................................30
4.8.1砂浆锚杆施工..............................................3()
4.8.2工艺流程..................................................3()
4.8.3锚杆孔的钻孔..............................................31
4.8.4普通砂浆锚杆安装与注浆....................................31
4.8.5喷射混凝土及挂网施工......................................31
4.8.6工艺流程..................................................31
4.8.7喷混凝土施工.............................................32
4.8.8挂网喷射混凝土...........................................33
4.8.9排水孔施工...............................................33
4.8.10钻孔....................................................33
4.8.11PVC排水管安装..........................................33
4.9质量、安全与环境保护...........................................33
4.9.1质量控制措施.............................................33
4.9.2安全措施.................................................34
4.9.3环境保护.................................................34
4.10主要施工设备...................................................34
5.混凝土结构及砌体工程.....................................36
5.1工程概况.........................................................36
5.1.1施工内容..................................................36
5.1.2主要工程量................................................36
5.2结构设计情况.....................................................36
5.2.1构筑物设计................................................37
5.3碎施工...........................................................37
531钢筋制安..................................................37
5.3.2模板施工..................................................38
5.3.3埋件施工..................................................38
5.3.4碎浇筑....................................................39
5.4砌体工程........................................................41
5.4.1砌体材料..................................................41
5.4.2砌筑施工..................................................41
5.4.3洞口过梁及抗震加固措施....................................42
5.4,4圈梁、构造柱等税工程......................................42
5.5碎质量保证措施..................................................42
5.6碎缺陷修补措施..................................................43
6.道路、围墙与绿化工程.....................................44
6.1工程概况.........................................................44
6.2道路施工.........................................................44
6.2.1施工程序..................................................44
6.2.2施工方法..................................................45
6.2.3质量控制措施..............................................47
6.2.4施工机械配备..............................................47
6.3围墙及绿化施工..................................................48
6.3.1围墙施工程序..............................................48
6.3.2围墙施工方法..............................................48
6.3.3绿化施工..................................................48
7.建筑装修工程.............................................49
7.1工程概况.........................................................49
7.2工程说明........................................................49
7.3施工布置........................................................49
7.3.1水电供应..................................................49
7.3.2运输措施..................................................49
7.3.3排水、排污措施............................................50
7.4主要施工措施....................................................50
7.4.1砌体工程..................................................50
7.4.2砌体材料..................................................50
7.4.3砌筑施工..................................................50
7.4,4洞口过梁及抗震加固措施....................................51
7.4.5圈梁、构造柱等碎工程......................................51
7.5屋面工程........................................................51
7.5.1说明......................................................51
7.5.2屋面保温..................................................51
7.5.3屋面防水..................................................52
7.5.4质量要求..................................................52
7.6门窗工程.........................................................52
7.6.1施工范围..................................................53
7.6.2施工工艺..................................................53
7.7玻璃及其安装....................................................54
7.7.1说明......................................................54
7.7.2材料......................................................54
7.8抹灰工程........................................................54
7.8.1施工范围..................................................54
7.8.2施工工艺..................................................55
7.8.3施工方法..................................................55
7.9楼地面工程......................................................56
7.9.1施工范围.................................................56
7.9.2施工方法..................................................56
7.10涂料工程........................................................57
7.10.1施工范围.................................................58
7.10.2施工工艺.................................................58
7.10.3各部位油漆具体做法.......................................59
7.10.4施工质量与安全...........................................59
8.金属结构制安装...........................................60
81金属结构制作及安装..............................................60
8.1.1概述......................................................60
8.1.2金属结构制作的工艺要求....................................60
8.1.3金属结构安装的总体工艺....................................60
8.1.4金属结构制作和安装所需设备................................61
8.2管道安装.........................................................61
8.2.1概述......................................................61
8.2.2管道安装的总体工艺........................................61
8.2.3管道的具体安装工艺........................................62
8.2.4室外管道埋地与安装........................................62
8.2,5室内管道安装..............................................63
8.3管道安装所需设备................................................64
8.3.1管道安装工程量............................................64
9.机电设备安装............................................67
9.1概述.............................................................67
9.2设备配置和安装..................................................68
9.2.1设备配置..................................................68
9.2.2设备安装..................................................69
9.2.3安装场地及环境............................................69
9.2.4安装基础及预埋件..........................................70
9.2.5设备安装..................................................70
9.2.6试运转....................................................72
9.2.7资料整理..................................................73
10.供配电工程.............................................74
10.1概述..........................................................74
10.1.1合同工程内容............................................74
10.2施工总体布置...................................................74
10.2.1施工布置.................................................74
10.2.2供电电源.................................................74
10.2.3电气主接线...............................................75
10.2.4主要电气设备的选择......................................75
10.2.5电气布置.................................................76
10.2.6继电保护与二次接线......................................76
10.2.7水厂控制方案............................................76
10.2.8电度计量.................................................77
10.2.9电气照明.................................................77
10.2.10防雷接地系统...........................................78
10.3安装措施计划...................................................78
10.3.1安装措施.................................................78
10.3.2变压器安装、检查.........................................78
10.3.30.4KV开关设备安装.......................................79
10.3.4电缆桥架、电缆管安装.....................................79
10.3.5照明设施安装.............................................80
10.3.6接地系统.................................................81
10.4检查与验收.....................................................81
10.4.1配电变压器检查和验收....................................81
10.4.20.4KV开关柜、动力配电箱和照明配电箱检查和验收.........81
10.4.3电线电缆检查验收........................................82
10.5调试和试运行...................................................82
10.5.1单机调试和试运行.........................................82
10.5.2联动调试和试运行.........................................82
10.6主要电气工程量及设备表.........................................82
11.监控及通讯工程..........................................86
11.1工程概述........................................................86
11.2主要设备、设施.................................................86
11.2.1PLC控制系统..............................................86
11.2.2计算机监控系统...........................................86
11.2.3工业电视监控系统.........................................86
11.2.4通讯系统.................................................87
11.25电缆...................................................87
11.3施工措施......................................................87
11.3.1施工步骤.................................................87
11.3.2施工内容.................................................88
11.4技术质量保证...................................................89
11.4.1一般规定.................................................89
11.4.2电气坦件.................................................89
11.4.3盘柜安装.................................................91
11.4.4电缆敷设、连接..........................................91
11.4.5其它.....................................................92
11.5调试............................................................92
11.5.1对线.....................................................93
11.5.2PLC从站单机调试.........................................93
11.5.3中控室集控设备调试.......................................93
12.工程验收...................................................95
12.1工程验收程序...................................................95
12.2单元工程验收...................................................95
12.3分部分项工程验收...............................................96
12.4阶段(中间)验收...............................................96
12.5测试、试车及试运行.............................................97
12.5.1测试.....................................................97
12.5.2试车.....................................................97
12.5.3试运行...................................................97
12.5.4空载试运行8小时的资源投入..............................98
12.5.5系统负荷试运行的资源投入................................98
12.6竣工验收.......................................................99
12.7缺陷修复及交接.................................................99
12.7.1缺陷修复.................................................99
12.7.2保修期..................................................100
12.7.3交接....................................................100
13.水厂运行及维护............................................101
13.1工作内容......................................................101
13.2水厂管理机构...................................................101
13.3水厂运行.......................................................102
13.3.1组织措施................................................102
13.3.2系统运行................................................103
13.3.3自动化管理..............................................104
13.3.4激励与保障机制..........................................104
13.4水厂维护.......................................................105
13.4.1概述....................................................105
13.4.2抓好人员组织和培训工作..................................105
13.4.3建立完善的设备管理制度..................................106
13.4.4制订严格的设备管理措施..................................107
14.施工组织机构和资源配置................................110
14.1项目部组织机构.................................................110
14.2项目经理部职能部门职责........................................111
14.3主要施工机械设备..............................................112
15.质量、安全和环保措施..................................115
15.1质量管理.......................................................115
15.1.1质量管理体系............................................115
15.1.2质量策划.................................................115
15.1.3质量管理职责............................................117
15.1.4质量控制.................................................123
15.1.5质量保证.................................................123
15.1.6质量改进.................................................124
15.2安全管理.......................................................124
15.2.1安全管理目标............................................124
15.2.2安全生产保证体系........................................124
15.2.3安全生产管理与控制.....................................125
15.2.4项目工程安全技术措施...................................126
15.3环境保护措施..................................................128
1.概述
1.1工程概况
略
1.2场内外施工条件
1.2.1水文气象
略
1.2.2工程地质
略
1.2.3交通条件
1.2.3.1场外交通条件
略
1.2.3.2场内交通条件
略
1.3合同项目的内容
1.3.1工作内容
XX水电站生产水系统建设的工作内容为:
(1)取水泵站、水厂、输配水工程施工;
(2)取水泵站、水厂、输配水工程工艺设备材料的采购与安装;
(3)变配电、控制系统设备材料的采购与安装;
(4)XX水电站施工期供水系统的运行管理;
1.3.2工程规模
生产水系统总供水量为5.0万t/do
1.3.3工程项目
1.3.3.1取水泵站
取水泵站由取水泵站和泵站至水厂的输水管线组成。
1.3.3.2水厂
(1)水厂包括生产构(建)筑物、生产辅助及附属建筑物、各类管道和其他设
施。
(2)生产构(建)筑物:絮凝沉淀池、生产水池、送水泵房、变配电控制室、
加矶间及矶库。
(3)生产辅助及附属建筑物:办公室和值班室。
(4)各类管道:生产水管道、加矶管道、水厂自用水管道、排水管道1雨水管
道)、及电缆沟槽。
(5)其他项目:场地平整、边坡支护、进厂道路、厂区道路、绿化、照明、围
墙及大门。
1.3.3.3输配水工程
输配水工程包括:高位水池和输水管线。水厂的送水泵房出水管将水引至高位水
池,由高位水池自流通过输水管网向用户供水,输水管线敷设至左岸混凝土系统供水
点。
1.4工程进度计划安排
由于发包人计划本工程于2006年2月1口进场开工。我公司将于2006年6月1
日前使XX生产水系统具备供水条件;2006年8月1日前完成全部工程的建设任务;
供水系统运行至2011年12月31日;运行期间满足用户对水质、水量及水压的要求。
1.5施工特点及对策
(1)本标中各种管道铺设工程量大,按照设计要求和相关施工规范,在管道的
转角处设置止推墩或镇墩,确保其基础坚实牢固,确保管道铺设施工质量。
(2)本标开挖工程较为集中,主要分布在厂区和取水泵站,厂区明挖的安全警戒
对319国道而言是难点,施工中必须采取可靠的安全防护措施,作好爆破警戎;取水
泵站的竖井及平洞开挖受水位影响,需采用围堰挡水,在已定工期的前提下,需加大
施工管理力度,确保各节点工期的实现。
(3)厂外的输水管道安装,需要穿过319国道,319国道改线尚未投入使用,该路
段需继续承担大流量交通职能,在开槽施工时,拟采取设置道路施工警示牌、分半边
先施工半边交通等措施,以尽量减少对车辆通行的影响,不阻断交通。施工总布置
1.6布置原则
本标工程施工布置的主要原则是:
(1)所有临建设施及施工道路均按招标文件要求在合同征地范围内进行规划布
置。
(2)以场内施工道路布置为先导,后布置临建及生活设施。
(3)临时与永久紧密结合,按工程进度分期进行,力求紧凑实用、施工方便、
经济合理、节约用地。
(4)现场临建设施布置须满足防火、防盗及场地排水等要求。
1.7施工条件
根据招标设计图和招标文件,业主提供的设施有:4#公路(319国道)、下游地
方汽渡码头、神溪沟弃料场、XX水厂及取水泵站均由10KV左岸I和II线供电、施工
供水根据现场情况采取从乌江抽水的方式供水,施工场地内交通利用场地内设计的
永久道路,同时修建临时道路RI、R2和R3。
1.8施工辅助企业及主要临建设施布置
1.8.1混凝土拌和站
根据混凝土浇筑需要,在现场设混凝土拌和站一座,拌和站布置在水厂下游侧
BEFC平台。拌和站由水泥库、粉煤灰库、砂石料堆场等构成。拌和站占地面积为400m)
其中水泥库及粉煤灰库建筑面积分别为60而和40而,棚架结构;砂、石堆场面积
分别为10080m2,露天堆放。根据施工进度安排,本标段混凝土浇筑最大小时
强度为9m:t,因此拌和站布置1台0.75m,拌和机和2台JZC350型自落式混凝土拌和
机即能满足混凝土浇筑强度要求。此外,为满足砌体工程和建筑装修工程的需要,在
拌和站另外配备3台型号为HJ-200型砂浆搅拌机。拌制混凝土时,石子、砂以及粉
煤灰采用磅秤现场称量,
1.8.2钢筋加工与模板修理车间车间
根据本标段特点,拟在BEFC平台下游侧布置一小型钢筋加工和模板修理车间。
钢筋加工和模板修理车间占地总面积为500m2,钢筋加工和模板修理车间均为棚架结
构,建筑面积分别为ICOm?和50m3o钢筋加工车间设钢筋调直、切断机各一台,钢
筋弯曲机两台,计划加工能力为5t/班。修理车间设模板矫正机一台。
1.8.3现场生产指挥中心
为方便现场施工管理,布置现场生产指挥中心,生产指挥中心占地面积为200/。
现场指挥中心设前方值班室,前方值班室采用活动式集装箱,面积为301一。
1.8.4物资仓库
本标段多数设备及材料从业主仓库提出后一次性安装就位,少量不能及时安装的
设备及材料•,储存在临时物资仓库。临时物资仓库布置在BEFC平台,建筑面积100m%
1.8.5生活营地
在水厂下游侧BEFC平台为前方从事生产的职工建临时生活营地。生活营地设职
工临时住房、食堂、澡堂及厕所等。其中职工住房建筑面积4001n2、食堂面积为80痛,
厕所36m1澡堂为361n2,主要施工临建设施项目详见表IT。
表1-1主要临建设施表
建筑面
序号项目场地面积备注
积
1临时拌和站400m2100m2钢管架、竹夹板、彩条布
钢筋加工及模板修理100/
2500m2钢管架、竹夹板、彩条布
车间50m2
3前方生产指挥中心200m230m"集装箱
4职工住房400m2砖混结构
5食堂80m-砖混结构
6临时库房1100m2100m2砖混结构
7厕所36nlZ砖混结构
8澡堂36m-砖混结构
1.9施工道路布置
乌江XX水电站施工供水系统工程开挖施工主要利用4#公路(319国道)及开挖
的3条施工便道RI、R2和R3入各工作面进行施工。主要施工道路参数详见第四章。
1.10施工供水、供风、供电及通讯布置
1.10.1施工供水
本标主要供水项目有:主体工程混凝土拌和及养护、砌体工程、填筑碾压工程、
施工辅助设施用水及办公生活用水等。因施工期业主永久供水系统还未建成,为保证
系统前期开挖和建安用水,须设置一套临时供水系统,供水量设计为20nl3/h,水源采
用乌江取水为主。
临时水池布置在水厂225m平台附近高程230m左右,水源主要是取自乌江,由1
台QS20-50/_5.5水泵供水,取水高程约178m。临时水池为2个6n?的水箱。
主要工程量见表
表1-2施工期临时供水材料表
序号名称型号规格单位数量备注
1潜心泵QS20-50/3_5.5台1P=5.5KW
2储水池66钢板个2容量Q=6m3
3钢管4)50*3.5米1000
4钢管625*2.5米200
5塑料软管DN25米100
6闸阀DN50个5
7闸阀DN25个7
1.10.2施工供风
本标开挖项目比较分散,根据这一特点,在场平及净水构筑物基础开挖现场布
置1台20和3台12/移动式空压机供风。施工供风主要设备见表l-3o
表1-3施工供风设备表
序号名称型号单位数量备注
1移动式空压机20m3/min介1场平开挖
2移动式空压机12m3/min台3基础及洞室开挖
1.10.3施工供电
2.5.3.1施工供电概述
电源取自XX变电所10KV供电回路,采用架空线送到施工场地,在施工场地
安装电力变压器500KVA一台,低压配电柜三面,在场地内架设0.4KV供电线路,可
满足场地内所有设备及照明的供电。源水泵站供电敷设电缆到施工现场。偏远地段的
管路施工用电从临近单位取电源,在无电可取的地段将自备小型发电机一台,以满足
施工需要。
2.5.3.2施工供电主要设备材料
施工供电主要设备材料见表1-4。
表『4主要配电设备、材料表
序
名称规格型号单位数量备注
号
1电力变压器S9-500台1
210KV架空线路LGJ-3X35m300
3低压开关柜GGD面3
4橡套电缆yc-3X120+1X35m500
5橡套电缆yc-3X50+1X16m500
6橡套电缆yc-3X25+1X10m400
7橡套电缆yc-3X10+1X4m300
8空气开关DZ20Y-400
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 太阳风暴影响预测-洞察分析
- 微生物群落与呼吸系统疾病关联-洞察分析
- 微生物发酵化妆品-洞察分析
- 物联网在农业信息化中的应用-洞察分析
- 升旗仪式关于国庆的讲话稿(7篇)
- 土地价值评估与可持续发展-洞察分析
- 应用心理研究方法比较研究-洞察分析
- 网络直播营销研究-洞察分析
- 医生副高职称评审个人工作总结范文(7篇)
- 《智创合业介绍》课件
- 2024年-电大《中央银行理论与实务》期末复习资料(作业、蓝本、学习指导(黄本)、试卷)8
- 2024年度物业管理服务合同纠纷调解协议3篇
- 2023年肝糖原的提取鉴定与定量实验报告
- 房地产开发基本流程(图解)
- 校园生活搞笑小品剧本
- 大型能源集团公司信息化规划(二)数据架构规划课件
- 中国医院质量安全管理 第4-6部分:医疗管理 医疗安全(不良)事件管理 T∕CHAS 10-4-6-2018
- 2.秸秆和落叶的有效处理课件
- 提高玻璃幕墙擦窗机轨道安装质量
- T∕CEMIA 020-2019 显示面板用N-甲基-2-吡咯烷酮
- 注塑机冷却水系统工程
评论
0/150
提交评论