版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
./工程特性序号指标名称单位数量备注1流域面积平方公里31802利用水文系列年1957~19813多年平均径流量亿立米26.01724代表性流量多年平均流量秒立米82.5实测最枯旬平均流量秒立米5.46设计洪峰流量秒立米校核洪峰流量秒立米5水库特征水位校核洪水位米设计洪水位米正常蓄水位米死水位米6水库特征库容总库容万立米调洪库容万立米兴利库容万立米死库容万立米7库容系数8调节性能9水量利用系数10水电站特性指标装机容量万千瓦保证出力万千瓦多年平均年发电量亿度年利用小时数小时多年平均电量/装机容量11水电站水头最大水头米最小水头米12河道特征水位下游校核洪水位米下游设计洪水位米正常尾水位米Q×台数相应下游水位最低尾水位米Q相应下游水位第一节基本概况流域概况黑水河发源于我国靖西县的新圩,经岳圩流入越南境内,再从德天沿中越分界线流入我国大新县的硕龙镇,经那岸、太平流到崇左县的新和、屯峒汇入左江,见那岸水电站流域示意图。黑水河上游坡陡水急,水力资源丰富。那岸水电站坝址位于河道中游,在大新县的太平乡那岸村王孟屯附近。坝址控制流域面积3180平方公里〔不包括越南境内面积,坝下游4公里处设有那岸水文站,集雨面积3210平方公里,自1957年至1981年有实测水文资料24年。基本资料1.年径流资料:表1给出那岸水文站历年〔1957-1981年实测水文年〔5-4月旬平均流量~保证率统计表,经分析后能直接移用至坝址,其多年平均流量Q=82.5秒立米。Q=5.46m/sQ=741m/s表1那岸水文站历年实测水文〔5-4月旬平均流量分组大小排列累积出现次数〔m和相应经验频率〔P=x100%≥Q〔m/smP<%>≥Q〔m/smP<%>≥Q〔m/smP<%>15015317.697128733.181955263.8214116919.546131135.951759068.2113118421.275135040.461562972.7212119923.014138944.971369680.4611121224.513641547.981174085.5510123026.603144150.98979591.919124428.212648155.61784397.468126730.872152660.81586499.882.坝址下游水位与流量关系曲线:那岸电站厂房尾水处原设置水尺,有短期〔1975-1979观测资料。根据观测的水位资料与对应时间那岸水文站观测流量资料比较,可绘制厂房尾水位与流量关系曲线,即坝址水位流量关系曲线。表3-1那岸水电站坝址水位~流量关系〔高水部分水位〔米180181182183184185186流量〔秒立米199415655900115014301730水位〔米187188189190191192流量〔秒立米203023502700308035003950表3-2那岸水电站坝址水位~流量关系〔低水部分水位〔米178.8178.9179.0179.1179.2179.3179.41179.5流量〔秒立米06.0014.525.338.051.867.086.0水位〔米179.6179.7179.8179.9180.0180.1180.2流量〔秒立米107.5130.0152.0175.5199.0200.0217.53.水位库容曲线:由水库实测地形图计算而得。表2那岸水电站水库水位~库容关系表水位〔米190195200205210215220〔万立米200330500765108014701970水位〔米225230235240245250库容〔万立米2580337043705600706085404.水库水量损失:库区两岸高山陡峻,水库面积较小,水量损失不大。根据地质人员提供的资料水库渗漏量也很少,故电站进行水能计算时水量损失可以忽略不计。5.表4那岸水电站正常蓄水位~枢纽建设总投资关系表正常蓄水位〔米205210215220225230240250枢纽总投资〔万元28203080336036904060447055507000表5那岸水电站正常蓄水位~枢纽工程关系表正常蓄水位〔米205210215220225230240250枢纽工程量〔万立米10.013.817.621.425.229.036.644.1第二节正常蓄水位方案的选择正常蓄水位方案的拟定正常蓄水位上限值的确定:主要考虑以下因素:水库的淹没限制:库区内只有王孟屯、念底屯等人口稀少的居民点,较大的居民点为硕龙镇,但该高程为286米。所以正常蓄水位高程的选定应小于286米。地形地质条件:水库库区属石灰峰林谷地,山顶标高一般在400-600米左右,一般卡斯特化不甚强烈。漏斗、溶洞、暗河等一般规模不大,溶洞分布在270米高程以上,暗河仅在沙屯出现一处,为250米。所以正常蓄水位高程的选定应小于250米。施工条件:那岸水电站由大新县组织施工,根据当地建筑材料情况,石料非常丰富,拟采取砌石大头坝,这种坝型的设计、施工经验不多,故不宜修筑高坝〔坝址处河床高程在175米左右。〔4蒸发、渗漏损失:库区两岸高山陡峻,水库面积较小,水量损失不大。根据地质人员提供的资料水库渗漏量也很少,故电站进行水能计算时水量损失可以忽略不计。综上,正常蓄水位上限值取250米。正常蓄水位上限值的确定:〔1正常蓄水位上限值的确定:必须满足电力系统对电站提出的最低出力要求。根据初步规划,那岸水电站的最低出力为N=2~3万千瓦〔2分析、计算过程:①因为N=2~3万千瓦=AH所以H===〔30.30~45.45〔m由Q=5.46m/s查那岸水电站坝址水位~流量关系曲线得下游水位的下限值Z=178.88m正常蓄水位的下限值Z=Z+H=178.88+〔30.30~45.45=〔209.18~224.250<m>有正常蓄水位的上、下限可得,正常蓄水位的取值范围为〔209.18~250选定方案:选定215m、225m、235m、245m正常蓄水位共四个比较方案。消落深度的确定方案一:Z=215m,Z=178.88mH=Z-Z=215-178.88=36.12<m>若为多年调节:h=0.30Hh=0.30H=0.30×36.12=10.836<m><2>若为年调节:h=0.25Hh=0.25H=0.25×36.12=9.03〔m〔3若为日调节:h=2m2.方案二:Z=225m,Z=178.88mH=Z-Z=225-178.88=46.12<m>〔1若为多年调节:h=0.30Hh=0.30H=0.30×46.12=13.836<m><2>若为年调节:h=0.25Hh=0.25H=0.25×46.12=11.53〔m〔3若为日调节:h=2m3.方案三:Z=235m,Z=178.88mH=Z-Z=235-178.88=56.12<m>〔1若为多年调节:h=0.30Hh=0.30H=0.30×56.12=16.836<m><2>若为年调节:h=0.25Hh=0.25H=0.25×56.12=14.03〔m〔3若为日调节:h=2m4.方案四:Z=245m,Z=178.88mH=Z-Z=245-178.88=66.12<m>〔1若为多年调节:h=0.30Hh=0.30H=0.30×66.12=19.836<m><2>若为年调节:h=0.25Hh=0.25H=0.25×66.12=16.53〔m〔3若为日调节:h=2m判断水库调节性能方案一:Z=215m,查得V=1470万立方米〔1若为多年调节:h=0.30H=0.30×36.12=10.836<m>此时,死水位Z=Z-h=215-10.836=204.164<m>由那岸水电站水库水位~库容关系曲线查得V=728〔万立方米V=V-V=1470-728=742〔万立方米库容系数:β=×100%=×100%=0.29%<2>若为年调节:h=0.25H=0.25×36.12=9.03〔m此时,死水位Z=Z-h=215-9.03=205.97<m>由那岸水电站水库水位~库容关系曲线查得V=840〔万立方米V=V-V=1470-840=630〔万立方米库容系数β=×100%=×100%=0.24%〔3若为日调节:h=2m此时,死水位Z=Z-h=215-2=213<m>由那岸水电站水库水位~库容关系曲线查得V=1308〔万立方米V=V-V=1470-1308=162〔万立方米库容系数β=×100%=×100%=0.06%方案二:Z=225m,查得V=2580万立方米〔1若为多年调节:h=0.30H=0.30×46.12=13.836<m>此时,死水位Z=Z-h=225-13.836=211.164<m>由那岸水电站水库水位~库容关系曲线查得V=1120〔万立方米V=V-V=2580-1120=1460〔万立方米库容系数:β=×100%=×100%=0.54%<2>若为年调节:h=0.25H=0.25×46.12=11.53〔m此时,死水位Z=Z-h=225-11.53=213.47<m>由那岸水电站水库水位~库容关系曲线查得V=1300〔万立方米V=V-V=2580-1300=1280〔万立方米库容系数β=×100%=×100%=0.49%〔3若为日调节:h=2m此时,死水位Z=Z-h=225-2=223<m>由那岸水电站水库水位~库容关系曲线查得V=2324〔万立方米V=V-V=2580-2324=256〔万立方米库容系数β=×100%=×100%=0.098%方案四:Z=235m,查得V=4370万立方米〔1若为多年调节:h=0.30H=0.30×56.12=16.836<m>此时,死水位Z=Z-h=235-16.836=218.164<m>由那岸水电站水库水位~库容关系曲线查得V=1760〔万立方米V=V-V=4370-1760=2610〔万立方米库容系数:β=×100%=×100%=1.00%<2>若为年调节:h=0.25H=0.25×56.12=14.03〔m此时,死水位Z=Z-h=235-14.03=220.97<m>由那岸水电站水库水位~库容关系曲线查得V=2076〔万立方米V=V-V=4370-2076=2294〔万立方米库容系数β=×100%=×100%=0.88%〔3若为日调节:h=2m此时,死水位Z=Z-h=235-2=233<m>由那岸水电站水库水位~库容关系曲线查得V=3952〔万立方米V=V-V=4370-3952=418〔万立方米库容系数β=×100%=×100%=0.16%方案四:Z=245m,查得V=7060万立方米〔1若为多年调节:h=0.30H=0.30×66.12=19.836<m>此时,死水位Z=Z-h=245-19.836=225.164<m>由那岸水电站水库水位~库容关系曲线查得V=2600〔万立方米V=V-V=7060-2600=4460〔万立方米库容系数:β=×100%=×100%=1.7%<2>若为年调节:h=0.25H=0.25×66.12=16.53〔m此时,死水位Z=Z-h=245-16.53=228.47<m>由那岸水电站水库水位~库容关系曲线查得V=3104〔万立方米V=V-V=7060-3104=3956〔万立方米库容系数β=×100%=×100%=1.52%〔3若为日调节:h=2m此时,死水位Z=Z-h=245-2=243<m>由那岸水电站水库水位~库容关系曲线查得V=6440〔万立方米V=V-V=7060-6440=620〔万立方米库容系数β=×100%=×100%=0.24%综上,四个方案得出的水库特性均为日调节消落深度为:h=2m设计历时保证率的确定1.根据电力系统中水电容量的比重,由规范确定。已知那岸水电站初步规划N=2~4万千瓦,近期在本县联网运行。目前大新县已建水电站有:中军潭水电站〔1400千瓦、隘江水电站〔196千瓦、下雷水电站〔80千瓦,远不能满足负荷要求。2.设计历时保证率的确定η===<26.76%~51.45%>大部分落在区间25~50上,设计保证率为90%~95%。又因为该水电站是小型水电站,水电站选取的保证率越高,则水电站的投资越大,故取下限值,即P=90%各方案水能计算按照那岸水文站全部实测平均流量系列,逐旬进行计算和绘制各方案出力保证率曲线。将全部实测旬平均流量系列,按其大小分组,统计计算各组出现的累积次数和相应的经验频率,将其电算结果列于表1。计算并绘制水电站出力~保证率曲线,N=AQH,A=8。计算并绘制出力~发电量〔N~E关系曲线。根据各方案计算的分组流量相应出力,自小至大分层计算各出力之间的发电量△E和累计发电量∑E,并绘制N~E关系曲线。各方案出力~保证率计算表Q〔秒立米〔秒立米Z〔米H=Z-Z-H〔米N=AH〔万千瓦时mP〔%〔%方案一方案二方案三方案四方案一方案二方案三方案四>150150179.79035.21045.21055.21065.2104.2255.4256.6257.82515317.69017.690141~150145.5179.77035.23045.23055.23065.2304.1015.2656.4297.59316919.54018.615131~140135.5179.72535.27545.27555.27565.2753.8244.9085.9927.07618421.27020.405121~130125.5179.68035.32045.32055.32065.3203.5464.5505.5546.55819923.01022.140111~120115.5179.63835.36245.36255.36265.3623.2674.1915.1156.03921224.51023.760101~110105.5179.59035.41045.41055.41065.4102.9893.8334.6775.52123026.60025.55591~10095.5179.54435.45645.45655.45665.4562.7093.4734.2375.00124428.21027.40581~9085.5179.49935.50145.50155.50165.5012.4283.1123.7964.48026730.87029.54071~8075.5179.44935.55145.55155.55165.5512.1472.7513.3553.95928733.18032.02561~7065.5179.39435.60645.60655.60665.6061.8662.3902.9143.43831135.95034.56551~6055.5179.33035.67045.67055.67065.6701.5842.0282.4722.91635040.46038.20541~5045.5179.25935.74145.74155.74165.7411.3011.6652.0292.39338944.97042.71536~4038179.20035.80045.80055.80065.8001.0881.3921.6962.00041547.98046.47531~3533179.16135.83945.83955.83965.8390.9461.2101.4741.73844150.98049.48026~3028179.12035.88045.88055.88065.8800.8041.0281.2521.47648155.61053.29521~2523179.08035.92045.92055.92065.9200.6610.8451.0291.21352660.81058.21019~2019.5179.05035.95045.95055.95065.9500.5610.7170.8731.02955263.82062.31517~1817.5179.03235.96845.96855.96865.9680.5040.6440.7840.92459068.21066.01515~1615.5179.00036.00046.00056.00066.0000.4460.5700.6940.81862977.72070.46513~1413.5178.98836.01246.01256.01266.0120.3890.4970.6050.71369680.46076.59011~1211.5178.96536.03546.03556.03566.0350.3320.4240.5160.60874085.55083.7309~109.5178.94036.06046.06056.06066.0600.2740.3500.4260.50279591.91088.7307~87.5178.91236.08846.08856.08866.0880.2170.2770.3370.39784397.46094.6855~65.5178.88536.11546.11556.11566.1150.1590.2030.2470.29186499.88098.670方案一出力~发电量计算表〔%T=8760×〔%〔小时方案一E〔万千瓦时N〔万千瓦△N〔万千瓦△E〔万千瓦时98.6708643.4920.1590.1591374.3151374.31594.6858294.4060.2170.058481.07551855.39188.7307772.7480.2740.057443.04662298.43783.7307334.7480.3320.058425.41542723.85376.5906709.2840.3890.057382.42923106.28270.4656172.7340.4460.057351.84583458.12866.0155782.9140.5040.058335.4093793.53762.3155458.7940.5610.057311.15134104.68858.2105099.1960.6610.1509.91964614.60853.2954668.6420.8040.143667.61585282.22349.4804334.4480.9460.142615.49165897.71546.4754071.211.0880.142578.11186475.82742.7153741.8341.3010.213797.01067272.83838.2053346.7581.5840.283947.13258219.97034.5653027.8941.8660.282853.86619073.83632.0252805.392.1470.281788.31469862.15129.5402587.7042.4280.281727.144810589.29627.4052400.6782.7090.281674.590511263.88625.5552238.6182.9890.28626.81311890.69923.7602081.3763.2670.278578.622512469.32222.1401939.4643.5460.279541.110513010.43220.4051787.4783.8240.278496.918913507.35118.6151630.6744.1010.277451.696713959.04817.6901549.6444.2250.124192.155914151.204方案二出力~发电量计算表〔%T=8760×〔%〔小时方案二△E〔万千瓦时E〔万千瓦时N〔万千瓦△N〔万千瓦98.6708643.4920.2030.2031754.6291754.62994.6858294.4060.2770.074613.7862368.41588.7307772.7480.350.073567.41062935.82683.7307334.7480.4240.074542.77143478.59776.5906709.2840.4970.073489.77773968.37570.4656172.7340.570.073450.60964418.98466.0155782.9140.6440.074427.93564846.92062.3155458.7940.7170.073398.4925245.41258.2105099.1960.8450.128652.69715898.10953.2954668.6421.0280.183854.36156752.47049.4804334.4481.210.182788.86957541.34046.4754071.211.3920.182740.96028282.30042.7153741.8341.6650.2731021.5219303.82138.2053346.7582.0280.3631214.87310518.69434.5653027.8942.390.3621096.09811614.79232.0252805.392.7510.3611012.74612627.53729.5402587.7043.1120.361934.161113561.69927.4052400.6783.4730.361866.644814428.34325.5552238.6183.8330.36805.902515234.24623.7602081.3764.1910.358745.132615979.37822.1401939.4644.550.359696.267616675.64620.4051787.4784.9080.358639.917117315.56318.6151630.6745.2650.357582.150617897.71417.6901549.6445.4250.16247.94318145.657方案三出力~发电量计算表〔%T=8760×〔%〔小时方案三E〔万千瓦时N〔万千瓦△N〔万千瓦△E〔万千瓦时98.6708643.4920.2470.2472134.9432134.94394.6858294.4060.3370.09746.4972881.43988.7307772.7480.4260.09699.5473580.98683.7307334.7480.5160.089652.7934233.77976.5906709.2840.6050.089597.1264830.90570.4656172.7340.6940.089549.3735380.27966.0155782.9140.7840.089514.6795894.95862.3155458.7940.8730.089485.8336380.79158.2105099.1961.0290.156795.4757176.26553.2954668.6421.2520.2231041.1078217.37249.4804334.4481.4740.222962.2479179.62046.4754071.211.6960.222903.80910083.42842.7153741.8342.0290.3331246.03111329.45938.2053346.7582.4720.4431482.61412812.07334.5653027.8942.9140.4421338.32914150.40232.0252805.393.3550.4421239.98215390.38429.5402587.7043.7960.4411141.17716531.56227.4052400.6784.2370.4411058.69917590.26125.5552238.6184.6770.44984.99218575.25323.7602081.3765.1150.439913.72419488.97722.1401939.4645.5540.439851.42520340.40220.4051787.4785.9920.438782.91521123.31718.6151630.6746.4290.437712.60521835.92117.6901549.6446.6250.196303.73022139.652方案四出力~发电量计算表〔%T=8760×〔%〔小时方案四E〔万千瓦时N〔万千瓦△N〔万千瓦△E〔万千瓦时98.6708643.4920.2910.2912515.2562515.25694.6858294.4060.3970.106879.2073394.46388.7307772.7480.5020.106823.9114218.37483.7307334.7480.6080.105770.1494988.52376.5906709.2840.7130.105704.4755692.99870.4656172.7340.8180.105648.1376341.13566.0155782.9140.9240.105607.2066948.34162.3155458.7941.0290.105573.1737521.51458.2105099.1961.2130.184938.2528459.76653.2954668.6421.4760.2631227.8539687.61949.4804334.4481.7380.2621135.62510823.24546.4754071.212.0000.2621066.65711889.90242.7153741.8342.3930.3931470.54113360.44238.2053346.7582.9160.5231750.35415110.79734.5653027.8943.4380.5221580.56116691.35732.0252805.393.9590.5221464.41418155.77129.5402587.7044.4800.5211348.19419503.96527.4052400.6785.0010.5211250.75320754.71825.5552238.6185.5210.521164.08121918.79923.7602081.3766.0390.5191080.23422999.03422.1401939.4646.5580.5191006.58224005.61520.4051787.4787.0760.518925.91424931.52918.6151630.6747.5930.517843.05825774.58717.6901549.6447.8250.232359.51726134.1053.确定各方案保证出力由出力~保证率曲线查得,P=90%时方案一:N=0.217方案二:N=0.277方案三:N=0.337方案四:N=0.397初步各方案的装机容量供电范围及负荷水平那岸水电站近期供电主要对象为大新县境内的518矿区、桂南锰矿、大新铝锌矿等矿区,另外还供县办小型厂〔机械厂、化肥厂、农药厂等和农业灌溉及居民用电,系统负荷初步估计为8.1万千瓦。远期纳入XX电网运行。水电站最大工作容量的确定由于缺乏完整的日负荷图,故只能按经验公式来估算。〔1判别水电站承担系统负荷情况P〞=8.1万千瓦,K=1.1,γ=0.85,β=0.70方案N〔万千瓦P〞〔γ-βKNKN与P〞〔γ-β的大小关系判别方案一0.2171.2150.2387KN<P〞〔γ-β担任峰荷及部分腰荷方案二0.2771.2150.3047KN<P〞〔γ-β担任峰荷及部分腰荷方案三0.3371.2150.3707KN<P〞〔γ-β担任峰荷及部分腰荷方案四0.3971.2150.4367KN<P〞〔γ-β担任峰荷及部分腰荷由判别式计算水电站的最大工作容量N=方案一:N==1.077〔万千瓦方案二:N==1.217〔万千瓦方案三:N==1.342〔万千瓦方案四:N==1.457〔万千万水电站备用容量的确定负荷备用容量:根据水利动能设计规范,可采用系统最大负荷的5%,即N=5%P〞=5%×8.1=0.405〔万千万事故备用容量:由于本电站水库调节库容小,调节性能差,不宜担任事故备用容量,N=0。检修备用容量:一般水电站检修安排在负荷低落期,以充分利用水电站的空闲容量,故本电站不再设置检修备用容量N=0,。所以水电站备用容量N=N+N+N=0.405水电站重复容量的确定计算重复容量的经济利用小时数h≥其中,K=500元/度,P=3%,r=8%,α=1.05,f=b.d,b=0.45公斤/度,d=48元/吨由i=8%,n=25年查得,=0.09368h≥=2726.631<小时>〔2将重复容量的经济利用小时换算为百分数后,在出力持续曲线上即可查得各方案经济装机容量N。×100%=×100%=31.13%查出力持续曲线得N如下表初步各方案的装机容量方案经济利用小时数百分数〔%N〔万千瓦方案一31.132.147方案二31.132.751方案三31.133.355方案四31.133.959水电站重复容量N=N-N-N各方案的重复容量方案N〔万千瓦N〔万千瓦N〔万千瓦N〔万千瓦方案一2.1471.0770.4050.665方案二2.7511.2170.4051.129方案三3.3551.3420.4051.608方案四3.9591.4570.4052.097多年平均年发电量计算由初定N查N~E曲线,即得该方案的多年平均年发电量。多年平均年发电量方案初定装机容量N〔万千瓦多年平均年发电量〔万千瓦时方案一2.1479862.151方案二2.75112627.537方案三3.35515390.384方案四3.95918155.771八、各方案经济计算各方案经济分析计算要求用效益费用比、增值效益费用比和内部回收率方法进行计算。基本资料枢纽总投资K:按表4绘制Z~K曲线,按各方案Z查取。各方案施工期m:正常蓄水位较低的第一、二方案为三年,正常蓄水位较高的第三、四方案为四年。各方案施工期各年投资占总投资的比例为:m=3年,取30%;45%;25%m=4年,取20%;40%;30%;10%年利率:取8%工程使用年限:水工建筑物使用年限按50年计算,机电设备使用年限按25年计算。机电设备更新费根据各方案装机容量按400元/千瓦计算。售电收入根据各方案多年平均发电量扣除厂用电计算,经济分析采用理论电价,按0.20元/度计,厂用电年发电量0.2%计。年运行费:根据各方案多年平均年发电量按0.01元/度计算。各方案均以工程全部建成开始投入运行的年份作为折算基准年。2.资金流程图第一、二方案资金流程图:第三、四方案资金流程图:3.各正常蓄水位方案动能技术经济指标计算〔1正常蓄水位:方案一:Z=215m;方案二:Z=225m;方案三:Z=235m;方案四:Z=245m〔2死水位:方案一:Z=213m;方案二:Z=223m;方案三:Z=233m;方案四:Z=243m〔3保证出力:方案一:N=0.217万千瓦;方案二:N=0.277万千瓦;方案三:N=0.337万千瓦;方案四:N=0.397万千瓦〔4装机容量:方案一:N=2.147万千瓦;方案二:N=2.751万千瓦;方案三:N=3.355万千瓦;方案四:N=3.959万千瓦〔5多年平均年发电量:方案一:=0.986亿度;方案二:=1.263亿度;方案三:=1.539亿度;方案四:=1.816亿度〔6工程量:由那岸水电站正常蓄水位~枢纽工程关系曲线可以查的,Z=215m、225m、235m、245m时,工程量为17.6、25.2、32.52、40.5万立米。〔7工程总投资K:由那岸水电站正常蓄水位~枢纽建设总投资关系曲线可以查的,Z=215m、225m、235m、245m时,K=3360、4060、4950、6187.5万元。〔8施工期:方案一、二m=3年,方案三、四m=4年〔9机电设备更新费K:K=400×N得〔10年运行费:U=0.01×10000得〔11年售电收入B:B=<1-0.2%>××0.2×10000〔12工程总投资折算值K:K=∑k<1+i>〔13机组更新折现值K:K=K/<1+i>〔14工程总运行费折现值:=U×[]〔15工程总效益折现值B:B=B×[〔16效益费用比:B/〔K+K+〔18单位千瓦投资K:K=K/N〔19单位电能投资K:K=K/〔20单位电能成本U:U=1<分/度>结果统计得下表:表6各正常蓄水位方案动能技术经济指标计算成果序号项目单位方案备注一二三四〔1正常蓄水位Z米215225235245〔2死水位Z米213223233243〔3保证出力N万千瓦0.2170.2770.3370.397〔4装机容量N万千瓦2.1472.7513.3553.959〔5多年平均发电量亿度0.9861.2631.5391.816〔6工程量万立米17.625.232.5240.5〔7工程总投资K万元3360406049506187.5〔8施工期m年3344〔9机电设备更新费K万元858.81100.413421583.6K=400×N
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 置换购车合同范例
- 矿山咨询合同范例
- 公房土地分割合同范例
- 出买房合同范本
- 门面房装修合同范本模板3篇
- 污水处理运营协议书全文
- 2024年度人力资源服务合同标的的招聘与培训2篇
- 矿山内部 转让合同模板
- 2024年度技术开发合同:某软件公司委托开发人工智能应用系统的合同3篇
- 水泥钢材材料购买合同模板
- 青岛版四年级上册数学课程纲要
- 摄影摄像知识竞赛考试题库500题(含答案)
- DL∕T 1100.1-2018 电力系统的时间同步系统 第1部分:技术规范
- Unit 4 Section A(2a-2f)课件人教版2024新教材七年级上册英语
- CJ/T 163-2015 导流型容积式水加热器和半容积式水加热器
- 个税专项附加扣除的政策影响及优化分析
- 人民陪审员培训教课件
- 泸州老窖“浓香文酿杯”企业文化知识竞赛考试题库大全-下(多选、填空题)
- 《Excel数据分析》考试复习题库(含答案)
- YC/T 613-2024烟草企业有限空间作业安全技术规范
- 离婚返还彩礼起诉状范本合集
评论
0/150
提交评论