版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
知名建筑企业
钢筋工程优化方案锦集
编制:_________________
审核:_________________
审批:_________________
202x年xx月
第一部分钢筋技术优化
1.1通用部分.........................................................8
1.钢筋接头优化.................................................8
2.钢筋代换.....................................................8
3.钢筋机械锚固.................................................9
4.钢筋级别变更................................................10
5.基础底板马凳筋形式优化.......................................11
6.结构措施钢筋优化.............................................12
7.型钢马凳支撑梁代替筏板同向钢筋..............................13
8.成品马凳代替钢筋马凳.........................................14
9.钢筋原材采购优化.............................................14
10.现场钢筋余料利用..........................................15
1.2基础............................................................16
11.梁板式筏型基础顺梁底方向板筋优化............................16
12.筏板增加钢筋网片优化.........................................16
13.桩承台范围内地梁箍筋优化....................................17
14.筏板高差处钢筋优化...........................................18
15.桩长变更减少钢筋废料.........................................19
16.支护桩钢筋笼增加三角支撑钢筋优化............................19
17.支护结构钢腰梁优化为混凝土腰梁..............................20
18.基坑支护钢筋网长度优化.......................................21
19.平板式筏基钢筋排布细节优化..................................22
20.塔吊基础深化策划.............................................23
21.后浇带采用跳仓法施工.........................................24
22.抗浮锚杆钢筋技术优化.........................................25
1.3柱..............................................................26
23.型钢混凝土柱模板优化.........................................26
24,型钢柱箍筋和拉筋施工优化....................................27
25.变径套筒优化.................................................27
1.4墙.................................................................29
26.梯子筋代替墙体竖向钢筋优化..................................29
27.墙体顶模棍优化................................................29
28.墙体筏板内水平定位筋优化....................................30
29.圈梁代替门窗过梁优化.........................................31
30.钢板墙拉筋与钢板连接方式优化................................32
1.5梁.................................................................33
31.梁纵向钢筋连接接头优化.......................................33
32.不同直径钢筋搭接改为同直径钢筋搭接..........................33
33.梁二排筋垫铁优化.............................................34
34.核心筒钢骨梁上剪力墙竖向钢筋优化............................35
1.6板.................................................................36
35.混凝土反坎墙下无梁处加筋优化................................36
36.现浇板内薄壁方箱措施钢筋优化................................37
37.抗裂钢筋网片的应用优化.......................................38
38.转换层暗支撑纵筋优化.........................................39
39.楼层板内暗梁处节点优化.......................................39
40.无梁板带板筋统一方向、变径套筒连接优化......................40
41.刚性地面框柱箍筋加密.........................................41
1.7其它...............................................................43
42.增加构造柱优化................................................43
43.改预留钢筋为预埋铁件.........................................43
44.二次结构图纸深化..............................................44
45.构造柱变更芯柱................................................45
46.结构后植筋优化................................................46
47.砌体拉结筋优化................................................47
48.超长结构加设预应力钢筋.......................................48
49.楼梯钢筋优化..................................................48
50.后砌附属墙优化为与主体整体施工..............................49
第二部分钢筋放样优化
2.1通用部分...........................................................51
51.钢筋允许偏差值................................................51
52.钢筋机械锚固弯钩优化..........................................52
53.钢筋下料合理搭配..............................................53
54.钢筋下料长度优化..............................................53
55.锚固区保护层大于5D时,锚固修正系数为0.7...............55
56.盘螺或盘圆钢筋数控调直优化..................................56
2.2基础...............................................................57
57.独立基础底板配筋长度缩尺10%.............................57
58.基础梁竖向加腋钢筋选型........................................58
59.基础底板分布钢筋布貉优化....................................58
60.取消筏板底筋在桩承台中贯通布貉..............................59
61.相同类别条形基础十字相交时受力钢筋布貉范围.................60
62.筏板封边构造策划..............................................60
63.封闭箍筋组合承台严禁双开口套插下料..........................61
64.后浇带钢筋优化................................................62
65.筏板内斜坡水平筋间距优化.....................................63
66.集水坑多层网片底筋的计算.....................................63
67.筏板变截面钢筋锚固优化........................................64
68.筏板钢筋端头锚固优化..........................................65
69.筏板高低互相锚固位貉优化.....................................65
70.基础底板马镜筋布络策划........................................66
71.马凳筋借用筏板钢筋............................................67
72.型钢马凳支撑梁代替筏板同向钢筋..............................68
73.承台梁箍筋优化................................................69
74.基础梁与柱结合部侧腋构造分布筋优化..........................69
75.基础底板上铁遇型钢柱的变化..................................70
76.斜交筏板钢筋施工优化..........................................71
2.3柱.................................................................72
77.箍筋化尺寸优化................................................72
78.带中间层钢筋网片筏基柱插筋优化..............................72
79.框架柱柱顶钢筋锚固长度优化..................................73
80.柱子主筋下料策划..............................................74
81.圆柱箍筋的拉筋弯钩优化........................................75
82.柱箍筋复合方式优化............................................76
83.中柱顶层节点策划..............................................77
2.4墙.................................................................78
84.基础插筋贯通楼层,减少钢筋接头..............................78
85.暗柱竖向钢筋下料优化..........................................79
86.约束边缘构件箍筋肢替代拉筋..................................80
87.约束边缘钢筋优化..............................................80
88.基础较厚时墙体竖向插筋优化..................................82
89.墙体水平筋优化................................................82
2.5梁.................................................................84
90.框架梁底排筋贯通布辂..........................................84
91.非框架梁的末端锚固优化........................................85
92.正确理解梁腹板高度,取消侧面构造钢筋........................86
93.梁附加吊筋的下料优化..........................................86
94.梁支座处钢筋放样优化..........................................88
95.梁相交附加箍筋数量优化........................................89
96.梁上部贯通筋接头排布优化....................................89
97.框架梁内架立筋优化............................................90
2.6板.................................................................92
98.板筋起步间距优化..............................................92
99.负筋尺寸优化..................................................93
100.弧形板板筋间距策划...........................................93
101.挑板钢筋优化..................................................94
102.压型钢板钢筋优化.............................................95
103.折板锚固钢筋使用弯折钢筋替换..............................96
2.7其它............................................................97
104.室外楼梯部位钢筋节点优化..................................97
第三部分钢筋精算优化
3.1通用部分........................................................98
105.钢筋弯钩计算方式.........................................98
106.易受扰动钢筋优化.........................................99
107.构件纵向钢筋搭接接头百分率..............................99
108.避免漏算搭接区的加密箍筋...............................100
109.箍筋弯钩抗震优化........................................101
110.钢筋连接方式优化...........................................102
111.钢筋比重设络...............................................103
112.钢筋根数设辂优化........................................103
113.大直径钢筋的定尺优化.......................................104
3.2基础...........................................................106
114.独立基础底板配筋优化.......................................106
115.底板人防与非人防交界处钢筋优化.........................106
116.筏板钢筋的布筋技巧......................................107
117.用筏板绘制桩承台优化....................................108
118.筏板斜坡面钢筋优化......................................108
119.后浇带附加钢筋.............................................109
120.承台间基础梁的支座设辂..................................110
121.后浇带钢丝网骨架钢筋....................................110
122.下柱墩的拉筋计算........................................111
123.分段绘制排水沟.............................................112
124.无梁板带软件钢筋计算优化...............................113
125.筏板封边构造钢筋........................................114
126.下柱墩内的马凳计算......................................114
127.柱墩遇筏板变截面时计算优化.................................115
128.筏板附加钢筋优化.............................................116
129.人防底板斜坡处缩尺拉筋......................................116
130.筏板放射筋...................................................117
131.复杂集水坑计算优化...........................................118
132.集水坑底筋斜坡长度计算......................................119
133.下柱墩、承台遇筏板高差时优化...............................119
134.桩承台基础分布筋计算错误...................................120
3.3柱.............................................................122
135.柱竖向钢筋在楼层间锚固....................................122
136.边角柱在"11G101T”的特殊要求...........................123
137.抗震边、角柱柱顶纵向钢筋构造.............................123
138.避免漏算柱子附加钢筋......................................124
139.螺旋箍筋起始位辂应有水平段...............................125
140.柱插筋内水平筋优化...........................................126
141.柱墩内钢筋是否扣减筏板钢筋...............................127
142.柱加腋箍筋优化...............................................128
143.箍筋排布方式优化.............................................129
144.刚性地面柱籁筋加密...........................................130
3.4墙.............................................................131
145.墙身纵向钢筋搭接..........................................131
146.剪力墙水平钢筋在暗梁处计算优化...........................132
147.剪力墙拐角外侧钢筋连接..................................132
148.暗柱封顶剪力墙插筋优化....................................133
149.墙体变截面时软件的正确处理...............................134
150.连梁拉钩正确处理.............................................135
151.连梁侧面钢筋计算优化......................................135
152.软件对剪力墙中特殊节点的正确处理........................136
153.剪力墙水平钢筋拐角处搭接...............................137
154.拉筋布貉方式优化.............................................137
155.连梁内侧面钢筋优化...........................................138
156.连梁设辂.....................................................139
157.剪力墙布貉优化...............................................140
3.5梁...............................................................141
158.梁支座第三排钢筋长度在软件中的设珞......................141
159.梁箍筋加密区优化.............................................141
160.带部分抗震墙框架梁箍筋设貉...............................142
161.框架梁下部钢筋锚固优化....................................143
162.梁钢筋锚固优化...............................................144
163.多跨梁在高差处支座钢筋锚固...............................145
164.屋面折梁打断布络..........................................145
165.悬挑梁上部钢筋节点选择与原位标注........................146
166.梁的布辂优化.................................................147
3.6板...............................................................148
167.板分布筋间距计算优化......................................148
168.板洞附加筋优化............................................148
169.楼层板钢筋分块布貉........................................149
170.隔墙加筋支座锚固优化.........................................150
171.板筋布辂优化.................................................150
172.分层绘制板通长筋与负筋....................................151
173.降板节点钢筋计算..........................................152
174.板洞加筋计算优化..........................................152
175.板筋复制.....................................................153
176.柱上板带下部钢筋在端支座处的做法........................154
3.7其他..............................................................155
177.楼梯休息平台钢筋布辂......................................155
178.钢筋等截面代换优化........................................155
179.汽车坡道“U”字型或“回”字型钢筋优化...................156
180.构造柱设貉优化...............................................157
第一部分钢筋技术优化
1.1通用部分
1.钢筋接头优化
⑴优化背景:某工程钢筋综合单价包括的内容:钢筋的采购运输,
钢筋(网、笼)制作、运输、安装,钢筋的损耗、接头(不含套
筒或电渣压力焊接头)或搭接等一切内容。
⑵优化实施:由于搭接的钢筋工程量不计,项目部在满足规范的
前提下,经与设计单位沟通,进行设计变更如下:直径16mli以下
的钢筋采用搭接,直径16mm及以上的钢筋采用直螺纹套筒连接。
⑶实施效果:通过优化,实现降本增效。
④提示:熟悉合同约定,掌握钢筋综合单价包含的内容,提前策
划。
2.钢筋代换
(1)优化背景:工程施工过程中常出现钢筋供应不及时、某类成品
钢筋库存量大、需考虑钢筋成本等情况,在满足施工进度、质量、
效益前提下,利用钢筋代换可解决上述问题。
⑵优化实施:钢筋代换前应与发包人沟通,强调因某钢筋型号供
货不足、影响进度等因素,争取发包人、监理、设计同意方可实
施。代换办法有两种:①钢筋以高强度钢筋代换低强度钢筋,此
代换后钢筋量变小,结算时仍按代换前图纸计量;②钢筋以低强
度钢筋代替高强度钢筋,此代换后钢筋量变大,结算时以代换后
设计变更计量。
⑶实施效果:某梁主筋原设计为4B20,拟用018的钢筋代换,
22
应用等强度法计算:n2>4*18*360/20*310=3.76(具体公式详见
《混凝土结构设计规范》GB50010-2010),取nM根,即代换为
4①18,通过代换节余钢筋用量。
(4)提示:钢筋代换方式、部位等须经发包人、监理及设计单位同
意后实施。对有抗震要求的框架,不宜用强度等级高的钢筋代替
设计中的钢筋,造价对比时还需考虑不同级别钢筋的价差。
3.钢筋机械锚固
⑴优化背景:工程施工时,通常采用直锚或90°弯锚形式,这两
种形式容易造成梁-柱节点区的弯折或弯钩钢筋拥挤、混凝土浇筑
困难,构件尺寸可能不满足锚固长度要求等。
②优化实施:当工程中采用高强度、大直径钢筋时,为方便施工、
降低成本,经项目部综合比较后,采用“UGlOl-rP53页螺栓锚
头形式进行机械锚固。
图1-1
(3)实施效果:通过优化,方便施工,实现降本增效。
⑷提示:①钢筋机械锚固性能良好、节约锚固用钢材、缓解钢筋
拥挤、加快施工速度、提高混凝土浇筑质量、为设计人员解决特
殊工况的钢筋锚固问题提供新方法。②机械锚固虽已编入
"GB50010-2010",并已有行业标准《钢筋锚固板应用技术规程》
(JGJ256-2011),但仍属较新技术,施工时需与发包人、监理及
设计沟通,经同意后实施。③使用机械锚固前需进行成本分析。
④清单报价中,若钢筋为亏损项,可创造条件,优化为机械锚固
获得重新报价机会。
4.钢筋级别变更
⑴优化背景:某工程原设计结构二级钢和三级钢混合使用,二级
钢主要用于锚杆钢筋、框架柱箍筋、暗柱箍筋、剪力墙钢筋、外
墙水平分布筋、外墙竖向分布筋及人防结构部分,钢筋用量大,
投标报价采用不平衡策略,二级钢报价比三级钢报价低1520元/t。
(2)优化实施:项目部针对优化背景进行了详细策划,向发包人及
设计单位发出钢筋级别变更理由:国家政策、新版国标规范都明
确推广使用高强钢筋,应用高强钢筋是落实中央节能减排部署的
重要措施之一,建设工程使用高强钢筋能够降低钢筋用量,相应
减少钢铁生产的能源资源消耗和污染物排放,实现国家年均节能
目标的2%;应用高强钢筋是绿色建筑行动方案的重要内容,有助
于带动建设领域科技创新。并最终得到发包人及设计单位的认可。
⑶实施效果:通过钢筋变更优化,实现降本增效。
(4)提示:与发包人及设计单位提前充分沟通,为变更留出充裕时
间。
5.基础底板马凳筋形式优化
(1)优化背景:某工程地下3层、地上8层、框架剪力墙结构、建
筑面积24万平方米、基础底板厚度为1000mm,原方案基础底板马
镣筋为025的“几”字型马凳筋,纵横向间距分别为1500mm。
(2)优化实施:项目部对底板马凳筋进行优化,经比较采用“卜”
字型马镣筋与架立筋焊接代替“几”字型马凳筋布貉方案。
⑶实施效果:通过优化,减少措施钢筋的使用。
⑷提示:应提前优化,结算时仍按优化前的施工方案计量。
6.结构措施钢筋优化
⑴优化背景:本工程建筑面积大,体量大,合同单价包含了措施
钢筋。考虑到现场同时使用了一部分图纸外的措施类钢筋,无法
得到业主的确认,组织商务、技术等部门对措施钢筋进行了相应
优化。
⑵优化实施:根据《建设工程工程量清单计价规范》(GB
50500-2013)中关于支撑类钢筋介绍,“现浇构件中固定位貉的支
撑钢筋……结算时按现场签证数量计算”。在主体结构施工方案中
编写关于支撑钢筋(措施筋)的相关内容,包括墙内梯子筋、框
架柱内定距框位箍筋、梁垫铁、后浇带支撑网片等。避开措施筋
字眼,引入支撑钢筋概念与清单描述一致,以现有规范为依据计
取此部分工程量。
图1-3
⑶实施效果:通过优化,确保措施钢筋得以计量。
⑷提示:针对定额计价工程,应注意结构措施钢筋在施工方案中
的有效体现;针对清单计价工程,应结合合同单价中包括的措施
钢筋类别,有针对性地进行优化,如清单措施费中包含了马登筋,
则应加强对定位钢筋、支撑筋、垫铁等的优化。
7.型钢马凳支撑梁代替筏板同向钢筋
(1)优化背景:本工程塔楼底板钢筋的面层钢筋需要搭设必要的支
架,将钢筋架空,以保证面筋的位貉符合要求,塔楼底板设计参
数见下表:
楼号底板普遍厚度底板最大厚度面筋布貉
A22.1m6.115m双层4>28@160
A32.2m6.5m双层。28@160
⑵优化实施:项目部采用型钢支撑设计了钢筋支架,经论证,支
架面层通长方向的支撑钢梁可取代相应位貉的面层受力钢筋。
图1-4
(3)实施效果:
A2、A3塔楼底板马镣上铁代替同向主筋(①28间距2.5米):
A2塔楼:63.04m92.5=25根;
25根*39.57M=989m*4.83kg/m=4776kg
A3塔楼:62.35m+2.5=25根;
25根*38.25M=956m*4.83kg/m=4617kg
共计节省钢筋量9.393吨。
⑷提示:与相关部门沟通协调,做好放样交底工作。
8.成品马凳代替钢筋马凳
(1)优化背景:某工程框架结构,建筑面积31万m,楼板厚120mm,
施工组织设计中采用钢筋马凳,马凳钢筋规格同板筋,间距1米。
⑵优化实施:施工前,项目部对钢筋马凳和成品马凳进行了成本
比较:劳务班组耗用项目钢筋制作钢筋马凳,而成品马凳安装方
便,效果良好,且在分包合同中约定由分包自行采购,综合比较
选用成品马凳。
⑶实施效果:通过优化,实现降本增效。
⑷提示:成品马凳施工时注意保护,避免踩踏损坏。
9.钢筋原材采购优化
(1)优化背景:某工程地上14层、高度为42.9m,框架剪力墙结构、
建筑面积99660m2,地下室底板钢筋直径较大,用量大。
⑵优化实施:一般钢筋原材长度9m,为节约钢筋损耗及套简使用
量,与钢材厂家或供应商沟通,采购长度12m的地下室底板主筋。
⑶实施效果:通过优化,实现降本增效。
⑷提示:钢筋用量大时,与供应商沟通,定尺供货。
10.现场钢筋余料利用
(1)优化背景:对建筑面积大、工期紧、结构复杂、异形结构多、
钢筋型号大等工程,若对现场钢筋管理不到位,工程收尾时会产
生大量短料钢筋无法使用,最终以废料处理,造成材料浪费。
⑵优化实施:施工前认真查阅图纸,提前掌握各个构件的钢筋型
号,结合现场钢筋短料的规格、数量,将短料钢筋用直螺纹(直
径16mm以上钢筋)或者闪光对焊(直径14mm以上钢筋)连接成
6m以上长度用于施工中,降低钢筋下料损耗。
图
余料套筒连接余料闪光对焊连接
⑶实施效果:通过优化,实现降本增效。
⑷提示:本案例所述钢筋更适合用于分布筋、腰筋等非主要受力
构件。
1.2基础
11.梁板式筏型基础顺梁底方向板筋优化
(1)优化背景:某工程基础采用筏板基础+基础梁,基础梁底标高
同筏板底标高,如图2T。
(2)优化实施:根据“11G101-3”P69页注1和“13G101T1"P91
页:当条形基础设有基础梁时,基础底板的分布钢筋在梁宽范围
内不设骼,如图2-2o本工程图纸设计梁宽范围内基础钢筋与梁底
部钢筋重复布貉。施工时按图集,结算时按原图纸计量。
图2-1图2-2
⑶实施效果:通过优化,实现降本增效。
⑷提示:与相关部门沟通协调,做好交底工作。
12.筏板增加钢筋网片优化
⑴优化背景:某工程为筏板基础,厚度2000mm,根据“11G101-3”
与“12G901-3”,与发包人、设计院沟通,通过图纸答疑,增加筏
板基础钢筋网片,减少柱及墙体伸入基础的锚固长度。
⑵优化实施:通过策划,根据“12G901-3”,在筏板中增加一层
钢筋网片,现场施工时,在增加钢筋网片的同时减少柱和墙竖向
钢筋锚固到基础的钢筋数量。结算时,按照已确认的图纸答疑和
“HG101-3”P59页的构造要求计量。
(3)实施效果:通过增加钢筋网片,节约柱墙竖向插筋工程量。
⑷提示:提前与发包人及设计院的沟通。
13.桩承台范围内地梁箍筋优化
(1)优化背景:某工程基础采用桩基础+防水筏板,桩基础由桩承
台+基础梁组成。
(2)优化实施:施工前通过图纸会审,将图纸中的基础梁明确为基
础连系梁,依据“11G101-3”P92页:基础连系梁伸入承台以柱子
为支座,基础连系梁的第一道箍筋从柱边缘50mm开始设貉。结算
时,根据图纸会审可计算伸入承台到柱边间的箍筋工程量。实际
施工时,将基础梁视为承台梁,伸入承台部分不布貉箍筋。
第18圆罢千58页
⑶实施效果:通过优化,实现降本增效。
(4)提示:施工前与相关部门沟通协调,做好交底工作;留存过程
资料,按实际现场放样料单与分包单位结算。
14.筏板高差处钢筋优化
⑴优化背景:某工程筏板厚度6000mm,筏板底部有150nm高差,
高差处钢筋锚固值为La,如图2-4o
⑵优化实施:经论证分析,土方开挖时将150nm的高差取消,混
凝土按筏板较低标高整体浇筑,如图2-5,虽增加了混凝土工程量
但节约了钢筋锚固量。
⑶实施效果:通过优化,实现降本增效。
⑷提示:优化案例比较适合底部高差变化较小基础,施工前做好
成本分析。
15.桩长变更减少钢筋废料
⑴优化背景:某工程共2068根抗拔桩,直径为410mm,桩长为
16.7m,纵向受力筋为7根中16mm钢筋。根据设计图纸进行钢筋加
工,每根纵向受力筋最优下料方式为:9m+9mT6.7m-0.1m(焊接)
=1.2m,所有抗拔桩产生的废料为2068x7x1.2m=17371m,钢筋损耗
率7.2%0
⑵优化实施:通过策划,会同地勘单位重新勘察,确认试桩在负
14-16m有流砂层。经测算,在不增加价款的前提下,提出合理等
效代换方案:桩总数仍为2068根,直径变为500™,桩长为13.4m,
纵向受力钢筋为7根中16,并获得了发包人及设计单位的认可。
⑶实施效果:按新设计进行钢筋加工,每根纵向受力筋最优下料
方式为:9m+4.5m-13.4m-0.1m(焊接)=0m,节约钢筋
17371mxl.58kg/m=27.5t
(4)提示:提前优化,与各方充分沟通。
16.支护桩钢筋笼增加三角支撑钢筋优化
(1)优化背景:工程支护桩直径1500mm,桩长20m,主筋直径①25nm,
图纸要求在延桩长方向每隔2000mm设貉一道直径为中18mm加强
筋,如图2-6o
⑵优化实施:由于桩径大,钢筋笼在吊装过程中易变形,为增加
钢筋笼整体稳定性,通过设计变更或图纸会审在原加强筋部位增
加三角支撑钢筋,并最终得到发包人、监理及设计认可,按新图
施工,如图2-70
图2-6图2-7
⑶实施效果:实际施工中必须使用三角加强筋(属措施筋),通
过变更将三角支撑筋绘入图纸,避免合同中措施费包干不计取三
角支撑的工程量。
⑷提示:此优化适用于直径21200mm支护桩,直径过小增加此钢
筋影响导管支设。
17.支护结构钢腰梁优化为混凝土腰梁
⑴优化背景:某工程占地面积71000m2,基坑周长1345m,支护
桩数量为1036根,原设计支护桩腰梁为型钢腰梁,由上至下共7
道,如图2-8o
⑵优化实施:由于低价中标且为固定总价合同,为实现扭亏为盈
且增强支护结构整体稳定性,在钢筋采购单价较低行情下,将型
钢腰梁优化为钢筋混凝土腰梁,如图2-9o
⑶实施效果:
每米槽钢腰梁造价为:2400X28.44-1000X2=136.32元
每米混凝土腰梁造价为:0.12X435+8X0.00617X1824-1000X
2400+1.3X10X0.00617X102+1000X2400=109.8元
每米腰梁节约费用为26.52元,共计节约费用:26.52X1345X
7=249685.2元
④提示:优化前需进行成本分析,当钢筋采购价格较低时多方案
探讨,组织专家论证混凝土腰梁的可行性。
18.基坑支护钢筋网长度优化
⑴优化背景:某工程地下两层,基坑开挖深度12米,基坑支护
设计由施工单位进行优化设计,建设单位确认后实施。
⑵优化实施:设计阶段考虑工程造价等因素,建设单位要求宽松
部位土坡采用放坡土钉墙加预应力锚杆肋梁的结构形式。原图纸
按钢筋网间距200mm,60°放坡设计,深化设计阶段经过现场土质
取样,在原配筋不变,放坡85°可满足安全性要求。竖向钢筋每
根原长13.86米,优化后为12.42米,每根钢筋节省1.44米,结
算时仍按原图纸计算。
(3)实施效果:通过方案优化,节余钢筋用量。
⑷提示:优化后的图纸应经具有设计资质的设计院进行专项计算
后方可进行施工,深基坑应进行专家论证,确保基坑支护安全。
19.平板式筏基钢筋排布细节优化
(1)优化背景:某工程筏板基础跨中板带配筋①22@200,柱下板带
配筋中25@200。通过在规范允许的范围内优化板带布筋范围,调
整跨中板带钢筋的起始位貉,使跨中板带的①22钢筋多布,柱下
板带的小25钢筋少布。
⑵优化实施:钢筋按图2-10排布:正好有一根柱下板带钢筋落
在跨中板带末端。
图2-10
将跨中板带布筋范围左右各偏移50mm,增大跨中板带布筋范围,
相应的缩小柱下板带布筋范围,如图271。
图2-11
⑶实施效果:通过优化,实现降本增效。
④提示:施工前需验算结构安全性,确保符合规范允许值;与相
关部门沟通协调,做好交底工作。
20.塔吊基础深化策划
⑴优化背景:某工程塔吊基础钢筋属于措施钢筋,且措施费包干,
不另行计算。
⑵优化实施:利用图纸会审的机会将塔吊基础的钢筋深化到筏板
基础内,结算时,按图2-12计算塔吊基础钢筋量并归类到基础筏
板中。
图2-12
⑶实施效果:通过优化,实现降本增效。
⑷提示:塔吊基础内主体钢筋应计入工程结算。
21.后浇带采用跳仓法施工
⑴优化背景:某工程基础底板面积大,工期紧。图纸中后浇带附
加钢筋多,且后浇带钢筋易生锈,后期建筑垃圾清理,混凝土接
茬清理、浇筑等复杂工序影响施工成本。如取消后浇带采用跳仓
法施工,既节约成本,又为施工提供便利。
⑵优化实施:施工过程中以新工艺及工期紧为由提出跳仓法代替
后浇带施工,在实施过程中节约后浇带支撑钢筋及止水板,结算
时按原图纸计算。
图2-13
⑶实施效果:通过优化,方便施工,实现降本增效,。
⑷提示:以加快工期为切入点,利用新工艺取得效益。
22.抗浮锚杆钢筋技术优化
(1)优化背景:某工程采用抗浮锚杆抵抗地下水的浮托力,锚杆采
用3032钢筋。
(2)优化实施:在考虑用抗浮锚杆代替马凳支撑钢筋前提下编写锚
杆施工方案,注明锚杆节点做法以及详细尺寸,如图2-14。施工
时,按照底板上层钢筋直径以及保护层高度控制锚杆弯头的顶标
高。
图2-14
⑶实施效果:通过优化,实现降本增效。
(4)提示:底板上层钢筋与锚杆钢筋严禁采用焊接方式连接,需采
用绑扎。工程桩可参照本优化案例。
1.3柱
23.型钢混凝土柱模板优化
(1)优化背景:某工程采用型钢混凝土柱,钢骨截面为双箱型。浇
筑型钢柱混凝土时,用614对拉螺杆与主筋或钢骨焊接固定模板,
螺杆不能周转,造成极大浪费。
图3-1
⑵优化实施:项目部将支模体系优化为在钢骨上焊接“14套筒,
用现场414废料两端套丝,一端与坡口套筒相连,另一端拧紧套
筒形成稳定的支模体系。
⑶实施效果:通过优化,实现降本增效。
⑷提示:确保套筒位谿对应,保证模板施工质量。
24,型钢柱箍筋和拉筋施工优化
⑴优化背景:某工程型钢柱较多,图纸设计“受钢骨影响拉筋需
要断开对焊”如图3-2o
图3-2图3-3
⑵优化实施:图纸而未说明外箍筋如何布貉,项目部在编写钢筋
专项施工方案时,将外箍筋特别说明受钢骨影响,外箍筋调整成
单面焊10d的两段U型组合箍筋,如图3-3o
⑶实施效果:现场实际施工时,外箍筋整体下料,而结算时按方
案采用两段U型组合箍筋计算,同时计取钢筋焊接费用。
④提示:控制焊接质量,采用E50以上焊条,保证焊接长度10d,
焊缝饱满要求。
25.变径套筒优化
⑴优化背景:某工程图纸中,楼层下层柱纵向钢筋①25,上层柱
纵向钢筋①22,且类似相邻楼层柱纵筋直径不同的情况较多。
(2)优化实施:原做法钢筋变径处,上下层柱纵筋需按图集进行锚
固设貉。项目部经论证采用变径套筒施工,以节省钢筋锚固长度。
⑶实施效果:通过优化,实现降本增效。
(4)提示:将变径套筒认价和按锚固设貉计算的钢筋量对比,选择
合适的方式进行结算。
1.4墙
26.梯子筋代替墙体竖向钢筋优化
⑴优化背景:某工程墙体按照相关规定需设貉梯子筋,用于抵抗
墙体倾倒、支撑模板、墙体水平筋绑扎间距控制等。
⑵优化实施:用梯子筋代替墙体竖向钢筋。
图4-1
⑶实施效果:通过优化,实现降本增效。
(4)提示:梯子筋的水平方向钢筋可与水泥支撑模棍共同加固模板
支撑体系。
27.墙体顶模棍优化
⑴优化背景:某工程剪力墙厚度在150nm-300mm之间,施工方案
中采用钢筋顶棍。
⑵优化实施:现场实际施工用水泥顶棍,且在劳务分包合同中约
定水泥顶棍由劳务队
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 高中英语故事演讲欣赏
- 2024年喀什小型客运从业资格证理论考试题
- 2024年辽宁客运资格证考试模拟题答案
- 2024年海口客运资格证实操试题
- 2024年连云港道路客运输从业资格证考试真题保过
- 2024年莱芜道路旅客运输驾驶员从业资格考试题库
- 2024年银川客运员考试题
- 【课件】战国时期的社会变革+课件-2024-2025学年统编版七年级历史上册
- 2024年辽宁省沈阳市辽中区城管执法局招聘60人高频500题难、易错点模拟试题附带答案详解
- 2024年辽宁省抚顺县综合执法局利原检量站招聘95人历年高频500题难、易错点模拟试题附带答案详解
- 租房合同电子版下载(标准版)
- 中国传统节日文化中现代德育价值的研究课题结题报告
- 全2023浙江高考英语卷高频词汇汇总
- 电动三轮车使用安全技术交底
- 企业调查报告10202xPPT模板下载
- 《运动生理学》第三版考试复习题库(汇总版)
- 2023年河北建投能源招聘笔试参考题库附带答案详解
- 人版小学数学二年级(上册)(全册)课件(第一单元全部)
- 人体的基本生理活动
- 《商品信息采集与处理》相关资源 职业活动教学设计(第三章)
- 电力公司公开招聘报名表
评论
0/150
提交评论