1、砂褥垫层夯填度施工记录表工程名称:龙韵华庭2#楼时间:2014.11.17 (第一步)点位夯实前厚度(mm)夯实后厚度(mm)夯填度点位夯实前厚度(mm)夯实后厚度(mm)夯填度1-12011650.8212-12031650.8131-22031660.8182-22021640.8121-32000.8102-32051660.8101-42011630.8112-42061660.8061-50.8142-52041630.7991-61981550.7832-62030.7981-72031630.8032-72010.8061-82011610.8012-82001600.8001-
2、92020.8022-92030.7981-102001610.8052-102051640.8001-111600.8042-112011600.7961-121971600.8122-121600.8041-131980.8182-131981600.8081-141971610.8172-141961580.8061-152011600.7962-151951550.7951-162020.8022-161940.7841-172051660.8102-171961580.8061-182041650.8092-181981580.7981-192031630.8032-190.7991
3、-202011610.8012-201981600.8081-212001610.8052-211971570.7971-221981600.8082-221951550.7951-231970.8072-231980.8031-241951580.8102-242021600.7921-251961580.8062-252031610.7931-261600.8042-262051640.8001-272011610.8012-272041610.7891-282001600.8002-282061660.806备注:图纸设计夯填度0.9,施工中由各楼施工员用水准仪测量,夯填前,每个控制 点
4、控制围不大于9m2,用白灰做标记,夯实后再用水准仪测量,使用机械为压路机18t)、 立式打夯机。压实遍数为四遍。施工员:质检员:监理单位(盖章):砂褥垫层夯填度施工记录表工程名称:龙韵华庭2#楼时间:2014.11.17 (第一步)点位夯实前厚度夯实后厚度夯填度点位夯实前厚度夯实后厚度夯填度(mm)(mm)(mm)(mm)3-12001650.8254-12011610.8013-22011660.8264-22031630.8033-32000.8104-32020.8023-41600.8044-42041630.7993-51981600.8084-52010.8063-62001600
5、.8004-61981550.7833-72031630.8034-71600.8043-82051640.8004-81970.8073-92010.8064-91970.8073-102031610.7934-102011610.8013-112041600.7844-112021610.7973-122061650.8014-121600.8043-132051650.8054-131981600.8083-142031610.7934-142031610.7933-152041640.8044-152040.7943-160.8144-162051630.7953-171981660.
6、8384-172030.7983-181650.8294-182011610.8013-192011630.8114-192021630.8073-202021610.7974-202041630.7993-212031610.7934-212011610.8013-221600.8044-221600.8043-231970.8074-231950.8153-241951580.8104-241981580.7983-252031580.7784-251971580.8023-262021600.7924-261981600.8083-272041610.7894-271961580.806
7、3-282021600.7924-281600.804备注:图纸设计夯填度0.9,施工中由各楼施工员用水准仪测量,夯填前,每个控制 点控制围不大于9m2,用白灰做标记,夯实后再用水准仪测量,使用机械为压路机18t)、 立式打夯机。压实遍数为四遍。施工员:质检员:监理单位(盖章):砂褥垫层夯填度施工记录表工程名称:龙韵华庭2#楼时间:2014.11.17 (第一步)点位夯实前厚度(mm)夯实后厚度(mm)夯填度点位夯实前厚度(mm)夯实后厚度(mm)夯填度5-11650.8296-12011650.8215-21981610.8136-22021660.8225-31951640.8416-32
8、020.8025-41980.8186-42001660.8305-52001660.8036-52010.8065-62031650.8136-61600.8045-72011630.8116-71981600.8085-82021610.7976-81961600.8165-92051610.7856-91951630.8365-102031600.7886-101941640.8455-112010.7916-111950.8315-121981580.7986-121961610.8215-130.8146-131981600.8085-141971610.8176-141650.82
9、95-151961660.8476-152021650.8175-161950.8316-162011660.8265-172001600.8006-172030.7985-182001600.8006-182041600.7845-192011600.7966-192051630.7955-202031630.8036-202031610.7935-212011640.8166-212011610.8015-220.8146-222001610.8055-232011610.8016-232001600.8005-242001600.8006-242010.7915-251981650.83
10、36-252011580.7865-261981650.8336-262051580.7715-271981660.8386-272041600.7845-280.8146-282031580.778备注:图纸设计夯填度0.9,施工中由各楼施工员用水准仪测量,夯填前,每个控制 点控制围不大于9m2,用白灰做标记,夯实后再用水准仪测量,使用机械为压路机18t)、 立式打夯机。压实遍数为四遍。施工员:质检员:监理单位(盖章):砂褥垫层夯填度施工记录表工程名称:龙韵华庭2#楼时间:2014.11.17 (第一步)点位夯实前厚度(mm)夯实后厚度(mm)夯填度点位夯实前厚度(mm)夯实后厚度(mm)夯
11、填度7-12001610.8058-12031650.8137-22031600.7888-22011660.8267-32010.7918-32000.8107-42021580.7828-42051630.7957-51580.7948-52040.7947-61981600.8088-62061550.7527-71951580.8108-72031630.8037-81961600.8168-82041610.7897-91981600.8088-92020.8027-101971630.8278-101610.8097-112011640.8168-111981600.8087-12
12、2020.8028-121981600.8087-131610.8098-131960.8277-141600.8048-141981660.8387-152011650.8218-150.8147-162031650.8138-162021600.7927-172001660.8308-172011600.7967-180.8148-182031600.7887-191961600.8168-192001630.8157-201951610.8268-202001640.8207-211961610.8218-212010.8067-221610.8098-222031610.7937-23
13、2011600.7968-232021600.7927-242030.7838-241650.8297-252001580.7908-251981650.8337-262021580.7828-261660.8347-272041600.7848-272000.8107-282051580.7718-282001600.800备注:图纸设计夯填度0.9,施工中由各楼施工员用水准仪测量,夯填前,每个控制 点控制围不大于9m2,用白灰做标记,夯实后再用水准仪测量,使用机械为压路机18t)、 立式打夯机。压实遍数为四遍。施工员:质检员:监理单位(盖章):砂褥垫层夯填度施工记录表工程名称:龙韵华庭2#
14、楼时间:2014.11.18 (第二步)点位夯实前厚度(mm)夯实后厚度(mm)夯填度点位夯实前厚度(mm)夯实后厚度(mm)夯填度1-12011650.8212-12031650.8131-22031660.8182-22021640.8121-32000.8102-32051660.8101-42011630.8112-42061660.8061-50.8142-52041630.7991-61981550.7832-62030.7981-72031630.8032-72010.8061-82011610.8012-82001600.8001-92020.8022-92030.7981-1
15、02001610.8052-102051640.8001-111600.8042-112011600.7961-121971600.8122-121600.8041-131980.8182-131981600.8081-141971610.8172-141961580.8061-152011600.7962-151951550.7951-162020.8022-161940.7841-172051660.8102-171961580.8061-182041650.8092-181981580.7981-192031630.8032-190.7991-202011610.8012-2019816
16、00.8081-212001610.8052-211971570.7971-221981600.8082-221951550.7951-231970.8072-231980.8031-241951580.8102-242021600.7921-251961580.8062-252031610.7931-261600.8042-262051640.8001-272011610.8012-272041610.7891-282001600.8002-282061660.806备注:图纸设计夯填度0.9,施工中由各楼施工员用水准仪测量,夯填前,每个控制 点控制围不大于9m2,用白灰做标记,夯实后再用水
17、准仪测量,使用机械为压路机18t)、 立式打夯机。压实遍数为四遍。施工员:质检员:监理单位(盖章):砂褥垫层夯填度施工记录表工程名称:龙韵华庭2#楼时间:2014.11.18 (第二步)点位夯实前厚度(mm)夯实后厚度(mm)夯填度点位夯实前厚度(mm)夯实后厚度(mm)夯填度3-12001650.8254-12011610.8013-22011660.8264-22031630.8033-32000.8104-32020.8023-41600.8044-42041630.7993-51981600.8084-52010.8063-62001600.8004-61981550.7833-720
18、31630.8034-71600.8043-82051640.8004-81970.8073-92010.8064-91970.8073-102031610.7934-102011610.8013-112041600.7844-112021610.7973-122061650.8014-121600.8043-132051650.8054-131981600.8083-142031610.7934-142031610.7933-152041640.8044-152040.7943-160.8144-162051630.7953-171981660.8384-172030.7983-181650
19、.8294-182011610.8013-192011630.8114-192021630.8073-202021610.7974-202041630.7993-212031610.7934-212011610.8013-221600.8044-221600.8043-231970.8074-231950.8153-241951580.8104-241981580.7983-252031580.7784-251971580.8023-262021600.7924-261981600.8083-272041610.7894-271961580.8063-282021600.7924-281600
20、.804备注:图纸设计夯填度0.9,施工中由各楼施工员用水准仪测量,夯填前,每个控制 点控制围不大于9m2,用白灰做标记,夯实后再用水准仪测量,使用机械为压路机18t)、 立式打夯机。压实遍数为四遍。施工员:质检员:监理单位(盖章):砂褥垫层夯填度施工记录表工程名称:龙韵华庭2#楼时间:2014.11.18 (第二步)点位夯实前厚度(mm)夯实后厚度(mm)夯填度点位夯实前厚度(mm)夯实后厚度(mm)夯填度5-11650.8296-12011650.8215-21981610.8136-22021660.8225-31951640.8416-32020.8025-41980.8186-420
21、01660.8305-52001660.8036-52010.8065-62031650.8136-61600.8045-72011630.8116-71981600.8085-82021610.7976-81961600.8165-92051610.7856-91951630.8365-102031600.7886-101941640.8455-112010.7916-111950.8315-121981580.7986-121961610.8215-130.8146-131981600.8085-141971610.8176-141650.8295-151961660.8476-15202
22、1650.8175-161950.8316-162011660.8265-172001600.8006-172030.7985-182001600.8006-182041600.7845-192011600.7966-192051630.7955-202031630.8036-202031610.7935-212011640.8166-212011610.8015-220.8146-222001610.8055-232011610.8016-232001600.8005-242001600.8006-242010.7915-251981650.8336-252011580.7865-26198
23、1650.8336-262051580.7715-271981660.8386-272041600.7845-280.8146-282031580.778备注:图纸设计夯填度0.9,施工中由各楼施工员用水准仪测量,夯填前,每个控制 点控制围不大于9m2,用白灰做标记,夯实后再用水准仪测量,使用机械为压路机18t)、 立式打夯机。压实遍数为四遍。施工员:质检员:监理单位(盖章):砂褥垫层夯填度施工记录表工程名称:龙韵华庭2#楼时间:2014.11.18 (第二步)点位夯实前厚度(mm)夯实后厚度(mm)夯填度点位夯实前厚度(mm)夯实后厚度(mm)夯填度7-12001610.8058-12031
24、650.8137-22031600.7888-22011660.8267-32010.7918-32000.8107-42021580.7828-42051630.7957-51580.7948-52040.7947-61981600.8088-62061550.7527-71951580.8108-72031630.8037-81961600.8168-82041610.7897-91981600.8088-92020.8027-101971630.8278-101610.8097-112011640.8168-111981600.8087-122020.8028-121981600.808
25、7-131610.8098-131960.8277-141600.8048-141981660.8387-152011650.8218-150.8147-162031650.8138-162021600.7927-172001660.8308-172011600.7967-180.8148-182031600.7887-191961600.8168-192001630.8157-201951610.8268-202001640.8207-211961610.8218-212010.8067-221610.8098-222031610.7937-232011600.7968-232021600.
26、7927-242030.7838-241650.8297-252001580.7908-251981650.8337-262021580.7828-261660.8347-272041600.7848-272000.8107-282051580.7718-282001600.800备注:图纸设计夯填度0.9,施工中由各楼施工员用水准仪测量,夯填前,每个控制 点控制围不大于9m2,用白灰做标记,夯实后再用水准仪测量,使用机械为压路机18t)、 立式打夯机。压实遍数为四遍。施工员:质检员:监理单位(盖章):砂褥垫层夯填度施工记录表工程名称:龙韵华庭2#楼时间:2014.11.19 (第三步)点位夯
27、实前厚度(mm)夯实后厚度(mm)夯填度点位夯实前厚度(mm)夯实后厚度(mm)夯填度1-11651250.7582-11711280.7481-21691260.7462-21741310.7531-31270.7472-31751320.7541-41711280.7492-41721320.7671-51721270.7382-51340.7881-61280.7392-60.7801-71691290.7632-71690.7981-81681280.7622-81681300.7731-91721300.7562-91691310.7751-101310.7572-101280.75
28、31-111751310.7492-111711290.7541-121741320.7592-121741270.7301-131760.7672-131721260.7321-141741340.7702-141250.7231-151720.7732-151711250.7311-160.7802-161691260.7451-171280.7532-171681260.7501-181691280.7572-181681280.7621-191691290.7632-191651310.7941-201681270.7562-201690.7981-211260.7542-211721
29、340.7791-221651250.7572-221740.7641-231631250.7662-231711320.7721-241681270.7562-241300.7651-251691270.7512-251691280.7571-261711290.7542-261681290.7681-271260.7282-271641250.7621-281691280.7532-281270.747备注:图纸设计夯填度0.9,施工中由各楼施工员用水准仪测量,夯填前,每个控制 点控制围不大于9m2,用白灰做标记,夯实后再用水准仪测量,使用机械为压路机18t)、 立式打夯机。压实遍数为四遍
30、。施工员:质检员:监理单位(盖章):砂褥垫层夯填度施工记录表工程名称:龙韵华庭2#楼时间:2014.11.19 (第三步)点位夯实前厚度(mm)夯实后厚度(mm)夯填度点位夯实前厚度(mm)夯实后厚度(mm)夯填度3-11661300.7834-11681260.7503-21280.7664-21661260.7593-31661290.7774-31310.7843-41691310.7754-41691300.7693-51681320.7864-51661300.7833-61681290.7674-61660.8133-71691250.7394-71681340.7973-8165
31、1250.7574-81651340.8123-91681260.7504-91710.7773-101300.7654-101751310.7483-111751310.7484-111300.7513-121761280.7274-121280.7393-131751290.7374-131721250.7263-141751250.7144-141260.7413-151300.8844-151751280.7313-161660.8134-161681290.7673-171681320.7864-171691270.7513-181320.7904-181661250.7533-19
32、1660.8014-191651310.7943-200.7824-201710.7893-211711340.7844-211751340.7653-221721300.7564-221721340.7793-231751280.7314-231740.7643-241250.7234-241320.7633-251711290.7544-251310.7703-261651270.7694-261300.7653-271681260.7504-271751310.7483-281270.7474-281651280.775备注:图纸设计夯填度0.9,施工中由各楼施工员用水准仪测量,夯填前,
33、每个控制 点控制围不大于9m2,用白灰做标记,夯实后再用水准仪测量,使用机械为压路机18t)立式打夯机。压实遍数为四遍。施工员:质检员:监理单位(盖章):砂褥垫层夯填度施工记录表工程名称:龙韵华庭2#楼时间:2014.11.19 (第三步)点位夯实前厚度(mm)夯实后厚度(mm)夯填度点位夯实前厚度(mm)夯实后厚度(mm)夯填度5-11651320.8006-11681250.7445-21661320.7956-21691280.7575-30.7826-31651290.7825-41250.7236-41250.7485-51260.7416-51260.7545-61661270.7
34、656-61681260.7505-71651290.7816-71711270.7435-81691310.7756-81270.7475-91681340.7976-91751310.7485-101691340.7926-101751310.7485-111690.7986-111340.7745-121680.8036-121720.7845-130.7946-131720.7845-141651280.7756-141340.7745-151661250.7536-151710.7775-161651260.7636-161711320.7715-171260.7546-171691300.7695-181691280.7576-181681300.7735-191711290.7546-191250.7485-201721290.7506-201651290.7815-211310.7576-211661280.7715-221751300.7426-221661270.7655-231741320.7586-231651250.7575-241661320.7956-241250.7485-251681250.7446-251681310.7795-
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2025年度专业演出场地租赁及活动策划服务协议3篇
- 2025年度码头货物短途运输及环保处理服务合同4篇
- 2024-2025学年高中历史第五单元近现代中国的先进思想第20课西学东渐课后习题含解析岳麓版必修3
- 二零二五版生态修复工程承揽合同模板-施工与生态保护2篇
- 2025年度门卫人员安全教育与聘用合同
- 2024版派遣员工合同样本2篇
- 2025版高端商务办公空间租赁合同4篇
- 2024码头场地租赁合同
- 2024版天然气安全运输合同
- 2024铁路旅客运输服务质量监督合同3篇
- 运输供应商年度评价表
- 机械点检员职业技能知识考试题库与答案(900题)
- 成熙高级英语听力脚本
- 北京语言大学保卫处管理岗位工作人员招考聘用【共500题附答案解析】模拟试卷
- 肺癌的诊治指南课件
- 人教版七年级下册数学全册完整版课件
- 商场装修改造施工组织设计
- (中职)Dreamweaver-CC网页设计与制作(3版)电子课件(完整版)
- 统编版一年级语文上册 第5单元教材解读 PPT
- 加减乘除混合运算600题直接打印
- ASCO7000系列GROUP5控制盘使用手册
评论
0/150
提交评论