关于砖砌体施工方案的知识_第1页
关于砖砌体施工方案的知识_第2页
关于砖砌体施工方案的知识_第3页
关于砖砌体施工方案的知识_第4页
关于砖砌体施工方案的知识_第5页
已阅读5页,还剩32页未读 继续免费阅读

下载本文档

版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领

文档简介

关于砖砌体施工方案的知识

关于砖砌体施工方案的知识XX市XX安置房、公租房工程填充墙砌体专项施工方案XX建筑集团总公司二〇一一年十月目录1编制说明········································································11.1编制目的········································································11.2编制原则········································································11.3编制依据········································································12工程概况········································································22.1工程简介········································································22.2参建单位概况··································································22.3砌体工程概况··································································23施工部署········································································33.1施工准备·······································································33.2材料准备········································································33.3机具准备········································································33.4劳动力计划·····································································44主要施工方法··································································44.1砖墙体砌筑·····································································44.2蒸压加气混凝土砌块墙体砌筑·············································54.3填充墙砌体构造及注意事项················································55质量管理措施··································································95.1质量控制措施与检验标准···················································95.2成品保护措施································································106安全文明施工措施···························································117环境保护措施·································································111编制说明1.1编制目的为了指导本工程填充墙砌体分项工程施工,加强质量、安全文明施工和环境保护的管理,使填充墙砌体施工符合技术先进、经济合理、安全适用的原则,确保工程质量,编制本方案。1.2编制原则1、符合本工程的施工图纸、设计文件和合同要求,符合国家现行的相关规范、规程、标准以及相关文件要求;2、结合本工程实际概况,以便于现场施工操作为前提进行编制;3、满足安全文明施工和环境保护要求;4、达到创优质工程的质量目标要求。1.3编制依据1、《砌体结构工程施工质量验收规范》GB50203-20202、《建筑节能工程施工质量验收规范》GB50411-20203、《砌体结构设计规范》GB50003-20204、《建筑装饰装修工程质量验收规范》GB50210-20015、《建筑抗震设计规范》GB50011-20206、《建筑工程施工质量验收统一标准》GB50300-20017、《建筑工程施工质量评价标准》GB/T50375-20208、《建筑施工安全检查标准》JGJ59-20209、《节能建筑评价标准》GB/T50668-202010、《混凝土结构后锚固技术规程》JGJ145-200411、《居住建筑节能工程施工技术规程》DBJ13-82-202012、《建筑机械使用安全技术规程》JGJ33-202013、《砌体填充墙结构构造》06SG614-114、《建筑物抗震构造详图》11G329-115、《蒸压加气混凝土砌块建筑构造》03J10416、《钢筋混凝土过梁》03G322-117、XX市XX安置房、公租房工程施工图纸18、XX市XX安置房、公租房工程施工合同19、XX市XX安置房、公租房工程施工图纸和施工合同20、我司的《质量、环境和职业健康安全管理手册》及相关规定文件21、我司以往类似工程经验2工程概况2.1工程简介本工程为XX市XX安置房、公租房工程,位于XX市XX街道,东侧为规划路,西侧为XX路,南侧为其他用地,北侧为XX路。总用地面积68227.2m2,建筑占地面积21724.42m2,总建筑面积为296701.09m2(其中地下建筑面积为46414.54m2。本工程1#~10#、13#楼为一类高层建筑,一、二层裙房为单间商铺、门厅、配套服务用房、配电室等,三~三十二层为住宅;11#、12#楼为二类高层建筑,一、二层裙房为单间商铺、门厅、配套服务用房等,三~十八层为住宅;属新建大型民用建筑。施工范围包含建筑、结构、电气、给排水、通风等专业单体、室外工程,不包含室内二次装修、绿化环境工程、变配电室等项目。工程总造价约6亿元,总工期23个月。2.2参建单位概况建设单位:XX市房屋建设开发勘察单位:福建省XX工程勘察院设计单位:厦门XX设计院监理单位:XX市XX监理事务所施工单位:XX建筑集团总公司质量安全监督单位:XX市建设工程行政执法大队2.3砌体工程概况名称使用部位墙厚规格强度砂浆强度水泥实心砖卫生间、厨房115240*115*53MU10M5.0电梯井180水泥多孔砖楼梯间、分户墙(含裙楼内墙及地下室190190*190*90上部主楼户内隔墙90190*90*90蒸压加气混凝土砌块所有外墙202000*200*180MU5配套砂浆M7.53施工部署3.1施工准备1、栋号长应熟悉图纸,了解各墙体砌筑材料的品种、规格、尺寸和强度等级,做好选材计量工作。2、砌体施工队伍进场后应接受三级教育,上报花名册并对其人员的食宿进行安排。3、砌筑前,墙体基层应经验收合格;墙体拉结筋抗拔承载力经检测合格并已验收;砌筑部位的楼地面、灰渣杂物及高出部分应清除干净。4、在结构墙、柱上弹好+500mm标高水平线,在墙体基层面上弹好墙身轴线、墙边线、门窗洞口和柱子的位置线。5、做好地面垫层;在蒸压加气混凝土砌块墙底部,砌好踢脚板高度的多孔砖墙或浇混凝土基础带。6、砌筑前2d,应将砖或砌块及与原结构相接处,洒水湿润,以保证砌体良好粘结。7、按砖或砌块每皮高度制作皮数杆,在墙转角处、楼梯间及内外墙交接处按标高立好皮数杆,皮数杆的间距以15~20m为宜,在两相对皮数杆之间拉准线。8、对进场的砖和砌块型号、规格、数量和堆放位置等已进行检查、验收,能满足施工要求。砖和砌块应按类别和规格分类码放。堆垛上应设标志。堆放场地应平整,并做好排水。9、所需机具设备已准备就绪,并已安装就位。10、砖和砌块表面的污物和泥土均应清除干净。3.2材料准备1、各栋号长及施工员应认真审阅图纸,做好砌筑材料的品种、规格、尺寸和强度等级等的计量工作,并根据进度计划进场。2、材料的装卸应用砖夹搬运,以免造成砖或砌块的破损;蒸压加气混凝土砌块在搬运过程中应轻拿轻放。3、材料进场后应在指定的堆放场地卸载,并且应按品种、规格等分类码放,堆置高度不宜超过2m。4、砌筑前,应提前2d对砖或砌块进行洒水湿润,以保证砌体良好粘结。3.3机具准备本工程各栋号每一单元楼的砌体工程量相差不大(11#楼、12#楼除外,故各栋号的主要机具具体计划如下表,因11#楼、12#楼仅为18层的故也采取如下计划。1、主要工具(每一单元楼计划投入:名称数量名称数量名称数量大铲4刨锛2瓦刀4托线板8线坠4水平尺4皮数杆16泥桶12砖夹4小撬棍4木槌4手推胶轮车42、主要机械设备(每栋计划投入:名称数量名称数量名称数量磅秤1搅拌机1淋灰机1切割机2砂浆贮存罐1水泥贮存罐13.4劳动力计划根据本工程工期计划,各栋安排泥水工4人,砖块搬运工3人,砂浆搬运工3人,搅拌机操作工1人,砂和水泥搬运工2人。4主要施工方法4.1砖墙体砌筑1、砖墙砌筑前应先在防潮层或其他基层上根据弹好的位置线进行排砖,并在相接的墙体上弹出砖墙边线。窗间墙、扶壁柱的位置尺寸应符合排砖模数,若不符合模数时,可用七分头或丁砖排在窗间墙或扶壁柱的不明显部位进行调整。门窗洞口两边顺砖层的第一块砖应为七分头,各楼层排砖和门窗洞口位置应与底层一致。2、砌筑时先盘角,每次不得超过五层,随盘随吊线,使砖的层数、灰缝厚度与皮数杆相符。一道墙可先砌两头的砖,再拉准线砌中间部分。3、砌砖宜采用一铲灰、一块砖、一挤揉的“三一”砌砖法或采用铺浆法(包括挤浆法和靠浆法。水泥多孔砖砌筑时,应先砌筑三皮灌满砂浆的多孔砖,再往上均为倒扣砌筑。砖要砌得横平竖直,灰缝饱满,做到“上跟线,下跟棱,左右相邻要对平”。采用铺浆法砌筑时,铺浆长度不得超过750mm;当施工期间气温超过30℃时,铺浆长度不得超过500mm。多孔砖墙上下皮竖向灰缝相互错开,错开长度不应小于水泥多孔砖长的1/3。每砌五皮左右要用靠尺检查墙面垂直度和平整度,随时纠正偏差,严禁事后凿墙。4、砌筑砂浆应随搅拌随使用,水泥砂浆应在3h内使用完。砌筑时应随砌随将舌头灰刮尽。水平和竖向灰缝厚度不小于8mm且不大于12mm,一般控制在10mm。水平灰缝的砂浆饱满度不得低于80%,竖向灰缝砂浆应饱满,不得出现透明缝、瞎缝。5、水泥多孔砖墙中不够整砖部分,可用无齿锯加工制作非整块砖,不得用砍凿方法将砖打断;管槽留置时,可用弹线定位后凿槽或开槽,不得采用砍砖预留槽。6、砌体日砌高度不宜超过1.5m,雨天不宜超过1.2m。雨天砌筑时,砂浆稠度应适当减少。7、预留孔洞和穿墙等均应按设计要求砌筑,不得事后凿墙。8、本工程门窗口采用后塞门窗框,砌筑时应先弹好线再砌筑(线宽比门窗实际尺寸大10~20mm。9、窗台出檐砌筑时,窗台标高以下的一层砖,应砌过分口线60mm,挑出墙60mm,出檐砖的立缝要打碰头灰。砌筑虎头砖时,斗砖应砌过分口线120mm,并向外倾斜20mm,挑出墙面60mm。10、扶壁柱砌筑时,应整砖砌筑,壁柱与墙身同时砌筑,逐皮搭接。其垂直灰缝至少错开1/4砖长,柱心不得有通缝,不许采用包心砌法。成排砖柱应拉通线砌筑,楼层柱的两个方向中心线应与下层柱吻合。砖柱日砌高度不得超过1.8m。灰缝宽度与砖墙相同。4.2蒸压加气混凝土砌块墙体砌筑1、砌筑前,按墙段实量尺寸和砌块规格尺寸进行排列摆块,不足整块的可锯截成需要尺寸,但不得小于砌块长度的1/3。最下一层人灰缝厚大于20mm时,应用细石混凝土找平铺砌。采用满铺满挤法砌筑,上下皮错缝砌结,转角处相互咬砌搭接,每隔二皮砌块钉扒钉一个,梅花形设置。砌块墙的丁字交接处应使横墙砌块隔皮露头。2、灰缝应横平竖直,砂浆饱满。水平灰缝厚度不得大于15mm;竖向灰缝宜用内外临时夹板夹住后灌缝,其宽度不得大于20mm。3、墙体洞口上部应防止2φ6mm钢筋,伸过洞口,每边长度不小于500mm。4、砌块与门窗框的联结采用后塞口,按洞口高度2m以内每边设置三块预制块,洞口高度大于2m时,每边设置四块预制块。5、蒸压加气混凝土砌块墙每天砌筑高度不宜超过1.5m,雨天不宜超过1.2m。4.3填充墙砌体构造及注意事项1、窗台压顶80高,C20混凝土同墙厚,内配2Ф10箍筋Ф6@200,两端伸入墙体或框架柱内,不少于300mm。2、管道井应在内壁随砌随抹平,至出屋面。厨房排气道为成品排气道,采用100厚砖砌外包。设备箱预留洞穿透墙体时,箱体背面为钢板网抹灰,网周边大于150mm。3、框架柱及剪力墙与砖隔墙应全高设置2Φ6竖向间距≤500mm的拉结筋,长度不小于墙长的1/5且≥700mm,当墙垛长度小于上述长度,则拉墙筋应伸满墙垛,拉结筋锚入柱内LaE且末端应加弯钩。(1隔墙之间拉结筋图:(2隔墙与剪力墙或框架柱之间拉结筋图:4、门窗洞口过梁选用图集《钢筋混凝土过梁》(03G322-1。荷载等级Ⅰ级,过梁支承长度为250mm。过梁底标高为洞顶标高。当过梁与框架柱相连时,主体结构施工时应在柱内预留过梁纵筋,待砌筑墙体时后浇过梁。5、除图中注明外,当墙长度大于5m时,在墙长中部设钢筋混凝土构造柱,无翼墙(悬墙端头亦应设置构造柱,构造柱截面:墙厚X200,配筋、Φ6@200。当墙高度大于4m时,在墙中部或门窗顶部设钢筋混凝土圈梁,截面:墙厚X200,配筋:4、Φ6@200。圈梁纵向钢筋应锚入框架柱或构造柱内。6、在填充墙中设有钢筋混凝土构造柱时,在砌筑前应先将构造柱的位置弹出,并把构造柱的插筋处理直(未预埋的应事先植筋。砌墙时与构造柱联结处,砌成马牙槎,每一马牙槎沿高度方向的尺寸应≤300mm。填充墙与构造柱之间应沿墙高每500mm设置2Φ6水平拉结筋,每边伸入墙内1m。详见下图:7、填充墙与承重墙或柱交接处,应在承重墙或柱内侧植入拉结筋,全高设竖向2Φ6间距≤500mm的拉结筋,伸入砌块墙水平灰缝内不小于墙长的1/5且≥700mm。当漏植拉结筋时,则可用粘结砂浆(体积配合比为:水泥:108胶:中砂=1:0.2:2,在砌块端头与立墙接触面各涂抹5mm厚的粘结砂浆,挤塞严实,将多余砂浆刮平。8、填充墙砌到接近上层梁、板底部时,应待下部平砌砖墙沉实后(一般在砌筑七天后用经加工成型的加气块或水泥实心砖斜砌挤紧,砖的倾斜60°度,砂浆应饱满密实。当墙长≥5m时,墙顶与梁(板应设拉结筋,详见下图(下一页:9、墙身防潮层于室内地面下60mm处,设20厚1:2.5水泥沙浆,(掺5%防水剂,当地面有高差时应沿墙身填土侧墙面设竖直防潮层与水平防潮层形成闭合。做法详见附图4。10、墙体不同材料连接处铺设镀锌钢丝加强网,宽200mm,搭接宽度不少于100mm。11、完全嵌入隔墙,防火墙,防火隔墙中安装的室内消火栓,其箱后部应保留10厚氧化镁防火板。12、地下室混凝土墙、柱阳角均应做1000mm高角钢护角,宽每边50mm。13、砌体在抹灰前时,墙面应全面进行界面剂处理,全部封闭孔隙,防止吸水。14、配电房墙体及顶棚须采取加贴镀锌电焊网DHW-1.9X9.53X9.53,并不小于2点接地,水泥砂浆抹平,隔音,防辐射屏蔽措施。5质量管理措施5.1质量控制措施与检验标准1、水泥实心砖、水泥多孔砖和蒸压加气混凝土砌块及其砌筑砂浆的强度等级必须符合设计要求。具体详见本方案2.3砌体工程概况。92、填充墙砌体的转角处和交接处应同时砌筑,严禁无可靠措施的内外墙分砌施工。对不能同时砌筑而又必须留置的临时间断处应砌成斜槎,斜槎水平投影长度不应小于高度的2/3。3、填充墙的的轴线位置及垂直度允许偏差应符合下表要求:填充墙砌体一般尺寸允许偏差项次1234项目轴线位移垂直度小于或等于3m大于3m表面平整度门窗洞口高、宽(后塞口)外墙上、下窗口偏移允许偏差(mm)105108±520检验方法用尺检查用2m托线板或吊线、尺检查用2m靠尺和楔形塞尺检查用尺检查用经纬仪或吊线检查4、墙体组砌方法应正确,上下错缝,内外搭砌(搭砌长度不应小于砖或砌块长度的1/3),砖柱不得采用包心砌法。同一面墙体的通缝不得超过2处。5、砌体的灰缝应横平竖直,厚薄均匀。砖砌体的灰缝不小于8mm且不大于12mm,一般为10mm;蒸压加气混凝土砌块的水平灰缝厚度不得大于15mm,竖向灰缝宽度不得大于20mm。6、填充墙砌体的砂浆饱满度应及检验方法见下表:填充墙砌体的砂浆饱满度及检验方法砌体分类水泥多孔砖砌体加气混凝土砌块灰缝水平垂直水平垂直饱满度及要求≥80%填满砂浆,不得有透明缝、瞎缝、假缝。≥80%≥80%检验方法采用百格网检查块材地面砂浆的粘结痕迹面积7、墙体砌筑时,严禁出现不同材料混砌。8、砌体留置的拉结钢筋或网片的位置应与砖或块体皮数相符合拉结钢筋或网片应置于灰缝中,埋置长度应符合设计要求,竖向位置偏差不应超过一皮高度。9、砌体砌至梁、板底时,应留有一定空隙,待砌筑完并至少间隔7d后,再将其补砌挤紧。补砌时,砖或加气块配套斜砌块应倾斜60°斜砌,缝间应灌砂浆。5.2成品保护措施1、水泥多孔砖和蒸压加气块运输和装卸过程中,严禁抛掷和倾倒。进场后应按品种、规格分别堆放整齐,堆置高度不宜超过2m,堆垛之间应保持适当的通道。2、砖和砌块搬运至施工部位时,应避免冲击已完成墙体。3、施工中,应采取措施防止砂浆污染墙、柱表面;在临时出入洞或料架周围,应用草垫、模板或塑料薄膜覆盖。104、砌体拉结钢筋、构造柱钢筋、各种预埋件、暖卫管线、电气管线,均应注意防护,不得随意碰撞、拆改或损坏。安装暖卫、电气设备和管线时,也不得随意拆打、剔凿墙体。5、安装脚手架及构造柱模板安装时,指挥人员应指挥到位,操作工人认真操作,防止碰撞砌好的填充墙砌体。6、落地砂浆及时清除干净,以免与地面粘结,影响地坪施工。7、雨天施工下班时,应适当覆盖墙体表面,以防雨水冲刷。8、墙体过梁底部的模板,应在砌筑砂浆强度达到50%以上时方可拆除。9、墙面禁止预留脚手眼。6安全文明施工措施1、脚手架应经检查后方能使用。砌筑时不准随意拆改和移动脚手架,楼层为盖上的盖板或防护栏杆不得随意挪动拆除。2、在架子上砍砖时,操作人员应面向里把碎砖打在架板上,严禁把砖头打向架外。挂线用的坠砖,应绑扎牢固,以免坠落伤人。脚手架上堆砖不得超过三层(侧放),分部应均匀,不应集中堆放。灰桶、灰斗应放置有序,使架子上保持畅通。3、使用施工电梯时,梯笼内不得过载,严禁打砸施工电梯,违者一经发现必重罚。4、操作人员应戴好安全帽,高空作业时应系上安全带、挂好安全网。5、砌块在楼面卸下堆放时,严禁倾卸及撞击楼板。在楼板上堆放砖或砌块,宜分散堆放,不得超过楼板的设计允许承载力。6、墙体砌筑时,不得站在墙上指挥和操作,不准随意在墙上设置受力支撑或拉缆绳等。操作过程中,对稳定性较差的窗间墙、独立柱等部分,适当加设临时支撑。7、严禁酒后上岗作业,违者一经发现必将重罚。7环境保护措施1、现场水泥、砂子及干粉砂浆等应采取遮盖措施,避免扬尘。2、搅拌机处应设置沉淀池,搅拌污水应排入沉淀池内,经沉淀后排入附近排污管网。3、砌块的切割作业,应选定加工点,并进行封闭作业,防止粉尘飞扬。4、操作人员应佩戴口罩,避免吸入粉尘。5、现场应经常进行清扫,并洒水,保持场地环境清洁,消除尘土飞扬。6、落地砂浆及砍砖剩料应回收利用,碎砖或随砌块应做到工完料清。7、施工垃圾应装入水泥袋内统一运走,不得到处抛撒,外运时应进行覆盖,防止粉尘污染。11中所新城金色佳苑各单位工程砌体工程(含砌体植筋施工专项方案为保证中所新城金色佳苑1-6号楼及相应裙楼商铺和地下车库工程围护墙砌体质量,为规范施工现场的操作,特编制中所新城金色佳苑项目各单位工程的砌体施工专项方案。一、编制依据1.1南郑益兴中所新城项目管理提供的中国轻工业西安设计工程有限责任公司设计的中所新城金色佳苑项目1-6号楼及相应的裙楼和地下车库工程的建筑、结构和公用等相关图纸。1.2国家、行业及地方有关、法律、法令、法规和国家强制性技术质量标准、施工验收规范、规程。1.3包括砌体工程施工质量验收规范50203-2020在内的国家、行业及地方各有关、法律、法令、法规和国家强制性技术质量标准、施工验收规范、规程。1.4建筑工程工艺标准及操作规程。二、工程概况:我公司承建的南郑县大河坎镇中所新城金色佳苑项目为1-6号楼商品房及相应裙楼和地下车库工程,总建筑面积为:45576.32㎡,其中:1号楼11层(含相应的裙楼和相邻的商铺,剪力墙结构,建筑面积6654.28㎡、总高度33.60m。2号楼17F/-1F(含相应的裙楼商铺,剪力墙结构,建筑面积8932.56㎡、总高度51.0m。3号楼11层,剪力墙结构,建筑面积5463.08㎡、总高度51.0m。4号楼17F/-1F,剪力墙结构,建筑面积8210.70㎡、总高度49.6m。5号楼17F/-1F,剪力墙结构,建筑面积8210.70㎡、总高度49.6m。6号楼6层,砖混结构,建筑面积4767.36㎡、总高度18.7m。地下车库(负一层,框架结构,建设面积3437.64㎡。三、砌体工程施工准备:3.1认真熟悉设计施工图3.1.1在建筑设计总说明中对墙体设计的要求为:a.钢筋混凝土墙、柱的位置、厚度、构造详见结施图。b.墙体:室外地坪以上外围护结构填充墙部分采用非承重空心砖,内隔墙均采用加气混凝土砌块,定位及厚度见建施平面图。砖及砂浆强度等级详见结构说明。c.墙身防潮:1水平防潮层:设于底层室内地面以下60处。2当室内墙身两侧地面有高差时,在临土的一侧做竖向防潮层(用料同上,以保证防潮的连续性。3当防潮层部位遇有钢筋混凝土基础梁或圈梁时,可不另作防潮层。d.过梁详见结施图。e.竖井的砌筑:竖井内侧随砌随抹20厚水泥砂浆并赶光压实。f.墙身留洞:建施图未表示预留洞口,留洞均根据设备工种图纸配合预留。g.另外在图号为9853-2020/MJ-J01-17等各幢楼“户型大样图上”的墙体设计均要求为:外墙填充墙为非承重空心砖,内隔墙均采用加气混凝土砌块。3.1.2结施总说明上的墙体要求:a.填充墙:±0.000以下:非承重空心砖,M10水泥砂浆。b.±0.000以上:外墙、非承重空心砖,M7.5混合砂浆;c.±0.000以上:内墙、加气混凝土砌块,M7.5混合砂浆;d.砌体施工质量控制等级为B级。3.1.3后砌墙的抗震构造措施a.后砌墙与框架柱墙的拉结严格按陕09系列《钢筋混凝土结构构造详图》(09G02第46~49页施工;施工时必须配合建施图纸按隔墙位置在柱或抗震墙内预留锚拉钢筋(施工前将该图集相应页面打印交砖砌体班组作施工参考。b.后砌墙,当墙高度>4m时,在墙高中部或门顶设置与柱连接的通长钢筋混凝土圈梁,圈梁梁宽同墙厚,梁高≥120mm,配筋:4Φ12/6@200。c.后砌隔墙,当墙长>5m时,墙顶部应与梁或板拉接,根椐抗震设防烈度按图14施工;d.墙长超过层高2倍时,宜设置钢筋混凝土构造柱,构造柱具体位置见平面图。e.电梯井道预埋支架安装由电梯厂家自理,井道地坑及机房平面的埋件必须待业主选定的电梯厂家确认后由厂家配合施工单位施工,不可遗漏。f.GZ及女儿墙GZ均表示构造柱,断面为200X200,纵筋4,箍筋φ8@200。高度超过600的女儿墙应锚固。g.楼梯间和人流通道的填充墙,尚应采用钢丝网砂浆面层加强。3.1.4砌筑用砂浆(详前面1.2结施总说明上的墙体要求3.1.5设计图上对后砌墙上的过梁配筋及断面详下面图表:(现场在具体操作时,原则上以预制为主,部分与剪力墙相连接的过梁只能考虑现浇3.2.主要机电设备:3.2.1本项目工程共用各大小施工机械包括:塔式起重机3台、1-6号楼各一台施工电梯以及3台砂浆搅拌机和若干切割机等其它小型机械设备。3.2.2工具:夹具、手锯、灰斗、吊篮、大铲、小撬棍、手推车。3.3.作业条件:3.3.1砌块砌筑施工前,应结合砌体和砌块的特点、设计图纸要求及现场具体条件,编制和作好砌体工程施工技术交底,准备好施工机具,做好施工平面布置,划分施工段,安排好施工流水、工序交叉衔接施工。3.3.2砌块砌筑施工前,应完善好各楼层各轴线和门窗的分墨放线,办完隐检预检手续。3.3.3放好砌体墙身位置线、门窗口等位置线,经验线符合设计图纸要求,预检合格。3.3.4按砌筑操作需要,找好标高,立好标尺杆。3.3.5搭设好操作和卸料架子。3.3.6配制异形尺寸砌块(同材割制;砂浆经试配确定配合比,准备好试模。四、操作工艺:4.1.砌体工程操作工艺流程为:墙体分墨放线→构造柱和墙拉筋植筋→安装和绑扎构造柱钢筋→砌块浇水→摆砖(包括加气砼砌块、空心砖和实心配砖等→铺设砌块→安装墙拉筋→浇注构造柱砼→竖缝灌砂浆→勒缝。4.2.墙体放线:砌体施工前,应将基础面或楼层结构面按标高找平,依据砌筑图放出第一皮砌块的轴线、砌体边线和洞口线。4.3.砌块排列:按砌块排列图在墙体线范围内分块定尺、划线。排列砌块的方法和要求如下:4.3.1砌块砌体在砌筑前,应根据工程设计施工图,结合砌块的品种、规格、绘制砌体砌块的排列图,经审核无误,按图排列砌块。4.3.2砌块排列应从地基或基础面、±0.00面排列,排列时尽可能采用主规格的砌块,砌体中主规格砌块应占总量的75%~80%。4.3.3砌块排列上、下皮应错缝搭砌,搭砌长度一般为砌块的1/2,不得小于砌块高的1/3,也不应小于150mm,如果搭错缝长度满足不了规定的压搭要求,应采取压砌钢筋网片的措施,具体构造按设计规定。4.3.4外墙转角及纵横墙交接处,应将砌块分皮咬槎,交错搭砌,如果不能咬槎时,可采取预留2φ6.5L=700的墙拉筋等其它的构造措施;砌体垂直缝与门窗洞口边线应避开同缝,且不得采用砖镶砌。4.3.5砌体水平灰缝厚应控制在8~12mm,如果加钢筋网片的砌体,水平灰缝厚度应控制在20~25mm之内,对于大于30mm的垂直缝,应用C20的细石混凝土灌实。4.3.6砌块排列尽量不镶砖或少镶砖,必须镶砖时,应用整砖平砌,且尽量分散,镶砌砖的强度不应小于砌块强度等级。4.3.7砌块墙体与结构构件位置有矛盾时,应先满足构件布置。4.4制配砂浆:按设计要求的砂浆品种、强度制配砂浆,配合比应由试验室确定,采用重量比,计量精度为水泥±2%,砂、灰膏控制在±5%以内,应采用机械搅拌,搅拌时间不少于1.5min。4.5铺砂浆:将搅拌好的砂浆,通过吊斗、灰车运至砌筑地点,在砌块就位前,用大铲、灰勺进行分块铺灰,较小的砌块量大铺灰长度不得超过1500mm。4.6砌块就位与较正:砌块砌筑前一天应进行浇水湿润,冲去浮尘,清除砌块表面的杂物后方可吊、运就位。砌筑就位应先远后近、先下后上、先外后内;每层开始时,应从转角处或定位砌块处开始;应吊砌一皮、校正一皮,皮皮拉线控制砌体标高和墙面平整度。4.7砌筑镶砖:用普通粘土砖镶砌前后一皮砖,必须选用无横裂的整砖,顶砖镶砌,不得使用半砖。4.8竖缝灌砂浆:每砌一皮砌块,就位校正后,用砂浆灌垂直缝,随后进行灰缝的勒缝(原浆勾缝,深度一般为3~5mm。补充窗洞口与窗连接构造示意图:五、质量标准:5.1保证项目:5.1.1使用的中型砌块和原材料,其技术性能、强度、品种必须符合设计要求,并有出厂合格证,规定试验项目必须符合标准。5.1.2砂浆的品种、强度等级必须达到设计要求,按规定制作试块,试压强度等级不得低于设计强度。5.2基本项目:5.2.1砌筑错缝应符合规定,不得出现竖向通缝,压缝尺寸应达到本标准的要求。5.2.2转角处、交接处必须同时砌筑,必须留槎时应留斜槎;灰缝均匀一致。5.2.3砌筑砂浆应密实,砌块应平顺,不得出现破槎、松动。5.2.4拉结钢筋、钢筋网片规格、根数、间距、位置、长度应符合设计要求。5.2.5中型砌块砌体允许偏差检查方法a.轴线位置用经纬仪,水平标高用水准仪检查,并检查施工记录。b.基础或楼面标高用水平仪检查,并检查施工记录。每楼层允许偏差5㎜,用吊线坠检查。c.垂直度在10m以下,允许偏差为10㎜,经纬仪或吊线检查。单层楼房在10m以下时,允许偏差为20㎜。d.表面平整度,用2m长直尺和塞尺检查清水墙允许偏差7㎜,10m长拉线和尺量检查混水墙10㎜。e.水平灰缝厚度+10、-5尺量检查f.垂直缝宽度+10、-5尺量检查g.门窗洞口宽度(后塞框+10、-5尺量检查h.清水墙面错缝2.0吊线和尺量检查六、成品保护:6.1.先装门窗框时,在砌筑过程应对所立之框进行保护;后装门窗框时,应注意固定框的埋件牢固,不可损坏、不可使其松动。6.2.砌体上的设备槽孔以预留为主,因漏埋或未预留时,应采取措施,不因剔凿而损坏砌体的完整性。6.3.砌筑施工应及时清除落地砂浆。6.4拆除施工架子时,注意保护墙体及门窗口角。七、应注意的质量问题:7.1.砌体粘结不牢:原因是砌块浇水、清理不好,砌块砌筑时一次铺砂浆的面积过大,校正不及时;砌块在砌筑使用的前一天,应充分浇水湿润,随吊运随将砌块表面清理干净;砌块就位后应及时校正,紧跟着用砂浆(或细石混凝土灌竖缝。7.2.第一皮砌块底铺砂浆厚度不均匀:原因是基底未事先用细石混凝土找平标高,必然造成砌筑时灰缝厚度不一,应注意砌筑基底找平。7.3.拉结钢筋或压砌钢筋网片不符合设计要求:应按设计和规范的规定,设置拉结带和拉结钢筋及压砌钢筋网片。7.4.砌体错缝不符合设计和规范的规定:未按砌块排列组砌图施工。应注意砌块的规格并正确的组砌。7.5.砌体偏差超规定:控制每皮砌块高度不准确。应严格按标帜杆高度控制,掌握铺灰厚度。7.6.质量记录:本工艺标准应具备以下质量记录:7.6.1砌块、原材料出厂合格证。7.6.2施工试验报告。7.6.3施工组砌图资料。7.6.4质量检验评定资料。八、二次砌体结构植筋8.1施工准备8.1.1劳动力及施工机具的配置要根据工期要求进行,以保证工期和质量要求为宗旨,并根据现场情况及时调整。8.1.2材料及机具准备a.粘结剂必须是粘结强度高,耐久性好,具有一定弹性。b.所用钢筋主要规格为6、8、12三种,均按图纸设计要求使用。c.本工程中植筋机械采用GSB20-2型冲击钻。其技术参数:最大钻孔直径为16毫米、冲击率为16000次/分钟、输入功率为700瓦。8.1.3完成植筋区混凝土表面剔凿工作,要求平整、坚实,不应有起壳、蜂窝、麻面等影响锚固承载力的现象。8.2施工工艺及方法8.2.1施工工艺放线定位——钻孔——清孔——钢筋清理——注胶及植筋——固化及成品保护——验收a.放线开始钻孔施工前,必须要将结构面清理干净;根据设计要求,由技术人员放线标明钢筋锚固点的钻孔位置,钻孔位置查标明后由现场负责人验线。墙体拉结筋第一道距地面530mm,第二道以上间距630mm;门口过梁钢筋,各楼层+000mm线以上2130mm;窗台压顶870mm。b.钻孔时严格按设计要求施工,钻孔时要尽量避开原结构钢筋;钢筋栽埋位置钻孔如遇到原结构主筋可适当调整位置,进行避让,但钢筋栽埋位置偏移不宜过大。钻孔过程应及时检查孔深。根据弹出的钻孔位置,用冲击钻钻孔,孔深和孔径按设计要求确定。如设计无要求时,孔深按≥15d考虑,一般采用100mm,孔径按d+2mm~4mm控制,一般采用10mm。钻孔时要使用冲击钻垂直于结构表面均

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论