版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
NB/T32044-2018
ICS27.160
P61
RecordNumber:J2571-2018
ENERGYSECTORSTANDARD
OFTHEPEOPLE’SREPUBLICOFCHINA
中华人民共和国能源行业标准
PNB/T32044-2018
SpecificationforPreparationofPre-feasibilityStudyReport
forPhotovoltaicPowerProjects
光伏发电工程预可行性研究报告编制规程
IssuedonJune6,2018ImplementedonOctober1,2018
IssuedbyNationalEnergyAdministrationofthePeople’sRepublicofChina
NB/T32044-2018
Introduction
ThisEnglishversionisoneofChina’senergysectorstandardseriesinEnglish.Itstranslationwas
organizedbyChinaRenewableEnergyEngineeringInstituteauthorizedbyNationalEnergy
AdministrationofthePeople’sRepublicofChinaincompliancewithrelevantproceduresandstipulations.
ThisEnglishversionwasissuedbyNationalEnergyAdministrationofthePeople’sRepublicofChinain
Announcement[202x]No.xxdatedxxxx,202x.
ThisversionwastranslatedfromtheChineseStandardNB/T32044-2018,SpecificationforPreparation
ofPre-feasibilityStudyReportforPhotovoltaicPowerProjects,publishedbyChinaWater&PowerPress.
ThecopyrightisreservedbyNationalEnergyAdministrationofthePeople’sRepublicofChina.Inthe
eventofanydiscrepancyintheimplementation,theChineseversionshallprevail.
Manythanksgotothestafffromtherelevantstandarddevelopmentorganizationsandthosewhohave
providedgenerousassistanceinthetranslationandreviewprocess.
ForfurtherimprovementoftheEnglishversion,allcommentsandsuggestionsarewelcomeandshould
beaddressedto:
ChinaRenewableEnergyEngineeringInstitute
No.2Beixiaojie,Liupukang,XichengDistrict,Beijing100120,China
Website:
Translatingorganizations:
ChinaRenewableEnergyEngineeringInstitute
POWERCHINANorthwestEngineeringCorporationLimited
Translatingstaff:
Reviewpanelmembers:
NationalEnergyAdministrationofthePeople’sRepublicofChina
1
翻译出版说明
本译本为国家能源局委托水电水利规划设计总院按照有关程序和规定,统一组织翻译的能源行
业标准英文版系列译本之一。202x年xx月xx日,国家能源局以202x年第x号公告予以公布。
本译本是根据中国水利水电出版社出版的《光伏发电工程预可行性研究报告编制规程》NB/T
32044—2018翻译的,著作权归国家能源局所有。在使用过程中,如出现异议,以中文版为准。
本译本在翻译和审核过程中,本标准编制单位及编制组有关成员给予了积极协助。
为不断提高本译本的质量,欢迎使用者提出意见和建议,并反馈给水电水利规划设计总院。
地址:北京市西城区六铺炕北小街2号
邮编:100120
网址:
本译本翻译单位:水电水利规划设计总院
中国电建集团西北勘测设计研究院有限公司
本译本翻译人员:
本译本审核人员:
国家能源局
2
NB/T32044-2018
AnnouncementofNationalEnergyAdministration
ofthePeople’sRepublicofChina
[2018]No.8
AccordingtotherequirementsofDocumentGNJKJ[2009]No.52,“NoticeonReleasingtheEnergy
SectorStandardizationAdministrationRegulations(tentative)anddetailedimplementationrulesissued
byNationalEnergyAdministrationofthePeople’sRepublicofChina”,87sectorstandardssuchas
WellboreQualityControlRequirementsforCoalbedMethaneDirectionalWell,including47energy
standards(NB)and40electricpowerstandards(DL),areissuedbyNationalEnergyAdministrationof
thePeople’sRepublicofChinaafterduereviewandapproval.
Attachment:DirectoryofSectorStandards
NationalEnergyAdministrationofthePeople’sRepublicofChina
June6,2018
Attachment:
DirectoryofSectorStandards
Adopted
SerialReplacedApproval
StandardNo.TitleinternationalImplementationdate
NumberstandardNo.date
standardNo.
…
SpecificationforPreparation
NB/TofPre-feasibilityStudy
152018-06-062018-10-01
32044-2018ReportforPhotovoltaic
PowerProjects
…
3
Foreword
AccordingtotherequirementsofDocumentGNKJ[2013]No.235issuedbyNationalEnergyAdministration
ofthePeople’sRepublicofChina,“NoticeonReleasingtheDevelopmentandRevisionPlanoftheFirst
BatchofEnergySectorStandardsin2013”,andafterextensiveinvestigationandresearch,summarization
ofpracticalexperience,andwidesolicitationofopinions,thedraftinggrouphaspreparedthis
specification.
Themaintechnicalcontentsofthisspecificationinclude:basicdata,projectoverview,projectpurpose
andscale,solarenergyresources,siteselection,photovoltaicpowergenerationsystemdesign,electrical
systems,generallayout,engineeringgeologyandcivilworks,constructionplanning,preliminaryanalysis
ofenvironmentalimpacts,costestimation,preliminaryanalysisoffinancialbenefits,andconclusionsand
recommendations.
NationalEnergyAdministrationofthePeople’sRepublicofChinaisinchargeoftheadministrationof
thisspecification.ChinaRenewableEnergyEngineeringInstitutehasproposedthisspecificationandis
responsibleforitsroutinemanagementandinterpretationofthespecifictechnicalcontents.Comments
andsuggestionsintheimplementationofthisspecificationshouldbeaddressedto:
ChinaRenewableEnergyEngineeringInstitute
No.2Beixiaojie,Liupukang,XichengDistrict,Beijing100120,China
Chiefdevelopmentorganizations:
ChinaRenewableEnergyEngineeringInstitute
POWERCHINANorthwestEngineeringCorporationLimited
Participatingdevelopmentorganizations:
POWERCHINAZhongnanEngineeringCorporationLimited
POWERCHINABeijingEngineeringCorporationLimited
HYDROCHINACorporationLimited
Chiefdraftingstaff:
XIAOBinLYUKangYANGMingqunWUChengzhi
LIAOEQINXiaoZHANGDejianLYUSong
LIUHuangchengZHANGYanWULaiqunLIUXiaoru
MAGaoxiangFANXiaomiaoWANGXudongLYUHongwei
YUANLijieSUNLihongHUANGZhiweiSUFang
WANGYueWENZiming
Reviewpanelnumbers:
WANGJixueQINChushengTIANJingkuiXUELianfang
YUQingguiWANGJilinHUANGLinWANGXiaolan
ANFuchengWANGZhaohuiLYUZhou’anZHANGWei
ZHANGYunjieLIUXiaoyunQIZhichengLIUQigen
DENGYuCHENXiaokangXIEHongwenWEIHuixiao
CHENYuyingLIFaguiZHANGJieZHANGXiaowei
HUANGHuiLIShisheng
4
NB/T32044-2018
1GeneralProvisions
1.0.1Thisspecificationisformulatedwithaviewtostandardizingtheprinciples,workcontentand
depth,andtechnicalrequirementsforpreparingpre-feasibilitystudyreportsforphotovoltaic(PV)power
projects.
1.0.2Thisspecificationisapplicabletothepreparationofpre-feasibilitystudyreportsforPVpower
projectstobeconstructed,renovated,orextended.
1.0.3Inadditiontothisspecification,thepreparationofpre-feasibilitystudyreportsforPVpower
projectsshallalsocomplywiththecurrentrelevantstandardsofChina.
1
2BasicRequirements
2.0.1Thepre-feasibilitystudyreportforaPVpowerprojectshallbepreparedbasedontheplanning
andotherearlystudyresultsofthesolarenergyresourcesdistributionandtheconstraintsaffectingthe
projectdevelopment.Thereportshallproposemaintechnicalschemes,makeacostestimationandinitial
financialbenefitevaluation,andpreliminarilyputforwardtheconclusionsandrecommendationsonthe
projectdevelopment.
2.0.2Thepreparationofthepre-feasibilitystudyreportshallobservetheprinciplesofsafety,reliability,
technicalfeasibility,practicalityandcost-effectiveness.Newmaterials,processes,equipmentand
technologiesshallbeanalyzedfortheirfeasibilityandbeencouragedtouseintheproject.
2.0.3Thecontentsofapre-feasibilitystudyreportshouldbeinaccordancewithAppendixAofthis
specification.
2
NB/T32044-2018
3BasicData
3.0.1ForaproposedPVpowerproject,thedevelopmentandconstructionconditionsoftheprojectshall
beinvestigated.
3.0.2Thefollowingbasicdatashallbecollected:
1Studyresultsobtainedintheplanningstageoftheproject.
2Statusanddevelopmentplanofenergyresources.
3Statusanddevelopmentplanofutilizationofnaturalresources.
4Statusanddevelopmentplanoftrafficandtransportation.
5Statusanddevelopmentplanofsocialeconomy.
6Datainrespectofecologicalenvironmentalprotection,soilandwaterconservation,mineral
resources,militaryinstallations,preservationofculturalrelics.
7Statusanddevelopmentplanofelectricpowersystem.
8Relevantlawsandregulations,policies,andcriteria,etc.
9Datafromnearbymeteorologicalreferencestations,including:
1)Basicinformationaboutthereferencestations,includingthegeographicallocation,
observationfieldelevation,ambientenvironment,surroundingobstructions,variationand
correspondingsituationsofthestationsite,solarradiationobservationinstrument,and
ambientenvironmentsincetheestablishmentofthestations.
2)Averageairtemperature,extrememaximumairtemperature,extrememinimumair
temperature,maximumairtemperatureindaytime,minimumairtemperatureindaytime,
andaveragemonthlyairtemperatureinrecent10consecutiveyearsandmore.
3)Averageprecipitationandevaporationinrecent10consecutiveyearsandmore.
4)Maximumoffrozensoildepthandsnowthicknessinrecent10consecutiveyearsandmore.
5)Averagewindvelocity,perennialextremewindvelocityanditsoccurrencetime,and
prevailingwinddirectioninrecent10consecutiveyearsandmore.
6)Disastrousweatherevents,suchassandstorm,thunderstorm,rainstorm,hailstorm,and
strongwind,inrecent10consecutiveyearsandmore.
7)Monthlysolarradiationofeachyearinrecent10consecutiveyearsandmore,andthesolar
radiationdataofatleastonecompleteyearthatismeasuredoverthesameperiodwiththe
onsiteobservation.
10Sunlightobservationdataoftheprojectsite.
11Thereanalysisdataofsolarradiationintheprojectsiteareashallbecollectedwhennoonsite
solarobservationdataisavailable.
12Thescaleofthetopographicmapofsiteareashallnotbelessthan1:50000.
13InthecasethatthePVprojectistobeintegratedwiththeroofofabuilding,thedrawingsof
thebuildingandthelayoutdrawingsofsurroundingbuildingsshallbecollected.
14Geologicalandhydrologicaldataofthesitearea,includingtheregionalgeologicaldrawings
3
andgeologicalinvestigationdataoftheprojectarea.
15Pricesofmainequipment,sourcesandpricesofmainconstructionmaterials,etc.
16Factorsinfluencingtheconstructionandoperationoftheproject.
3.0.3Theselectionofthemeteorologicalreferencestationsshallcomplywiththecurrentnational
standardGB50797,CodeforDesignofPhotovoltaicPowerStation.
3.0.4Theonsitesolarobservationdatashouldbecollectedforatleastoneyearataconsecutiveseries
ofeveryfiveminutes,andtheobservationitemshallincludetotalsolarradiation,directradiation,diffuse
radiation,andairtemperature.
4
NB/T32044-2018
4ProjectOverview
4.0.1Thegeographicallocation,developmentpurposeandscale,localsolarenergyresources,general
designscheme,gridconnectionmode,maintechnicalandeconomicindicators,andcomprehensive
benefits,etc.ofthePVpowerprojectshallbedescribedbriefly.
4.0.2Thegeographicallocationoftheprojectsiteshallbesketched.
5
5ProjectPurposeandScale
5.1ProjectNecessity
ThenecessityfortheconstructionofaPVpowerprojectshallbeanalyzedanddemonstratedfromthe
pointofnationalstrategyforsustainabledevelopment,withconsiderationofthefactorssuchasnational
policiesonrenewableenergysources,regionalenergystructure,powerstructureoptimization,statusand
planningofpowersystem,andenvironmentalprotectionoftheregion.
5.2ProjectPurpose
5.2.1Theactualeconomicconditionanddevelopmentplanaswellasthestatusofelectricpower
systemanditsdevelopmentplanintheprojectareashallbedescribed.
5.2.2Theprojectpurposeshallbeproposedbasedonthesupplyanddemandofenergyresourcesas
wellasthesocialandeconomicdevelopmentoftheprojectarea.
5.3ProjectScale
5.3.1Theprojectscaleshallbeproposedbasedontheenergyresourcesandthestatusofelectricpower
systemanditsdevelopmentplanintheprojectarea,theeffectandrequirementsoftheprojectonthe
powersystem,andtheconditionsfortheprojectdevelopment.
5.3.2Apreliminaryanalysisshallbemadeforthepowerconsumptionmarketoftheproject.
6
NB/T32044-2018
6SolarEnergyResources
6.1OverviewofRegionalSolarEnergyResources
Thegeographicalconditions,climatecharacteristics,andsolarenergyresourcesintheprojectareashall
bedescribed,andadistributiondiagramofthesolarenergyresourcesintheprovince,autonomousregion,
ormunicipalitywheretheprojectislocatedshallbeprepared.
6.2PreliminaryAnalysisofSolarEnergyResources
6.2.1Thesourcesofthesolarradiationdatashallbeexplainedandtherationalityoftheemployeddata
sourcesshallbeanalyzedandproven.
6.2.2Theinter-annualandintra-annualvariationoflocalglobalsolarradiationforyearsshallbe
analyzedbasedontheemployedsolarradiationdata,soastoconcludetheinter-annualandintra-annual
variationpatternandcharacteristicsofglobalsolarradiationbyyears.
6.2.3Theaverageannualglobalsolarradiationandmonthlyaverageglobalsolarradiationshallbe
calculatedbasedontheemployedsolarradiationdata,andadiagramshowingtheinter-annualand
intra-annualvariationsofglobalsolarradiationforyearsintheprojectareashallbeprovided.
6.3PreliminaryAssessmentofSolarEnergyResources
Basedonthecalculatedaverageannualglobalsolarradiationandmonthlyaverageglobalsolarradiation,
apreliminaryassessmentofsolarenergyrecoursesshallbemadeforthesiteareainaccordancewiththe
currentnationalstandardsGB/T31155,ClassificationofSolarEnergyResources–GlobalRadiation,in
whichtheannualglobalsolarradiationanditsstabilityshallbeclassifiedandevaluated.
7
7SiteSelection
7.0.1Thesiteselectionshallcomplywiththecurrentnationalandlocalpolicies,andcoordinatewith
thedevelopmentplanningconcerned.
7.0.2Theprojectsiteshallbedeterminedtentativelyaccordingtothesiteconditions,distribution
characteristicsofsolarenergyresources,gridconnectionandtransportationconditions,withdue
considerationofnaturalresourcesutilization,ecologicalenvironmentalprotection,soilandwater
conservation,floodcontrol,preservationofculturalrelics,militaryuse,underlyingminerals,andsocial
stability,etc.
7.0.3Thefloorareaandconstructionscaleoftheprojectsiteshallbeproposed,andthemain
developmentadvantagesandpotentialproblemsshallbeassessedpreliminarily.
7.0.4Theconclusionaboutsiteselectionshallbeproposed,thesitepropertyshallbestated,the
coordinatesofinflectionpointsofthesiteshallbedeterminedtentatively,andthearealmapoftheproject
siteshallbeplotted.
8
NB/T32044-2018
8PhotovoltaicPowerGenerationSystemsDesign
8.1SelectionofPVModule
8.1.1ThedevelopmentstatusofPVmodulesshallbedescribedbriefly.
8.1.2ThetypesandmaintechnicalparametersofthePVmodulesshallbeproposedthrougha
techno-economiccomparisonbasedontheoverallconsiderationofthecharacteristicsofsolarenergy
resources,incidentphoton-to-electronconversionefficiency(IPCE),technicalprogressivenessand
maturity,marketprices,operationreliabilityandmode,naturalenvironmentoftheproject,etc.
8.1.3ThemaintechnicalparametersofthePVmodulesshallbetabulated.
8.2SelectionofPVArrayOperationMode
8.2.1ApreliminaryanalysisandcomparisonshallbemadefordifferentPVarrayoperationmodes,
includingtheoperationwithfixedmountingstructures,operationwithfixedadjustablemounting
structures,operationwithsingle-axistrackingsystem,andoperationwithdouble-axistrackingsystem,
fromtheaspectsofgeneratingefficiency,operationreliability,costestimate,andmaintenancecost,based
onwhichanoperationmodeshallberecommended.
8.2.2ForthePVarraysapplyingthefixedmountingstructures,themonthlysolarradiationonthetilted
surfaceswithdifferenttiltanglesshallbecalculatedbasedontheaverageannualsolarradiationand
monthlyaveragesolarradiation,theyear-roundenergyoutputunderdifferenttiltanglesshallbeproposed,
andthetiltanglesforinstallationshallbesuggestedbyconsideringtheconstructionconditionsand
practicalmodesoftheproject.ForthePVarraysapplyingtrackingsystemthetiltanglesforinstallation
shallbecalculatedanddeterminedbasedontheoperationmodeofthetrackingsystemandthe
characteristicsofsolarradiation.
8.3SelectionofInverter
8.3.1Thedevelopmentstatusandtheperformancecharacteristicsofinvertersshallbedescribedbriefly.
8.3.2Thetypesandmaintechnicalparametersoftheinvertersshallbeproposedbasedonthe
preliminaryanalysisofthefactorssuchasthesiteconstructionconditions,projectoperationand
maintenanceinlaterstage.
8.3.3Themaintechnicalparametersoftheinvertersshallbetabulated.
8.4LayoutofPVArray
8.4.1TheconnectionmodeofPVmodules(inseriesorparallel)shallbedesignedandthedesign
schemeofPVmodulesstringshallbeproposedbasedontheinitialselectionofPVmodulesand
inverters.
8.4.2ThelinespacingofPVarraysshallbecalculatedbasedonthePVarrayoperationmodeandthe
siteconditions.
8.4.3ThelayoutschemeofPVarraysshallbedeterminedtentatively.
8.4.4InthecaseofahybriddevelopmentcombiningthePVpowerprojectwithsuchindustriesas
agricultureorfishery,therequirementsoftheindustriesforsunlightshallbetakenintoaccount.
9
8.5EstimationofAnnualOn-GridEnergy
8.5.1ThetheoreticalannualpoweroutputofaPVpowerprojectshallbeestimatedaccordingtothe
installedcapacity,globalsolarradiation,andtheoperationmodeofPVarrays.
8.5.2TheoverallefficiencyofthePVpowergenerationsystemshallbeproposedaccordingtothe
amountofsolarradiationthatcannotbeutilized,thetemperatureeffect,theinfluenceofdustandsnow
accumulatedonPVmodulesurfaces,theinfluenceofcompatibilityofPVmodules,andthepowerlosses
oflines,invertersandtransformers,etc.
8.5.3TheannualattenuationrateofthePVpowergenerationsystemduringoperationperiodshallbe
proposedaccordingtotheperformancecharacteristicsofthePVmodules.
8.5.4Theannualon-gridenergyduringtheoperationperiod,averageannualon-gridenergy,and
averageutilizationhoursinthefirstyearandforyearsshallbeestimatedaccordingtothetheoretical
annualpoweroutputandtheefficiencyandannualattenuationrateofthePVpowergenerationsystem.
8.5.5Theestimationtableoftheannualon-gridenergyshallbemade,andthehistogramsofthe
monthlyon-gridenergyinthefirstyearofoperationandthemonthlyon-gridenergyduringtheoperation
periodshallbeplotted.
10
NB/T32044-2018
9ElectricalSystems
9.1ElectricalPrimarySystem
9.1.1ThegridconnectionmodeofthePVpowerplant,voltageclassforgridconnection,numberof
outgoinglinecircuits,powertransmissiondistance,transmissioncapacity,andassociatedtransmission
andtransformationworksshallbedescribedaccordingtotheinstalledcapacityofthecurrentstageor
differentdevelopmentstages,andthestatusanddevelopmentplanoftheelectricpowersystem;in
addition,thelocationsofthestep-upsubstationorswitchyardshallbedeterminedtentatively.
9.1.2Themainelectricalwiringschemeshallbedeterminedtentatively.
9.1.3Thesupplyschemeofthestationpowershallbedeterminedtentatively.
9.1.4Thetypesandmaintechnicalparametersofmainelectricalequipment,includingmaintransformer,
powerdistributionequipment,andreactivecompensationdevices,shallbeproposed.
9.1.5Theschemeofcollectionlinesshallbeproposed.
9.1.6Thegenerallayoutschemeforthepowerdistributionequipmentofdifferentvoltageclassesshall
beproposed.
9.1.7Alistofmainequipmentandmaterialsfortheelectricalprimarysystemshallbeprovided,in
addition,thegeographicwiringdiagramofgridconnectionsystemandthemainelectricalwiringdiagram
ofthePVpowerproject,andthelayoutplanoftheelectricalequipmentforthestep-upsubstationor
switchyardshallbeplotted.
9.2ElectricalSecondarySystem
9.2.1Thedispatchingmanagementandoperationmodeaswellastheautomationdesignprincipleof
thePVpowerplantshallbedescribed.
9.2.2Theschemesofmonitoring,protection,andcommunicationsforthePVpowergenerationsystem
shallbeproposed.
9.2.3Theschemesofmonitoring,protection,andcommunicationsforthestep-upsubstationor
switchyardshallbeproposed.
9.2.4Alistofmainequipmentandmaterialsfortheelectricalsecondarysystemandcommunication
systemshallbeprovided.
11
10GeneralLayout
10.0.1ThegenerallayoutschemeofthePVpowerplantshallbeproposedaccordingtothesite
coverage,naturalconditions,terrainandlandform,transportation,etc.ofthePVpowerproject.The
schemeshallinvolvesthestep-upstationorswitchyard,PVarrayzone,roads,andotherprotective
facilities;agenerallayoutplanofthePVpowerprojectshallbeplotted.
10.0.2Alistofmaintechnicalindexesshallbeproposed,includingtheinstalledcapacity,overallfloor
areaoftheproject,floorareaofthePVmodulearrayzone,floorareaofthestep-upstationorswitchyard,
buildingarea,greenarea,andtheareaofroads.
12
NB/T32044-2018
11EngineeringGeologyandCivilWorks
11.1EngineeringGeologyandHydrology
11.1.1Thegeologicalconditionsofthesiteareashallbedescribed,andtheregionalstructuralstability
shallbeevaluated.AccordingtothecurrentnationalstandardGB18306,SeismicGroundMotion
ParametersZonationMapofChina,thegroundmotionparametersandbasicseismicintensityofthe
projectsiteshallbeproposed.
11.1.2Thebasicgeologicalconditionsofthesiteareashallbedescribedbriefly,includingtheterrain
andlandform,stratigraphiclithology,geologicalstructure,adversegeologicalconditionsandgeological
hazards,hydrogeologicalconditions,andphysicalandmechanicalpropertiesandparametersofrock/soil
mass.
11.1.3Theengineeringgeologicalconditionsofthesiteareashallbeassessedpreliminarily,andthe
recommendedvaluesofrock/soilmassphysicalandmechanicalparametersandtheschemeoffoundation
treatmentshallbeproposed.
11.1.4Hydrologicconditionsinthesiteareashallbeintroduced.
11.2CivilWorks
11.2.1Thefunctions,scale,andgradesofvariousbuildings/structuresshallbedescribedaccordingto
thedesignschemeofthePVpowergenerationsystem.
11.2.2ThebracketsandfoundationtypesofthePVmodulesaswellasthestructuresandfoundation
typesofotherbuildings/structuresshallbeproposedaccordingtotheengineeringgeologicalconditions
andtheprojectrank,inaddition,thepreliminaryschemeoffoundationtreatmentshallbeprovidedas
required.InthecaseofahybriddevelopmentcombiningthePVpowerprojectwithsuchindustriesas
agricultureorfishery,thestructuretypeofthePVmodulebracketshallbeproposedbasedonthe
propertiesoftheindustry.
11.2.3Intheareasubjectedtofrequentwindstorms,aprotectionsachemshallbeputforward
preliminarilyfortheprojectsite,buildings,andequipment.
11.2.4Fortheprojectthatmaysufferfromgeologicalhazards,ahazardcontrolschemeshallbe
proposedaccordingly.
11.2.5Thebillofquantitiesforcivilworksshallbeprovided.
13
12ConstructionPlanning
12.0.1Theconstructionconditions,includingthegeographicallocation,naturalconditions,andsite
accessandtransportconditionsshallbestated.
12.0.2Theconstructiongenerallayoutschemeshallbeproposed,thesourcesofconstructionmaterials,
powersupplyandwatersupplyaswellasthemeansofcommunicationsshallberecommended,the
schemeofsiteaccessandtransportandthelayoutschemeofon-siteaccessroadsshallbedetermined
tentatively,andtheconstructionstandardandlengthoftheon-siteaccessroadsshallbeproposed.
12.0.3Thecurrentnationalandlocalpoliciesconcerninglandutilizationshallbebrieflydescribed,the
constructionlanduseschemeandtheoccupiedlandareashallbepresented.
12
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 沈阳理工大学《化工过程自动控制与仪表》2022-2023学年期末试卷
- 沈阳理工大学《电力拖动直流控制系统》2022-2023学年期末试卷
- 光伏施工专业合同文本
- 广州市合同制护士工资
- 航次出船合同类型
- 2024-2025学年高中数学第三章概率3.1.3概率的基本性质课时素养评价含解析新人教A版必修3
- 作画课件秋之姑娘的花裙子
- 米仓山国家森林公园风景资源调查与评价报告
- 中国物品编码中心(GS1China)UDI结构-及相关国家标准
- 2024电子产品委托加工合同范本
- 2023年数学竞赛AMC8试卷(含答案)
- 正畸教学查房
- 高空涂料施工方案
- 船舶定位-天文定位
- 早期康复介入管理制度范文
- “能救命的AED”了解它吗?学生主题班会课件
- 无人机低空遥感网服务平台建设需求
- 简历制作技巧培训
- JGT161-2016 无粘结预应力钢绞线
- 高铁乘务员职业规划书
- MES项目启动会模板
评论
0/150
提交评论