PAGE/r/n82/r/n//r/nNUMPAGES/r/n82/r/n表B1-3施工组织设计(方案)报审表/r/n工程名称:/r/n丽景国际商务中心铝塑板幕墙工程/r/n/r/n/r/n/r/n/r/n编号:/r/n致/r/n/r/n河北联谊工程项目治理有限公司/r/n/r/n(监理单位)/r/n我方已依照施工合同的有关规定完成了/r/n丽景国际商务中心铝塑板幕墙/r/n工程施工组织设计(方案)的编制,并经我单位上级技术负责人审查批准,请予以审查。/r/n附件:/r/n施工组织设计(方案)/r/n承包单位(章):/r/n/r/n石家庄鑫宝锐建筑工程有限公司/r/n/r/n项目经理:/r/n/r/n日期:/r/n/r/n2014.4.18/r/n/r/n/r/n专业监理工程师审核意见:/r/n专业监理工程师:/r/n/r/n日期:/r/n/r/n总监理工程师审核意见:/r/n/r/n项目监理机构(章):/r/n/r/n总监理工程师:/r/n/r/n日期:/r/n/r/n丽景国际商务中心铝塑板幕墙工程/r/n施工组织设计方案/r/n批准:/r/n审核:/r/n编制:/r/n/r/n编制单位:/r/n/r/n石家庄鑫宝锐建筑工程有限公司/r/n编制日期:/r/n/r/n二零一四年四月/r/n目录/r/n/r/n/r/n/r/n/r/n/r/n/r/n第一章/r/n/r/n编制讲明及依据/r/n/r/n/r/n/r/n第一节/r/n/r/n编制讲明/r/n/r/n/r/n/r/n第二节/r/n/r/n编制依据/r/n/r/n/r/n/r/n第二章/r/n/r/n工程概况/r/n/r/n/r/n/r/n第三章/r/n/r/n要紧机具仪表配备表/r/n/r/n/r/n/r/n第四章/r/n/r/n施工要紧组织措施/r/n/r/n/r/n/r/n第一节/r/n/r/n施工组织机构/r/n/r/n/r/n/r/n第二节/r/n/r/n施工组织打算/r/n/r/n/r/n/r/n第五章/r/n/r/n要紧施工方案/r/n/r/n/r/n/r/n第一节/r/n/r/n施工总体安排/r/n/r/n/r/n/r/n第二节/r/n/r/n锚固件安装/r/n/r/n/r/n/r/n第三节/r/n/r/n测量放线/r/n/r/n/r/n/r/n第四节/r/n/r/n铝塑板幕墙施工方法/r/n/r/n/r/n/r/n第五节/r/n/r/n幕墙防雷施工/r/n/r/n/r/n/r/n第六节/r/n/r/n幕墙防火施工/r/n/r/n/r/n/r/n第六/r/n章/r/n/r/n工程质量治理及保证质量措施/r/n/r/n第一节/r/n/r/n工程质量治理/r/n/r/n/r/n/r/n第二节/r/n/r/n工程保证质量措施/r/n/r/n/r/n/r/n第/r/n七/r/n章/r/n/r/n确保安全生产施工的技术组织措施/r/n/r/n/r/n/r/n第一节/r/n/r/n安全治理原则/r/n/r/n/r/n/r/n第二节/r/n/r/n安全保障体系表/r/n/r/n/r/n/r/n第三节/r/n/r/n保证安全生产总体措施/r/n/r/n/r/n/r/n第四节/r/n/r/n施工安全保证措施/r/n/r/n/r/n/r/n第五节/r/n/r/n保证安全的具体规定及技术措施/r/n/r/n/r/n/r/n第六节/r/n/r/n防火安全措施/r/n/r/n/r/n/r/n第七节/r/n/r/n防大风措施/r/n/r/n/r/n/r/n第/r/n八/r/n章/r/n/r/n文明施工保证措施/r/n/r/n/r/n/r/n第一节/r/n/r/n文明施工治理网络图/r/n/r/n/r/n/r/n第二节/r/n/r/n文明施工内容/r/n/r/n/r/n/r/n第三节/r/n/r/n文明施工的保障措施/r/n/r/n/r/n/r/n第/r/n九/r/n章/r/n/r/n环境爱护保证措施/r/n/r/n/r/n/r/n第一节/r/n/r/n减少扰民噪音、降低环境污染技术措施/r/n/r/n/r/n/r/n第二节/r/n/r/n环保设计/r/n/r/n/r/n/r/n第十/r/n章/r/n/r/n施工措施/r/n/r/n/r/n/r/n第十/r/n一/r/n章/r/n/r/n幕墙清洗及交验/r/n/r/n/r/n/r/n第一节/r/n/r/n幕墙清洗一般要求/r/n/r/n/r/n/r/n第二节/r/n/r/n幕墙清洗/r/n/r/n/r/n/r/n第三节/r/n/r/n工程验收/r/n /r/n第一章/r/n/r/n编制讲明及依据/r/n第一节编制讲明/r/n一、本工程施工组织设计是严格按照工程施工图和总承包方施工组织设计的要求进行质量策划后编制的,在人员、机械、材料供应、平衡调配、施工方案、质量要求、进度安排等方面统一部署的原则下,编写而成的。/r/n二、我公司能够接到本工程深感责任重大,因此高度重视本工程的施工组织的编制工作,对本工程的重点及专门部位的施工技术,力求本方案重点突出,具有呼应性、针对性和可操作性。/r/n三、本着对业主负责和资金的合理使用,对工程质量的高度责任感,针对本工程设计特点和使用功能要求,我们编制原则是:/r/n“/r/n确保工程质量优、速度快、造价低、操作性强,使、用功能发挥好/r/n”/r/n。同时保证周边和施工现场的良好环境。/r/n四、本施工组织设计的编制内容是依据建设单位提供的幕墙设计图纸及同类工程的相关经验编制的,指导施工。/r/n第二节编制依据/r/n一、丽景国际商务中心外墙干挂铝塑板设计图纸。/r/n二、我公司目前的技术治理力量及机械设备装备情况。/r/n三、国家和行业现行施工及验收规范、规程。/r/n1、《建筑装饰装修工程施工质量验收规范》GB50210/r/n—/r/n2001/r/n2、《/r/n建筑工程施工质量验收统一标准》GB50300/r/n—/r/n2001/r/n3、/r/n《建筑幕墙》JG3035-96/r/n4/r/n、《建筑防腐蚀工程施工及验收规范》GB50212-91/r/n
/r/n第二章/r/n/r/n工程概况/r/n一、工程名称:/r/n丽景国际商务中心铝塑板幕墙工程/r/n二、建设单位:/r/n河北丽景房地产开发(集团)有限公司/r/n三、监理单位:/r/n河北联谊工程项目治理有限公司/r/n四、工程地点:/r/n/r/n新华路和靶场街交叉口东北角/r/n五、工程内容:本工程为铝塑板/r/n干挂/r/n。/r/n1、Q235精工天猴国标10*80型膨胀螺栓/r/n2/r/n、7mm厚100*200镀锌预埋板/r/n3/r/n、50镀锌方管骨架,壁厚2.5mm/r/n4/r/n、30*50镀锌方管骨架,壁厚2.5mm/r/n5/r/n、百富林4mm30丝双面铝塑板幕墙/r/n
/r/n第三章/r/n/r/n要紧机具仪表配备表/r/n要紧机具仪表配备打算表/r/n序号/r/n机械或设备名称/r/n型号规格/r/n数量/r/n国不产地/r/n制造年份/r/n额定功率KW/r/n1/r/n激光经纬仪/r/nJ2-JDA/r/n1/r/n苏州/r/n2008.8/r/n精度2/r/n″/r/n2/r/n水准仪/r/nDS3-D/r/n1/r/n南京/r/n2006.3/r/n精度2/r/n″/r/n3/r/n交流电焊机/r/nBX6-300A/r/n3/r/n成都西南设备厂/r/n2007.9/r/n13.50/r/n4/r/n冲击电锤/r/n2K-2U01-22/r/n3/r/n德国博世/r/n2009.12/r/n0.52/r/n5/r/n手枪电钻/r/nJ12-CD-8C/r/n3/r/n成都电动工具厂/r/n2008.2/r/n0.36/r/n6/r/n台式钻/r/nLT-16G/r/n1/r/n山东腾州/r/n2003.8/r/n1.88/r/n7/r/n型材切割机/r/nJ3G-400A-/r/nⅡ/r/n1/r/n郑州通用设备厂/r/n2007/r/n2.2/r/n8/r/n砂轮切割机/r/nJ3G-4004/r/n2/r/n郑州通用设备厂/r/n2010.2/r/n2.8/r/n10/r/n胶枪/r/n10/r/n广东/r/n2009.4/r/n11/r/n乙炔氧气割具/r/n2/r/n成都/r/n200/r/n7/r/n.9/r/n12/r/n真空吸盘(3盘)/r/n8/r/n南京/r/n200/r/n9/r/n.9/r/n13/r/n空压机/r/n2-0.12/8/r/n2/r/n日本牧田/r/n20/r/n1/r/n0.5/r/n1.2/r/n14/r/n曲线锯/r/nM12-CD-55/r/n1/r/n成都电动工具厂/r/n2008/r/n.4/r/n0.4/r/n15/r/n手提电锯/r/nC12/r/n2/r/n日本日立/r/n2005/r/n.9/r/n1/r/n16/r/n质检工具/r/nJZC-8/r/n1/r/n温州/r/n200/r/n9/r/n.10/r/n19/r/n角磨机/r/n4/r/n200/r/n9/r/n.4/r/n0.63/r/n20/r/n配电箱/r/n内配空气开关及电表、/r/n2/r/n200/r/n7/r/n.12/r/n8/r/n21/r/n电缆线/r/n二芯和三芯/r/n300M/r/n200/r/n8/r/n.01/r/n第四章/r/n/r/n施工要紧组织措施/r/n第一节施工组织机构/r/n一、项目治理机构的组建/r/n我公司高度重视本工程的建设,把本工程列为重点工程。公司的指导方针为/r/n“/r/n优质、高效、安全文明地做好每一个工程,为公司制造良好的社会效益和经济效益,为社会奉献精品/r/n”/r/n。因此依照该工程的规模和特点,建立以优秀项目经理为首的项目治理层,选派思想好、业务精、能力强、能融合、合作好、原则性强的具有丰富实践经验的治理人员进入项目治理班子。/r/n项目经理作为公司法人的项目托付人对外行使权力和应尽的义务,适应业主治理的要求,充分发挥公司的经济技术优势和精诚合作的精神,业主的指示、意见、建议能直接得到项目部的贯彻执行。/r/n对内建立健全项目经理、技术负责人、工长、内业、材料、质安等岗位责任制,由项目领导班子定期对各专业进行考核,确保预定目标的最终实现。/r/n㈠、建立完整的组织机构/r/n依照本工程特点,项目经理部由一名项目经理,两名工程师组成,下设内业技术、质量安全、材料供应、施工治理、打算统计部五个组,具体实施项目的职能。/r/n⑴/r/n、内业技术组由具有大专学历的专业工程师和技术员组成,其职能是:/r/n①/r/n、工作流程化标准/r/n②/r/n、技术治理规范化/r/n③/r/n、参与图纸会审、技术交底、编写施工方案/r/n④/r/n、参加项目质量、安全检查,参与制定纠正和预防措施。/r/n⑤/r/n、指导专业班组按施工图施工,按规范操作并执行标准进行验收。/r/n⑵/r/n、质量安全组设有专职质检员、专职安全员,其职能是:/r/n编制质量、安全技术措施。/r/n②/r/n、对工人进行质量、安全教育。/r/n③/r/n、督促劳动层按照质量、安全操作规程施工。/r/n④/r/n、检查现场质量、安全情况并制定落实整改措施,消除和处理质量、安全隐患和事故。/r/n⑤/r/n、执行材料设备,工程产品的质量检验工作,对检验产品负直接责任。/r/n⑥/r/n、对经检验不合格的产品有权禁止放行。/r/n⑦/r/n、对违章作业,违章指挥,有权责令其暂停施工,有权按规定进行处罚或提出处罚建议。/r/n⑶/r/n、材料供应组由材料部主管和材料员组成,其职能是:/r/n①/r/n、负责材料进场时登记、清点及验收;/r/n②/r/n、负责堆码标识以及材料发放和保管;/r/n③/r/n、有权拒收不符合规定要求的材料;/r/n⑷/r/n、施工治理组由各专业工长组成,其职能是;/r/n①/r/n、严格执行/r/n“/r/n三检制/r/n”/r/n,并做好/r/n“/r/n三检/r/n”/r/n记录;/r/n②/r/n、认真填写施工技术资料;/r/n③/r/n、对分管的施工产品质量负直接责任。/r/n⑸/r/n、打算统计部社预算员,其职能是:/r/n⑸/r/n、项目成本治理/r/n①/r/n、项目预(结)算/r/n②/r/n、项目各方施工时期的打算发放。/r/n
/r/n项目经理/r/n二、施工组织机构框图/r/n项目经理/r/n项目副经理/r/n项目技术负责人/r/n项目副经理/r/n项目技术负责人/r/n/r/n装/r/n饰专/r/n业/r/n一人/r/n材料采购一人/r/n材料库管人/r/n装饰工长一人/r/n质安员一人/r/n预/r/n算员一人/r/n各生产作业班组/r/n装/r/n饰专/r/n业/r/n一人/r/n材料采购一人/r/n材料库管人/r/n装饰工长一人/r/n质安员一人/r/n预/r/n算员一人/r/n各生产作业班组/r/n三、施工组织机构的高效运作/r/n㈠、明确项目经理的责、权、利/r/n⑴/r/n、依照项目经理部的工作实际,具体明确每个项目治理人员的责、权、利,使全体治理人员有条不紊,紧张有序地开展工作,从而较大幅度提高项目经理部的工作效率,有效促进治理整体实力的强化,使项目治理班子有更好的精力和时刻来分析运筹较为复杂的环节,做到项目整体下活一盘棋。/r/n⑵/r/n、项目经理受公司法人托付,全权处理本工程施工过程中的一切事务,并享有人事组阁权,劳动力选择权,材料采购权以及资金使用权,同时项目上的一切开支(装饰、水电)由项目经理签字后方能支付,项目经理有权奖罚治理人员及施工班组。/r/n⑶/r/n、项目所需的材料,机械设备,周转材料由项目经理部按工程进度自行配置。/r/n⑷/r/n、项目经理部必须按GB/T19002-ISO9002质量体系进行全面治理,组织好各工种、各专业的施工协调配合,实现决策准,指挥灵,落实快的工作方针,确保工程按照既定质量、进度目标交付使用。/r/n㈡、企业形象,创工程精品/r/n市场需要精品,用户需要精品。精品工程是由施工治理的全过程及各分部分项工程质量精细的程序所组成的,同时职业道德也是精品工程不可分割的重要部分,我公司建立了/r/n“/r/n职业道德考核机制/r/n”/r/n,并在项目中大力推行和运用。具体做法是将考核标准具体落实到人头并与他们的收入直接挂钩,以形成自觉抵制施工质量和材料质量的以次充好,偷工减料,弄虚作假等不良行为,实施用户中意工程。/r/n㈢、证施工组织机构高效运作的措施/r/n⑴/r/n、项目经理部直接隶属公司总部,由公司法人代表授权项目经理处理施工现场一切事务。/r/n⑵/r/n、组织强有力的项目班子,由项目经理选用思想好、业务精、能力强、善合作、服务好的治理人员进入项目治理班子。/r/n⑶/r/n、建立健全项目治理岗位责任制,定期对各专业进行考核。项目经理,业主或监理认为不称职的治理人员及施工班组立即更换。/r/n⑷/r/n、强化激励与约束机制,制定业绩评比,奖罚方法,定期组织项目经理部治理人员会议,检查工作质量。/r/n⑸/r/n、每半月召开一次现场办公会,重点解决项目的质量、进度等难题,以确保工程能高质、高效的运转。/r/n⑹/r/n、每天下午召开由项目经理主持的班子碰头会,对次日的工作进行协调安排。/r/n⑺/r/n、实行劳动用工治理,选用组织能力强,技术水平高,能打硬仗的作业队伍,树立连续作战的精神,确保工期按时完成。/r/n⑻/r/n、项目经理部加强对项目职工进行素养教育,强化敬业精神,提高工作技能,鼓舞参战人员困难作业,同时提高其福利待遇,让他们以旺盛的精神积极投入工程建设。/r/n第二节施工组织打算/r/n一、工程的总工期目标及施工工期的安排/r/n按照本工程的特点和现场条件,我公司结合多年类似工程施工经验,经测算确定为天。我公司依照工程特点制定一系列保证工期的技术与组织措施,以确保工期的合理性。/r/n二、工期保证措施/r/n为确保对业主承诺的投标工期的实现,我公司制定了一套完整的保证工期的技术组/r/n织/r/n措施,具体的内容如下:/r/n㈠、组织保证措施/r/n为了早日装修好该工程,我公司将成立以公司经理为工程总负责人,总工程师为技术总负责人的高效、精干的项目治理机构,采取行之有效的科学模式来达到预期目标。/r/n⑴/r/n、对内采纳全新治理模式,成立工程总承包项目经理部,实行公司法人代表授权的项目经理负责制,对外与业主、设计、监理等单位紧密配合,充分发挥公司的经济技术优势和精诚合作的诚意,严格按照施工组织设计进行施工,保证总进度的如期进行。/r/n⑵/r/n、项目经理受公司法人托付,处理本工程施工过程中的一切事务,并享有人事组阁权,劳动力选择权,材料采购权。/r/n⑶/r/n、劳务作业队伍由公司劳资处和项目共同进行综合评估,项目经理择优录用与其签订劳务合同,规定其工期、质量、安全要求,以确保每一道工序按时保质完成。/r/n⑷/r/n、我公司依照本工程的特点和现场施工条件,将本工程划分为装饰专业和水电专业两者之间平行交叉施工,互为依托,始终如一的协调配合,以确保工程如期完成。/r/n⑸/r/n、施工过程中实行目标分解,责任到人。项目经理全面负责进度打算的实施,项目各专业工长具体领导执行,操作人员则服从安排积极投入具体工作,并保质、按时完成各自任务,内业人员每周按实填写工程进度表,并负责上报项目经理,公司生产部门每月定时核实工程进度,并督促其按进度打算执行,实行责任与利益挂钩的方法,做到奖先进罚后进的奖罚制度。/r/n⑹/r/n、采纳严格的目标治理,建立全方位、全过程、多层次的目标治理体系。向治理要效益、要质量、要工期/r/n㈡、周密的施工进度安排/r/n在施工进程中,要求各进场的专业队伍以总进度打算为基础,编制各自的作业打算,以实现各专业施工工期。/r/n㈢、理科学的施工技术措施/r/n⑴/r/n、现场技术人员主动与各协作单位取得联系,从施工角度给预出谋划策,将往常施工过类似工程的经验运用到本工程中,减少因工作安排不当造成的返工现象,从而保证工程优质高效的完成。/r/n⑵/r/n、项目成立专门的技术组,加强技术治理的力度,适应施工进度的需要,将差不多确定技术变更及时通知施工工长和施工班组;临时性的修改,要立即制定相应的技术处理措施,对可能阻碍装修和进度的问题,要主动向监理、甲方及早提出,尽量幸免事后处理。/r/n⑶/r/n、编制详细的各种资源打算,尤其是材料部门及时按打算准确地提供各种材料,/r/n以满足施工进度需要。/r/n⑷/r/n、加强施工的预见性,所有施工技术预备工作进度提早一周,所有材料及半成品较实际进度提早3/r/n—/r/n5天到现场,并应随附所需的合格证,复检证明等,从而保证材料能及时使用到工程上。/r/n⑸/r/n、针对各时期施工情况对事实上行动态治理,投入足够的劳动力,对全公司范围内实行招标择优使用施工作业队伍。/r/n⑹/r/n、中标的作业队伍与项目签订经济承包合同,实行平米包干,采纳优奖劣罚政策,调动职工的劳动热情。/r/n㈣、合理地配置机械设备/r/n机械设备的配置是整个工程进度的保障,要加强机械设备治理和维护保养,确保正常运转,机械设备完好率保证达到98%以上,利用率保证达到95%以上,并设置专业机械维修人员,加强治理,保证施工连续性。/r/n㈤、合理的劳动力安排/r/n按照本工程特点,结合四川省建筑装饰工程劳动定额和施工工序的先后安排及各施工段工程量,确保本工程装修,水电的劳动力配备,在劳动力配备上采取以下几条组织措施和原则。/r/n1、劳动作业队进场前,由公司劳资处和项目共同进行综合评估,项目经理择优录用,与其签订合同,规定其工期、质量、安全要求,明确承包任务,工程量结算方式和奖惩的措施。项目经理部还对劳务队引入激励机制,推行优质优价治理方法。/r/n2、本工程劳动力组织综合考虑装修、水电的用工特点,施工前组织两支劳务作业队伍,一支为装饰劳务作业队,一支为水电施工作业队。/r/n3、本工程中所有专门工种(电工、焊工等)均持证上岗,并在重要施工程序中投放技师。/r/n
/r/n第五章要紧施工方案/r/n第一节施工总体安排/r/n整个工程施工原则为:幕墙龙骨施工为先下后上,板块施工则先上后下。充分利用平面、空间和时刻,组织平面立体流水交叉作业,为及早竣工制造条件,做到科学治理均衡施工。/r/n为确保大楼的安装进度、施工质量,弹线放样后首先对角位板片进行安装,使之成为闭合型,确保转角的准确,以减少各种累积误差。/r/n第二节/r/n锚固件安装/r/n骨架锚固件应尽量采纳预埋件,在无预埋件的情况下采纳后置埋件,埋件的结构形式要符合设计要求,施工前要依照该工程基准轴线和中线以及基准水平点对预埋件进行检查和校核,一般同意位置尺寸偏差为/r/n±/r/n20mm/r/n。锚栓要现场进行拉拔试验,满足强度要求后才能使用。如有预埋件位置超/r/n差而无法使用或漏放时,应依照实际情况提出选用膨胀螺栓围定后置预埋件的方案,并必须报设计单位审核批准,且应在现场做拉拔试验,做好记录。锚固件一般由埋板和连接角码组成,施工时按照设计要求在已测放竖框中心线上准确标出埋板位置,后打孔将埋件固定,并将竖框中心线引至埋件上,然后计算出连接角码的位置,在埋板上划线标记,同一竖框同侧连接角码位置要拉通线检测,不能有偏差。角码位置确定后,将角码按此位置焊到埋板上,焊缝宽度和长度要符合设计要求,焊完后焊口要重新做防锈处理,一般涂刷防锈漆两遍。/r/n第三节/r/n/r/n测量放线/r/n1、测量人员以每层的500mm线与轴线作为基准线进行放线及校核现场结构及埋件尺寸,并确定主体结构边角尺寸反馈给技术部及早进行边角龙骨分格尺寸调整。/r/n2、利用钢卷尺、经纬仪从原始轴线操纵点、标高点引测辅助轴线;/r/n3、利用经纬仪、测距仪对辅助轴线进行尺寸和角度复核,确保偏差在同意范围内,并标识于层面;/r/n4、利用辅助轴线,依据纵向龙骨布置图,用钢卷尺、经纬仪定出每边边角龙骨外表中心位置和每边中部龙骨外表中心点,复核后标识于层面:/r/n5、利用激光铅垂仪从标识点向上垂直引测直至斜面层顶,校核后安挂定位钢丝,利用经纬仪进行双向正交校核后固定;/r/n6、幕墙分格轴线的测量放线与主体结构的测量放线配合,对误差进行操纵、分配、消化,不使其积存;/r/n7、每天定时校核,以确保幕墙的垂直及立柱位置的正确;/r/n8、放线的顺序:按土建方提供的轴线,经复测后上、下放钢线,用经纬仪校核其准确性。幕墙支座的水平放线每二个分格设一个固定支点,用水平仪检测其准确性,同样按中心放线方法放出主梁的进出位线;/r/n9、每层楼的支座位置,由水平仪检测,相邻支座水平误差应符合设计标准。/r/n第四节/r/n/r/n铝塑板幕墙施工方法/r/n4.1/r/n骨架制作安装/r/n4.2/r/n确立基准层框架/r/n依照基准线及测出的外墙面进行误差,确定基准层,然后将基准框立好,每个平面选择两根或三根(视长度定)基准框。基/r/n准框要保证位置垂直度,水平高度绝对准确。基框立好后,再将基准层框完并检查各面框的位置是否与设计相符。检查无误后,将质量检测记录提交业主及监理单位复检,经复检合格后,依次安装其它框架。/r/n4/r/n.3骨架与主体连接骨架与主体是由竖框通过连接钢角码与预埋件和主体连接,钢角码与竖框接触面用尼龙垫处隔开,以防止不同金属间的电位腐蚀。转接钢角码与预埋板用焊接的方式连接起来,采纳先点焊,再调整,调整准确后再满焊。焊接后刷防锈漆,并做防腐处理。/r/n4.4/r/n竖框与竖框连接/r/n安装基准竖框时,竖框上端按上述方法安装,竖框下端插入一根插蕊,把插蕊预固定在主体上。基准框以上的竖框在安装时,先把竖框在工作台上按上方做好立框预备工作,然后抬到指定位置,把竖框下端套在基准框上端的插蕊上,竖框与竖框之间垫入/r/n8mm/r/n厚的伸缩垫,竖框上端连接焊牢后,将伸缩撤掉,保证竖框之间留下/r/n16mm/r/n的距离。每支竖框差不多上上端固定,下端可伸缩,满足在温度发生变化时,竖框有一定的伸缩范围。基准框以上的框架安装方法依此类推。安装基准框以下的竖框时,先将基准框下端的插芯卸掉,插入下边竖框上端空腔内,并与竖框需连接再插入基准框下端空腔内,保持/r/n18mm/r/n的伸缩缝,调节竖框位置的准确程度,最后连接牢固,下边的框架安装依次类推。带窗竖框由上下插芯与上部梁及窗台板连接。/r/n2.5/r/n竖框与横框的连接/r/n竖框与横框通过铝角片和螺栓连接起来。首先依照分格把一组横框套在相邻两竖框对应的角片位置上,横框与竖框接触面垫上Imm厚度胶皮垫(幸免硬接触,当温度发生变化时,横框与竖框能够自由伸缩)。调整横框的进出位置,使横框外表面与竖框外表面保持在一个垂直平面上;调整横框的上下位置,并用水平仪检测横框的水平度,确保横框的位置符合设计图纸分格尺寸的要求,然后用螺栓/r/n把横框和角片连接在一起。横竖框在立框之前,型材外表面贴爱护胶带/r/n。穿胶条时,首先豁断一条与横竖框长度相应的胶条,然后穿入横竖框的凹槽内。穿胶条时要杜绝中间短缺现象,胶条连接处要用专用胶粘接。/r/n5、调整/r/n大面骨架安装后,进行校正调整,达到横平竖直,误差操纵在同意偏差范围内。/r/n5.1、立柱安装标高偏差不大于3mm,轴线前后偏差不大于2mm,左右偏差不大于3mm;/r/n5.2、相邻两根立柱安装标高偏差不大于3mm,同层立柱的最大标高偏差不大于5mm,相邻两根立柱的距离偏差不大于2mm;/r/n5.3、横梁两端的连接件安装在立柱的预定位置,应安装牢古其接缝应严密;/r/n5.4、相邻两根横梁的水平标高偏差不大于1mm,同层标高偏差:当一幅幕墙宽度小于或等于35m时,不应大于5mm,当一幅幕墙宽度大于35m时,不应大于7mm。/r/n6、铝塑复合板(面板)加工/r/n铝塑复合板为塑料基层上下都压合一层铝板材后,再在铝板材表面经滚涂方式涂上氟化乙烯树脂,经烤制而成,铝塑板采纳机械铣槽,并留有/r/n0./r/n3mm/r/n6.1/r/n面板安装/r/n钢骨架焊接完成后,应保证连接牢固,位置尺寸准确,立柱、横梁外侧面处于同一水平面,铝塑板安装前,钢骨架上弹出铝塑板安装的边线,定好板间接缝的位置。铝塑板加设边肋和中肋用结构胶与铝塑板相连接。板折边后的角部、切口用耐候胶密封。铝角长度通常/r/n35mm/r/n,沿板四周布置间距300~400mm,铝角与板通过抽芯铝铆钉连成一体;板安装是自上而下,用高强自攻钉将板四周铝角固定在钢骨架上。面板要依照其村质选择合适的固定方式,一般采纳自攻钉直接固定到骨架上或板折边加角铝后再用自攻钉固定角铝的方法,饰面板安装前要在骨架上标出板块位置,并拉通线,操纵整个墙面板的竖向和水平位置。安装时要使各固定点均匀受力,不能挤压板面,不能敲击板面,以免发生板面凹凸或翘曲变形,同时饰面板要轻拿轻放,幸免磕碰,以防损伤表面漆膜。面板安装要牢固,固定点数量要符合设计及规范要求,施工过程中要严格操纵施工质量,保证表面平坦,缝格顺直。/r/n6.2/r/n嵌缝打胶/r/n打胶要选用与设计颜色相同的耐侯胶,打胶前要在板缝中嵌塞大于缝宽2/r/n-4mm/r/n的泡沫棒,嵌塞深度要均匀,打胶厚度一般为缝宽的1/2。打胶时板缝两侧饰面板要粘贴美纹纸进行爱护,以防污染,打完后要在表层固化前用专用刮板将胶缝刮成凹面,胶面要光滑圆润,不能有流坠、褶皱等现象,刮完后应立立即缝两侧美纹纸撕掉。室外打胶操作阴雨天不宜进行。/r/n6.3/r/n封修安装/r/n幕墙框架上工程建筑主体交接之处做好封修处理。其材料选用铝塑板。首先依照封修节点结构把封修板加工成要求的型状。安装时一侧用抽心铆钉或自攻钉与框架连接在一起,另一侧与主体保证有足够的接触面,用射钉固定。封修皮之间并逢缝处用耐厚密封胶密封。为了起到了保温防火的目的,封修板内部及层间封修之间还要用保温岩棉等材料填充。/r/n6.4/r/n避雷系统的安装/r/n依照整体建筑工程避雷系统的特点,在幕墙框架安装过程中,每立一层框架按照避雷设计节点图,把幕墙框架上主体避雷系统连接起来,形成lOm/r/n×/r/nlOm的避雷网络,幸免因雷雨天气丽使幕墙受到破坏。避雷系统的安装要符合国家有关的标准及规范。每一个带窗处框架与墙内处至少连接一点。/r/n6.5/r/n清洗保洁/r/n待耐候胶固化后,将整片铝塑板墙用清水或中性清洗剂(清洗剂与饰面材料不能产生反应)清洗洁净,个不污染严峻的地点可采纳有机溶剂清洗,但严禁用尖锐物体刮,以免损坏饰面板表层涂膜。清洗后要设专人爱护,在明显位置设警示牌以防污染或破坏。/r/n7、材料要求及要紧机具/r/n7.1/r/n要紧材料:铝塑复合板、型材骨架、预埋件、连接件、嵌缝密封材料和紧固件等。/r/n7.2/r/n施工时要依照设计要求选择适当厚度及规格的铝塑复合板,饰面板的外观及内在质量要符合国家或行业相关标准及规定。/r/n7.3/r/n型材骨架要紧有:铝合金型材骨架和型钢骨架,骨架材料的选择要符合设计要求,骨架选用规格及材质要符合国家规范及相关标准规定。/r/n7/r/n.4/r/n/r/n预埋件及连接件:骨架锚固一般采纳预埋件或后置埋件,后置埋件形式要符合设计要求,并在现场做拉拨试验;钢板连接件与非同质骨架连接时,中间要垫有机材质垫块,以免发生电化学腐蚀。/r/n7/r/n.5/r/n/r/n结构粘结材料必须是中性硅酮结构密封胶,其性能必须符合建筑用硅酮结构密封胶GB16776的规定;硅酮结构密封胶必须在有效期内使用。/r/n7/r/n.6/r/n/r/n紧固件要紧是螺丝和自攻丝,其材质一般为不锈钢或铝制品,紧固件选择要符合设计要求,且质量要符合国家规范及有关标准规定。/r/n7/r/n.7/r/n/r/n要紧机具(工具):电焊机、型材切割机、手枪钻、经纬仪、水准仗、铆钉枪、自攻钻及铣槽机等。/r/n8/r/n、劳动组织与安全措施/r/n8/r/n.1/r/n/r/n劳动组织:依照工程量及工作面情况,制定施工进度,合理安排劳动力,一般情况下,测量工2-3人;电焊工2人以上;幕墙安装工人3以上;材料搬运工2人以上;/r/n8/r/n.2/r/n/r/n安全措施:/r/n8/r/n.2.1/r/n8/r/n.2.2/r/n8/r/n.2.3/r/n9、质量要求/r/n9/r/n.1/r/n/r/n主控项目/r/n9/r/n.1.1/r/n检验方法:检查产品合格证书、性能检测报告、材料进场验收记录和复验报告。/r/n9/r/n.1.2/r/n检验方法:观看;尺量检查。/r/n9/r/n.1.3/r/n检验方法:观看;检查进场验收记录。/r/n9/r/n.1.4/r/n检验方法:检查拉拔力检测报告和隐蔽工程验收记录。/r/n9/r/n.1.5/r/n检验方法:手扳检查;检查隐蔽工程验收记录。/r/n9/r/n.1.6/r/n检验方法:检查隐蔽工程验收记录。/r/n9/r/n.1.7/r/n检验方法:检查隐蔽工程验收记录和施工记录。/r/n9/r/n.1.8/r/n检验方法:检查隐蔽工程验收记录。/r/n9/r/n.1.9/r/n检验方法:观看;检查隐蔽工程验收记录。/r/n9/r/n.1.10/r/n检验方法:观看;尺量检查;检查施工记录。/r/n9/r/n.1.11/r/n检验方法:在易渗漏部位进行淋水检查。/r/n9/r/n.2-般项目/r/n9/r/n.2.1/r/n检验方法:观看。/r/n9/r/n.2.2/r/n检验方法:观看;手扳检查。/r/n9/r/n.2.3/r/n检验方法:观看。/r/n9/r/n.2.4/r/n检验方法:观看;用水平尺检查。/r/n9/r/n.2.5/r/n9/r/n.2.6/r/n表1-l每平方米金属板的表面质量和检验方法/r/n项次/r/n项目/r/n质量要求/r/n检验方法/r/nl/r/n明显划伤和长度/r/n>lOOmm/r/n的轻微划伤/r/n不同意/r/n观看/r/n2/r/n长度/r/n≤/r/nlOOmm/r/n的轻微划伤/r/n≤/r/n8/r/n条/r/n用钢尺检查/r/n3/r/n擦伤总面积/r/n≤/r/n500mm/r/n2/r/n用钢尺检查/r/n
/r/n表1-2金属幕墙安装的同意偏差和检验方法/r/n项次/r/n项目/r/n同意偏差/r/n(mm)/r/n检验方法/r/n幕墙高度/r/n≤/r/n30m/r/n10/r/nl/r/n幕墙垂/r/n30/r/n≤/r/n幕墙高度/r/n≤/r/n60m/r/n15/r/n用经伟仪检查/r/n直度/r/n60/r/n≤/r/n幕墙高度/r/n≤/r/n90m/r/n20/r/n幕墙高度/r/n>/r/n90m/r/n25/r/n2/r/n幕墙水/r/n层高/r/n≤/r/n3m/r/n3/r/n用水平仪检查/r/n平度/r/n层高/r/n>/r/n3m/r/n5/r/n3/r/n幕墙表面平坦度/r/n2/r/n用/r/n2m/r/n靠尺和塞尺/r/n4/r/n板材立面垂直度/r/n3/r/n垂直检测尺检查/r/n5/r/n板材上沿水平度/r/n2/r/n用/r/nIm/r/n水平尺和钢直尺检查/r/n6/r/n相邻板材角错位/r/n1/r/n用钢直尺检查/r/n7/r/n阳角方正/r/n2/r/n盲角柃测尺柃杏/r/n8/r/n接缝直线度/r/n3/r/n拉/r/n5m/r/n线不足/r/n5m/r/n拉通线用钢直尺检杳/r/n9/r/n接缝高低差/r/n1/r/n用钢盲尺和寨尺柃杏/r/n10/r/n接缝宽度/r/nl/r/n用钢直尺检查/r/n第五节/r/n/r/n幕墙防雷施工/r/n一、防雷安装工艺概述/r/n /r/n防雷安装保证做到:幕墙竖向避雷带由上下电气连通的竖骨料构成,其水平距离不大于/r/n10m/r/n,幕墙在位于与主体防雷引线可靠连接的均压环处的预埋件均以小于/r/n10m/r/n的间隔与均压环电气连连通,竖骨料再通过钢质连接件和不锈防雷垫片与预埋件连通。如此,在不大于/r/n100平方米/r/n的范围内,上下连通的竖骨料和均压环构成的避雷网格与主体防雷引下线连通的幕墙避雷网,而使幕墙形成统一的避雷系统。/r/n本工程要求/r/n每三层和顶层采纳40*4扁铁或/r/nФ/r/n12钢筋作均压环与主体防雷提焊牢导电,再通过防雷体与主体防雷网连接,从而使幕墙与主体防雷系统连成一体,确保安全可靠/r/n二、防雷安装/r/n幕墙防雷安装,要紧分为两个时期,即:/r/n1.预埋件敷设时期/r/n防雷安装必须在预埋件敷设时期就跟进。在预埋件敷设时期的防雷处理措施要紧是采纳直接利用连接钢筋焊接于主体防雷钢筋和预埋件上。/r/n2.幕墙骨架安装时期/r/n幕墙在完成连接件安装后,进行幕墙立柱安装时,同样跟进防雷的施工。要确保幕墙的竖向避雷带由上下电气连通的竖骨料构成,从而使幕墙有统一的避雷系统。由于上下竖骨料之间连接是采纳插接件连接并注打密封胶,因此我司设计一连接导线利用螺钉固定于上下两立柱上。/r/n第/r/n六/r/n节幕墙防火施工/r/n一、工艺概述/r/n本工程可利用窗下墙(梁)和窗间墙(柱)起到防火分区的作用,幕墙防火除按建筑设计防火分区外,在水平方向以每个自然楼层作为防火分区进行防火处理。具体做法是:用/r/n1.5mm/r/n厚镀锌钢板将主体结构和幕墙框架之间缝隙铺满,在其上铺满许多于/r/n100mm/r/n厚的防火岩棉,确保火灾情况下楼层之间可不能窜火,同时幸免烟囱现象产生。本工程耐火等级为一级,窗墙部位耐火极限2小时。/r/n二、防火棉安装/r/n1、防火隔断板安装/r/n安装防火棉之前先安装防火托板,防火托板是通过射钉和自攻钉分不固定于楼板砼结构和横料上,防火托板采纳/r/n1.5mm/r/n厚镀锌钢板。/r/n就位后的防火板一侧固定在防火隔断横染上(或可当作防火隔断横梁),用拉钉固定,/r/n一侧与主体连接,用射钉固定,在安装中先在横梁钻孔,用拉钉连接钻孔时要注意对比防火板上的孔位钻孔。/r/n选择适当的拉钉在钻好的孔处将防火板与横梁拉锚固。注意假如拉钉不稳要重新拉锚。/r/n将拉好拉钉的防火板从下向上紧靠结构定位,然后用射钉枪将防火板的另一侧钉在主体结构上。/r/n2、防火棉安装/r/n为满足幕墙的防火性能和保温节能的要求,在幕墙设计中必须考虑防火和保温的措施。防火除了安装防火隔断板上,还要在板内堵塞防火岩棉。/r/n1)安装工艺流程:/r/n防火岩棉(保温棉)尺寸测量/r/n→/r/n按尺寸下料/r/n→/r/n按放/r/n→/r/n固定/r/n→/r/n检查修补/r/n→/r/n隐蔽验收。/r/na、防火岩棉面依照设计图纸要求的厚度及现场实测的宽度尺寸进行截切后安装在此防火钢板内,安装需在晴天进行,并立即进行封闭,以免被雨水淋湿。可在板块安装后安装的应后安装以爱护防火岩棉,安装完后应在表面用钢丝封闭。/r/n/r/n
/r/n第/r/n六/r/n章工程质量治理及保证质量措施/r/n第一节/r/n/r/n工程质量治理/r/n我公司历来特不重视工程质量的治理,视工程质量为企业的生命。有明确的质量体系及工程质量方针。依照本工程的质量要求,结合我公司的ISO9001质量保证体系,本工程施工质量采取全过程的质量操纵+事后检验的治理方式,保证本工程施工质量达到国家或行业的质量检验标准合格。工程质量治理规定如下:/r/n一、适应范围/r/n适用于公司/r/n外墙干挂铝塑板/r/n工程项目。/r/n二、要紧职责/r/n工程施工由项目经理组织质量策划,并编制施工项目质量打算;幕墙构件加工由加工厂厂长组织质量策划,并编制加工生产质量打算。/r/n三、程序内容/r/n⑴/r/n幕墙工程项目签定合同后,由项目经理或其授权人组织工程项目技术负责人、质检负责人、采购负责人、施工班组长等骨干人员,召开质量策划会议,提出项目的质量目标和组织机构、对工程设计、采购、工期、造价、施工治理、检验、交付等个体事项进行讲座策划。由指定人员做好质量策划会议记录,讲座策划的结果形成《项目质量打算》。/r/n⑵/r/n由项目经理或其授权人对策划结果,编制《项目质量打算》,公司制订了项目质量打算范本,供编制人员参考。/r/n⑶/r/n编制《项目质量打算》时,参照范本提出的相关要求,内容必须完整、准确、语言必须简明易明白并体现范本中有关的各质量要素及要紧运作的要求。/r/n⑷/r/n《项目质量打算》的批准公布。《项目质量打算》经项目经理签字后报工程治理部经理审核,由总经理批准公布。/r/n⑸/r/n《项目质量打算》的发放、治理。《项目质量打算》由体系办负责发放到有关部门和人员,做好发放登记记录。所有在用的《项目质量打算》为受控文本,按《文件操纵程序》的有关规定操纵。/r/n⑹/r/n项目质量打算的实施。经批准公布的项目质量打算由工程负责人组织有关人员贯彻实施,项目经理对质量打算实施情况进监督检查。/r/n⑺/r/n项目质量打算的修改。项目质量打算的修改由项目技术负责人指定人员进行,并由项目经理审核后报工程治理部经理批准,修改后的项目质量打算要及时发放到持有人手中,并收回作废的版本。修改后的项目质量打算应依照本程序规定发放治理。/r/n⑻/r/n质量打算的检查和验证:/r/n项目质量打算落实情况由项目经理组织检查,采购打算由材料科主任组织检查,检查结果由工程部经理审核后提交总工验证确认,《加工质量打算》由副厂长组织检查,检查结果由厂长审批后,提交总工验证确认,记录在《质量策划实施情况检查表》中。/r/n第二节/r/n/r/n工程保证质量措施/r/n一、质量目标/r/n达到国家建筑工程施工质量验收统一标准(/r/nGB50300-2001/r/n)。/r/n二、项目质量保证体系/r/n及实施方法/r/n
/r/n1、项目质量保证体系/r/n图纸会签/r/n加工放样/r/n评审/r/n总经理/r/n总质量师、质安处/r/n合同签订/r/n评审/r/n施工组织/r/n设计/r/n评审/r/n方案设计/r/n评审/r/n总体工作/r/n打算评审/r/n详细设计/r/n评审/r/n签订材料/r/n合同评审/r/n材料入库/r/n检验/r/n加工中心:/r/n加工评审/r/n半成品包装检验/r/n半成品:/r/n入库检验/r/n下步工序安装/r/n测量、放线/r/n评审/r/n预埋件处理/r/n检验、验收/r/n骨架安装/r/n检验、验收/r/n层间防火、保温、防雷/r/n连接/r/n幕墙安装/r/n检验、验收/r/n产品性能测验试/r/n复验/r/n竣工检验/r/n整体验收/r/n交付/r/n售后服务/r/n材料预算/r/n评审/r/n下步工序:/r/n加工/r/n图纸会签/r/n加工放样/r/n评审/r/n总经理/r/n总质量师、质安处/r/n合同签订/r/n评审/r/n施工组织/r/n设计/r/n评审/r/n方案设计/r/n评审/r/n总体工作/r/n打算评审/r/n详细设计/r/n评审/r/n签订材料/r/n合同评审/r/n材料入库/r/n检验/r/n加工中心:/r/n加工评审/r/n半成品包装检验/r/n半成品:/r/n入库检验/r/n下步工序安装/r/n测量、放线/r/n评审/r/n预埋件处理/r/n检验、验收/r/n骨架安装/r/n检验、验收/r/n层间防火、保温、防雷/r/n连接/r/n幕墙安装/r/n检验、验收/r/n产品性能测验试/r/n复验/r/n竣工检验/r/n整体验收/r/n交付/r/n售后服务/r/n材料预算/r/n评审/r/n下步工序:/r/n加工/r/n
/r/n2、质检仪器一览表/r/n序号/r/n仪器名称/r/n型号规格/r/n产地/r/n数量/r/n制造年份/r/n1/r/n光谱仪/r/nFSQ/r/n广州/r/n1/r/n2003/r/n2/r/n手提式韦氏硬度计/r/nMODEL-B/r/n广州/r/n3/r/n2003/r/n3/r/nPVB胶膜水份测定/r/nLAMM-1/r/n北京/r/n1/r/n2003/r/n4/r/n铅垂仪/r/n索佳PD3/r/n德国/r/n1/r/n2004/r/n5/r/n钢卷尺/r/n5m/r/n江苏/r/n4/r/n2005/r/n6/r/n钢卷尺/r/n3m/r/n江苏/r/n4/r/n2005/r/n3/r/n、实施方法/r/n1)程序操纵/r/n⑴/r/n《设计过程操纵程序》和《设计评审、验证确认程序》规定职责,编制/r/n“/r/n设计任务书/r/n”/r/n,按国家和行业标准和规范进行设计,评审和经设计院和业主确认,达到技术规范和业要紧求。/r/n⑵/r/n《生产和服务提供操纵程序》规定职责,安装流程,施工预备,技术交底,施工安装及检验验收等的操纵。/r/n⑶/r/n《专门工序操纵程序》规定横竖龙骨安装,隐蔽工程验收和打耐候密封胶为安装施工的专门工序,并按技术规范编制作业指导书,使用合格材料,对重要技术参数进行检验,并跟踪检测,使用计量器具通过校核,操作人员持证上岗等。/r/n⑷/r/n《施工过程监视和测量》程序,规定在施工预备、工程放线、隐蔽工程、工序交接验收等方面进行监视。/r/n⑸/r/n《竣工工程监视和测量程序》规定工程竣工的验收。/r/n⑹/r/n施工流程图/r/n施工预备/r/n→/r/n测量放线/r/n→/r/n埋件安装/r/n→/r/n验收/r/n→/r/n龙骨安装/r/n→/r/n验收板件安装/r/n→/r/n检验/r/n→/r/n打耐候胶/r/n→/r/n验收/r/n→/r/n清洗/r/n→/r/n成品爱护/r/n→/r/n内部验收/r/n→/r/n竣工资料预备/r/n→/r/n竣工验收/r/n→/r/n成品交接/r/n→/r/n售后服务维修/r/n2/r/n)过程操纵/r/n⑴/r/n施工图经设计评审、验证、认可达到技术规范要求,设计图纸齐全,包括设计讲明、满足施工需要的立面图、平面图、节点大样图(伸缩缝沉降缝防震缝及转角节点,构件与主体的连接节点,防雷节点)型材图等,并经设计、核对审核、批准人签署,盖章、装订。/r/n⑵/r/n制定工序作业指导书,操作人员通过培训持证上岗并按作业指导书施工。/r/n⑶/r/n质检人员按检验规程、技术规范、检验记录表检验并记录、保存。/r/n⑷/r/n执行操作人员和检验人员的自检、互检、专检的/r/n“/r/n三检制/r/n”/r/n和首检、巡检、终检的质检人员/r/n“/r/n三检制/r/n”/r/n。/r/n⑸/r/n制订各种制度,约束执行者的质量行为,并纳入考核。/r/n⑹/r/n每个施工项目甚至每道工序由项目技术负责人对技术主管进行技术交底,技术主管对施工队长技术交底,技术主管和施工队长对施工人员技术交底并记录。/r/n⑺/r/n做好/r/n“/r/n施工日志/r/n”/r/n记录,及时发觉问题,及时报告及时处置。/r/n3/r/n)各工序质量操纵/r/n(1)弹线放样(附图)/r/n⑴/r/n开线组首先对基线进行复核(标高线、轴线);/r/n⑵/r/n复核无误后填写基线复核单,并由总包签证认可、归档;/r/n⑶/r/n弹操纵线以总包基线为准,弹出幕墙结构操纵线,墨线必须清晰;/r/n⑷/r/n各层面弹出标高线以绿色油漆为标记;/r/n⑸/r/n放结构操纵钢线,经复核无误下一道工序施工;/r/n⑹/r/n埋件结构检查,检查完毕予以记录(全数检查),若误差较大即向设计、业主反馈及时调整及补救方案;/r/n(2)调码组/r/n⑴/r/n调码组必须依据放线组所放操纵线进行安装施工;/r/n①/r/n调码过程中埋件与砼结构接触面须达到70%以上;/r/n②/r/n竖料调校过程中竖料里外居中,否则阻碍下道工序的安装(检查、记录);/r/n⑵/r/n埋件偏位问题实施;/r/n①/r/n依据埋件定位表,采取化学螺栓补救;/r/n②/r/n经强度计算定出螺栓的规格,施工队依据设计部文件为依据进行施工;/r/n③/r/n化学螺栓结构上打到规范深度,吹清灰尘;/r/n④/r/n放入药剂、螺杆,经充分搅拌完工后填写隐蔽验收单,归档;/r/n⑤/r/n化学螺栓埋入,必须做技艺评定,请政府有关部门做拉拔试验,出具有关证明归档;/r/n(3)焊接工序/r/n⑴/r/n焊工必须持证上岗,须有符合要求的等级证书;/r/n⑵/r/n焊工须在样板焊接通过后,才能实施上岗施焊(项目部组织此活动,邀请监理参加)/r/n⑶/r/n焊工施焊过程中/r/n①/r/n焊工在施焊过程中应第一遍施焊后敲渣后才能进行第二遍施焊;/r/n②/r/n施焊后自检所有焊缝,并予以记录;/r/n③/r/n施焊自觉毕后通知质量进行互检,并予以记录;/r/n④/r/n质量员检查完毕后报监理验收,并填隐蔽验收单,记录归档;/r/n⑷/r/n在施焊过程中要爱护下方产品,施焊过程中必须用接火盘;/r/n(4)中间验收/r/n⑴/r/n上述工序完成后,进行中间验收(按东、南、西、北四个面分面分层进行;)/r/n①/r/n各完工作进行自检、互检,做好隐蔽工作验收单;/r/n②/r/n完工后报监理验收;/r/n③/r/n监理验收完毕报质监站验收;/r/n(5)挂板片(依据板片编号图)/r/n⑴/r/n在总体挂板片之前,先试挂样板板片,上下3块,左右3块,共9块;/r/n①/r/n将试挂中存在的问题记录下来,反馈给设计及修改;/r/n②/r/n样板试挂完毕请业主、监理评定;/r/n③/r/n填写样板试挂评定表,归档;/r/n④/r/n大面积挂板每隔二层进行标高及安装质量检查并记录;/r/n(6)喷淋试验/r/n⑴/r/n待幕墙挂到一定数量后进行现场喷淋试验;/r/n①/r/n由业主、监理指定一面进行喷淋;/r/n②/r/n以设计值为依据,进行喷淋;/r/n⑵/r/n喷淋完毕予以记录,并请业主、监理签字认可。/r/n(7)避雷连接/r/n⑴/r/n请业主提供各均压环连接点的位置图;/r/n⑵/r/n依据设计部避雷连接方案进行连接;/r/n⑶/r/n连接完毕进行自检、互检、做好隐蔽验收单;/r/n⑷/r/n采纳ZC29B型接地电阻测试仪进行连接检查:/r/n①/r/n自检检查连接电阻予以记录;/r/n②/r/n填写避雷测试表,报监理验收;/r/n③/r/n接电阻/r/n≤/r/n10/r/nΩ/r/n。/r/n(8)施工用具/r/n⑴/r/n施工测量检测工具:/r/n①/r/n必须有年检合格证;/r/n②/r/n施工中量具须经检验后才能进行使用。/r/n(9)半成品到工地检验/r/n⑴/r/n校对数量、是否有损坏;/r/n⑵/r/n检查板片尺寸(并记录);/r/n⑶/r/n半成品至工地通知监理到交货点并验收,并出具合格证、质保资料。/r/n(10)质量标准/r/n⑴/r/n质量标准应符合规范要求;/r/n4/r/n)专门工序操纵/r/n(1)龙骨安装:按作业指导书进行安装和检查,施工人员持证上岗。/r/n1)立柱为竖向构件立柱的安装准确和质量,阻碍整个幕墙的质量,通过连接件幕墙的平面轴线与建筑物的外平面轴线距离的同意偏差在2㎜以内。立柱先与连接件连接,然后连接件再与主体预埋件连接并进行调整固定,立柱长以层高为一根接头留空隙,采纳套筒连接。/r/n2)横梁为横向构件,横梁两端立信连接处用弹性橡胶垫、并应有20~35%压缩性,横梁安装由下而上进行,安装完一层高度,应检查、调整、校正、固定。/r/n3)严格按检验规程检查,并记录。/r/n(2)隐蔽工程验收/r/n由于幕墙施工差不多完成后,许多节点已被遮盖,因此,隐蔽工程验收必须严格操纵。/r/n1)坚持哪里有隐蔽工程,哪里必须进行验收,不得遗漏,隐蔽验收合格后,才能接着下道施工工序。/r/n2)隐蔽验收前预备好验收单,认真填写验收部位,验收要求,验收结论并及时记入/r/n验收单,参加验收人签字,监理工程师签字认可。/r/n(3)打耐候密封胶/r/n按作业指导书和检验规程进行施工和检查,操作人员持证上岗。/r/n1)耐候密封胶的施工厚度为3.5㎜~4.5㎜,宽度按设计要求。/r/n2)施工温度为/r/n5/r/n℃/r/n~/r/n48/r/n℃/r/n,严禁低于/r/n3)防止三面粘结。/r/n4)打胶前清洗必须认真,周密,防止污染饰面。/r/n5)胶缝横平竖直,均匀、饱满、连续不隔断。第一次打胶与第二次打胶时刻相隔较长时,原打胶处应将胶切除一段,切面为斜面,以便与新打的胶紧密相接。/r/n三、薄弱环节预防措施(幕墙质量通病的防治措施/r/n)/r/n(1)幕墙渗水缘故分析/r/n1)设计/r/n①/r/n要紧受力构件铝型材立柱不按规范设置/r/n20mm/r/n伸缩缝,铝型材热胀冷缩产生渗水现象。/r/n②/r/n设计时没有采纳伸缩量较大的密封胶,也没有进行必要的计算。例如耐候硅酮密封胶其位移能力达/r/n±/r/n25%,为一般密封胶的2倍,必须按此数据计算预留注胶位置尺寸,否则密封胶适应变形能力差,受温度变化会自行拉裂或鼓起,失去防水功能。/r/n③/r/n开启窗防水密封处理失效或密封层数不足(一般要求二至三道密封),导致雨水沿幕墙流淌时,直接进入开启窗内,出现倒泛水。/r/n④/r/n与建筑物接合收口处理时,没有与土建单位共同研究和配合,而是各自施工,各管一面,导致出现渗水通道。特不是幕墙顶部与女儿墙之间的幕墙压顶连接不牢固,封闭不严,如螺丝孔、压顶搭接处不打胶或打胶不严密、遗漏等,都会形成渗水通道。/r/n2)铝型材/r/n①/r/n铝型材表面处理不符合国家标准,表面涂层附着力不强,氧化膜太薄或过厚(规范规定阳极氧化膜厚度不应低于AA15级),导致密封胶粘接失效。/r/n②/r/n要紧受力构件铝型材立柱和横梁的强度不足,刚度不够,其截面受力部分的壁厚小于3mm,在风荷载标准值作用下,相对挠度大于L/180或绝对挠度大于20mm,幕墙严峻变形,出现移位和雨水渗漏。/r/n③/r/n没有采纳优质高精度等级铝型材(其中幕墙立柱应采纳超高精度等级),铝型材不合格,其弯曲度、扭拧度、波浪度等严峻超标,造成整幅幕墙的平面度、垂直度不能达到要求。/r/n3)密封胶/r/n①/r/n为节约成本,采纳一般密封胶而没有采纳耐候硅酮密封胶进行室外嵌缝,在幕墙上经太阳光紫外线照耀,胶缝过早老化,造成开裂。/r/n②/r/n没有注意工程所采纳的结构硅酮密封胶、耐候硅酮密封胶、墙边胶的有效使用期,过期使用,胶缝起泡、开裂或不凝固,导致幕墙渗水。/r/n③/r/n没有按规范进行结构硅酮密封胶接触材料相容性试验,结果结构硅酮密封胶与铝型材、胶条等材料不相容,发生阻碍粘结性的化学变化,同时阻碍密封作用。/r/n5)施工/r/n①/r/n铝框架安装时,不按规范操作,没有抓好质量,水平度、垂直度、对角线差和直线度超标,直接阻碍幕墙的物理性能。/r/n②/r/n耐候硅酮密封胶施工不密实,封堵不严或长宽比不符合规范。规范规定施工厚度应大于/r/n3.5mm/r/n、小于/r/n4.5mm/r/n,高度不应小于厚度的2倍,且不得三面粘结。耐候硅酮密封胶施工厚度太薄则不能保证密封质量,对型材温度变化产生的拉应力不利;太厚又反而容易被拉断,使密封和防渗漏失效,雨水从填嵌的空隙和裂隙渗入室内。/r/n③/r/n对密封胶施工条件不重视。南方地区雨水较多,如在雨季强行露天施工耐候密封胶,无法保证密封质量。结构胶施工也有一定的温度、湿度条件,必须注意。/r/n④/r/n密封胶条尺寸不符或采纳劣质材料,专门快松脱或老化,失去密封防水功能。/r/n6)使用/r/n①/r/n没有提供详细的竣工资料及使用讲明书给使用单位,用户入住后,不明白幕墙的使用方法,造成对幕墙的损坏、碰撞变形、污染等,导致渗水。/r/n②/r/n外墙清洁时,操作不当容易对幕墙造成损坏,例如清洁公司的吊篮挂绳,往往直接挂在幕墙顶部胶缝上,来回摩擦拉裂胶缝,造成渗水/r/n③/r/n住户擅自进行改造,对破坏的部位没有进行认真填塞、防水处理。/r/n(2)幕墙渗水防治措施/r/n导致幕墙渗水与漏水的差不多条件有三个:有孔隙存在;有水的存在;有渗水裂缝的压力差存在。消除一个或更多的这些差不多条件是防治水渗漏的途径:一是尽量减少孔隙;二是遮挡雨水,使之尽量不浸湿缝隙;三是减少被浸湿缝隙处的风压差。/r/n1)设计时首先考虑幕墙防水装置设计构造,运用等压原理,在幕墙铝型材上设置等压腔和特不压力引入孔,如此,等压腔内部压力通过特不压力引入孔与外部压力平衡,将压力差移至接触不到雨水的室内一侧,因此有水处没有风压力差而有压差的部位又没有水,达到防止外部水利用压力差渗入幕墙的目的,这是积极防水的措施。/r/n2)在幕墙铝型材上开设流向室外的泄水小孔,把通过细小缝隙进入幕墙内部的水收集排出幕墙外。/r/n3/r/n)选用优质结构硅酮密封胶、耐候硅酮密封胶、墙边胶,而且要加强检验,防止过期使用。/r/n5)注意操纵密封胶的使用环境,严禁下雨天露天进行耐候硅酮密封胶施工。结构胶的施工车间要求清洁无尘土,室内温度不宜高于/r/n27/r/n℃/r/n6)结构硅酮密封胶、耐候硅酮密封胶、墙边胶注胶前,应先将铝框、缝隙上的尘埃、油渍、松散物和其他脏物清除洁净,注胶后应嵌填密实、表面平坦,加强养护,防止手摸、水冲等。/r/n7/r/n)开启窗应认真检查是否达到密封程度,配件是否材质优良、功能可靠,开启、关闭是否灵活。/r/n8/r/n)完善竣工验收资料,移交给有关部门,使用单位应依照使用讲明书及时制订幕墙的保养、维修打算与制度。/r/n四、成品、半成品运输及存储爱护措施/r/n(1)搬运:/r/n1)运输:/r/n①/r/n装车要求:针对不同的物料不同的物料有不同的装车加固方法速度要求:针对幕墙构件爱护高标准要求,在没有专门情况下,车速应在限制速度内。/r/n2)公路运输/r/n①/r/n装车要求:针对不同的物料有不同的装车加固方法速度要求:针对幕墙构件爱护标准要求,在没有专门情况下,车速应在限制速度内。/r/n3)二次搬运:/r/n①/r/n按要求分类堆放:/r/n②/r/n易碎物品搬运须有治理人员在场指挥;/r/n(2)各类部件包装应保证在运输中可不能发生相互碰撞:/r/n包装箱应有定钩的牢固程度,并在明显的部位标明下列标志:/r/n1)制造厂商/r/n2)产品名称及标志/r/n3)制作日期/r/n(3)成品、半成品储存地点的一般要求:/r/n1)应不易受其他工程施工阻碍而搬迁。/r/n2)应选择平坦的混凝土地面,且强度不宜低于C10,浇筑厚度不宜小于/r/n100mm/r/n。/r/n3)应能避开材料的搬运通路,安全性好。/r/n4)应接近装配现场和运输梯口。/r/n5)应能与办公室,保安室等部门联系方便。/r/n6)应靠近消防设施。/r/n(4)半成品储存的堆放要求:/r/n1)半成品应分门不类堆放并有专门的标识牌,标识牌上应注明型号、规格、数量等内容。/r/n2/r/n)油漆、酒精、泡沫等易燃材料应隔离放置并配备有专门的消防装置。/r/n(5)成品爱护措施及工程保险/r/n1)工地已安装上墙材料的成品爱护:/r/n现场外露钢件均需补刷红丹、灰铅油两遍防蚀;另外,要与其他承包商,如土建单位紧密配合,共同搞好成品爱护,必要时我司可向保险公司购买专项保险。/r/n2)工程保险:/r/n工程保险通常购买以下方面的保险:/r/n①/r/n进口材料购买运输保险:/r/n②/r/n施工人员购买人身损害保险。/r/n总之,我司在科学治理,严格施工的基础上,保证在限定的工期内,按时竣工,并达到业要紧求的工程质量。/r/n安装工艺流程操纵图/r/n弹线放样/r/n进行复核/r/n合格/r/n预埋件支座安装/r/n(/r/n检测/r/n)/r/n測/r/n支座龙骨等安装/r/n幕墙板块安装/r/n隐蔽工程自检、专检/r/n合格/r/n监理验收/r/n调/r/n/r/n整/r/n调整后自检、专检/r/n不合格/r/n验收/r/n合格/r/n检/r/n/r/n查/r/n调整/r/n调/r/n/r/n整/r/n不合格/r/n打/r/n/r/n胶/r/n检/r/n/r/n查/r/n整/r/n/r/n改/r/n合格/r/n清/r/n/r/n洗/r/n最终验收/r/n合/r/n格/r/n不合格/r/n弹线放样/r/n进行复核/r/n合格/r/n预埋件支座安装/r/n(/r/n检测/r/n)/r/n測/r/n支座龙骨等安装/r/n幕墙板块安装/r/n隐蔽工程自检、专检/r/n合格/r/n监理验收/r/n调/r/n/r/n整/r/n调整后自检、专检/r/n不合格/r/n验收/r/n合格/r/n检/r/n/r/n查/r/n调整/r/n调/r/n/r/n整/r/n不合格/r/n打/r/n/r/n胶/r/n检/r/n/r/n查/r/n整/r/n/r/n改/r/n合格/r/n清/r/n/r/n洗/r/n最终验收/r/n合/r/n格/r/n不合格/r/n弹线放样质量操纵/r/n学习图纸和技术资料/r/n学习操作规程和质量标准/r/n预备工作/r/n仪器预备(包括检定证书)/r/n确定弹线方案/r/n现/r/n/r/n场/r/n/r/n清/r/n/r/n理/r/n基/r/n/r/n线/r/n/r/n问/r/n/r/n讯/r/n基/r/n/r/n线/r/n/r/n复/r/n/r/n核/r/n弹/r/n/r/n水/r/n/r/n平/r/n/r/n标/r/n/r/n高/r/n弹/r/n/r/n控/r/n/r/n制/r/n/r/n线/r/n钢/r/n/r/n丝/r/n/r/n线/r/n结/r/n/r/n构/r/n/r/n检/r/n/r/n查/r/n/r/n执/r/n/r/n行/r/n/r/n验/r/n/r/n评/r/n/r/n标/r/n/r/n准/r/n基线复核符合土建标准总标高/r/n≤/r/n25mm/r/n、分割线/r/n学习图纸和技术资料/r/n学习操作规程和质量标准/r/n预备工作/r/n仪器预备(包括检定证书)/r/n确定弹线方案/r/n现/r/n/r/n场/r/n/r/n清/r/n/r/n理/r/n基/r/n/r/n线/r/n/r/n问/r/n/r/n讯/r/n基/r/n/r/n线/r/n/r/n复/r/n/r/n核/r/n弹/r/n/r/n水/r/n/r/n平/r/n/r/n标/r/n/r/n高/r/n弹/r/n/r/n控/r/n/r/n制/r/n/r/n线/r/n钢/r
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 金蝉养殖回收合同范本
- 装修泥瓦工合同范本
- 土方船舶运输合同范本
- 浙江国企招聘2024金华义乌市属国有企业招聘76人笔试参考题库附带答案详解
- 2025至2030年中国户外箱体数据监测研究报告
- 2025至2030年中国微波涂膜烘干固化设备数据监测研究报告
- 安全急救课件
- 栓皮买卖合同范本
- 有机化学反应课件
- 2025年度汽车配件销售兼职佣金结算合同
- 穷查理宝典课件
- 生物补片及相关应用进展课件
- 高危新生儿管理
- 贷款调查表-经营类
- 做时间的主人课件- 高中时间管理主题班会
- 附件3.信息化项目建设方案论证审批报告书
- 小桥涵水文计算软件
- 李德新中医基础理论讲稿
- Photoshop图像处理课件(完整版)
- 05844 全国 江苏 自考国际商务英语课后习题答案 详解
- 重庆道路交通事故认定书(简易程序)样本
评论
0/150
提交评论