版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
TestReport
Client:Address:
ShanghaiHanshiMoldingShapeCo.,Ltd.
No.355,YouDongRoad,Shanghai,P.RChina
DUNS: —
TestedSample: ASSYFRONTBEAMPartNumber:55005311
SampleDescription: Model:C30
Materialandgrade:P7-GF45-0790-BK711
ReceivingDate: 2015-03-12 EvaluationType:—
TechnicalSpecification:GMW14650-2013
TestItems:
TestResults:
DimensionalStability
ResistancetoTemperature-HumidityCycle(DimensionalStability)
ResistancetoHigh-HumidityEnvironment
ImpactResistance
Accordingtoclient’srequirements,thetesthasbeenconductedonreceivedsamples.Refertopage2fordetailsofresults.
Editedby:ZhangWeiqi
Checkedby:NingWentao
Approvedby:
Signature:
Signature:
Signature:
Dateofissue:
TestSummary
SectionNo.
ClauseNo.
TestItem
Ref.Standard
Evaluation
Section001
Accordingtoclient’s
requirements
DimensionalStability
Accordingtoclient’s
requirements
Pass
Section002
GMW14650-2013
§4.3
ResistancetoTemperature-HumidityCycle(Dimensional
Stability)
GMW14650-2013
—
Section003
GMW14650-2013
§4.4
Resistanceto
High-HumidityEnvironment
GMW14729-2010
Pass
Section004
GMW14650-2013
§4.9
ImpactResistance
GMW14093-2013
Pass
D15009701
SamplePhotos
Section001DimensionalStability
Ref.
Standard
Client`srequirement
DateofTest
2015-03-25~2015-03-26
Tested
SampleID.
D150097010102
TestConditions
A:After8hunder110℃,theproductcontourdeformationcomparedwiththeoriginal,parts,evaluation:heightofZ5comparedwiththeinitialstateofnomorethan2mm;
B:Toputproductsatroomtemperature(23±3℃),fromAstateslowlycooledtoBstatemeasurement,evaluation:heightofZ5comparedwiththeinitialstateislessthan1mm;
A:After8hunder-40℃,theproductcontourdeformationcomparedwiththeoriginal,parts,evaluation:heightofZ5comparedwiththeinitialstateofnomorethan2mm;
B:Toputproductsatroomtemperature(23±3℃),fromAstateslowlycooledtoBstate
measurement,evaluation:heightofZ5comparedwiththeinitialstateislessthan1mm.
TestInstruments
No.
Name
Type
Number
Calibration
ValidDate
1
Highandlowtemperature
testchamber
SDJ41FD
EQ-0032
2015.09.02
Test
Requirement
SeeTestConditions(Accordingtothecustomer’srequirements)
TestResults
Sampl
No.
Condition
Change(mm)
Verdict
Z1
Z6
Z7
Z8
Z9
Z10
1#
Afterhightemp
0.07
0.04
0.66
0.21
0.47
0.66
P
Roomtemp
0.03
0.01
0.55
0.20
0.25
0.50
P
Afterlowtemp
0.58
0.34
0.74
0.41
0.45
0.40
P
Roomtemp
0.12
0.40
0.50
0.30
0.22
0.31
P
2#
Afterhightemp
0.11
0.18
0.54
0.58
0.40
0.54
P
Roomtemp
0.36
0.16
0.48
0.41
0.31
0.15
P
Afterlowtemp
0.42
0.33
0.67
0.02
0.44
0.24
P
Roomtemp
0.35
0.20
0.45
0.40
0.20
0.15
P
3#
Afterhightemp
0.08
0.07
0.74
0.14
0.45
0.75
P
Roomtemp
0.05
0.04
0.31
0.05
0.22
0.55
P
Afterlowtemp
0.12
0.02
0.41
0.20
0.35
0.45
P
Roomtemp
0.10
0.00
0.32
0.18
0.24
0.15
P
Test
Conclusions
Pass
Remark
P:Pass;F:Fail;“—”:NotApplicable
TestPictures
Testing
Testing
Section002ResistancetoTemperature-HumidityCycle(DimensionalStability)
Ref.
Standard
GMW14650-2013
DateofTest
2015-03-25~2015-04-09
Tested
SampleID.
D150097010401
Sample
Quantity
3pcs
TestConditions
Thiscycleshallbecarriedouttwotimeswithoutinterruption:
Cycle:17±0.5h,-30±3℃→72±1hat85±3℃→24±1h,38±2℃,100%RH→7h±0.5h,
-30±3℃→24±1h,38±2℃,100%RH→24±1h,22±3℃
Checktheappearanceandthedimensionscomparedwiththeoriginalparts.
TestInstruments
No.
Name
Type
Number
Calibration
ValidDate
1
Highandlow
temperaturetestchamber
SDJ610A
EQ-0069
2015.12.14
TestRequirement
Appearance:Testpiecesshallshownocracking,crazing,appreciablecolorchanges,discoloration,cloudiness,blistering,objectionableshrinkage,anddeformation,lossofadhesiontothesubstratebetweenlayersofthecompositeorotherchangesdetrimentalto
serviceability.
TestResults
SampleNo.
Result
Verdict
Appearance
Dimension
1#
Shownocracking,crazing,appreciablecolor
changes,discoloration,cloudiness,blistering,objectionableshrinkage,anddeformation,
Seethenextpage
—
2#
Shownocracking,crazing,appreciablecolorchanges,discoloration,cloudiness,blistering,
objectionableshrinkage,anddeformation,
—
3#
Shownocracking,crazing,appreciablecolor
changes,discoloration,cloudiness,blistering,objectionableshrinkage,anddeformation,
—
Test
Conclusions
—
Remark
P:Pass;F:Fail;“—”:NotApplicable
SampleNo.
Condition
Result(mm)
1#
Change
Z1
Z6
Z7
Z8
Z9
Z10
-0.11
-0.41
-0.05
-1.31
-1.46
-0.86
2#
Z1
Z6
Z7
Z8
Z9
Z10
-0.57
-1.47
-2.03
-1.41
-1.32
2.25
3#
Z1
Z6
Z7
Z8
Z9
Z10
-1.10
-1.97
-2.65
-1.32
-1.32
-1.87
Section002ResistancetoTemperature-HumidityCycle(DimensionalStability)
TestPictures
Pre-test1#
Pre-test1#
Pre-test2#
Pre-test2#
Pre-test3#
Pre-test3#
Testing
Post-test1#
Post-test1#
Post-test2#
Post-test2#
Post-test3#
Post-test3#
Section003ResistancetoHigh-HumidityEnvironment
Ref.
Standard
GMW14729-2010
DateofTest
2015-03-20~2015-03-27
Tested
SampleID.
D150097010104
TestConditions
Measurethedimensionsoftestpiecesbeforetest;
Placetestpiecesat(40±3)℃,~100%RHfor(168±2)hand(22±3)℃,(50±5)%RHfor24h;
Evaluatethesurfacevisuallyandmeasurethedimensionsoftestpiecesaftertest.
TestInstruments
No.
Name
Type
Number
Calibration
ValidDate
1
Highandlowtemperature
testchamber
SDJ610A
EQ-0069
2015.12.14
TestRequirement
Testpiecesshallshownosignificantsurfacechanges,particularlychangesincolororgloss,orotherchangesdetrimentaltoserviceability.Thedimensionsshouldbeno
significantchanges.
TestResults
Seethenextpage.
Test
Conclusions
Pass
Remark
P:Pass;F:Fail;“—”:NotApplicable
SampleNo.
Result
Verdict
Appearance
1#
Shownosignificantsurfacechanges
P
2#
Shownosignificantsurfacechanges
P
3#
Shownosignificantsurfacechanges
P
SampleNo.
Change(mm)
Z1
Z6
Z7
Z8
Z9
Z10
1#
0.24
0.77
0.04
0.41
0.22
0.07
2#
0.15
0.61
0.23
0.11
0.06
0.14
3#
0.04
0.54
0.14
0.05
0.21
0.91
Section003ResistancetoHigh-HumidityEnvironment
TestPictures
Testing
Testing
1#Pre-test
1#Post-test
2#Pre-test
2#Post-test
3#Pre-test
3#Post-test
Section004ImpactResistance
Ref.
Standard
GMW14093-2013
DateofTest
2015-04-13~2015-04-14
Tested
SampleID.
D150097010501
TestConditions
Testintheas-receivedcondition,afterheatagingandaftertemperaturecycling;
Conditioning:(22±3)°C&(50±5)%RHfor24h;
Freezertemperature:-30°C;Freezingtime:4h;Impactenergy:5J.
TestInstruments
No.
Name
Type
Number
Calibration
ValidDate
1
Lowtemperature
freezingfreezer
DW-FW251
EQ-0101
2015.07.21
2
Fallingballimpact
tester
LQ-001
YQ-0069
2015.12.15
Test
Requirement
Nocracksorbreakage.
TestResults
SampleNo.
Result
Verdict
As-received
1#
Nocracksorbreakage
P
2#
Nocracksorbreakage
P
3#
Nocracksorbreakage
P
Afterheataging
4#
Nocracksorbreakage
P
5#
Nocracksorbreakage
P
6#
Nocracksorbreakage
P
After
temperaturecycling
7#
Nocracksorbreakage
P
8#
Nocracksorbreakage
P
9#
Nocracksorbreakage
P
Test
Conclusions
Pass
Remark
P:Pass;F:Fail;“—”:Notapplicable;
Wedirectlyusedthesamplesthathadbeentreatedintheagingtestandtemperaturecyclingtesttoperformimpacttest.
Section004ImpactResistance
TestPictures
Testing
Testi
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 体育馆环境卫生承诺书
- 2024年研发设计与技术咨询协议3篇
- 证券公司投资资产管理
- SP馆租赁合同模板
- 铁路轨道施工安全合同
- 设计工作室隔断租赁协议
- 跨境支付项目澄清函参考模板
- 环保行业污染防治培训费管理办法
- 能源利用评审员管理办法
- 机场化粪池改造工程合同
- 脊柱区1教学讲解课件
- KK5-冷切锯操作手册-20151124
- 教你炒红炉火版00缠论大概
- 消防管道施工合同
- 大学生计算与信息化素养-北京林业大学中国大学mooc课后章节答案期末考试题库2023年
- 2023年国开大学期末考复习题-3987《Web开发基础》
- 《骆驼祥子》1-24章每章练习题及答案
- 国际金融课后习题答案(吴志明第五版)第1-9章
- 《基于杜邦分析法周大福珠宝企业盈利能力分析报告(6400字)》
- 全国英语等级考试三级全真模拟试题二-2023修改整理
- 02R112 拱顶油罐图集
评论
0/150
提交评论