/Construction
of
the
Project
Management
of
the
importance
of
organization
design
Abstract:
The
construction
organization
is
a
construction
project
and
guide
the
importanttechnical
and
economic
documents.
Can
regulate
the
construction
workers,
machinery,
raw
materials,
environment,
technology,
equipment,
construction,
installation,
management,
production
and
other
conflicts,
to
supervise
the
construction
and
control
of
organizational
design
in
order
to
ensure
scientific
and
rational
project
high-quality,
low
cost,
less
the
completion
of
energy.
Keywords:
project
management;
construction
organization;
design;
importance
Construction
design
and
project
construction
is
an
important
document
guiding
construction,
construction
enterprises
are
able
to
high-quality,
high
speed,
low
cost,
low
consumption
of
completed
building
projects
to
ensure
effective
measures,
but
also
strengthen
the
management,
the
importance
of
improving
economic
efficiency
means,
is
also
properly
handle
the
construction
workers,
machinery,
raw
materials,
methods,
environment
and
technology
and
equipment,
civil
works
and
installation
of
collaboration,
consumption
and
supply,
management
and
production
and
other
kinds
of
contradictions,
scientific
and
rational,
planned
and
orderly
,
the
equilibrium
organization
of
production
and
an
important
guarantee
for
project
construction.
With
the
establishment
of
socialist
market
economy,
an
increasingly
competitive
construction
market,
the
objective
situation
of
construction
enterprises
have
become
increasingly
demanding,
not
only
in
technology
and
equipment,
personnel
quality,
the
construction
put
forward
higher
requirements
of
the
organizers,
and
engineering
economic
management
Pre-settlement
work
in
the
project
is
also
facing
new
challenges.
Strict
construction
market
situation,
some
construction
companies
are
not
actively
taken
measures,
professional
and
technical
staff
is
not
updated,
training,
science
and
technology
management
level
is
very
backward,
with
the
preparation
of
construction
design
review
did
not
attract
enough
attention,
so
there
will
be
the
following
common
situations:
(1)
audit
is
not
compiled
before
the
start
of
construction
organization
design:
not
to
pursue
the
construction
of
floor
plans,
materials,
cluttered,
moving
out
of
import
of
machinery
and
equipment,
unplanned
demand
for
labor,
quality,
security,
construction
without
assurance
measures,
resulting
in
nest
Workers
serious
waste
management
lower.
(2)
whether
it
is
the
preparation
of
construction
design
professionals:
In
order
to
cope
with
the
higher
authorities
and
supervisory
agencies,
Party
member
or
check
the
information
to
the
construction
workers
on
behalf
of
the
Code
construction
design,
because
the
data
simply
do
not
know
right
now
who
is
a
leading
construction
management
recent
arrangements,
had
casually
made
up,
just
go.
(3)
the
preparation
of
the
low
level
of
construction
organization
design:
Some
construction
units,
construction
organizations
do
not
understand
the
importance
of
the
construction
process,
to
write
about
the
sub-construction
process,
draw
a
floor
plan,
schedule
progress,
it
regarded
construction
organization
design.
(4)
to
abandon
technology
economy:
a
considerable
number
of
construction
enterprises
in
the
preparation
of
construction
organization
design,
construction
organization
which
only
concerned
the
various
sub-project
of
the
technical
measures,
without
considering
the
sub-project
aspects
of
economic
indicators,
leading
to
the
completion
of
settlement
disputes
about
economic
loss.
[Example
1]
in
a
district
of
Nanning
City,
the
life
of
a
dormitory
building
to
be
a
form
of
water
renovation
project,
but
because
the
dormitory
was
built
in
the
eighties,
has
been
twenty
years,
the
owners
between
buildings
without
authorization
of
their
own
debris
occupied
the
public
space
of
normal
channels,
resulting
in
too
narrow
passage
between
two
buildings,
traffic
problems,
so
the
resulting
need
for
manual
handling
of
construction
materials
to
construction
sites,
construction
materials
are
stated
not
to
enter
the
venue
and
request
for
additional
materials
secondary
transportation
fee,
Party
A
will
not
sign
recognition,
resulting
in
economic
losses.
If
the
construction
units
in
the
field
before
the
start
of
the
investigation,
carefully
review
the
preparation
of
construction
design
and
engineering
contract
be
described
in
the
notes,
you
can
reduce
unnecessary
trouble.
[Example
2]
of
a
residential
building
project
excavation,
construction
site
is
not
large,
the
construction
unit
construction
with
construction
design,
but
no
earth
survey
program,
no
excavation
of
the
slope
coefficient
of
discharge,
nor
the
accumulation
of
pre-construction
earthwork
calculation,
the
original
machine
in
the
pit
excavation
uppercut
on
it,
because
there
is
no
construction
design
survey
on
the
ground,
resulting
in
ruptured
a
nearby
residential
building
to
the
water,
resulting
in
increased
costs
of
grading
required
to
show
there
is
no
clear
,
resulting
in
a
Jixietaiban
increase
moving
away
more,
but
also
back
when
the
backfill
backfill,
resulting
in
construction
enterprises
in
the
economy
by
the
economic
loss
in
vain.
[Example
3]
Construction
of
a
residential
building
products
business
in
the
construction
process,
when
preparing
to
start
construction
organization
is
very
simple,
even
the
template
sub-project
calculations
are
not,
in
the
basement
of
the
construction
of
the
installation
template
template
installation
height
of
5
m,
maximum
beam
for
the
600
×
1200,
thickness
250,
in
the
erection
of
experience
by
the
workers
under
their
erection,
supervision
and
acceptance
can
not
be
acceptance
of
the
results,
but
also
re-checking,
the
results
support
the
strength
of
pole
did
not
meet
the
template
requirements
of
a
full
return
to
work.
Rework
the
economic
losses
can
be
imagined.
Such
as
steel
is
now
more
fitting
to
discuss
the
situation,
the
tender
list
or
did
not
say
by
welding
sleeve,
you
said
in
the
welding
construction
organization,
it
can
talk
with
the
sleeve
construction
of
a
visa;
Earthwork
and
temporary
facilities
in
the
Shih
group
calculated
as
long
as
the
excess
of
the
quota
rules
set
paved
the
way
is
part
of
the
claim.
The
problem
is
now
that
this
file
is
isolated,
not
construction,
not
cost,
because
it
is
not
targeted.
The
above
three
examples
fully
show
that
the
construction
design
in
the
construction
process
as
well
as
pre-settlement
project
plays
an
important
role,
not
only
organized
the
construction
of
organizational
design,
guiding
production
role
in
the
objective
economic
management
has
become
a
very
important
can
not
be
ignored
component.
Construction
design
is
the
arrangement
of
a
construction
company
building
a
comprehensive
technical
and
economic
documentation
of
construction
products.
The
depth
of
the
content
of
their
preparation,
can
be
divided
into
construction
design,
construction
organization
design,
construction
design
outline
and
so
on.
Meaning:
in
order
to
process
the
entire
project
implementation
macro-control.
Complete
the
construction
of
a
sub-organization
design
should
include:
project
overview,
construction
methods,
quality
assurance
measures,
manpower
and
machinery
plan
and
guarantee
measures,
construction
of
network
diagrams,
and
bar
charts,
safety
measures,
details
of
resources,
energy
conservation
measures,
construction
period
to
ensure
measures.
Implementation
of
the
project
in
the
construction
of
the
session,
the
price
of
construction
projects
through
the
construction
drawings
to
determine
the
general
preparation
of
the
budget,
the
determination
of
the
construction
contract
price,
engineering
and
project
final
settlement
price
to
determine
price
and
other
processes.
Construction
design
of
which
is
the
main
factor
of
the
project
cost,
therefore,
project
cost
management,
construction
design
must
pay
close
attention
as
an
important
link
in
this
regard
should
address
the
following
two
aspects
of
the
relations.
Fixed
construction
budget
to
reflect
the
actual
construction
of
each
sub-part
of
the
construction
process
of
each
project
component
of
labor,
materials,
Jixietaiban
consumption
standards.
It
is
to
identify
and
control
the
construction
and
installation
cost
base;
is
to
design
technical
and
economic
comparison,
based
on
technical
and
economic
analysis;
is
the
construction
unit
based
on
the
analysis
of
economic
activities;
the
preparation
of
bidding
price,
bidding
price
of
the
base;
is
the
preparation
of
the
fixed
budget
and
estimates
based
on
indicators;
is
construction
drawing
budget,
project
contracts,
project
budget
and
project
an
important
basis
for
final
prices,
but
the
budget
is
fixed
under
normal
construction
conditions,
the
majority
of
the
construction
unit
to
the
current
level
of
machinery
and
equipment,
the
reasonable
construction
period
,
construction
technology,
labor
organizations
based
on
each
sub-part
of
the
preparation
of
the
consumption
of
the
project.
However,
construction
of
the
project
there
are
many
special
cases
in
which
sub-part
of
the
project
construction
method
is
not
necessarily
the
same
under
a
fixed
budget,
as
currently
stipulated
in
the
budget
scale,
"based
on
construction
design
OK"
and
so
on.
Such
as
"consumption
of
fixed
construction
Guangxi
Zhuang
Autonomous
Region",
the
earth
and
stone
work
on
the
manual
calculation
rules.
Trench
digging,
earthwork
grading
time
required
to
"construction
design"
shall
be
calculated,
"construction
design"
no
clearly
defined,
put
the
slope
coefficient
by
a
fixed
proportion
of
the
implementation
of
the
provisions.
Construction
projects
with
construction
design
is
closely
related
to
project
cost.
The
basic
construction
design
includes:
project
overview
and
analysis
of
construction
conditions,
construction
programs,
construction
technology,
construction
schedule,
construction
general
layout.
There
are
economic
analysis
and
construction
preparation
work
plan.
Among
them,
the
construction
program
and
construction
process
is
more
important
to
determine,
for
example:
the
choice
of
construction
machinery,
horizontal
transport
method
of
choice,
moving
the
main
structure
of
the
construction
methods
and
construction
methods
and
construction
technology
of
choice,
etc.,
are
a
direct
impact
on
project
budget
price
changes.
In
ensuring
the
quality
and
meet
the
owners
requirements
and
schedule
requirements
of
the
premise,
optimize
the
construction
program
and
construction
process
is
to
control
the
cost
of
investment
projects
and
reduce
the
importance
of
measures
and
means.
Construction
design
is
not
only
an
important
guiding
document
production
and
management
activities,
preparation
of
construction
plans
is
an
important
basis
for
the
budget.
Therefore,
the
construction
unit
leaders
before
the
start
of
the
unit
project
to
tissue
engineering,
materials
and
equipment,
industrial
scale,
economic
planning,
project
cost
and
other
personnel
to
seriously
familiar
with
the
drawings,
in-depth
on-site
field
survey
of
the
technical
and
economic
organizational
measures.
Project
cost
in
the
preparation
of
construction
design
is
directly
related
to
the
economic
interests
of
enterprises,
because,
in
the
project
cost
management
and
implementation
of
the
provisions
of
the
budget
scale,
the
cost
of
personnel
staff
plays
the
role
of
business
manager
in
charge;
in
the
bidding
and
construction
contract,
the
cost
commissioned
by
the
enterprise
legal
person
can
be
used
as
the
legal
representative
of
the
agent,
the
exercise
of
powers
conferred
by
enterprise
legal
person;
in
the
construction
and
budget
work,
supervision
plays
a
role
in
the
economy.
Therefore,
the
full
cost
of
in-house
staff
not
only
understands
technology,
understand
the
policy,
but
also
understands
the
role
of
legal
expertise
and
is
prepared
well
construction
design
and
improve
an
important
aspect
of
economic
efficiency
of
enterprises,
but
also
works
to
overcome
and
avoid
an
economic
dispute
settlement
reasonable
and
effective
way.
Finally,
the
construction
organization
of
this
document
is
very
important,
it
is
the
technical
and
economic
documents.
Construction
of
the
project,
be
sure
to
supervise
the
construction
and
control
of
organizational
design
to
ensure
the
project's
construction
order,
to
prevent
the
construction
design
a
mere
formality.
Engineering
construction
design
is
the
quality,
safety,
effective
measures
to
guarantee
progress.浅谈项目管理中施工组织设计重要性
摘要:施工组织是项目建设和指导工程施工的重要技术经济文件。能调整施工中人员、机器、原料、环境、工艺、设备、土建、安装、管理、生产等冲突,要对施工组织设计进行监督和限制,才能科学合理的保证工程项目高质量、低成本、少耗能的完成。
关键字:项目管理;施工组织;设计;重要性
施工组织设计是项目建设和指导工程施工的重要文件,是建筑施工企业单位能以高质量、高速度、低成本、少消耗完成工程项目建筑的有力保证措施,也是加强管理、提高经济效益的重要手段,也是很正确处理施工中人员、机器、原料、方法、环境及工艺和设备,土建和安装协作,消耗和供应,管理和生产等各种各样的冲突,科学合理地、支配而有序地、均衡地组织项目施工生产的重要保障。
随着社会主义市场经济的建立,建筑市场的竞争日趋激烈,客观形势对施工企业的要求越来越高,不仅在技术装备、人员素养、施工组织者方面提出较高的要求,而且工程经济管理工作中有关工程预结算也面临新的挑战。严谨建筑市场形势下,有些施工企业没有主动实行应对措施,对员工的专业技术没有更新、培训,科学技术管理水平相当落后,加上对编制审核施工组织设计没有引起足够的重视,因此就会出现以下几种常见的状况:
(1)开工前没有编制审核施工组织设计:不搞施工平面布置图,材料乱堆乱放,土方运出运进,机械设备、劳动力需求无支配,工程质量、平安施工无保证措施,造成窝工奢侈现象严峻,管理水平较低。
(2)是否是专业人员编制施工组织设计:为应付上级部门及监理单位、甲方检查而给施工员或资料员代编施工组织设计,因为资料根本对现在的施工管理不了解而又是领导最近支配的,不得不胡乱编造,应付了事。
(3)施工组织设计编制水平低:有的施工单位,不明白施工组织在施工过程中的重要性,写一写各分项施工工艺、画张平面布置图、工程进度支配表,便认为是施工组织设计了。
(4)要技术弃经济:相当多的施工企业单位在编制施工组织设计时,只重视施工组织当中的各分项工程的技术措施,没有考虑分项工程经济指标方面内容,导致工程竣工结算时纠纷不断,蒙受经济损失。
[例1]南宁市某小区某宿舍楼要对生活用水进行一户一表改造工程,但由于宿舍楼是八十年头建成的,已经有二十几年了,业主擅自由楼和楼之间的自家杂物用房挤占了公用正常的通道,导致两楼之间通道过于狭窄,通车困难,所以造成了施工材料须要人力搬运到施工地点,施工单位则以材料未进入场地而要求增加材料的二次搬运费,甲方不予签认,造成了经济损失。假如施工单位在开工前进行现场勘测,细致编制审核施工组织设计并在工程承包合同中附注加以说明,则可削减不必要的麻烦。
[例2]某住宅楼工程的基坑开挖,施工现场并不宽敞,施工单位施工时有施工组织设计,但是无土方调查方案,没有开挖的放坡系数,也未进行施工前土方积累计算,原本上勾机在坑上开挖就可以了,就因为施工组织设计中没有对地下调查,导致挖破了旁边居民楼的给水管,致使成本增加,对放坡要示也没有明确
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 年度办公设备租赁服务合同04
- 健身俱乐部运营管理咨询合同2024年度
- 个人债权转让合同书
- 苗木购销合同简化 苗木购销合同下载
- 全新小企业劳动合同范本
- 物业房屋出租租赁合同
- 煤矿生产设备维修合同(2024版)
- 桥梁工程劳务协议
- 预防医学史周华课件
- 服装厂简易劳务合同范本电子版
- 2023年国家公务员考试《申论》真题(副省卷)及答案解析
- 【初中道法】爱护身体+课件-2024-2025学年统编版(2024)道德与法治七年级上
- 《品牌推广策划案N》课件
- 智慧旅游景区建设规划方案
- 2024年医疗器械经营质量管理规范培训课件
- 代办消防验收合同范本共22024年
- 电缆隧道施工合同
- 2023年中考英语模拟卷(河南专用)(原卷版)
- 2024-2025学年福建省百校联考高三上学期10月测评物理试题及答案
- 景区旅游安全风险评估报告
- GB/T 36187-2024冷冻鱼糜
评论
0/150
提交评论